<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>homeX – Building Materials News &amp; Articles (Indonesia)</title><link>https://www.homex.co.id/en/</link><description>Prices, factories, costs and guides for building materials in Indonesia by homeX.</description><language>en</language><lastBuildDate>Sat, 07 Nov 2026 05:17:14 +0800</lastBuildDate><atom:link href="https://www.homex.co.id/feed-en.xml" rel="self" type="application/rss+xml"/><item><title>Wall Paint Gloss Levels: Matt, Eggshell, Satin, Semi-Gloss and Gloss</title><link>https://www.homex.co.id/en/news/414</link><guid isPermaLink="true">https://www.homex.co.id/en/news/414</guid><pubDate>Fri, 06 Nov 2026 09:15:58 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Wall paint gloss level in 60° gloss units (ASTM D523): matt ≤5, eggshell 10–25, satin 20–35, semi-gloss 35–70, gloss 70–85. Rooms and care tips.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261106-i-tingkat-kilap-cat-tembok-matt-gloss.jpg" alt="Wall Paint Gloss Levels: Matt, Eggshell, Satin, Semi-Gloss and Gloss"></p><p><strong>Wall paint gloss levels</strong> — matt, eggshell, satin, semi-gloss and gloss — are not only an aesthetic choice. The industry measures gloss with a gloss meter at 60° under ASTM D523; the Master Painters Institute (MPI) defines seven Gloss Levels. In practice: matt/flat tops out near 5 units, eggshell 10–25, satin 20–35, semi-gloss 35–70, gloss 70–85, and high gloss above 85. Higher gloss cleans more easily but shows wall defects more clearly. This article summarises what the gloss units mean, which rooms fit each level, and how to maintain them, with matt and mid-sheen product examples sold in Indonesia.</p>
<h2>Key Facts</h2><ul>
<li>MPI Gloss Level 1 (flat/matt): max 5 units @60°; Level 3 eggshell 10–25; Level 4 satin 20–35; Level 5 semi-gloss 35–70; Level 6 gloss 70–85; Level 7 >85 (2026-11-06, source: <a href="https://www.roddapaint.com/how-to/selecting-gloss-level/" target="_blank" rel="noopener">Rodda Paint, Selecting gloss level (MPI Gloss Levels 1–7, ASTM D523)</a>).</li>
<li>Gloss is measured at 60°, sheen at 85°; the 0–100 scale is independent of colour; higher means glossier (ASTM D523) (2026-11-06, source: <a href="https://www.roddapaint.com/how-to/selecting-gloss-level/" target="_blank" rel="noopener">Rodda Paint, Selecting gloss level (MPI Gloss Levels 1–7, ASTM D523)</a>).</li>
<li>Sherwin-Williams: flat/matte reflects very little; eg-shel/satin low to medium; semi-gloss medium; gloss reflects strongly (2026-11-06, source: <a href="https://www.sherwin-williams.com/architects-specifiers-designers/inspiration/styles-and-techniques/sw-art-gloss-sheen-differences" target="_blank" rel="noopener">Sherwin-Williams, Gloss and sheen guide</a>).</li>
<li>Nippon Satin Glo: acrylic wall paint with a mid-sheen (silk-like) finish, positioned as easy to clean and anti-fungal (2026-11-06, source: <a href="https://www.nipponpaint-indonesia.com/products/interior/dinding-interior/nippon-satin-glo" target="_blank" rel="noopener">Nippon Paint Indonesia, NIPPON SATIN GLO (mid sheen)</a>).</li>
<li>Dulux Pentalite: Matt / Ultra Matt Smooth Finish, spreading rate 12–14 m²/L, low VOC (2026-11-06, source: <a href="https://www.dulux.co.id/id/produk/dulux-pentalite" target="_blank" rel="noopener">Dulux Indonesia, Dulux Pentalite (matt finish)</a>).</li>
</ul>
<h2>What wall paint gloss level means at 60°</h2>
<p>A gloss meter shines light onto the paint film and reads specular reflection. Per Rodda Paint's guide, which references ASTM D523 and MPI specs:</p>
<ul><li><strong>60°</strong> is the most common angle for separating flat from high gloss.</li>
<li><strong>85°</strong> (called sheen) helps distinguish low-gloss finishes that are hard to judge by eye at 60°.</li>
<li>The practical scale runs 0–100: 0 barely reflects, near 100 looks mirror-like.</li></ul>
<p>Trade names (matt, eggshell, pearl, sheen, satin) are not standardised across brands. What you can compare between TDS sheets is the gloss-unit number, not just the word on the can. One brand's "sheen" may sit in another brand's "satin" range.</p>
<h2>Matt, eggshell, satin, semi-gloss, gloss: which rooms fit</h2>
<ul><li><strong>Matt / flat (≤5 @60°)</strong>: ceilings, bedrooms, living rooms with imperfect walls. Hides filler marks and roller tracks. An Indonesia-market example is Dulux Pentalite in the Matt category. Less ideal for oily kitchen walls unless the matt product is specifically washable.</li>
<li><strong>Eggshell (10–25)</strong>: living-room and corridor walls with a soft glow; a bit more scrub-resistant than pure matt.</li>
<li><strong>Satin / mid sheen (20–35)</strong>: kitchens, kids' areas and walls that are wiped often. Nippon Satin Glo, for example, is positioned as mid sheen with a smooth, easy-clean surface.</li>
<li><strong>Semi-gloss (35–70)</strong>: door/window trim, waterproofed bathroom walls, lightly wet zones; stronger reflection demands a flatter substrate.</li>
<li><strong>Gloss / high gloss (70–85 / >85)</strong>: accents, wood/metal doors or architectural details; rarely used on full wall planes in homes because every wave shows.</li></ul>
<h2>Care by gloss level</h2>
<ul><li>Matt: wipe with a soft, slightly damp cloth; avoid harsh scrubbers that leave shiny patches.</li>
<li>Eggshell and satin: usually tolerate damp wiping; use mild soap, rinse and dry.</li>
<li>Semi-gloss and gloss: grease and fingerprints come off more easily, but scratches and dust show more — wipe regularly with microfibre.</li>
<li>Whatever the sheen: let the film fully dry per the TDS (often 1–2 hours touch dry, but full cure can take days) before the first wash.</li></ul>
<h2>Buying tips at the building store</h2>
<ul><li>Compare gloss numbers on the technical data sheet, not only the sheen name.</li>
<li>Sample the colour on the real wall: gloss changes how colour looks as the viewing angle shifts.</li>
<li>Contrasting sheens (matt walls + semi-gloss trim) often sharpen architectural lines without changing hue.</li>
<li>For children's rooms or low-VOC spaces, check VOC content as well as gloss (see the wall-paint VOC article).</li></ul>
<p>homeX, an Indonesian one-stop building materials and furniture platform with showroom, warehousing and delivery, helps compare gloss and VOC data sheets from several paint brands before you order.</p>
<h2>wall paint gloss level: related articles and products</h2><ul>
<li><a href="/en/news/394">Wall-paint VOC content and the 30 g/L matt limit</a></li>
<li><a href="/en/news/36">Wall paint prices: Avian, Nippon, Dulux</a></li>
<li><a href="/en/news/260">Anti-alkali primer for new walls</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What is the difference between matt and gloss paint?</strong> Matt reflects very little light (MPI Level 1, max about 5 units @60°) and hides defects; gloss is 70–85 units, cleans easily but shows every wall wave.</p>
<p><strong>Which rooms suit satin paint?</strong> Satin/mid sheen (about 20–35 units @60°) is common in kitchens and frequently wiped walls, balancing soft shine and cleanability.</p>
<p><strong>Is "eggshell" the same for every brand?</strong> No. Trade names are not standardised; compare ASTM D523 gloss units on the TDS, not only the word on the can.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.roddapaint.com/how-to/selecting-gloss-level/" target="_blank" rel="noopener">Rodda Paint, Selecting gloss level (MPI Gloss Levels 1–7, ASTM D523)</a>; <a href="https://www.sherwin-williams.com/architects-specifiers-designers/inspiration/styles-and-techniques/sw-art-gloss-sheen-differences" target="_blank" rel="noopener">Sherwin-Williams, Gloss and sheen guide</a>; <a href="https://www.nipponpaint-indonesia.com/products/interior/dinding-interior/nippon-satin-glo" target="_blank" rel="noopener">Nippon Paint Indonesia, NIPPON SATIN GLO (mid sheen)</a>; <a href="https://www.dulux.co.id/id/produk/dulux-pentalite" target="_blank" rel="noopener">Dulux Indonesia, Dulux Pentalite (matt finish)</a></em></p>]]></content:encoded></item><item><title>Ceramic Tile Water Absorption Groups BIa, BIb, BIIa, BIIb (ISO 13006)</title><link>https://www.homex.co.id/en/news/413</link><guid isPermaLink="true">https://www.homex.co.id/en/news/413</guid><pubDate>Fri, 06 Nov 2026 09:15:58 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Ceramic tile water absorption groups under ISO 13006: BIa ≤0.5%, BIb 0.5–3%, BIIa 3–6%, BIIb 6–10%. Differs from PEI; indoor vs outdoor.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261106-i-daya-serap-air-keramik-bia-biib.jpg" alt="Ceramic Tile Water Absorption Groups BIa, BIb, BIIa, BIIb (ISO 13006)"></p><p><strong>Ceramic tile water absorption</strong> under ISO 13006:2018 (and the SNI ISO 13006 edition required in Indonesia) splits dry-pressed tiles into BIa (E ≤ 0.5%), BIb (0.5% < E ≤ 3%), BIIa (3% < E ≤ 6%) and BIIb (6% < E ≤ 10%). E is the mass percentage of water absorbed by the tile body, tested by the vacuum method in ISO 10545-3 (the 2018 edition no longer uses the boiling method). This article focuses only on the absorption groups: what the percentages mean, indoor versus outdoor choices, and how they differ from PEI.</p>
<h2>Key Facts</h2><ul>
<li>BIa: water absorption Ev ≤ 0.5% (Annex G); BIb: 0.5% < Ev ≤ 3% (Annex H) for dry-pressed tiles (2026-11-06, source: <a href="https://webstore.ansi.org/preview-pages/ISO/preview_ISO+13006-2018.pdf" target="_blank" rel="noopener">ISO 13006:2018 preview, Ceramic tiles — definitions, classification, characteristics and marking</a>).</li>
<li>BIIa: 3% < Ev ≤ 6% (Annex J); BIIb: 6% < Ev ≤ 10% (Annex K); BIII: Ev > 10% (Annex L, typically wall tiles) (2026-11-06, source: <a href="https://webstore.ansi.org/preview-pages/ISO/preview_ISO+13006-2018.pdf" target="_blank" rel="noopener">ISO 13006:2018 preview, Ceramic tiles — definitions, classification, characteristics and marking</a>).</li>
<li>BIa is usually called porcelain / granite tile; suitable for busy floors and outdoors; BIb for interiors and semi-outdoor areas (2026-11-06, source: <a href="https://www.homex.co.id/news/17" target="_blank" rel="noopener">homeX, How to choose floor tiles: PEI, water absorption and SNI ISO 13006</a>).</li>
<li>PEI rates glazed-surface abrasion (ISO 10545-7), not water absorption; read both labels on the box separately (2026-11-06, source: <a href="https://www.homex.co.id/news/17" target="_blank" rel="noopener">homeX, How to choose floor tiles: PEI, water absorption and SNI ISO 13006</a>).</li>
<li>Letter B = dry-pressed; A = extruded; Roman numerals I/II/III = low/medium/high absorption groups (2026-11-06, source: <a href="https://eagleassurancehouse.com/id/classification-of-ceramic-tiles-by-iso-and-en-standards" target="_blank" rel="noopener">Eagle Assurance House, Ceramic tile classification by ISO and EN standards</a>).</li>
</ul>
<h2>How to read ceramic tile water absorption codes BIa–BIIb</h2>
<p>ISO 13006 classifies tiles on two axes: manufacturing method and water absorption. The first letter:</p>
<ul><li><strong>A</strong> = extruded tiles</li>
<li><strong>B</strong> = dry-pressed tiles — the type most common in Indonesian building stores</li>
<li><strong>C</strong> = other methods</li></ul>
<p>Roman numerals mark the absorption group: I low, IIa/IIb medium, III high. For dry-pressed tiles, Annexes G–L of ISO 13006:2018 set:</p>
<ul><li><strong>BIa</strong> — Ev ≤ 0.5%</li>
<li><strong>BIb</strong> — 0.5% < Ev ≤ 3%</li>
<li><strong>BIIa</strong> — 3% < Ev ≤ 6%</li>
<li><strong>BIIb</strong> — 6% < Ev ≤ 10%</li>
<li><strong>BIII</strong> — Ev > 10% (typically wall tiles)</li></ul>
<p>Ev is measured as a mass percentage. The lower the figure, the denser the body, usually with higher flexural strength and better stain and frost resistance.</p>
<h2>Indoor or outdoor: picking the right group</h2>
<ul><li><strong>BIa (≤0.5%)</strong>: porcelain / granite tile. Dense and strong; first choice for terraces, carports, open balconies and busy floors. Also fine for wet indoor areas if the surface is anti-slip enough.</li>
<li><strong>BIb (0.5–3%)</strong>: dense stoneware. Suits interior floors and semi-outdoor spots that are not constantly soaked by heavy rain.</li>
<li><strong>BIIa (3–6%) and BIIb (6–10%)</strong>: common interior floor tiles — living rooms, bedrooms, dry corridors. Avoid as open-terrace floors that stay wet.</li>
<li><strong>BIII (>10%)</strong>: wall tiles. Light and easy to fix, but not for floors.</li></ul>
<p>The standard gives technical characteristics, not a mandatory room list. Final choice still follows the drawings, local weather and the maker's box notes.</p>
<h2>Water absorption versus PEI</h2>
<p>Buyers often mix the two labels on the box. In short:</p>
<ul><li><strong>Water absorption (groups BIa–BIII)</strong> = how the tile body takes up water; critical outdoors, in wet zones and where freeze–thaw or expansion cracking is a risk.</li>
<li><strong>PEI (I–V)</strong> = glazed-surface abrasion resistance per ISO 10545-7; critical for foot traffic. PEI does not apply to unglazed full-body porcelain, which is tested by deep abrasion.</li></ul>
<p>A BIa tile with a low PEI can still wear fast in a mall; a BIIb tile with PEI IV can still fail on a rainy terrace. Read both, plus the SNI ISO 13006 mark and the shade/calibre codes.</p>
<h2>Quick checklist in the store</h2>
<ul><li>Look for the group (BIa/BIb/BIIa/BIIb) or the absorption percentage on the box or technical sheet.</li>
<li>For outdoors and carports, prefer BIa or at least BIb.</li>
<li>Bathroom walls may use BIII, but bathroom floors are safer in BIa/BIb with an anti-slip surface.</li>
<li>Adhesive: very low-absorption BIa granite tiles usually need a C2 adhesive, not a plain cement slurry.</li></ul>
<p>homeX, an Indonesian one-stop building materials and furniture platform with showroom, warehousing and delivery, helps compare absorption-group specs across brands before you order.</p>
<h2>ceramic tile water absorption: related articles and products</h2><ul>
<li><a href="/en/news/17">How to choose tiles: PEI and SNI ISO 13006</a></li>
<li><a href="/en/news/111">Granite vs ceramic: differences and prices</a></li>
<li><a href="/en/news/276">Ceramic anti-slip classes R9–R13</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What does BIa mean on a tile box?</strong> BIa is a dry-pressed tile with water absorption Ev ≤ 0.5% under Annex G of ISO 13006:2018; usually porcelain / granite tile.</p>
<p><strong>Can BIIb be used on a terrace?</strong> BIIb absorbs 6–10% water and suits general interior floors. For open terraces, prefer BIa or BIb.</p>
<p><strong>How does water absorption differ from PEI?</strong> Absorption rates the tile body against water; PEI rates glaze wear. Check both separately.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://webstore.ansi.org/preview-pages/ISO/preview_ISO+13006-2018.pdf" target="_blank" rel="noopener">ISO 13006:2018 preview, Ceramic tiles — definitions, classification, characteristics and marking</a>; <a href="https://www.homex.co.id/news/17" target="_blank" rel="noopener">homeX, How to choose floor tiles: PEI, water absorption and SNI ISO 13006</a>; <a href="https://eagleassurancehouse.com/id/classification-of-ceramic-tiles-by-iso-and-en-standards" target="_blank" rel="noopener">Eagle Assurance House, Ceramic tile classification by ISO and EN standards</a></em></p>]]></content:encoded></item><item><title>Concrete Strength Class K-225, K-250, K-300 and fc&#x27; under SNI 2847</title><link>https://www.homex.co.id/en/news/412</link><guid isPermaLink="true">https://www.homex.co.id/en/news/412</guid><pubDate>Fri, 06 Nov 2026 09:15:58 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Concrete strength class K-225, K-250 and K-300 are cube strengths (kg/cm²). SNI 2847 uses cylinder fc&#x27; (MPa); house vs structural use.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261106-i-kelas-kuat-beton-k225-k300-sni2847.jpg" alt="Concrete Strength Class K-225, K-250, K-300 and fc&#x27; under SNI 2847"></p><p>The <strong>concrete strength class K-225</strong>, along with K-250 and K-300, still appears in bills of quantities and site talk, yet SNI 2847:2019 specifies fc' in MPa from cylinder specimens. The K figure is the characteristic cube strength (15 cm cubes, kg/cm²) from PBI 1971. With the 0.83 shape factor, K-225 ≈ 18.3 MPa, K-250 ≈ 20.3 MPa and K-300 ≈ 24.4 MPa; the SNI 7394:2008 pairing table lists 19.3, 21.7 and 26.4 MPa. This article explains the codes, when each fits houses versus structural frames, and how to read a simple material schedule.</p>
