Electrical Installation Cost per Point 2026: Lights, Sockets, MCB

2026 年电路安装每点位费用:灯位、插座、配电箱

The electrical installation cost per point as of 22 October 2026 per Sejasa: light point Rp50,000–80,000 (labour only) or Rp150,000–225,000 (with materials), socket Rp55,000–85,000 / Rp160,000–240,000, switch Rp50,000–75,000 / Rp145,000–220,000, AC/water heater point Rp70,000–100,000 / Rp200,000–300,000, and main MCB box Rp100,000–150,000 / Rp350,000–500,000. Compare materials with homeX NYM cable, switch and MCB prices.

Cost per point

PointLabour onlyLabour + materialsSource
LampuRp50.000–80.000Rp150.000–225.000Sejasa
Stop kontakRp55.000–85.000Rp160.000–240.000Sejasa
Saklar (tunggal/ganda)Rp50.000–75.000Rp145.000–220.000Sejasa
AC / water heaterRp70.000–100.000Rp200.000–300.000Sejasa
Box MCB utamaRp100.000–150.000Rp350.000–500.000Sejasa

Sejasa estimates as of 22 October 2026; depend on distance to the panel, wall type (concealed/surface) and city.

Example: type-36 house

10 light points + 8 sockets + 6 switches + 1 AC + 1 MCB box, with materials: ≈Rp1.5–2.25m + Rp1.28–1.92m + Rp0.87–1.32m + Rp0.2–0.3m + Rp0.35–0.5m ≈ Rp4.2–6.3 million.

Buy materials yourself

You can buy NYM cable, switches, sockets and MCBs yourself and pay labour only; check prices in related homeX articles.

Buyer tips

  • Plan points before plastering.
  • Separate AC circuits.
  • Ask for a wiring diagram.
  • Get the installation tested (SLO) before PLN connection.

Request a electrical installation cost per point Indonesia quote for your project

homeX can compare several brands at once and prepare a written quote for projects, renovations or shop stock. Send your needs (brand, size, quantity, location) via WhatsApp +62 821 1818 998, or visit the homeX showroom: Priskilla Tower, 6th floor, Jl. Atang Sanjaya No.21, Benda, Kota Tangerang, Banten 15125.

Disclaimer: prices change without notice and differ by store, city, pack size, grade and promotion. Data as of 22 October 2026; always confirm with the seller before buying.

FAQ

Light point cost? Rp50–80k labour only; Rp150–225k with materials (Sejasa, Oct 2026).

Wiring cost for a type-36 house? Example 26 points + MCB box ≈ Rp4.2–6.3 million with materials.

Is SLO needed? Yes, an operational-worthiness certificate (SLO) is needed for new PLN connections.

Electrical installation cost per point Indonesia: related articles and products

Related articles:

Related products at homeX:

Price sources (checked 22 October 2026): Sejasa — New house wiring cost.

Ask for a Price on WhatsApp +62 821 1818 998