Renovation Contract with a Contractor: Checklist from Article 47 of Law 2/2017

与承包商签订装修合同:依据 2017 年第 2 号法第 47 条的检查清单

A renovation contract with a contractor is more than a price note. Article 46 of Law No. 2 of 2017 on Construction Services requires the working relationship between user and provider to be set out in a contract, and Article 47 lists 16 minimum items, from the parties' identities to the dispute-resolution option. This article turns those articles into a builder contract checklist and a guide on how to choose a renovation contractor, based on the law text we read on 23 October 2026. It is general information, not legal advice.

Renovation contract with a contractor: 16 minimum items and how to choose a renovation contractor

Contract itemWhat the law requiresBasisHow to apply it (homeX analysis)Source
The partiesParties' identities stated clearlyArticle 47(1)(a)Ask for the contractor's ID/NIB or business licence and a fixed addressUU No. 2 Tahun 2017 (JDIH BPK)
Scope of workScope, contract value, unit prices or lump sum, and time limit described clearly and in detailArticle 47(1)(b)Attach an itemised RAB, drawings and material brands; use homeX reference prices to checkUU No. 2 Tahun 2017 (JDIH BPK)
Liability periodImplementation and maintenance period for which the provider is responsibleArticle 47(1)(c)State start date, completion date and the defect-fixing period after handoverUU No. 2 Tahun 2017 (JDIH BPK)
Equal rights and dutiesUser's right to results per contract; provider's right to information and paymentArticle 47(1)(d)Decide who buys materials, who handles permits and site accessUU No. 2 Tahun 2017 (JDIH BPK)
Certified workersDuty to employ certified construction workers; every construction worker must hold a Work Competency CertificateArticle 47(1)(e); Article 70(1)–(2)Ask for the worker list and certificates; see the homeX builder certification articleUU No. 2 Tahun 2017 (JDIH BPK)
Payment methodUser's payment duty, including payment guaranteeArticle 47(1)(f)Pay in stages against verified progress, not in full upfrontUU No. 2 Tahun 2017 (JDIH BPK)
Default, termination, force majeureResponsibility if duties are unmet; termination terms; events beyond the parties' controlArticle 47(1)(g), (i), (j)Set late-completion penalties and stop conditions if work does not conformUU No. 2 Tahun 2017 (JDIH BPK)
Dispute resolutionConsultation first; if it fails: mediation, conciliation, arbitration; parties may form a dispute boardArticle 47(1)(h), (p); Article 88Write your chosen steps into the contract; if blank, Article 88(3) requires a written agreementUU No. 2 Tahun 2017 (JDIH BPK)
Building failureProvider is liable for the design life of the works; if over 10 years, at most 10 years from final handover; the period must be written in the contractArticle 47(1)(k); Article 65For small renovations, state the structural warranty period (e.g. slab, roof) explicitlyUU No. 2 Tahun 2017 (JDIH BPK)
Safety, third parties, environment, riskSafety and social-security duties; third-party protection; environmental aspects; guarantee for risk and legal liabilityArticle 47(1)(l), (m), (n), (o)Decide who bears damage to a neighbour's house or worker accidentsUU No. 2 Tahun 2017 (JDIH BPK)
Provider's business fitChoose by checking: business field matches the scope, qualification matches the workload, track record, and experience with similar productsArticle 43(1)Ask for photos and addresses of 2–3 similar projects you can visitUU No. 2 Tahun 2017 (JDIH BPK)
Individual vs companyIndividual businesses and small companies may only take low-risk, simple-technology, low-cost work; individuals need a Tanda Daftar Usaha Perseorangan, companies a business licenceArticles 21; 26–27A major structural renovation (adding a floor) should not go to a worker without a business licenceUU No. 2 Tahun 2017 (JDIH BPK)

Source: the text of Law No. 2 of 2017 on Construction Services (official PDF copy on JDIH BPK) read directly on 23 October 2026, Articles 21, 26–27, 43, 46–48, 65, 70 and 88. Data gaps: we have not read the implementing regulations (Government Regulation 14/2021 and PUPR ministerial regulations), so penalty details, performance guarantees and business classification are not covered; no standard clause samples; application to small private home renovations may differ and should be checked with a lawyer. Not legal advice.

Order for choosing a renovation contractor (homeX analysis)

homeX analysis, not the content of the law: (1) collect 3 quotes with the same itemised RAB; (2) check the business field, licence and 2–3 similar projects (Article 43); (3) compare material prices with public price lists, for example cost per m2 and the bathroom renovation cost in the homeX articles; (4) write the schedule, payment stages, warranty period and dispute steps into the contract; (5) ask for a list of certified workers.

Daily wage or fixed-price: which is safer?

The law names the contract value as unit prices or a lump sum; both are valid. A fixed price gives cost certainty if scope and specifications are written; daily wages suit small repairs with unclear scope. See the daily wage rates in the homeX article for comparison, then write the chosen method into the contract.

Buyer tips

  • Ask for a written contract with the RAB, drawings and material specifications attached.
  • Check the business licence or TDUP, worker certificates and 2–3 similar projects.
  • Pay in stages against progress; hold back part until the defect period ends.
  • Write the warranty period, late penalties and dispute-resolution steps.

Request a renovation contract with a contractor quote for your project

homeX can compare several brands at once and prepare a written quote for projects, renovations or shop stock. Send your needs (brand, size, quantity, location) via WhatsApp +62 821 1818 998, or visit the homeX showroom: Priskilla Tower, 6th floor, Jl. Atang Sanjaya No.21, Benda, Kota Tangerang, Banten 15125. Visit the homeX Showroom.

Disclaimer: prices change without notice and differ by store, city, pack size, grade and promotion. Data as of 23 October 2026; always confirm with the seller before buying.

FAQ

Must a home renovation use a written contract? Article 46 of Law 2/2017 states that the working relationship between user and provider must be set out in a construction work contract. For small individual workers practice may differ; it is still wise to write the agreement down.

How long is a contractor liable for building failure? For the design life of the works; if over 10 years, at most 10 years from final handover (Article 65), and the period must be written in the contract.

What must a renovation contract contain? Article 47 lists 16 minimum items: parties, scope and value, liability period, rights and duties, certified workers, payment, default, disputes, termination, force majeure, building failure, safety, third parties, environment, risk guarantee and dispute-resolution option.

Renovation contract with a contractor: related articles and products

Related articles:

Related products at homeX:

Price sources (checked 23 October 2026): UU No. 2 Tahun 2017 (JDIH BPK) — Law on Construction Services (PDF).

Ask for a Price on WhatsApp +62 821 1818 998