<h2>Key Facts</h2><ul>
<li>K-225 ≈ fc' 18.3 MPa (0.83 factor) or 19.3 MPa (SNI 7394:2008 pairing); above the 17 MPa general minimum in SNI 2847 (2026-10-19, source: <a href="https://ruangteknik.com/sipil/mutu-beton" target="_blank" rel="noopener">Ruang Teknik, Concrete grade K and fc&#x27;: meaning, conversion and examples (updated 19 Oct 2026)</a>).</li>
<li>K-250 ≈ 20.3 MPa (0.83) or 21.7 MPa (SNI 7394); a grey zone for the 21 MPa special-frame limit (2026-10-19, source: <a href="https://ruangteknik.com/sipil/mutu-beton" target="_blank" rel="noopener">Ruang Teknik, Concrete grade K and fc&#x27;: meaning, conversion and examples (updated 19 Oct 2026)</a>).</li>
<li>K-300 ≈ 24.4 MPa (0.83) or 26.4 MPa (SNI 7394); both above 21 MPa (2026-10-19, source: <a href="https://ruangteknik.com/sipil/mutu-beton" target="_blank" rel="noopener">Ruang Teknik, Concrete grade K and fc&#x27;: meaning, conversion and examples (updated 19 Oct 2026)</a>).</li>
<li>SNI 2847:2019: general concrete minimum fc' 17 MPa; special moment frames/walls 21 MPa; tested on 28-day cylinders (2026-10-19, source: <a href="https://ruangteknik.com/sipil/mutu-beton" target="_blank" rel="noopener">Ruang Teknik, Concrete grade K and fc&#x27;: meaning, conversion and examples (updated 19 Oct 2026)</a>).</li>
<li>SNI 7394:2008: K-300 needs 413 kg cement (~8.3 bags of 50 kg), 681 kg sand, 1,021 kg gravel per m³ (slump 12±2 cm) (2026-10-03, source: <a href="https://civplanner.com/reference/concrete-grade-conversion" target="_blank" rel="noopener">CivPlanner, Concrete grade conversion K to f&#x27;c (data checked 3 Oct 2026)</a>).</li>
</ul>
<h2>What concrete strength class K-225, K-250 and K-300 mean</h2>
<p>The letter K comes from Indonesia's 1971 reinforced-concrete code (PBI 1971). The number is the characteristic compressive strength of 15 cm cubes at 28 days, in kg/cm², with at most a 5% chance of test results falling below it. K-225 therefore means 225 kg/cm² on that cube.</p>
<p>SNI 2847:2019 (structural concrete for buildings) does not use K. It uses fc', the specified compressive strength in MPa, proven on 150×300 mm cylinders (or three 100×200 mm cylinders) at 28 days. One "test result" is the average of two cylinders from the same sample.</p>
<h2>How to convert K to fc' (MPa)</h2>
<p>Conversion needs two steps: change units (1 kg/cm² = 0.0980665 MPa) then correct for specimen shape. PBI 1971 Table 4.1.3 gives a 0.83 factor for a 15×30 cm cylinder versus a 15 cm cube. Approximate formula: fc' ≈ 0.83 × 0.0980665 × K ≈ 0.0814 × K. For the three grades most used in houses and shophouses:</p>
<ul><li>K-225 → ≈ 18.3 MPa (SNI 7394 pairing: 19.3 MPa)</li>
<li>K-250 → ≈ 20.3 MPa (SNI 7394 pairing: 21.7 MPa)</li>
<li>K-300 → ≈ 24.4 MPa (SNI 7394 pairing: 26.4 MPa)</li></ul>
<p>Do not simply divide K by 10: that skips the shape factor and slightly overstates the unit conversion. For ready-mix orders and acceptance records, write fc' and prove it with cylinders.</p>
<h2>When to use each grade in houses vs structure</h2>
<p>SNI 2847:2019 Table 19.2.1.1 sets a general minimum of 17 MPa and raises it to 21 MPa for special moment frames and special structural walls. In practice:</p>
<ul><li><strong>K-225 (≈18–19 MPa)</strong>: blinding, pavements or non-critical house elements when the drawing asks for this grade. Above 17 MPa, but below 21 MPa for special frames.</li>
<li><strong>K-250 (≈20–22 MPa)</strong>: a grey zone. The older AHSP pairing gives 21.7 MPa; the 0.83 factor gives only 20.3 MPa. If the drawing asks for fc' 21 MPa, order "fc' 21 MPa" directly.</li>
<li><strong>K-300 (≈24–26 MPa)</strong>: columns, beams and floor slabs in multi-storey houses and shophouses designed above 21 MPa.</li></ul>
<p>The current AHSP under Permen PUPR 8/2023 lists concrete items only in fc' (for example 20, 25, 30 MPa) without a K pairing. Old bills that still use K need conversion before ordering.</p>
<h2>Reading a simple mix / material schedule</h2>
<p>SNI 7394:2008 coefficients (slump 12±2 cm, max aggregate 30 mm) give a rough per-m³ guide, not the site mix design:</p>
<ul><li>K-225: 371 kg cement (~7.4 bags), 698 kg sand, 1,047 kg gravel, 215 L water</li>
<li>K-250: 384 kg cement (~7.7 bags), 692 kg sand, 1,039 kg gravel, 215 L water</li>
<li>K-300: 413 kg cement (~8.3 bags), 681 kg sand, 1,021 kg gravel, 215 L water</li></ul>
<p>Official mix design follows SNI 7656:2012 or SNI 03-2834-2000 and is proven by cylinder tests. Without field standard-deviation data, SNI 03-2834-2000 targets at least fc' + 12 MPa average. After casting, acceptance depends on test results, not the K conversion.</p>
<p>homeX, an Indonesian one-stop building materials and furniture platform with showroom, warehousing and delivery, can help compile cement, sand, gravel and rebar lists to match the grade written on the drawings.</p>
<h2>concrete strength class K-225: related articles and products</h2><ul>
<li><a href="/en/news/136">Ready-mix concrete prices for K-225, K-250, K-300</a></li>
<li><a href="/en/news/18">OPC, PCC and PPC cement types in Indonesia</a></li>
<li><a href="/en/news/303">7-day concrete curing and formwork striking</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How many MPa is K-300?</strong> About 24.4 MPa with the PBI 1971 0.83 factor; SNI 7394:2008 pairs it with fc' 26.4 MPa.</p>
<p><strong>Is K-225 enough for house columns?</strong> K-225 ≈ 18–19 MPa, above the 17 MPa general minimum but below 21 MPa for special frames. Follow the fc' on the structural drawing.</p>
<p><strong>Why not just divide K by 10?</strong> Dividing by 10 only roughly changes units and does not correct cube strength to cylinder strength.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://ruangteknik.com/sipil/mutu-beton" target="_blank" rel="noopener">Ruang Teknik, Concrete grade K and fc&#x27;: meaning, conversion and examples (updated 19 Oct 2026)</a>; <a href="https://civplanner.com/reference/concrete-grade-conversion" target="_blank" rel="noopener">CivPlanner, Concrete grade conversion K to f&#x27;c (data checked 3 Oct 2026)</a></em></p>]]></content:encoded></item><item><title>Sarmuji–ASAKI: Competitive Gas &amp; Tighter Ceramic Import Rules</title><link>https://www.homex.co.id/en/news/411</link><guid isPermaLink="true">https://www.homex.co.id/en/news/411</guid><pubDate>Fri, 06 Nov 2026 09:15:37 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Indonesia ceramic import policy China after Sarmuji–ASAKI (21 Oct 2026): gas US$11/MMBtu, China AD 20–25%, tighter SNI for exporters.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261106-i-menperin-asaki-gas-impor-keramik-china.jpg" alt="Sarmuji–ASAKI: Competitive Gas &amp; Tighter Ceramic Import Rules"></p><p>After the Indonesian Ceramic Industry Association (ASAKI) met Industry Minister Muhammad Sarmuji in Jakarta on 21 October 2026, the policy direction is clear: the government will push for <strong>competitive natural-gas supply</strong> for domestic tile plants and <strong>tighten entry of imported ceramics</strong>, including products from China. For Chinese suppliers and exporters this is not a repeat of the plant-utilisation story (#315); it is a policy map: HGBT/gas, antidumping duties (BMAD), SNI, and only a narrow window for selective relaxation.</p>
<h2>Key Facts</h2><ul>
<li>Minister Sarmuji: Indonesian ceramic makers can already produce almost every type; focus is competitive gas certainty and protection from cheap imports (2026-10-21, source: <a href="https://www.industry.co.id/read/157734/lindungi-industri-keramik-nasional-menperin-sarmuji-perjuangkan-pasokan-gas-dan-perketat-impor" target="_blank" rel="noopener">Industry.co.id, Minister Sarmuji–ASAKI on gas &amp; ceramic imports (21 Oct 2026, accessed 6 Nov 2026)</a>).</li>
<li>ASAKI (Edy Suyanto): gas allocation ~73% of need; price should be US$8–8.5/MMBtu, but Sep–Oct disruptions pushed the October average to US$11/MMBtu (2026-10-21, source: <a href="https://www.cnbcindonesia.com/news/20261021181236-4-778358/pengusaha-keramik-ri-ngadu-ke-menperin-soal-gas-ungkit-soal-vietnam" target="_blank" rel="noopener">CNBC Indonesia, ASAKI meeting with Minister on gas &amp; Vietnam (21 Oct 2026, accessed 6 Nov 2026)</a>).</li>
<li>Bloomberg Technoz/Minister: China ceramic products face about 20–25% AD duty; possible India dumping to be reviewed by KADI (2026-10-21, source: <a href="https://www.bloombergtechnoz.com/detail-news/125323/menperin-evaluasi-tarif-antidumping-pasokan-gas-industri-keramik" target="_blank" rel="noopener">Bloomberg Technoz, Minister on ceramic antidumping review (21 Oct 2026, accessed 6 Nov 2026)</a>).</li>
<li>Installed capacity 2026 ~686 million m²; utilisation projected 75% (~510 million m² output); 2026–2028 expansion +110 million m², ~Rp12 tn investment (2026-10-21, source: <a href="https://www.industry.co.id/read/157734/lindungi-industri-keramik-nasional-menperin-sarmuji-perjuangkan-pasokan-gas-dan-perketat-impor" target="_blank" rel="noopener">Industry.co.id, Minister Sarmuji–ASAKI on gas &amp; ceramic imports (21 Oct 2026, accessed 6 Nov 2026)</a>).</li>
<li>Import relaxation only for ceramic types not yet made in Indonesia, and only case by case (2026-10-21, source: <a href="https://www.cnbcindonesia.com/news/20261021181236-4-778358/pengusaha-keramik-ri-ngadu-ke-menperin-soal-gas-ungkit-soal-vietnam" target="_blank" rel="noopener">CNBC Indonesia, ASAKI meeting with Minister on gas &amp; Vietnam (21 Oct 2026, accessed 6 Nov 2026)</a>).</li>
</ul>
<h2>What Minister Sarmuji and ASAKI said</h2>
<p>According to Industry.co.id and CNBC Indonesia (21 October 2026), Sarmuji stressed two pillars: certainty of gas supply so plants can plan output, and a gas price that remains competitive. ASAKI added that while ESDM Decree 281.K/2026 looks sound on paper, supply implementation failed, so the effective October price rose to US$11 per MMBtu—more than 50% above the expected HGBT range.</p>
<h2>Indonesia ceramic import policy China: implications for exporters</h2>
<ul><li><strong>China AD duty 20–25%.</strong> The minister cited antidumping duties already applied to Chinese ceramics; exporters must cost landed price after BMAD, not FOB alone.</li>
<li><strong>Tighter SNI and technical rules.</strong> Products that Indonesia can already make will be protected as far as possible; secure SNI certification and full technical files before shipment.</li>
<li><strong>India is also watched.</strong> If KADI finds dumping from India, extra duties may follow—non-China import channels are affected too.</li>
<li><strong>Narrow relaxation.</strong> Only for types not produced in Indonesia. Do not bank on relaxation for standard mass tiles.</li>
<li><strong>Domestic market is strengthening.</strong> Rising utilisation and a 110 million m² expansion in 2026–2028 mean denser local competition; more realistic openings are in machinery, glaze, frit, or niche types still absent in Indonesia.</li></ul>
<h2>Practical steps before exporting to Indonesia</h2>
<p>Map the HS code and current BMAD status at the Trade Ministry/KADI; prepare SNI testing; compare post-duty prices with local makers (Arwana, Roman and others); and consider local investment or partnership—ASAKI cited a former importer that built a plant in Subang. In short, <strong>Indonesia ceramic import policy China</strong> after the ASAKI meeting points to a more protective market for local makers. homeX, an Indonesian B2B building-materials platform, can help partners read project demand without promising customs privileges.</p>
<h2>Indonesia ceramic import policy China: related articles and products</h2><ul>
<li><a href="/en/news/20">Ceramic prices &amp; US$11 industrial gas: ASAKI expansion</a></li>
<li><a href="/en/news/315">Ceramic industry utilisation below 70%</a></li>
<li><a href="/en/news/178">2026 gas export halt: ASAKI response</a></li>
<li><a href="/en/news/391">Keramika Indonesia 2027: China machinery &amp; materials</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What China ceramic AD duty did the minister cite?</strong> About 20–25%, as stated by Minister Sarmuji and reported by Bloomberg Technoz on 21 October 2026.</p>
<p><strong>Why did ceramic gas rise to US$11?</strong> ASAKI cited supply disruptions in September–October 2026; the October average reached US$11/MMBtu versus an expected HGBT range of US$8–8.5.</p>
<p><strong>Can every imported ceramic get a relaxation?</strong> No. Relaxation is only for types not yet produced in Indonesia, and it is highly selective.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.industry.co.id/read/157734/lindungi-industri-keramik-nasional-menperin-sarmuji-perjuangkan-pasokan-gas-dan-perketat-impor" target="_blank" rel="noopener">Industry.co.id, Minister Sarmuji–ASAKI on gas &amp; ceramic imports (21 Oct 2026, accessed 6 Nov 2026)</a>; <a href="https://www.cnbcindonesia.com/news/20261021181236-4-778358/pengusaha-keramik-ri-ngadu-ke-menperin-soal-gas-ungkit-soal-vietnam" target="_blank" rel="noopener">CNBC Indonesia, ASAKI meeting with Minister on gas &amp; Vietnam (21 Oct 2026, accessed 6 Nov 2026)</a>; <a href="https://www.bloombergtechnoz.com/detail-news/125323/menperin-evaluasi-tarif-antidumping-pasokan-gas-industri-keramik" target="_blank" rel="noopener">Bloomberg Technoz, Minister on ceramic antidumping review (21 Oct 2026, accessed 6 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>Zehn Royal FXG uPVC Roof Tile Price November 2026</title><link>https://www.homex.co.id/en/news/410</link><guid isPermaLink="true">https://www.homex.co.id/en/news/410</guid><pubDate>Fri, 06 Nov 2026 09:15:37 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Zehn uPVC roof tile price November 2026 at Mitra10: Royal FXG-1040 black Rp429,900, brown Rp439,900 per 10×6 panel (6 Nov 2026).</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261106-i-harga-genteng-upvc-zehn-november.jpg" alt="Zehn Royal FXG uPVC Roof Tile Price November 2026"></p><p>The <strong>Zehn uPVC roof tile price November 2026</strong> for the Royal FXG-1040 at Mitra10, according to product and roofing-category listings checked on 6 November 2026, is about <strong>Rp429,900</strong> (black) to <strong>Rp439,900</strong> (brown) per panel with a 10×6-leaf layout. This is a Zehn uPVC/ASA plastic roof tile, not ceramic or Onduline asphalt, and it is separate from earlier Zehn window/hinge price articles.</p>
<h2>Key Facts</h2><ul>
<li>Zehn Royal FXG-1040 brown 10×6-leaf panel at Mitra10 about Rp439,900 (2026-11-06, source: <a href="https://www.mitra10.com/product/zehn-royal-roof-tile-upvc-asa-brown-10x6-fxg-1040" target="_blank" rel="noopener">Mitra10, Zehn uPVC Royal FXG-1040 brown 10x6 (checked 6 Nov 2026)</a>).</li>
<li>Zehn Royal FXG-1040 black on Mitra10 listings about Rp429,900 (2026-11-06, source: <a href="https://www.mitra10.com/bahan-bangunan/roofing-gutter" target="_blank" rel="noopener">Mitra10, Roofing &amp; Gutter category (checked 6 Nov 2026)</a>).</li>
<li>Mitra10 roof-tile promo pages also show special prices below list for some Zehn SKUs (2026-11-06, source: <a href="https://www.mitra10.com/top-banner/produk-termurah-genteng-mitra10-tahun-2026" target="_blank" rel="noopener">Mitra10, cheapest roof-tile promo 2026 (checked 6 Nov 2026)</a>).</li>
<li>Zehn Roma FXG-1045 (6×5 leaves) is also listed at Mitra10 as a different module size (2026-11-06, source: <a href="https://www.mitra10.com/product/zehn-roma-roof-tile-upvc-asa-black-6x5-fxg-1045" target="_blank" rel="noopener">Mitra10, Zehn uPVC FXG-1045 Roma (checked 6 Nov 2026)</a>).</li>
<li>E-commerce prices move with stock and promos; verify on the product page before a PO (2026-11-06, source: <a href="https://www.mitra10.com/bahan-bangunan" target="_blank" rel="noopener">Mitra10, Building Materials (checked 6 Nov 2026)</a>).</li>
</ul>
<h2>Zehn Royal FXG-1040 uPVC price at Mitra10</h2>
<p>Royal FXG-1040 is a Zehn uPVC roof panel in a 10×6-leaf layout. On 6 November 2026 Mitra10 listings showed normal prices around Rp429,900 for black and Rp439,900 for brown. Some Mitra10 promo pages have shown lower special prices for the same SKUs; because promos change quickly, a bill of quantities should use the normal price plus a note to “re-check promo on order day”.</p>
<h2>What uPVC/ASA means for a house roof</h2>
<p>uPVC tiles are lighter than clay tiles, do not rust like bare metal, and go up relatively quickly on light-steel frames. An ASA top layer on many plastic roof products is intended for UV resistance. Still check Zehn’s colour warranty and thickness in the datasheet, and match purlin spacing to the maker’s guide so panels do not sag.</p>
<h2>How to estimate panel count</h2>
<ul><li>Measure effective roof length and width, then divide by the effective cover of one panel after overlap.</li>
<li>Add 5–10% for ridge cuts, hips and waste.</li>
<li>Order ridges, gutters and roofing screws together so colour and lot match.</li>
<li>Also compare FXG-1045 (6×5 leaves) if the frame module is smaller.</li></ul>
<h2>Zehn uPVC roof tile price November 2026 versus other roofs</h2>
<p>At about Rp430,000–Rp440,000 per Royal FXG-1040 panel, compare with Onduline/Onduvilla asphalt sheets (see the separate Mitra10 article) and sand-coated metal tiles. uPVC is often chosen for a tile look without clay weight, and for corrosion resistance near the coast. Factor frame cost too: light plastic panels sometimes allow wider purlin spacing, but still follow Zehn’s guide so panels do not sag in tropical heat.</p>
<p>For housing projects, ask for black and brown samples at a Mitra10 branch, because catalogue renders can differ under tropical sun. Record the FXG-1040 SKU so the PO is not mixed up with FXG-1045.</p>
<p>homeX can align uPVC roofing with light steel and gutters. Prices above are Mitra10 public prices, not homeX prices.</p>
<h2>Zehn uPVC roof tile price November 2026: related articles and products</h2><ul>
<li><a href="/en/news/59">Roof tile prices 2026: sand metal, ceramic &amp; Onduline</a></li>
<li><a href="/en/news/223">Ridge and roof accessory prices</a></li>
<li><a href="/en/news/384">October 2026 building PPI: roof tiles up</a></li>
<li><a href="/en/news/76">Aluminium &amp; uPVC Zehn window prices</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much is Zehn Royal FXG-1040 at Mitra10?</strong> About Rp429,900 (black) to Rp439,900 (brown) per 10×6-leaf panel, checked 6 November 2026.</p>
<p><strong>What is the difference between FXG-1040 and FXG-1045?</strong> FXG-1040 is Royal with 10×6 leaves; FXG-1045 is Roma with 6×5 leaves, a smaller module in Mitra10’s catalogue.</p>
<p><strong>Are promo prices always available?</strong> No. Mitra10 promo pages are sometimes below list, but they change quickly; use list price for a first estimate.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.mitra10.com/product/zehn-royal-roof-tile-upvc-asa-brown-10x6-fxg-1040" target="_blank" rel="noopener">Mitra10, Zehn uPVC Royal FXG-1040 brown 10x6 (checked 6 Nov 2026)</a>; <a href="https://www.mitra10.com/bahan-bangunan/roofing-gutter" target="_blank" rel="noopener">Mitra10, Roofing &amp; Gutter category (checked 6 Nov 2026)</a>; <a href="https://www.mitra10.com/bahan-bangunan" target="_blank" rel="noopener">Mitra10, Building Materials (checked 6 Nov 2026)</a>; <a href="https://www.mitra10.com/top-banner/produk-termurah-genteng-mitra10-tahun-2026" target="_blank" rel="noopener">Mitra10, cheapest roof-tile promo 2026 (checked 6 Nov 2026)</a>; <a href="https://www.mitra10.com/product/zehn-roma-roof-tile-upvc-asa-black-6x5-fxg-1045" target="_blank" rel="noopener">Mitra10, Zehn uPVC FXG-1045 Roma (checked 6 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>PTPP Wins Rp400 Billion EPC for Pupuk Kaltim Jetty 11 in Bontang</title><link>https://www.homex.co.id/en/news/409</link><guid isPermaLink="true">https://www.homex.co.id/en/news/409</guid><pubDate>Fri, 06 Nov 2026 09:15:23 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Pupuk Kaltim Jetty 11: PTPP EPC Rp400 billion in Bontang, 40,000 DWT, conveyor and ship loader, 570 days from 18 September 2026.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261106-i-ptpp-dermaga-pupuk-kaltim-400m.jpg" alt="PTPP Wins Rp400 Billion EPC for Pupuk Kaltim Jetty 11 in Bontang"></p><p><strong>Pupuk Kaltim Jetty 11</strong> is being built by PT PP (Persero) Tbk (PTPP) under a Rp400 billion EPC contract in the Pupuk Kaltim industrial estate, Bontang, East Kalimantan. The package east of Tursina Jetty covers a multipurpose jetty, support structures, a conveyor system and a mobile ship loader for dry-bulk ships up to 40,000 DWT—direct demand for concrete, structural steel, conveyor fabrication and port equipment.</p>
<h2>Key Facts</h2><ul>
<li>EPC contract value for Jetty 11: Rp400 billion; location east of Tursina Jetty, Bontang (2026-11-04, source: <a href="https://www.antaranews.com/berita/5831555/pt-pp-peroleh-proyek-dari-pupuk-kaltim-senilai-rp400-miliar" target="_blank" rel="noopener">ANTARA, 4 November 2026</a>).</li>
<li>Duration: 570 calendar days from 18 September 2026 (2026-11-04, source: <a href="https://www.antaranews.com/berita/5831555/pt-pp-peroleh-proyek-dari-pupuk-kaltim-senilai-rp400-miliar" target="_blank" rel="noopener">ANTARA, 4 November 2026</a>).</li>
<li>Scope: multipurpose jetty, support structures, conveyor system, mobile ship loader installation (2026-11-04, source: <a href="https://www.antaranews.com/berita/5831555/pt-pp-peroleh-proyek-dari-pupuk-kaltim-senilai-rp400-miliar" target="_blank" rel="noopener">ANTARA, 4 November 2026</a>).</li>
<li>Dry-bulk ship capacity up to 40,000 DWT; supports material distribution and the national soda-ash ecosystem (2026-11-04, source: <a href="https://www.antaranews.com/berita/5831555/pt-pp-peroleh-proyek-dari-pupuk-kaltim-senilai-rp400-miliar" target="_blank" rel="noopener">ANTARA, 4 November 2026</a>).</li>
<li>PTPP Corporate Secretary Joko Raharjo: part of expanding the industrial and maritime infrastructure portfolio (official notes 3–4 Nov 2026) (2026-11-03, source: <a href="https://www.idxchannel.com/market-news/ptpp-raih-kontrak-epc-dermaga-11-pupuk-kaltim-senilai-rp400-miliar" target="_blank" rel="noopener">IDXChannel, 3 November 2026</a>).</li>
</ul>
<h2>EPC scope of Pupuk Kaltim Jetty 11</h2>
<p>Per ANTARA (4 November 2026) and IDXChannel (3 November 2026), PTPP is doing engineering, procurement and construction for Jetty 11. Besides the jetty structure, the package includes a conveyor and mobile ship loader to speed dry-bulk handling. The 40,000 DWT rating lets larger ships berth east of Tursina Jetty, which can cut queues and demurrage if operations match the design.</p>
<p>The 570 calendar days from 18 September 2026 put the peak of civil and mechanical work across 2026–2027. That is a demand window for cement, ready-mix, rebar, structural steel, protective coatings, conveyor fabrication and site electrical gear.</p>
<h2>Impact on building-materials demand</h2>
<p>Industrial jetties need mass concrete for pile caps, decks and abutments; structural steel for trestles and conveyor supports; and corrosion-resistant finishes in a marine setting. The mobile ship loader and conveyor add steel fabrication and equipment foundations. For East Kalimantan distributors, projects of this size usually pull local aggregate and ready-mix, while steel and special equipment often come from Java or imports.</p>
<p>homeX tracks port and industrial-estate projects because they create parallel demand for civil materials and warehouse logistics. A building-materials platform with warehousing and delivery is relevant when EPC contractors list foundation and superstructure materials.</p>
<h2>Soda-ash context and industrial ports</h2>
<p>Jetty 11 is expected to optimise large-ship loading and unloading, smooth material distribution inside the Pupuk Kaltim estate, and support national soda-ash needs and its industrial ecosystem. The maritime asset is therefore not “just another berth” but a link between chemical feedstocks and downstream markets—similar to other estates that attach bulk ports to plants.</p>
<h2>Notes for suppliers and support contractors</h2>
<ul><li><strong>Schedule</strong>: count back from 570 days starting 18 September 2026 for casting and fabrication windows.</li>
<li><strong>Marine specs</strong>: match steel and coatings to a corrosive environment; ask for mill certificates and data sheets.</li>
<li><strong>Bontang logistics</strong>: ship materials by sea; keep buffer stock in a yard near site.</li>
<li><strong>HSE and project commitment</strong>: PTPP and Pupuk Kaltim signed a project-commitment document on quality, safety and on-time delivery.</li></ul>
<p>This is not a generic earnings story: it focuses on a port EPC package that absorbs concrete, steel and material-handling systems in Bontang’s industrial zone.</p>
<h2>Pupuk Kaltim Jetty 11: related articles and products</h2><ul>
<li><a href="/en/news/316">Inter-island cement shipping and sea logistics risk</a></li>
<li><a href="/en/news/339">WIKA Beton performance and precast demand</a></li>
<li><a href="/en/news/401">Indonesia Supply Chain 2026: warehouses and logistics</a></li>
<li><a href="/products/217">Elastic sealant for structural joints</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What is the EPC contract value for Pupuk Kaltim Jetty 11?</strong> Rp400 billion, per PTPP’s official notes carried by ANTARA on 4 November 2026 and IDXChannel on 3 November 2026.</p>
<p><strong>What ship capacity will Jetty 11 serve?</strong> It is designed for dry-bulk ships up to 40,000 DWT, with a conveyor and mobile ship loader.</p>
<p><strong>How long is the construction period?</strong> 570 calendar days from 18 September 2026.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.antaranews.com/berita/5831555/pt-pp-peroleh-proyek-dari-pupuk-kaltim-senilai-rp400-miliar" target="_blank" rel="noopener">ANTARA, 4 November 2026</a>; <a href="https://www.idxchannel.com/market-news/ptpp-raih-kontrak-epc-dermaga-11-pupuk-kaltim-senilai-rp400-miliar" target="_blank" rel="noopener">IDXChannel, 3 November 2026</a></em></p>]]></content:encoded></item><item><title>SBI–Taiheiyo CLEAN SET at HATTI 2026: Soft-Soil Stabilization</title><link>https://www.homex.co.id/en/news/408</link><guid isPermaLink="true">https://www.homex.co.id/en/news/408</guid><pubDate>Fri, 06 Nov 2026 09:15:23 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>CLEAN SET soil stabilization by SBI–Taiheiyo debuted at PIT HATTI on 3–4 Nov 2026; used on Tol Penggaron, Kalimantan and Cikarang/Bekasi warehouses.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261106-i-sbi-taiheiyo-clean-set-hatti-2026.jpg" alt="SBI–Taiheiyo CLEAN SET at HATTI 2026: Soft-Soil Stabilization"></p><p><strong>CLEAN SET soil stabilization</strong> was introduced by PT Solusi Bangun Indonesia Tbk with Taiheiyo Cement Corporation (Japan) at the 30th HATTI Annual Scientific Meeting (PIT) at Bidakara, Jakarta, on 3–4 November 2026. The solution targets soft soils with low bearing capacity—a common issue on toll roads, warehouses and coastal industrial estates in Java and Kalimantan.</p>
<h2>Key Facts</h2><ul>
<li>CLEAN SET introduced at the 30th PIT HATTI, Bidakara Jakarta, 3–4 November 2026 (2026-11-04, source: <a href="https://solusibangunindonesia.com/perkuat-ketahanan-infrastruktur-indonesia-solusi-bangun-indonesia-dan-taiheiyo-perkenalkan-clean-set-di-forum-geoteknik-nasional/" target="_blank" rel="noopener">Solusi Bangun Indonesia, press release 4 November 2026</a>).</li>
<li>Strategic Taiheiyo–SIG/SBI collaboration since 2021, expanded by a business partnership in January 2026 (2026-11-04, source: <a href="https://solusibangunindonesia.com/perkuat-ketahanan-infrastruktur-indonesia-solusi-bangun-indonesia-dan-taiheiyo-perkenalkan-clean-set-di-forum-geoteknik-nasional/" target="_blank" rel="noopener">Solusi Bangun Indonesia, press release 4 November 2026</a>).</li>
<li>Already applied on Semarang–Solo Toll Road Penggaron section, projects in Kalimantan, and warehouses/malls/parking in Cikarang and Bekasi (2026-11-04, source: <a href="https://solusibangunindonesia.com/perkuat-ketahanan-infrastruktur-indonesia-solusi-bangun-indonesia-dan-taiheiyo-perkenalkan-clean-set-di-forum-geoteknik-nasional/" target="_blank" rel="noopener">Solusi Bangun Indonesia, press release 4 November 2026</a>).</li>
<li>Approach: raise shear strength and bearing capacity of soft soil with binders; an alternative to soil replacement and vertical drains (2026-11-04, source: <a href="https://solusibangunindonesia.com/perkuat-ketahanan-infrastruktur-indonesia-solusi-bangun-indonesia-dan-taiheiyo-perkenalkan-clean-set-di-forum-geoteknik-nasional/" target="_blank" rel="noopener">Solusi Bangun Indonesia, press release 4 November 2026</a>).</li>
<li>SBI Offtake & Partnership director Yasuhide Abe: focus on foundation resilience, material efficiency and durable infrastructure (2026-11-04, source: <a href="https://solusibangunindonesia.com/perkuat-ketahanan-infrastruktur-indonesia-solusi-bangun-indonesia-dan-taiheiyo-perkenalkan-clean-set-di-forum-geoteknik-nasional/" target="_blank" rel="noopener">Solusi Bangun Indonesia, press release 4 November 2026</a>).</li>
</ul>
<h2>What CLEAN SET soil stabilization is</h2>
<p>Per Solusi Bangun Indonesia’s 4 November 2026 press release, CLEAN SET raises the shear strength and bearing capacity of soft soil through binder stabilization. Soil that was previously hard to use can become part of the works, reducing the need for soil replacement or vertical drains. The company cites chances for material efficiency, faster construction time and less surplus-soil disposal—effects on cost, environment and service life.</p>
<p>The technical message is simple: infrastructure resilience starts at the foundation. On soft ground prone to settlement, improving in-situ soil is often more measurable than hauling fill over long distances, especially for wide warehouse pads or long road embankments.</p>
<h2>Projects that already use a similar approach</h2>
<p>SBI and Taiheiyo cite application on the Semarang–Solo Toll Road Penggaron section, which has soft, settlement-prone soils, so the road foundation can carry traffic loads over time. Similar solutions have been used on projects in Kalimantan and on warehouse, shopping-mall and parking facilities in Cikarang and Bekasi—areas relevant to B2B warehouse developers and building-materials distribution hubs.</p>
<h2>Why it matters for building materials and warehouses</h2>
<p>Warehouse and mall projects in Cikarang/Bekasi need working floors that do not settle quickly. Weak subgrades lead to cracked slabs, skewed loading doors and ponding in yards. Stabilizing soil before casting slabs or installing piles can cut later repair claims. For cement, binder and admixture suppliers, technologies like CLEAN SET also signal demand for specialized binders beyond ordinary bagged cement.</p>
<p>homeX is building toward warehouse and materials-distribution services; understanding pad bearing capacity helps with lease location and floor specs. The platform watches geotechnical innovations that change clients’ foundation costs.</p>
<h2>SBI–Taiheiyo collaboration context</h2>
<p>Taiheiyo’s collaboration with SIG through SBI dates from 2021 and was expanded by a January 2026 business partnership. Combining SBI’s building-materials capability with Japanese geotechnical experience is framed as SBI’s move from materials supplier toward integrated construction solutions. The HATTI forum is a knowledge exchange with soil experts, academics and practitioners.</p>
<ul><li><strong>Warehouse owners</strong>: request a site geotechnical report and compare stabilization versus fill options.</li>
<li><strong>Contractors</strong>: put binder specs and shear-strength test methods into the contract.</li>
<li><strong>Materials distributors</strong>: watch binder demand along the Cikarang–Bekasi corridor and Central Java toll projects.</li></ul>
<h2>CLEAN SET soil stabilization: related articles and products</h2><ul>
<li><a href="/en/news/385">Solusi Bangun Indonesia (SMCB) performance</a></li>
<li><a href="/en/news/400">Ambarawa–Bawen toll and materials logistics</a></li>
<li><a href="/en/news/332">Jabodetabek warehouse rents and occupancy</a></li>
<li><a href="/products/233">A Plus compound for finishing</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What is CLEAN SET?</strong> A soft-soil stabilization solution introduced by SBI with Taiheiyo at the 30th PIT HATTI (3–4 November 2026) to raise shear strength and bearing capacity with binders.</p>
<p><strong>Where has CLEAN SET or a similar approach been used?</strong> Semarang–Solo Toll Road Penggaron section, projects in Kalimantan, and warehouses, malls and parking in Cikarang and Bekasi.</p>
<p><strong>When and where was it presented to the technical community?</strong> At the 30th PIT HATTI at Bidakara, Jakarta, on 3–4 November 2026.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://solusibangunindonesia.com/perkuat-ketahanan-infrastruktur-indonesia-solusi-bangun-indonesia-dan-taiheiyo-perkenalkan-clean-set-di-forum-geoteknik-nasional/" target="_blank" rel="noopener">Solusi Bangun Indonesia, press release 4 November 2026</a></em></p>]]></content:encoded></item><item><title>Sumbawa Cement Supply 9,500 Tons: Shipment Plan 12–30 November 2026</title><link>https://www.homex.co.id/en/news/407</link><guid isPermaLink="true">https://www.homex.co.id/en/news/407</guid><pubDate>Fri, 06 Nov 2026 09:15:23 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Sumbawa cement supply November 2026: 9,500 tons in stages on 12–30 Nov to refill distributor stock; normal need 3,500–4,500 tons/month.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261106-i-sumbawa-pasokan-semen-9500-ton-november.jpg" alt="Sumbawa Cement Supply 9,500 Tons: Shipment Plan 12–30 November 2026"></p><p><strong>Sumbawa cement supply November 2026</strong> is scheduled to recover with an extra 9,500 tons shipped in stages on 12–30 November 2026. The Sumbawa regency government is directing that volume to refill thinned distributor stock after scarcity, so building stores, tradespeople and homeowners can work again without waiting on empty bags.</p>
<h2>Key Facts</h2><ul>
<li>Sumbawa regency will bring in 9,500 tons of cement in stages on 12–30 November 2026 to restore supply (2026-11-05, source: <a href="https://mataram.antaranews.com/berita/580623/pemkab-sumbawa-memulihkan-semen-datangkan-9500-ton-pada-12-30-november" target="_blank" rel="noopener">ANTARA News Mataram, 5 November 2026</a>).</li>
<li>Normal demand in Sumbawa Regency is 3,500–4,500 tons/month; peak can reach 6,000–7,500 tons/month (2026-11-05, source: <a href="https://mataram.antaranews.com/berita/580623/pemkab-sumbawa-memulihkan-semen-datangkan-9500-ton-pada-12-30-november" target="_blank" rel="noopener">ANTARA News Mataram, 5 November 2026</a>).</li>
<li>Regent letter No. 500.2.1/534/Diskoperindag/X/2026 dated 27 October 2026 asked for supply recovery (2026-11-05, source: <a href="https://mataram.antaranews.com/berita/580623/pemkab-sumbawa-memulihkan-semen-datangkan-9500-ton-pada-12-30-november" target="_blank" rel="noopener">ANTARA News Mataram, 5 November 2026</a>).</li>
<li>PT Semen Tonasa (SIG) replied on 2 November 2026: disruption from delayed coal; speeding production recovery (2026-11-05, source: <a href="https://mataram.antaranews.com/berita/580623/pemkab-sumbawa-memulihkan-semen-datangkan-9500-ton-pada-12-30-november" target="_blank" rel="noopener">ANTARA News Mataram, 5 November 2026</a>).</li>
<li>Three main distributors: Sumber Mas Maju (Gresik), Catur Kencana Sakti (Tonasa), Saka Agung (Tiga Roda); 9 retailers in Sumbawa city (2026-11-05, source: <a href="https://mataram.antaranews.com/berita/580623/pemkab-sumbawa-memulihkan-semen-datangkan-9500-ton-pada-12-30-november" target="_blank" rel="noopener">ANTARA News Mataram, 5 November 2026</a>).</li>
</ul>
<h2>Sumbawa cement supply November 2026: schedule and volume</h2>
<p>According to DisKUKMindag head ES Adi Nusantara, quoted by ANTARA News Mataram (5 November 2026), the extra 9,500 tons is prioritised to refill distributor stock. Staged deliveries on 12–30 November 2026 follow PT Semen Tonasa’s reply to the regent’s letter. The volume is roughly two months of normal demand, so it can ease store queues if distribution is even.</p>
<p>Normally the regency needs 3,500–4,500 tons a month. In peak building seasons consumption can rise to 6,000–7,500 tons. One 9,500-ton wave must not sit in a single depot; it has to reach distributors and retailers so tradespeople in outlying areas also get bags.</p>
<h2>Distributor chain and impact on builders</h2>
<p>Sumbawa has three main distributors: Sumber Mas Maju for Semen Gresik, PT Catur Kencana Sakti for Tonasa, and PT Saka Agung for Tiga Roda. Sumbawa city has nine retailers, plus dozens across the regency. Earlier scarcity thinned distributor stock until some stores ran out, delaying home renovations and site work.</p>
<p>For small contractors and homeowners, the signal to watch is not only “cargo arrived” but stock at the nearest store. Ask distributors for arrival dates, compare bag prices with the previous week, and order early if the project is already scheduled. homeX, a building-materials platform with warehousing and delivery, tracks regional supply recovery because shortages on smaller islands quickly affect prices and work calendars.</p>
<h2>Why supply stalled</h2>
<p>In its 2 November 2026 reply, PT Semen Tonasa apologised for the delay. The disruption was linked to late coal deliveries for kiln fuel, so production capacity missed market schedules. The company said it is speeding production recovery, securing coal and coordinating with Sumbawa distributors on shipment plans and realisation. Maximum support “subject to production conditions” will be reported periodically to the local government.</p>
<h2>Practical notes for November–December projects</h2>
<ul><li><strong>Check weekly stock</strong> at the three distributors and nearby stores; do not rely on one brand only.</li>
<li><strong>Adjust estimates</strong> for inter-island freight if you must source from another port.</li>
<li><strong>Avoid over-hoarding</strong> in small yards: cover 2–4 weeks of need so market flow stays healthy.</li>
<li><strong>Document</strong> order dates and bag lot numbers for claims if delivery slips.</li></ul>
<p>This piece covers the recovery side after earlier scarcity reports; what matters for tradespeople and project owners is whether bags return to distributor shelves in the 12–30 November 2026 window.</p>
<h2>Sumbawa cement supply November 2026: related articles and products</h2><ul>
<li><a href="/en/news/319">Sumbawa cement scarcity October 2026</a></li>
<li><a href="/en/news/365">Cement scarce in Bima and Lombok</a></li>
<li><a href="/en/news/379">Cement coal supply tight: impact on SIG output</a></li>
<li><a href="/products/232">A Plus gypsum for wall finishing</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How many tons of cement will Sumbawa receive in November 2026?</strong> Per ANTARA on 5 November 2026, the regency will bring in 9,500 tons in stages on 12–30 November 2026.</p>
<p><strong>What is normal monthly cement demand in Sumbawa Regency?</strong> Normally 3,500–4,500 tons per month; at peak it can reach 6,000–7,500 tons.</p>
<p><strong>Who replied to the regent’s supply letter?</strong> PT Semen Tonasa (a SIG subsidiary) replied on 2 November 2026 and cited coal delays.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://mataram.antaranews.com/berita/580623/pemkab-sumbawa-memulihkan-semen-datangkan-9500-ton-pada-12-30-november" target="_blank" rel="noopener">ANTARA News Mataram, 5 November 2026</a></em></p>]]></content:encoded></item><item><title>Onduline &amp; Onduvilla Asphalt Roof Prices November 2026</title><link>https://www.homex.co.id/en/news/406</link><guid isPermaLink="true">https://www.homex.co.id/en/news/406</guid><pubDate>Fri, 06 Nov 2026 09:15:12 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Onduline Onduvilla price November 2026 at Mitra10: Onduline 200x94 Rp243,300–250,700; Onduvilla 106x40 Rp64,200–76,100 (6 Nov 2026).</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261106-i-harga-onduline-onduvilla-november.jpg" alt="Onduline &amp; Onduvilla Asphalt Roof Prices November 2026"></p><p>The <strong>Onduline Onduvilla price November 2026</strong> at Mitra10’s online store, based on indexed product listings and brand pages checked on 6 November 2026, puts Onduline sheets sized 200×94×0.3 cm at about Rp243,300 (black/red/brown) to about Rp250,700 (green), while Onduvilla 106×40×0.3 cm runs from about Rp64,200 (green/brown) to Rp74,500–Rp76,100 (red/black). These are bitumen asphalt roofing sheets from the Onduline Group, distinct from the ridge-accessory article (#223) or the mixed roof-tile roundup (#59).</p>
<h2>Key Facts</h2><ul>
<li>Onduline asphalt sheet 200×94×0.3 cm at Mitra10 about Rp243,300 for black, red and brown (2026-11-06, source: <a href="https://www.mitra10.com/product/onduline-genteng-aspal-hitam-200cmx94x3mm" target="_blank" rel="noopener">Mitra10, Onduline asphalt sheet 200x94 Black (checked 6 Nov 2026)</a>).</li>
<li>Onduline green 200×94 at Mitra10 about Rp250,700 (2026-11-06, source: <a href="https://www.mitra10.com/product/onduline-genteng-aspal-hijau-200cmx94cmx3mm" target="_blank" rel="noopener">Mitra10, Onduline asphalt sheet 200x94 Green (checked 6 Nov 2026)</a>).</li>
<li>Onduvilla 106×40×0.3 cm red/black about Rp74,500–Rp76,100 per sheet at Mitra10 (2026-11-06, source: <a href="https://www.mitra10.com/product/onduvilla-genteng-aspal-merah-106x40x3mm" target="_blank" rel="noopener">Mitra10, Onduvilla asphalt tile 106x40 Red (checked 6 Nov 2026)</a>).</li>
<li>Onduvilla green and brown about Rp64,200 per sheet on Mitra10 brand/category listings (2026-11-06, source: <a href="https://www.mitra10.com/brands/onduvilla" target="_blank" rel="noopener">Mitra10, Onduvilla brand page (checked 6 Nov 2026)</a>).</li>
<li>Mitra10 prices can change with promotions; always open the product page before ordering (2026-11-06, source: <a href="https://www.mitra10.com/bahan-bangunan/roofing-gutter" target="_blank" rel="noopener">Mitra10, Roofing &amp; Gutter category (checked 6 Nov 2026)</a>).</li>
</ul>
<h2>Onduline 200×94 price at Mitra10 November 2026</h2>
<p>Onduline is a large corrugated bitumen roof sheet, suited to canopies, light sheds and simple houses. At Mitra10, the 200×94×0.3 cm sheet is listed around <strong>Rp243,300</strong> for black, red and brown, and around <strong>Rp250,700</strong> for green. Effective cover is smaller than the nominal size because of overlap; size the order from the maker’s fixing table, not gross roof area alone.</p>
<h2>Onduvilla 106×40: colour changes the price</h2>
<p>Onduvilla is a smaller asphalt tile (106×40×0.3 cm) with a more “tile-like” look than Onduline waves. On 6 November 2026 Mitra10 listings showed red around Rp74,500–Rp76,100, black around Rp76,100, and green/brown around Rp64,200. Houses that want a light tile look often pick Onduvilla; wide canopies usually go faster with Onduline.</p>
<h2>Estimating quantity and cost</h2>
<ul><li>Use overlap and pitch factors from Onduline/Onduvilla guides, not floor-plan area alone.</li>
<li>Add ridges, flashings and special screws; accessories are covered in a separate homeX ridge article.</li>
<li>Compare price per effective m², not only price per sheet.</li>
<li>Check colour stock at the nearest Mitra10 branch; promo colours change.</li></ul>
<h2>Onduline Onduvilla price November 2026 per effective m²</h2>
<p>As a rough illustration: if one Onduline 200×94 sheet covers about 1.5–1.6 m² after overlap (confirm with the maker’s table), sheet material is about Rp150,000–Rp165,000 per m² at Rp243,300. Onduvilla is smaller, so work per m² from effective leaf width and batten spacing. Also weigh light-steel frame cost: bitumen sheets often allow a lighter structure than thick clay tiles.</p>
<p>Keep a dated Mitra10 page screenshot or link (6 November 2026) in the estimate file. Outside Java, add freight for long Onduline sheets that do not fit a small pickup.</p>
<p>homeX can help put light roofing together with light-steel framing and gutters. Prices above are Mitra10 public prices, not homeX prices.</p>
<h2>Onduline Onduvilla price November 2026: related articles and products</h2><ul>
<li><a href="/en/news/59">Roof tile prices 2026: sand metal, ceramic &amp; Onduline</a></li>
<li><a href="/en/news/223">Ridge and Onduline accessory prices</a></li>
<li><a href="/en/news/384">Building-materials PPI October 2026: roof tiles up</a></li>
<li><a href="/news/398">Harga Semen MU November 2026</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much is Onduline at Mitra10 in November 2026?</strong> A 200×94×0.3 cm sheet is about Rp243,300 (black/red/brown) to about Rp250,700 (green), checked 6 November 2026.</p>
<p><strong>How much is Onduvilla per sheet?</strong> About Rp64,200 (green/brown) to Rp74,500–Rp76,100 (red/black) for 106×40×0.3 cm at Mitra10.</p>
<p><strong>What is the difference between Onduline and Onduvilla?</strong> Onduline is a large 200×94 corrugated sheet; Onduvilla is a smaller 106×40 asphalt tile with a tile-like look.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.mitra10.com/product/onduline-genteng-aspal-hitam-200cmx94x3mm" target="_blank" rel="noopener">Mitra10, Onduline asphalt sheet 200x94 Black (checked 6 Nov 2026)</a>; <a href="https://www.mitra10.com/product/onduline-genteng-aspal-hijau-200cmx94cmx3mm" target="_blank" rel="noopener">Mitra10, Onduline asphalt sheet 200x94 Green (checked 6 Nov 2026)</a>; <a href="https://www.mitra10.com/product/onduvilla-genteng-aspal-merah-106x40x3mm" target="_blank" rel="noopener">Mitra10, Onduvilla asphalt tile 106x40 Red (checked 6 Nov 2026)</a>; <a href="https://www.mitra10.com/product/onduvilla-genteng-antrachite-black-106x40x3mm" target="_blank" rel="noopener">Mitra10, Onduvilla tile 106x40 Black (checked 6 Nov 2026)</a>; <a href="https://www.mitra10.com/bahan-bangunan/roofing-gutter" target="_blank" rel="noopener">Mitra10, Roofing &amp; Gutter category (checked 6 Nov 2026)</a>; <a href="https://www.mitra10.com/brands/onduvilla" target="_blank" rel="noopener">Mitra10, Onduvilla brand page (checked 6 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>Dynamix, Merah Putih, Conch &amp; Semen Padang Prices Nov 2026</title><link>https://www.homex.co.id/en/news/405</link><guid isPermaLink="true">https://www.homex.co.id/en/news/405</guid><pubDate>Fri, 06 Nov 2026 09:15:12 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Dynamix cement price November 2026 with Merah Putih, Conch and Padang: about Rp38,000–73,750 per 40/50 kg bag (checked 6 Nov 2026).</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261106-i-harga-semen-dynamix-merah-putih-november.jpg" alt="Dynamix, Merah Putih, Conch &amp; Semen Padang Prices Nov 2026"></p><p>The <strong>Dynamix cement price November 2026</strong>, together with Merah Putih, Conch and Semen Padang on the retail market, runs roughly from Rp38,000 to Rp73,750 per bag, depending on brand, 40 kg or 50 kg pack, region and sales channel. Figures below were compiled on 6 November 2026 from HargaBeton’s November 2026 list, List Harga Material, and a Jabodetabek Conch distributor list. This article does not rehash Tiga Roda/Gresik-only coverage; it focuses on these four brands for renovation bills of quantities.</p>
<h2>Key Facts</h2><ul>
<li>Dynamix/Holcim: 40 kg Rp52,350 and 50 kg Rp64,500 on HargaBeton; List Harga Material lists Dynamix 40 kg Rp44,500 and Holcim 40/50 kg Rp42,500/Rp52,500 (2026-11-06, source: <a href="https://hargabeton.com/harga-semen/" target="_blank" rel="noopener">HargaBeton, Cement bag prices NOVEMBER 2026 (accessed 6 Nov 2026)</a>).</li>
<li>Semen Padang: 40 kg Rp50,350 and 50 kg Rp61,350 (HargaBeton); List Harga Material Rp50,000 / Rp60,000 (2026-11-06, source: <a href="https://hargabeton.com/harga-semen/" target="_blank" rel="noopener">HargaBeton, Cement bag prices NOVEMBER 2026 (accessed 6 Nov 2026)</a>).</li>
<li>Merah Putih: 40 kg Rp50,350 and 50 kg Rp60,000 (HargaBeton); List Harga Material Rp42,700 / Rp52,700; Conch Jabodetabek distributor Rp43,040 / Rp53,800 (2026-11-06, source: <a href="https://hargabeton.com/harga-semen/" target="_blank" rel="noopener">HargaBeton, Cement bag prices NOVEMBER 2026 (accessed 6 Nov 2026)</a>).</li>
<li>Conch: 50 kg Rp64,000 (HargaBeton); List Harga Material 40/50 kg Rp40,500 / Rp49,500; Conch PCC distributor 40/50 kg Rp38,000 / Rp47,500 (2026-11-06, source: <a href="https://semenconch.net/harga-semen-conch/" target="_blank" rel="noopener">Semen Conch Jabodetabek / Raja Sukses Transindo price list (accessed 6 Nov 2026)</a>).</li>
<li>Public prices can differ by city and shop; always re-check before large orders (2026-11-06, source: <a href="https://listhargamaterial.com/material-bangunan-umum/harga-semen/" target="_blank" rel="noopener">List Harga Material, Cement prices November 2026 (accessed 6 Nov 2026)</a>).</li>
</ul>
<h2>Dynamix cement price November 2026 for 40 kg and 50 kg bags</h2>
<p>Dynamix (the Holcim/Solusi Bangun Indonesia retail brand) is widely used for bricklaying, plaster and light concrete in houses. On HargaBeton’s November 2026 list, a 40 kg bag is Rp52,350 and a 50 kg bag Rp64,500. List Harga Material for the same period shows Dynamix 40 kg at Rp44,500 and Holcim at Rp42,500 (40 kg) / Rp52,500 (50 kg). A Jabodetabek Conch distributor lists Dynamix at Rp59,000 (40 kg) and Rp73,750 (50 kg). The public range we recorded is about <strong>Rp42,500–Rp59,000 (40 kg)</strong> and <strong>Rp52,500–Rp73,750 (50 kg)</strong>.</p>
<h2>Merah Putih and Semen Padang bag prices</h2>
<p>Merah Putih on HargaBeton: Rp50,350 (40 kg) and Rp60,000 (50 kg). List Harga Material is lower: Rp42,700 / Rp52,700. The Jabodetabek distributor: Rp43,040 / Rp53,800. Semen Padang on HargaBeton: Rp50,350 / Rp61,350; List Harga Material Rp50,000 / Rp60,000. For a bill of quantities, use a range and ask for a local quote, because haulage of heavy bags often changes the total.</p>
<h2>Conch cement 40 kg and 50 kg</h2>
<p>Conch (a Chinese producer active in Indonesia) is listed at Rp64,000 for 50 kg on HargaBeton. List Harga Material: Rp40,500 (40 kg) and Rp49,500 (50 kg). The Conch Jabodetabek distributor PCC list: Rp38,000 / Rp47,500 (OPC slightly higher). The wide spread shows how much channel matters: mill/wholesale distributor versus retail building stores.</p>
<h2>Using these figures in a November 2026 estimate</h2>
<ul><li>Record the check date (here 6 November 2026) and source links.</li>
<li>Decide 40 kg or 50 kg bags before comparing brands.</li>
<li>Get volume quotes from 2–3 shops in the project city; delivery often changes the total.</li>
<li>Do not mix HargaBeton retail list prices with distributor prices without labelling the channel.</li></ul>
<p>homeX, an Indonesian building-materials and renovation platform, can help compile cement needs with other materials. The prices above are third-party public prices, not homeX selling prices.</p>
<h2>Dynamix cement price November 2026: related articles and products</h2><ul>
<li><a href="/en/news/40">40 kg cement prices 2026: Tiga Roda, Gresik, SCG</a></li>
<li><a href="/en/news/398">MU mortar prices November 2026</a></li>
<li><a href="/en/news/365">Cement shortage in Bima and Lombok</a></li>
<li><a href="/en/news/389">Indocement Q3 2026 earnings</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much is Dynamix 50 kg in November 2026?</strong> HargaBeton’s November 2026 list shows about Rp64,500 per bag; other sources put Holcim/Dynamix 50 kg in the Rp52,500–Rp73,750 range by channel.</p>
<p><strong>How much is Semen Padang 40 kg?</strong> HargaBeton lists Rp50,350 and List Harga Material Rp50,000 per 40 kg bag (checked 6 November 2026).</p>
<p><strong>How much is Conch cement per bag?</strong> Public range: about Rp38,000–Rp40,500 (40 kg) and Rp47,500–Rp64,000 (50 kg) from the Conch distributor, List Harga Material and HargaBeton.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://hargabeton.com/harga-semen/" target="_blank" rel="noopener">HargaBeton, Cement bag prices NOVEMBER 2026 (accessed 6 Nov 2026)</a>; <a href="https://listhargamaterial.com/material-bangunan-umum/harga-semen/" target="_blank" rel="noopener">List Harga Material, Cement prices November 2026 (accessed 6 Nov 2026)</a>; <a href="https://semenconch.net/harga-semen-conch/" target="_blank" rel="noopener">Semen Conch Jabodetabek / Raja Sukses Transindo price list (accessed 6 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>Domestic Cement Demand Up 7.9% Through September 2026</title><link>https://www.homex.co.id/en/news/404</link><guid isPermaLink="true">https://www.homex.co.id/en/news/404</guid><pubDate>Fri, 06 Nov 2026 09:14:49 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Domestic cement demand September 2026 rose 7.9% YoY (bulk +9.3%, bagged +7.4%); Indocement volume +7.8%, share 29.3%, cash Rp4.7 T.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261106-i-permintaan-semen-domestik-naik-79-2026.jpg" alt="Domestic Cement Demand Up 7.9% Through September 2026"></p><p><strong>Domestic cement demand September 2026</strong> stayed strong: Indocement’s 3 November 2026 press release says national demand rose 7.9% year-on-year through September 2026, with bulk cement +9.3% and bagged cement +7.4%, helped by dry weather that sped up construction. This industry-demand focus differs from Indocement’s profit write-up; what matters for suppliers and projects is that market volumes moved.</p>
<h2>Key Facts</h2><ul>
<li>National domestic cement demand rose 7.9% YoY through September 2026; bulk +9.3%, bagged +7.4% (2026-11-03, source: <a href="https://www.indocement.co.id/id/press-release/siaran-pers-kinerja-indocement-kuartal-3-2026" target="_blank" rel="noopener">Indocement, Q3 2026 performance press release (3 Nov 2026, accessed 6 Nov 2026)</a>).</li>
<li>Dry weather is cited as accelerating construction activity nationwide (2026-11-03, source: <a href="https://www.indocement.co.id/id/press-release/siaran-pers-kinerja-indocement-kuartal-3-2026" target="_blank" rel="noopener">Indocement, Q3 2026 performance press release (3 Nov 2026, accessed 6 Nov 2026)</a>).</li>
<li>Indocement volume grew 7.8% YoY; bulk +12.6%, bagged +5.9%; domestic market share 29.3% (2026-11-03, source: <a href="https://www.indocement.co.id/id/press-release/siaran-pers-kinerja-indocement-kuartal-3-2026" target="_blank" rel="noopener">Indocement, Q3 2026 performance press release (3 Nov 2026, accessed 6 Nov 2026)</a>).</li>
<li>Indocement cash and equivalents stood at Rp4.7 trillion as of 30 September 2026 (2026-11-03, source: <a href="https://www.indocement.co.id/id/press-release/siaran-pers-kinerja-indocement-kuartal-3-2026" target="_blank" rel="noopener">Indocement, Q3 2026 performance press release (3 Nov 2026, accessed 6 Nov 2026)</a>).</li>
<li>Cumulative January–September 2026 consumption reached 48.1 million tonnes (+7.9% YoY), per HargaSemen industry summary (2026-10-31, source: <a href="https://hargasemen.id/konsumsi-semen-domestik-prospek-emiten-2026/" target="_blank" rel="noopener">HargaSemen, cement consumption up 7.9% to September 2026 (31 Oct 2026, accessed 6 Nov 2026)</a>).</li>
</ul>
<h2>Domestic cement demand September 2026: bulk outpaced bagged</h2>
<p>Indocement’s 3 November 2026 press release says growth covered both bulk and bagged cement. Bulk (+9.3%) usually ties to infrastructure, large property and ready-mix; bagged (+7.4%) is closer to building stores, renovation and house construction. Both rose, so demand was not confined to one channel.</p>
<p>Indocement also wrote that dry weather accelerated national construction activity. Pouring and masonry schedules were less often delayed by rain in the first nine months of 2026, so site absorption of cement was faster.</p>
<h2>Market volume and Indocement’s position</h2>
<p>On the producer side, Indocement’s volume grew 7.8% YoY, with bulk +12.6% and bagged +5.9%. Domestic cement market share was 29.3%. The company kept a strong balance sheet with Rp4.7 trillion cash as of 30 September 2026. Same-day Indocement news put total cement and clinker sales at 15.75 million tonnes (+9.0%), including a sharp export rise—but for domestic demand, the industry 7.9% figure remains the main reference.</p>
<p>HargaSemen’s 31 October 2026 summary adds that cumulative January–September consumption reached 48.1 million tonnes, matching the 7.9% growth. Their September monthly figures still show bulk as the main monthly driver.</p>
<ul><li>Bulk grew faster than bagged on a cumulative basis through September.</li>
<li>Dry weather is an operational factor, not only an issuer-finance story.</li>
<li>Large producers’ cash remains ample, though the press release still flags energy-cost pressure.</li></ul>
<h2>What it means for projects and building-material suppliers</h2>
<p>For contractors and stores, rising demand means bulk and bagged supply must be secured so peak-season shortages are avoided. The arrival of the rainy season, which Indocement also notes, may slow construction in coming months—so stock planning and delivery schedules still matter.</p>
<p>homeX, a building-materials platform with warehousing and delivery, can help assemble cement and related material needs for renovation and construction projects using verified industry demand data.</p>
<h2>domestic cement demand September 2026: related articles and products</h2><ul>
<li><a href="/en/news/8">National cement demand up 10.2% in H1 2026</a></li>
<li><a href="/en/news/352">Cement rail freight 1.83 million tonnes through September 2026</a></li>
<li><a href="/en/news/389">Indocement profit performance through September 2026</a></li>
<li><a href="/products/394">PPR pipe for project water installations</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much did domestic cement demand grow through September 2026?</strong> Indocement’s 3 November 2026 press release says domestic demand rose 7.9% YoY; bulk +9.3% and bagged +7.4%.</p>
<p><strong>What was Indocement’s market share in that period?</strong> The press release records Indocement’s domestic cement share at 29.3%, with volume up 7.8% YoY.</p>
<p><strong>What was cumulative cement consumption in January–September 2026?</strong> HargaSemen’s summary cites 48.1 million tonnes, up 7.9% year-on-year.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.indocement.co.id/id/press-release/siaran-pers-kinerja-indocement-kuartal-3-2026" target="_blank" rel="noopener">Indocement, Q3 2026 performance press release (3 Nov 2026, accessed 6 Nov 2026)</a>; <a href="https://www.indocement.co.id/id/news-events/penjualan-indocement-tumbuh-9-persen-laba-tembus-rp1-3-triliun" target="_blank" rel="noopener">Indocement, sales grow 9 percent news (3 Nov 2026, accessed 6 Nov 2026)</a>; <a href="https://hargasemen.id/konsumsi-semen-domestik-prospek-emiten-2026/" target="_blank" rel="noopener">HargaSemen, cement consumption up 7.9% to September 2026 (31 Oct 2026, accessed 6 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>SID Forklift Certification: 70 Operators at Regional Cement Warehouses</title><link>https://www.homex.co.id/en/news/403</link><guid isPermaLink="true">https://www.homex.co.id/en/news/403</guid><pubDate>Fri, 06 Nov 2026 09:14:49 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>SID forklift certification with Indo Safe Academy: 70 operators at regional warehouses in Jakarta–West Java, East Java, Central Java and Bali (24 Sep–Oct 2026).</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261106-i-sid-sertifikasi-forklift-gudang-semen.jpg" alt="SID Forklift Certification: 70 Operators at Regional Cement Warehouses"></p><p><strong>SID forklift certification</strong> (PT Semen Indonesia Distributor) covered 70 operators across four distribution regions—Jakarta–West Java, East Java, Central Java and Bali—from 24 September to October 2026. Announced by SID on 1 October 2026 with PT Indo Safe Academy, the programme treats workplace safety and safe handling in cement warehouses as core operations, in line with building-materials warehousing needs that homeX also runs.</p>
<h2>Key Facts</h2><ul>
<li>70 participants from four SID regions: Malang 25, Central Java 22, Jakarta–West Java 17, Bali 6 (2026-10-01, source: <a href="https://sidistributor.com/berita/pelatihan-dan-sertifikasi-forklift/" target="_blank" rel="noopener">SID (PT Semen Indonesia Distributor), Forklift Operator Training and Certification (1 Oct 2026, accessed 6 Nov 2026)</a>).</li>
<li>Training ran 24 September–October 2026; the final batch was in Central Java (2026-10-01, source: <a href="https://sidistributor.com/berita/pelatihan-dan-sertifikasi-forklift/" target="_blank" rel="noopener">SID (PT Semen Indonesia Distributor), Forklift Operator Training and Certification (1 Oct 2026, accessed 6 Nov 2026)</a>).</li>
<li>Content: theory, written test, forklift driving practice and pre-use equipment checks (2026-10-01, source: <a href="https://sidistributor.com/berita/pelatihan-dan-sertifikasi-forklift/" target="_blank" rel="noopener">SID (PT Semen Indonesia Distributor), Forklift Operator Training and Certification (1 Oct 2026, accessed 6 Nov 2026)</a>).</li>
<li>Regulatory basis: Manpower Minister Regulation No. 8/2020 on OHS for lifting and transport equipment including forklifts (2026-10-01, source: <a href="https://sidistributor.com/berita/pelatihan-dan-sertifikasi-forklift/" target="_blank" rel="noopener">SID (PT Semen Indonesia Distributor), Forklift Operator Training and Certification (1 Oct 2026, accessed 6 Nov 2026)</a>).</li>
<li>Erwin (Indo Safe Academy): certification supports regulation, productivity and lower accident risk (2026-10-01, source: <a href="https://sidistributor.com/berita/pelatihan-dan-sertifikasi-forklift/" target="_blank" rel="noopener">SID (PT Semen Indonesia Distributor), Forklift Operator Training and Certification (1 Oct 2026, accessed 6 Nov 2026)</a>).</li>
</ul>
<h2>SID forklift certification detail at regional warehouses</h2>
<p>According to SID’s official site, K3 licence training and certification for forklift operators was held in four distribution regions. The East Java batch at SID Malang warehouse had 25 participants; Central Java 22; Jakarta–West Java 17; SID Bali warehouse 6. Total: 70 people. The series started on 24 September 2026 and ended in Central Java in October 2026.</p>
<p>Participants received theory, a written test and practical forklift operation, including checking equipment condition before use. SID’s stated goal is understanding workplace safety, operating procedures and spotting damage risks before incidents occur.</p>
<h2>Why forklift K3 matters in cement warehouses</h2>
<p>Cement distribution warehouses move heavy bags, pallets and lifting equipment every day. Forklift errors risk worker injury, damaged bags and disrupted deliveries to stores or projects. SID says certification meets regulatory needs and supports safety and productivity.</p>
<p>Erwin of PT Indo Safe Academy praised rolling out forklift licences across SID’s distribution network for both regulation and productivity. Competent operators support distribution, cut accident risk and limit operational losses.</p>
<ul><li>Manpower Minister Regulation No. 8/2020 covers OHS for lifting and transport equipment, including forklifts.</li>
<li>Pre-operation inspection helps detect damage before equipment is used.</li>
<li>The same standard across four regions keeps handling quality consistent from Java to Bali.</li></ul>
<h2>Implications for building-materials logistics</h2>
<p>For suppliers and platforms that run building-materials warehouses, forklift training is not optional: it is an operating requirement so cement bags, mortar and palletised goods move safely. As a cement distributor, SID shows investment in regional training, not only at one central hub.</p>
<p>That pattern matters when Greater Jakarta warehouse occupancy is high and material supply chains depend on warehouse handling before site delivery. homeX, which operates warehousing and delivery of building materials, treats safe warehouse handling as part of service to project and renovation customers.</p>
<p>homeX, an Indonesian one-stop building-materials platform with showroom, warehousing and delivery, can help plan material supply with orderly warehouse handling.</p>
<h2>SID forklift certification: related articles and products</h2><ul>
<li><a href="/en/news/401">Indonesia Supply Chain 2026: warehousing and material logistics</a></li>
<li><a href="/en/news/388">AZKO 29 distribution centres and material logistics</a></li>
<li><a href="/en/news/184">B2B building materials supply: warehouses and logistics</a></li>
<li><a href="/products/232">A Plus Gypsum for interior finishing</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How many operators joined SID forklift certification?</strong> SID reports 70 participants in four regions: Malang 25, Central Java 22, Jakarta–West Java 17 and Bali 6.</p>
<p><strong>When did SID run the forklift training?</strong> The series ran from 24 September 2026 to October 2026, ending with the Central Java batch.</p>
<p><strong>Which regulation underpins forklift certification?</strong> SID cites Manpower Minister Regulation No. 8 of 2020 on OHS for lifting and transport equipment, including forklifts.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://sidistributor.com/berita/pelatihan-dan-sertifikasi-forklift/" target="_blank" rel="noopener">SID (PT Semen Indonesia Distributor), Forklift Operator Training and Certification (1 Oct 2026, accessed 6 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>Semen Padang Akademi Jago Bangunan: 101 Craftsmen Certified in Bengkulu</title><link>https://www.homex.co.id/en/news/402</link><guid isPermaLink="true">https://www.homex.co.id/en/news/402</guid><pubDate>Fri, 06 Nov 2026 09:14:48 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Semen Padang Akademi Jago Bangunan in South Bengkulu certified 101 craftsmen in Manna (30 Sep 2026) with LSP Astekindo, after Jambi and Kuantan Singingi.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261106-i-akademi-jago-bangunan-semen-padang-bengkulu.jpg" alt="Semen Padang Akademi Jago Bangunan: 101 Craftsmen Certified in Bengkulu"></p><p><strong>Semen Padang Akademi Jago Bangunan</strong> reached South Bengkulu Regency with 101 construction workers taking competency certification at Manna Water Park, Manna, on Wednesday 30 September 2026. ANTARA Sumbar reported the event on 11 October 2026. It strengthens craftsman skills far from major industrial hubs and matters for building-material supply chains and tukang delivery services of the kind homeX uses when materials reach a job site.</p>
<h2>Key Facts</h2><ul>
<li>101 construction workers in South Bengkulu joined Semen Padang Akademi Jago Bangunan at Manna Water Park, Manna (30 Sep 2026) (2026-09-30, source: <a href="https://sumbar.antaranews.com/berita/782348/akademi-jago-bangunan-pt-semen-padang-hadir-di-bengkulu-selatan-101-tukang-ikuti-sertifikasi-kompetensi" target="_blank" rel="noopener">ANTARA Sumbar, Semen Padang Akademi Jago Bangunan in South Bengkulu (11 Oct 2026, accessed 6 Nov 2026)</a>).</li>
<li>Certification covered technical material, field practice and interviews with LSP Astekindo assessors (2026-09-30, source: <a href="https://sumbar.antaranews.com/berita/782348/akademi-jago-bangunan-pt-semen-padang-hadir-di-bengkulu-selatan-101-tukang-ikuti-sertifikasi-kompetensi" target="_blank" rel="noopener">ANTARA Sumbar, Semen Padang Akademi Jago Bangunan in South Bengkulu (11 Oct 2026, accessed 6 Nov 2026)</a>).</li>
<li>Similar events were previously held in Jambi City and Kuantan Singingi Regency (2026-10-11, source: <a href="https://sumbar.antaranews.com/berita/782348/akademi-jago-bangunan-pt-semen-padang-hadir-di-bengkulu-selatan-101-tukang-ikuti-sertifikasi-kompetensi" target="_blank" rel="noopener">ANTARA Sumbar, Semen Padang Akademi Jago Bangunan in South Bengkulu (11 Oct 2026, accessed 6 Nov 2026)</a>).</li>
<li>South Bengkulu Public Works construction services head Dwi Eka Noprayanti praised the programme for local construction HR (2026-10-11, source: <a href="https://sumbar.antaranews.com/berita/782348/akademi-jago-bangunan-pt-semen-padang-hadir-di-bengkulu-selatan-101-tukang-ikuti-sertifikasi-kompetensi" target="_blank" rel="noopener">ANTARA Sumbar, Semen Padang Akademi Jago Bangunan in South Bengkulu (11 Oct 2026, accessed 6 Nov 2026)</a>).</li>
<li>Semen Padang corporate secretary Win Bernadino: building quality depends on materials and the workers who apply them (2026-10-11, source: <a href="https://sumbar.antaranews.com/berita/782348/akademi-jago-bangunan-pt-semen-padang-hadir-di-bengkulu-selatan-101-tukang-ikuti-sertifikasi-kompetensi" target="_blank" rel="noopener">ANTARA Sumbar, Semen Padang Akademi Jago Bangunan in South Bengkulu (11 Oct 2026, accessed 6 Nov 2026)</a>).</li>
</ul>
<h2>What Semen Padang Akademi Jago Bangunan did in Bengkulu</h2>
<p>According to ANTARA Sumbar, Semen Padang Akademi Jago Bangunan in South Bengkulu used the tagline “Jago Bangun Keahlian, Bangga Bangun Indonesia”. Participants received product briefings and a full certification path: technical lessons, field practice, then interviews with assessors from the Astekindo Professional Certification Body (LSP). Assessor Yoka Mahendra called the move strategic for professionalising construction labour in South Bengkulu.</p>
<p>Holding the event in Manna, the regency capital, made it easier for local craftsmen to attend. For contractors and building stores there, certified workers help with plastering, brickwork and light casting that use bagged cement.</p>
<h2>Why craftsman certification matters for material supply</h2>
<p>Win Bernadino, Semen Padang corporate secretary, stressed that craftsmen are the front line of building quality: good materials are not enough if site application is weak. Jambi and Bengkulu area sales manager Ryan Eka Saputra added that “Jago Bangunan” partners need standardised competence.</p>
<p>Participants such as Wijoyo, Riskan and Rangge Anggori said they gained knowledge they can use daily. The local Public Works office said certification supports regional development with better technical standards, safety and workmanship.</p>
<ul><li>Recognised competency standards help local government gauge construction workforce readiness.</li>
<li>Material producers get a direct channel to end users on site.</li>
<li>Small projects and home renovations find it easier to hire workers already tested in practice and interview.</li></ul>
<h2>A regional series: Jambi, Kuantan Singingi, then South Bengkulu</h2>
<p>The South Bengkulu academy follows similar events in Jambi City and Kuantan Singingi Regency. That regional pattern shows a cement maker reaching craftsman bases across central and southern Sumatra, not only big industrial cities. For homeX, which links building materials with craftsman services and delivery, the same logic applies: materials only create value when site labour can install them to specification.</p>
<p>The day also included entertainment and door prizes, but the reported core remained competency certification. Collaboration among producer, local government and an LSP is a useful model for a more professional construction ecosystem.</p>
<p>homeX, an Indonesian building-materials and craftsman-service platform with showroom, warehousing and delivery, can help prepare materials and labour for renovation and small-to-mid-scale construction projects.</p>
<h2>Semen Padang Akademi Jago Bangunan: related articles and products</h2><ul>
<li><a href="/en/news/171">2026 construction worker training: 201 certified with cement makers</a></li>
<li><a href="/en/news/369">Shortage of certified construction workers</a></li>
<li><a href="/en/news/31">Construction worker certification: Public Works targets</a></li>
<li><a href="/products/228">Gypsum mesh for ceiling repairs</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How many craftsmen joined Semen Padang Akademi Jago Bangunan in South Bengkulu?</strong> ANTARA Sumbar reported 101 construction workers at Manna Water Park, Manna, on 30 September 2026.</p>
<p><strong>Who assessed the competency certification?</strong> Participants took field practice and interviews with assessors from LSP Astekindo after technical lessons.</p>
<p><strong>Where else was Akademi Jago Bangunan held before South Bengkulu?</strong> The report says earlier sessions took place in Jambi City and Kuantan Singingi Regency.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://sumbar.antaranews.com/berita/782348/akademi-jago-bangunan-pt-semen-padang-hadir-di-bengkulu-selatan-101-tukang-ikuti-sertifikasi-kompetensi" target="_blank" rel="noopener">ANTARA Sumbar, Semen Padang Akademi Jago Bangunan in South Bengkulu (11 Oct 2026, accessed 6 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>Indonesia Supply Chain 2026 at NICE, 25–27 Nov: Warehousing and Material Logistics</title><link>https://www.homex.co.id/en/news/401</link><guid isPermaLink="true">https://www.homex.co.id/en/news/401</guid><pubDate>Thu, 05 Nov 2026 09:11:11 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Indonesia Supply Chain 2026 runs 25–27 November at NICE PIK 2 with LogiSYM: warehouse automation, AI, fleet visibility and an ODOL session for distributors.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261105-i-indonesia-supply-chain-2026.jpg" alt="Indonesia Supply Chain 2026 at NICE, 25–27 Nov: Warehousing and Material Logistics"></p><p><strong>Indonesia Supply Chain 2026</strong> will take place on 25–27 November 2026 at the Nusantara International Convention & Exhibition (NICE), PIK 2, Jakarta, alongside the LogiSYM Indonesia 2026 symposium. For building materials distributors and stores the event matters because it covers warehouse automation, supply chain data systems, fleet visibility and the ODOL rules, four factors that directly shape the cost of moving cement, tiles, steel and paint.</p>
<h2>Key Facts</h2><ul>
<li>Indonesia Supply Chain 2026: 25–27 November 2026 at NICE PIK 2 Jakarta, powered by CeMAT and LogiSYM (2026-11-05, source: <a href="https://www.indosupplychain.com/" target="_blank" rel="noopener">Indonesia Supply Chain 2026, official organiser website (accessed 5 Nov 2026)</a>).</li>
<li>Organisers: Deutsche Messe (Hannover Messe, CeMAT), with LogiSYM and Debindo (2026-11-05, source: <a href="https://www.indosupplychain.com/" target="_blank" rel="noopener">Indonesia Supply Chain 2026, official organiser website (accessed 5 Nov 2026)</a>).</li>
<li>The LogiSYM agenda for 26 November includes sessions on Over-Dimension and Over-Load (ODOL) implementation and AI in Supply Chain (2026-11-05, source: <a href="https://logisym.org/events/logisym-indonesia-2026/" target="_blank" rel="noopener">LogiSYM Indonesia 2026, official event page and agenda (accessed 5 Nov 2026)</a>).</li>
<li>The Head of SCM, Logistics & National Distribution of PT Propan Raya is listed as a speaker (2026-11-05, source: <a href="https://logisym.org/events/logisym-indonesia-2026/" target="_blank" rel="noopener">LogiSYM Indonesia 2026, official event page and agenda (accessed 5 Nov 2026)</a>).</li>
<li>Dow launched the Dow Master Connect platform in Indonesia on 1 September 2026 for ordering and tracking construction materials (2026-09-01, source: <a href="https://www.medcom.id/ekonomi/ekonomi-digital/PNg1rmPk-digitalisasi-rantai-pasok-konstruksi-dorong-efisiensi-bisnis-b2b-di-indonesia" target="_blank" rel="noopener">Medcom.id, construction supply chain digitalisation and B2B efficiency in Indonesia, 1 Sep 2026</a>).</li>
</ul>
<h2>What Indonesia Supply Chain 2026 is</h2>
<p>According to its official website, Indonesia Supply Chain is a new exhibition and leadership platform for end-to-end logistics, industrial supply chains and intralogistics technology. It is backed by Deutsche Messe, organiser of Hannover Messe and the CeMAT series, and co-produced with LogiSYM and Debindo. The venue is NICE in PIK 2, Jakarta, from 25 to 27 November 2026.</p>
<p>The exhibition profile covers transport and freight, warehousing and material handling (storage systems, automation, robotics), supply chain technology (software, IoT, AI, data analytics), manufacturing support such as inventory management, and last-mile and e-commerce logistics.</p>
<h2>LogiSYM sessions relevant to building materials</h2>
<p>The LogiSYM Indonesia 2026 symposium runs at the same venue. Several sessions on the official agenda are close to the daily problems of material distributors:</p>
<ul><li><strong>Real-time fleet visibility</strong> (25 November): truck tracking for efficiency and sustainability.</li>
<li><strong>AI in Supply Chain</strong> (26 November).</li>
<li><strong>RO-RO and short sea shipping</strong> (26 November): important for inter-island material shipments.</li>
<li><strong>ODOL implementation</strong> (26 November), with speakers including the General Chairman of the Indonesian Trucking Association (APTRINDO) and the Managing Director of PT Depot Hub Indonesia.</li></ul>
<p>The speaker list also includes the Head of SCM, Logistics & National Distribution of PT Propan Raya, a paint maker, so a building materials manufacturer's view is represented.</p>
<h2>Why warehousing and data matter for material supply chains</h2>
<p>Building materials are heavy and bulky, unit margins are thin, and project orders often come at short notice. Warehouse cost, truck loads and stock accuracy therefore weigh heavily on the final price. The ODOL rules limit overloading, which changes the number of trips and route planning.</p>
<p>Digitalisation is also reaching the upstream side. Medcom.id reported that Dow launched Dow Master Connect in Indonesia on 1 September 2026, a platform to browse the catalogue, place orders, track shipments in real time and check stock of construction materials and sealants.</p>
<h2>What distributors and contractors can take away</h2>
<ul><li><strong>Warehouse management systems (WMS)</strong>: rack locations, stock by batch and recorded picking.</li>
<li><strong>Fleet tracking</strong>: arrival estimates that can be shared with project customers.</li>
<li><strong>ODOL-compliant load planning</strong>: combining cement, tiles and steel on one truck without overloading.</li>
<li><strong>Clean product data</strong>: code, weight and dimensions per SKU so digital orders are correct.</li></ul>
<p>Visitors should check the latest agenda on the official website, as session times can change. homeX, an Indonesian one-stop building materials and furniture platform with a showroom, warehousing and delivery, follows these developments to speed up material delivery to projects.</p>
<h2>Indonesia Supply Chain 2026: related articles and products</h2><ul>
<li><a href="/en/news/388">29 AZKO distribution centres and material logistics</a></li>
<li><a href="/en/news/332">Greater Jakarta warehouse rents in Q3 2026</a></li>
<li><a href="/en/news/184">B2B building materials supply model: warehousing and ODOL</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>When and where is Indonesia Supply Chain 2026?</strong> On 25–27 November 2026 at the Nusantara International Convention & Exhibition (NICE), PIK 2, Jakarta.</p>
<p><strong>Is there an ODOL session at LogiSYM Indonesia 2026?</strong> Yes. The official agenda lists an Over-Dimension and Over-Load (ODOL) implementation session on 26 November 2026.</p>
<p><strong>Who organises Indonesia Supply Chain 2026?</strong> It is backed by Deutsche Messe, organiser of Hannover Messe and CeMAT, and co-produced with LogiSYM and Debindo.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.indosupplychain.com/" target="_blank" rel="noopener">Indonesia Supply Chain 2026, official organiser website (accessed 5 Nov 2026)</a>; <a href="https://logisym.org/events/logisym-indonesia-2026/" target="_blank" rel="noopener">LogiSYM Indonesia 2026, official event page and agenda (accessed 5 Nov 2026)</a>; <a href="https://www.medcom.id/ekonomi/ekonomi-digital/PNg1rmPk-digitalisasi-rantai-pasok-konstruksi-dorong-efisiensi-bisnis-b2b-di-indonesia" target="_blank" rel="noopener">Medcom.id, construction supply chain digitalisation and B2B efficiency in Indonesia, 1 Sep 2026</a></em></p>]]></content:encoded></item><item><title>Ambarawa–Bawen Toll Road Targeted to Open in November 2026: Logistics Impact</title><link>https://www.homex.co.id/en/news/400</link><guid isPermaLink="true">https://www.homex.co.id/en/news/400</guid><pubDate>Thu, 05 Nov 2026 09:09:46 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>The Ambarawa–Bawen toll road, the 5.2 km Section 6 of the Yogyakarta–Bawen toll, is targeted to open in November 2026. Impact on Central Java deliveries.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261105-i-tol-ambarawa-bawen-november.jpg" alt="Ambarawa–Bawen Toll Road Targeted to Open in November 2026: Logistics Impact"></p><p>The <strong>Ambarawa–Bawen toll road</strong>, the 5.2 km Section 6 of the Yogyakarta–Bawen toll road, is targeted by Jasa Marga to open in November 2026 after its operational feasibility test (ULFO). This short link matters because it connects the Trans-Java toll road at Bawen towards Magelang and Yogyakarta, and could ease the Simpang Bawen bottleneck also used by material trucks.</p>
<h2>Key Facts</h2><ul>
<li>Section 6 Ambarawa–Bawen, 5.2 km, is in ULFO and expected to open in November 2026, said Jasa Marga CEO Rivan A. Purwantono (2026-09-09, source: <a href="https://www.antaranews.com/berita/5732915/jasa-marga-tol-yogya-bawen-seksi-6-akan-beroperasi-november-tahun-ini" target="_blank" rel="noopener">ANTARA, 9 Sep 2026</a>).</li>
<li>The Yogyakarta–Bawen toll road totals 75.12 km in 6 sections (2026-09-09, source: <a href="https://www.antaranews.com/berita/5732915/jasa-marga-tol-yogya-bawen-seksi-6-akan-beroperasi-november-tahun-ini" target="_blank" rel="noopener">ANTARA, 9 Sep 2026</a>).</li>
<li>Jasa Marga aims to open 62 km of new toll road, including Probolinggo–Banyuwangi and Yogya–Solo–Yogya–Bawen, from end-2026 to early 2027 (2026-09-09, source: <a href="https://www.merdeka.com/uang/read/8288199/tol-yogyakarta-bawen-seksi-6-ambarawa-bawen-beroperasi-november-2026" target="_blank" rel="noopener">Merdeka.com, 9 Sep 2026</a>).</li>
<li>During the Lebaran functional opening on 13–30 March 2026, the roughly 4.98 km stretch was open to Class I vehicles only; buses and trucks were barred (2026-03-10, source: <a href="https://jatengprov.go.id/publik/urai-lalin-simpang-bawen-ruas-tol-bawen-ambarawa-mulai-difungsikan-13-maret/" target="_blank" rel="noopener">Central Java Provincial Government, 10 Mar 2026</a>).</li>
</ul>
<h2>Current status of the Ambarawa–Bawen toll road</h2>
<p>At an online press conference on 9 September 2026, Jasa Marga CEO Rivan A. Purwantono said Section 6 Ambarawa–Bawen had entered its operational feasibility test and was expected to open in November 2026. The section had already been used functionally during the 2026 Lebaran travel period.</p>
<p>According to the Central Java provincial government, during the functional period of 13–30 March 2026 the roughly 4.98 km stretch from the Bawen exit to the Ambarawa exit opened one way at a time, 06:00–17:00 WIB, free of charge and for Class I vehicles only. Buses and trucks in Class II and above were not allowed. Full operation is different: once officially open, vehicle classes and tariffs follow the government decision, which should be checked when it is announced.</p>
<h2>The Yogyakarta–Bawen toll road at a glance</h2>
<p>The 75.12 km Yogyakarta–Bawen toll road has six sections:</p>
<ul><li>Section 1 Sleman–Banyurejo 8.8 km</li>
<li>Section 2 Banyurejo–Borobudur 15.20 km</li>
<li>Section 3 Borobudur–Magelang 8.10 km</li>
<li>Section 4 Magelang–Temanggung 16.65 km</li>
<li>Section 5 Temanggung–Ambarawa 21.39 km</li>
<li>Section 6 Ambarawa–Bawen 5.2 km</li></ul>
<p>Jasa Marga also targets about 62 km of new toll roads opening from end-2026 to early 2027, including parts of the Probolinggo–Banyuwangi and Yogya–Solo–Yogya–Bawen toll roads that were previously used on a limited basis. Public Works Minister Dody Hanggodo said toll roads are expected to cut travel time and lower logistics costs.</p>
<h2>What it means for building material deliveries</h2>
<p>Simpang Bawen is where traffic from Semarang and Solo meets on the way to Ambarawa, Magelang and Yogyakarta, and the provincial government notes it is often congested. If the toll section opens fully to all vehicle classes, trucks carrying cement, steel and tiles from factories and warehouses in the Semarang corridor could bypass this bottleneck. The full benefit, however, will come only when the other sections towards Magelang and Yogyakarta also open.</p>
<ul><li><strong>Contractors in Magelang–Ambarawa</strong>: watch for the official opening and permitted vehicle classes before changing fleet routes.</li>
<li><strong>Building material shops</strong>: weigh toll costs against travel time when setting delivery fees.</li>
<li><strong>Project owners</strong>: delivery schedules may become more reliable if Simpang Bawen congestion eases.</li></ul>
<p>homeX, a one-stop building materials and furniture platform with warehousing and delivery, tracks toll network changes like this to plan material distribution routes.</p>
<h2>Ambarawa–Bawen toll road: related articles and products</h2><ul>
<li><a href="/en/news/336">Jabodetabek toll tariff integration and material delivery costs</a></li>
<li><a href="/en/news/352">Cement rail freight in 2026</a></li>
<li><a href="/en/news/388">AZKO distribution centres and material logistics</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>When will the Ambarawa–Bawen toll road open?</strong> Jasa Marga targets November 2026, after the section entered its operational feasibility test.</p>
<p><strong>How long is the Ambarawa–Bawen toll road?</strong> Section 6 is listed at 5.2 km; the Central Java government describes the functional stretch as about 4.98 km from the Bawen exit to the Ambarawa exit.</p>
<p><strong>Could trucks use it during the 2026 Lebaran opening?</strong> No. Only Class I vehicles were allowed; buses and trucks in Class II and above were barred.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.antaranews.com/berita/5732915/jasa-marga-tol-yogya-bawen-seksi-6-akan-beroperasi-november-tahun-ini" target="_blank" rel="noopener">ANTARA, 9 Sep 2026</a>; <a href="https://www.merdeka.com/uang/read/8288199/tol-yogyakarta-bawen-seksi-6-ambarawa-bawen-beroperasi-november-2026" target="_blank" rel="noopener">Merdeka.com, 9 Sep 2026</a>; <a href="https://jatengprov.go.id/publik/urai-lalin-simpang-bawen-ruas-tol-bawen-ambarawa-mulai-difungsikan-13-maret/" target="_blank" rel="noopener">Central Java Provincial Government, 10 Mar 2026</a></em></p>]]></content:encoded></item><item><title>BPJS Jakon for Renovation Workers: Rp240,000 Contribution on a Rp100 Million Contract</title><link>https://www.homex.co.id/en/news/399</link><guid isPermaLink="true">https://www.homex.co.id/en/news/399</guid><pubDate>Thu, 05 Nov 2026 09:09:46 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>BPJS Jakon covers renovation workers with JKK and JKM. Official example: a Rp100 million contract pays Rp240,000. Here is how to register a project on e-Jakon.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261105-i-bpjs-jakon-tukang-renovasi.jpg" alt="BPJS Jakon for Renovation Workers: Rp240,000 Contribution on a Rp100 Million Contract"></p><p><strong>BPJS Jakon</strong> is the BPJS Ketenagakerjaan programme for construction services workers, including carpenters, labourers and foremen. The project is registered by the service provider, cover consists of JKK and JKM, and in BPJS's official example a Rp100 million contract pays only Rp240,000. For home renovation, it is a cheap way to keep the cost of a worker's accident from falling on the homeowner.</p>
<h2>Key Facts</h2><ul>
<li>BPJS example: Rp100 million contract, JKK 0.21% and JKM 0.03%, total Rp240,000 (2025-12-02, source: <a href="https://www.bpjsketenagakerjaan.go.id/artikel/18904/artikel-perlindungan-untuk-pekerja-jasa-konstruksi-(jakon).bpjs" target="_blank" rel="noopener">BPJS Ketenagakerjaan, Protection for Construction Services Workers (Jakon), 2 Dec 2025</a>).</li>
<li>JKK benefits: unlimited treatment per medical need, death benefit 48x wage, permanent total disability 56x wage (2025-12-02, source: <a href="https://www.bpjsketenagakerjaan.go.id/artikel/18904/artikel-perlindungan-untuk-pekerja-jasa-konstruksi-(jakon).bpjs" target="_blank" rel="noopener">BPJS Ketenagakerjaan, Protection for Construction Services Workers (Jakon), 2 Dec 2025</a>).</li>
<li>Individuals can register with a letter from the relevant agency and/or a cost estimate (RAB) (2025-12-02, source: <a href="https://www.bpjsketenagakerjaan.go.id/artikel/18904/artikel-perlindungan-untuk-pekerja-jasa-konstruksi-(jakon).bpjs" target="_blank" rel="noopener">BPJS Ketenagakerjaan, Protection for Construction Services Workers (Jakon), 2 Dec 2025</a>).</li>
<li>Membership certificate within 7 days after paying at a branch; via e-Jakon a digital certificate can be printed straight away (2025-12-02, source: <a href="https://www.bpjsketenagakerjaan.go.id/artikel/18904/artikel-perlindungan-untuk-pekerja-jasa-konstruksi-(jakon).bpjs" target="_blank" rel="noopener">BPJS Ketenagakerjaan, Protection for Construction Services Workers (Jakon), 2 Dec 2025</a>).</li>
</ul>
<h2>Who BPJS Jakon covers</h2>
<p>Referring to Law No. 2 of 2017, BPJS Ketenagakerjaan defines construction services workers across consulting, execution and supervision. Execution includes electrical technicians, carpenters, construction labourers, foremen and site managers. In other words, a team renovating a house, shophouse or office falls into this category as long as the project is registered.</p>
<h2>Two benefits: JKK and JKM</h2>
<ul><li><strong>Work Accident Insurance (JKK)</strong>: treatment and compensation if a worker has an accident or work-related illness, including unlimited treatment according to medical need, homecare, a death benefit of 48 times wage and 56 times wage for permanent total disability.</li>
<li><strong>Death Insurance (JKM)</strong>: payments to heirs if the member dies from causes other than work accidents, including a death benefit, funeral costs and periodic payments for 24 months.</li></ul>
<h2>How much it costs</h2>
<p>BPJS Ketenagakerjaan gives an example based on contract value: for a Rp100 million contract, JKK is 0.21% or Rp210,000 and JKM 0.03% or Rp30,000, a total of Rp240,000 for all project workers. Contributions can also be calculated from worker wage data if the provider prefers. Compared with the risk of a fall from scaffolding or an electric shock, the amount is small.</p>
<h2>How to register a renovation project</h2>
<ol><li>Prepare documents: the contract or work order (SPK); for individuals, a letter from the relevant agency and/or the cost estimate (RAB).</li>
<li>Prepare the number of workers, types of work and unit wage rates (if using contract value), or worker and wage data.</li>
<li>Register at a branch office (take the dedicated Jakon queue) or on the e-Jakon site: create an account, activate by email and fill in project data.</li>
<li>Pay with the payment code you receive, then download or collect the membership certificate.</li></ol>
<h2>Tips for homeowners and small contractors</h2>
<ul><li>Ask the contractor whether the project is registered with BPJS Jakon and request a copy of the certificate.</li>
<li>Put the contribution into the cost estimate from the start so it is not skipped.</li>
<li>Register before work begins, not after an incident.</li>
<li>Also provide basic safety gear such as helmets, harnesses and work boots.</li></ul>
<p>homeX, a one-stop building materials and furniture platform with a showroom, warehousing and delivery, supports well-organised renovation projects, from material supply to coordination with workers on site.</p>
<h2>BPJS Jakon: related articles and products</h2><ul>
<li><a href="/en/news/369">Shortage of certified construction workers</a></li>
<li><a href="/en/news/377">Jakarta home renovation programme worker needs</a></li>
<li><a href="/en/news/353">Home renovation worker pay per unit</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>Can an individual home renovation be registered with BPJS Jakon?</strong> Yes. For individuals, the contract can be replaced by a letter from the relevant agency and/or the cost estimate.</p>
<p><strong>What is the BPJS Jakon contribution for a Rp100 million contract?</strong> In the BPJS Ketenagakerjaan example: JKK Rp210,000 and JKM Rp30,000, total Rp240,000.</p>
<p><strong>What does a worker get after a work accident?</strong> Unlimited treatment per medical need, a death benefit of 48 times wage and 56 times wage for permanent total disability.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.bpjsketenagakerjaan.go.id/artikel/18904/artikel-perlindungan-untuk-pekerja-jasa-konstruksi-(jakon).bpjs" target="_blank" rel="noopener">BPJS Ketenagakerjaan, Protection for Construction Services Workers (Jakon), 2 Dec 2025</a>; <a href="https://ejakon.bpjsketenagakerjaan.go.id/" target="_blank" rel="noopener">BPJS Ketenagakerjaan e-Jakon portal</a></em></p>]]></content:encoded></item><item><title>MU Mortar Price November 2026: MU-380, MU-301, MU-200 and MU-400</title><link>https://www.homex.co.id/en/news/398</link><guid isPermaLink="true">https://www.homex.co.id/en/news/398</guid><pubDate>Thu, 05 Nov 2026 09:09:22 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>MU mortar price November 2026 at Depo Bangunan: MU-380 40 kg Rp125,594–168,900, MU-301 Rp96,800–110,100, plus MU-200 20 kg and MU-400 25 kg.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261105-i-harga-mortar-utama-mu.jpg" alt="MU Mortar Price November 2026: MU-380, MU-301, MU-200 and MU-400"></p><p>The <strong>MU mortar price</strong> (Mortar Utama) on the Depo Bangunan website on 5 November 2026 ranged from Rp65,603 to Rp198,250 per bag, depending on the product and whether a special price applied. MU-380 lightweight block adhesive in 40 kg was listed at Rp168,900 regular and Rp125,594 special. These prices apply to Greater Jakarta stores and may differ elsewhere.</p>
<h2>Key Facts</h2><ul>
<li>MU-380 lightweight block adhesive 40 kg: regular Rp168,900, special Rp125,594 (2026-11-05, source: <a href="https://www.depobangunan.co.id/mu-semen-perekat-bata-ringan-mu-380-40kg.html" target="_blank" rel="noopener">Depo Bangunan, MU-380 40 kg product page (accessed 5 Nov 2026)</a>).</li>
<li>MU-301 plaster mortar 40 kg: regular Rp110,100, special Rp96,800 (2026-11-05, source: <a href="https://www.depobangunan.co.id/mu-adukan-plester-mu-301-40kg.html" target="_blank" rel="noopener">Depo Bangunan, MU-301 40 kg product page (accessed 5 Nov 2026)</a>).</li>
<li>MU-200 wall skim filler 20 kg: regular Rp90,900, special Rp65,603 (2026-11-05, source: <a href="https://www.depobangunan.co.id/mu-plamir-dinding-mu-200-20kg.html" target="_blank" rel="noopener">Depo Bangunan, MU-200 20 kg product page (accessed 5 Nov 2026)</a>).</li>
<li>MU-400 GranitFix granite tile adhesive 25 kg grey: regular Rp198,250, special Rp137,506 (2026-11-05, source: <a href="https://www.depobangunan.co.id/mu-400-granitfix-perekat-granite-tile-25kg-grey.html" target="_blank" rel="noopener">Depo Bangunan, MU-400 GranitFix 25 kg product page (accessed 5 Nov 2026)</a>).</li>
<li>Depo Bangunan prices apply to its Jakarta, Bogor, Depok, Tangerang and Bekasi stores (2026-11-05, source: <a href="https://www.depobangunan.co.id/mu-semen-perekat-bata-ringan-mu-380-40kg.html" target="_blank" rel="noopener">Depo Bangunan, MU-380 40 kg product page (accessed 5 Nov 2026)</a>).</li>
</ul>
<h2>MU mortar price list November 2026 at Depo Bangunan</h2>
<p>We checked Depo Bangunan's official product pages on 5 November 2026. Each product shows two figures: a regular price and a special (promotional) price. The ranges below use both:</p>
<ul><li><strong>MU-380</strong> lightweight block adhesive, 40 kg: Rp125,594–Rp168,900.</li>
<li><strong>MU-301</strong> plaster mortar, 40 kg: Rp96,800–Rp110,100.</li>
<li><strong>MU-200</strong> wall skim filler, 20 kg: Rp65,603–Rp90,900.</li>
<li><strong>MU-400 GranitFix</strong> granite tile adhesive, 25 kg grey: Rp137,506–Rp198,250.</li>
<li><strong>MU-408PB-41</strong> tile grout in Granite Grey: Rp24,000–Rp32,800 per pack.</li></ul>
<p>The gap between regular and special prices is large: Rp43,306 per bag for MU-380 and Rp60,744 for MU-400. Special prices are usually time-limited and page stock can be low, so check again before buying in volume.</p>
<h2>What each MU product does in wall and floor work</h2>
<ul><li><strong>MU-380</strong> is an adhesive for laying lightweight concrete blocks (hebel). It is applied as a thin bed, unlike a normal cement-sand mix.</li>
<li><strong>MU-301</strong> is a ready-mix plaster for rendering walls before skimming.</li>
<li><strong>MU-200</strong> is a wall skim filler to smooth surfaces before painting.</li>
<li><strong>MU-400 GranitFix</strong> is an adhesive for granite tiles, whose low water absorption makes them a poor match for ordinary cement mortar.</li>
<li><strong>MU-408PB</strong> is a cement grout for joints between ceramic or granite tiles.</li></ul>
<h2>How to compare MU mortar prices with other stores</h2>
<p>MU products are also sold through the Mortar Utama Official Shop on Shopee and in building stores in many cities. When comparing, watch these points:</p>
<ul><li><strong>Pack weight.</strong> MU-380 and MU-301 come in 40 kg, MU-200 in 20 kg and MU-400 in 25 kg. Compare bags of the same weight.</li>
<li><strong>Price region.</strong> Depo Bangunan states its page prices apply to stores in Jakarta, Bogor, Depok, Tangerang and Bekasi.</li>
<li><strong>Delivery cost.</strong> Mortar comes in heavy bags. For small online orders, shipping can change the final price significantly.</li>
<li><strong>Usage per m².</strong> Work out the number of bags from the wall or floor area and the planned layer thickness, then add a margin for waste.</li></ul>
<h2>Notes for a renovation budget</h2>
<p>For lightweight block walls, material cost usually covers adhesive (MU-380), plaster (MU-301), skim coat and filler (MU-200) before paint. For granite floors, a dedicated adhesive such as MU-400 and grout should be budgeted separately from the tile price per box. Record the date of the price check in your budget, because special prices can change at any time.</p>
<p>homeX, an Indonesian one-stop building materials and furniture platform with a showroom, warehousing and delivery, can help estimate dry-mix mortar quantities for your project.</p>
<h2>MU mortar price: related articles and products</h2><ul>
<li><a href="/en/news/50">Dry-mix mortar prices: MU, SCG, AM, Demix</a></li>
<li><a href="/en/news/75">Dry-mix mortar and waterproofing factories in Indonesia</a></li>
<li><a href="/en/news/53">Wall putty and filler prices</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much is MU-380 40 kg in November 2026?</strong> At Depo Bangunan on 5 November 2026, MU-380 40 kg was Rp168,900 regular and Rp125,594 special.</p>
<p><strong>What is the difference between MU-380 and MU-301?</strong> MU-380 is an adhesive for laying lightweight blocks, while MU-301 is a plaster mortar for rendering walls. Both come in 40 kg bags.</p>
<p><strong>Which MU adhesive is for granite tiles?</strong> MU-400 GranitFix 25 kg, priced Rp137,506–Rp198,250 at Depo Bangunan on 5 November 2026.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.depobangunan.co.id/mu-semen-perekat-bata-ringan-mu-380-40kg.html" target="_blank" rel="noopener">Depo Bangunan, MU-380 40 kg product page (accessed 5 Nov 2026)</a>; <a href="https://www.depobangunan.co.id/mu-adukan-plester-mu-301-40kg.html" target="_blank" rel="noopener">Depo Bangunan, MU-301 40 kg product page (accessed 5 Nov 2026)</a>; <a href="https://www.depobangunan.co.id/mu-plamir-dinding-mu-200-20kg.html" target="_blank" rel="noopener">Depo Bangunan, MU-200 20 kg product page (accessed 5 Nov 2026)</a>; <a href="https://www.depobangunan.co.id/mu-400-granitfix-perekat-granite-tile-25kg-grey.html" target="_blank" rel="noopener">Depo Bangunan, MU-400 GranitFix 25 kg product page (accessed 5 Nov 2026)</a>; <a href="https://www.depobangunan.co.id/mu-408pb-41-granite-grey-tile-grout.html" target="_blank" rel="noopener">Depo Bangunan, MU-408PB-41 product page (accessed 5 Nov 2026)</a>; <a href="https://shopee.co.id/muofficial" target="_blank" rel="noopener">Mortar Utama Official Shop on Shopee (accessed 5 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>Rucika Pipe Price November 2026: 5.8 m Lengths and 5&quot;–12&quot; Sizes</title><link>https://www.homex.co.id/en/news/397</link><guid isPermaLink="true">https://www.homex.co.id/en/news/397</guid><pubDate>Thu, 05 Nov 2026 09:09:22 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Rucika pipe price November 2026 from the official list: Standard AW 4 m from Rp28,200, 5.8 m lengths from Rp41,700 and 12&quot; up to Rp4,738,200, incl. 11% VAT.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261105-i-harga-pipa-rucika-november.jpg" alt="Rucika Pipe Price November 2026: 5.8 m Lengths and 5&quot;–12&quot; Sizes"></p><p>The <strong>Rucika pipe price November 2026</strong> on Rucika's official list (prices as of 1 November 2026, including 11% VAT) ranges from Rp28,200 for a 1/2" Standard AW pipe in 4 m length to Rp6,197,300 for a 12" JIS VP pipe in 5.8 m length. For 1/2"–4" in 4 m length the figures match the 1 October 2026 list, so there is no increase this month. This article focuses on data that is rarely covered: 5.8 m lengths and large 5"–12" diameters.</p>
<h2>Key Facts</h2><ul>
<li>Standard AW 4 m: 1/2" Rp28,200, 4" Rp388,900, 12" Rp3,159,000; incl. 11% VAT (2026-11-01, source: <a href="https://www.rucika.co.id/harga-pipa-pvc/" target="_blank" rel="noopener">Rucika, PVC Pipe Price and Size List November 2026 (prices as of 1 Nov 2026, accessed 5 Nov 2026)</a>).</li>
<li>Standard AW 5.8 m: 1/2" Rp41,700, 4" Rp582,800, 12" Rp4,738,200 (2026-11-01, source: <a href="https://www.rucika.co.id/harga-pipa-pvc/" target="_blank" rel="noopener">Rucika, PVC Pipe Price and Size List November 2026 (prices as of 1 Nov 2026, accessed 5 Nov 2026)</a>).</li>
<li>Standard D 4 m (drainage): 4" Rp199,900, 6" Rp405,600, 8" Rp713,000 (2026-11-01, source: <a href="https://www.rucika.co.id/harga-pipa-pvc/" target="_blank" rel="noopener">Rucika, PVC Pipe Price and Size List November 2026 (prices as of 1 Nov 2026, accessed 5 Nov 2026)</a>).</li>
<li>JIS VP 4 m: 1/2" Rp51,000 up to 12" Rp4,274,400; JIS VU 4" Rp355,300 (2026-11-01, source: <a href="https://www.rucika.co.id/harga-pipa-pvc/" target="_blank" rel="noopener">Rucika, PVC Pipe Price and Size List November 2026 (prices as of 1 Nov 2026, accessed 5 Nov 2026)</a>).</li>
<li>The official price list can be downloaded from the Downloads menu of the Rucika website (2026-11-05, source: <a href="https://www.rucika.co.id/faq/" target="_blank" rel="noopener">Rucika, FAQ: product information and price list downloads (accessed 5 Nov 2026)</a>).</li>
</ul>
<h2>Rucika pipe price November 2026 for 5.8 m lengths</h2>
<p>Rucika sells PVC pipe in two lengths: 4 m and 5.8 m. The 5.8 m length suits long runs such as main lines in warehouses, shophouses or yard drainage, because it needs fewer joints. These are the list prices for Standard AW (pressurised clean water) and D (drainage) in 5.8 m length:</p>
<ul><li>1/2" AW Rp41,700; 3/4" Rp57,200; 1" Rp77,900.</li>
<li>2" AW Rp171,100, D Rp106,100.</li>
<li>3" AW Rp351,800, D Rp190,200.</li>
<li>4" AW Rp582,800, D Rp299,400.</li>
<li>6" AW Rp1,295,400, D Rp607,800.</li>
<li>12" AW Rp4,738,200, D Rp2,472,300.</li></ul>
<p>Roughly, a 5.8 m length costs about 1.5 times a 4 m length, in line with the extra pipe. The price per metre is therefore almost the same; the benefit is fewer joints and less solvent cement.</p>
<h2>Large sizes 5"–12": AW, D and JIS</h2>
<p>Building main lines, estate drainage and project water networks often need 5" and above. List prices for 4 m lengths:</p>
<ul><li>Standard AW: 5" Rp615,900, 6" Rp863,700, 8" Rp1,449,000, 10" Rp2,240,400, 12" Rp3,159,000.</li>
<li>Standard D: 5" Rp307,600, 6" Rp405,600, 8" Rp713,000, 10" Rp1,174,400, 12" Rp1,648,200.</li>
<li>JIS VP: 6" Rp1,307,700, 8" Rp1,977,800, 12" Rp4,274,400.</li>
<li>JIS VU: 6" Rp768,900, 8" Rp1,282,700, 12" Rp2,666,900.</li></ul>
<p>The gap between AW and D widens at large sizes. At 12", D pipe costs about half of AW. Confirm the purpose of each line before ordering: D pipe is not for pressurised water. Rucika states that AW/VP pipe has a maximum pressure rating of 10 kg/cm².</p>
<h2>How to use this price list in a bill of quantities</h2>
<ul><li><strong>List prices already include 11% VAT.</strong> Do not add VAT again in your estimate.</li>
<li><strong>Store prices can differ.</strong> Distributors and building stores often discount from the list, and delivery of long pipes is charged separately.</li>
<li><strong>5.8 m lengths need a suitable vehicle.</strong> Pipes this long are hard to carry on a small pickup, so ask how they will be delivered.</li>
<li><strong>A dash (–) means not available.</strong> For example, class D is not offered in 1/2"–1", and JIS VU 10"–12" is not listed in 5.8 m length.</li></ul>
<h2>What changed since October</h2>
<p>For the common 1/2"–4" sizes in 4 m length, the November figures equal the 1 October 2026 list we covered earlier; for example, 4" AW stays at Rp388,900. For contractors, last month's estimates for Rucika pipe can still be used, as long as store prices are checked again. The latest list can always be downloaded from the Downloads menu of the official Rucika website.</p>
<p>homeX, an Indonesian one-stop building materials and furniture platform with a showroom, warehousing and delivery, can help put together pipe and fitting lists for your project.</p>
<h2>Rucika pipe price November 2026: related articles and products</h2><ul>
<li><a href="/en/news/60">Rucika PVC pipe price AW, D and JIS 1/2&quot;–4&quot;</a></li>
<li><a href="/en/news/89">Rucika Kelen Green PPR pipe price</a></li>
<li><a href="/en/news/188">Pralon pipe and fitting price</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much is a 4 inch Rucika pipe in 5.8 m length?</strong> On the 1 November 2026 list, 4" AW in 5.8 m is Rp582,800 and 4" D is Rp299,400, including 11% VAT.</p>
<p><strong>Did Rucika pipe prices rise in November 2026?</strong> For 1/2"–4" in 4 m length the figures equal the 1 October 2026 list; for example, 1/2" AW stays at Rp28,200.</p>
<p><strong>How much is a 12 inch Rucika pipe?</strong> In 4 m length: AW Rp3,159,000, D Rp1,648,200, JIS VP Rp4,274,400 and JIS VU Rp2,666,900.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.rucika.co.id/harga-pipa-pvc/" target="_blank" rel="noopener">Rucika, PVC Pipe Price and Size List November 2026 (prices as of 1 Nov 2026, accessed 5 Nov 2026)</a>; <a href="https://www.rucika.co.id/faq/" target="_blank" rel="noopener">Rucika, FAQ: product information and price list downloads (accessed 5 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>Indonesia Uses 18 Million Tonnes of Steel: Krakatau Posco Still Imports Iron Ore</title><link>https://www.homex.co.id/en/news/396</link><guid isPermaLink="true">https://www.homex.co.id/en/news/396</guid><pubDate>Thu, 05 Nov 2026 09:08:29 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Indonesia steel consumption is about 18 million tonnes as Chinese products pressure local mills, and Krakatau Posco imports all its iron ore.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261105-i-krakatau-posco-bahan-baku.jpg" alt="Indonesia Uses 18 Million Tonnes of Steel: Krakatau Posco Still Imports Iron Ore"></p><p><strong>Indonesia steel consumption</strong> is now about 18 million tonnes, but part of that demand is met by Chinese products and domestic producers say they are under pressure. This was said by Haryanto, commercial director of PT Krakatau Posco, at Minerba Convex 2026 in Jakarta on 4 November 2026. He also revealed that all of the mill’s iron ore is still imported, so local steel raw-material costs remain closely tied to global prices and the exchange rate.</p>
<h2>Key Facts</h2><ul>
<li>Indonesian steel consumption put at about 18 million tonnes (2026-11-04, source: <a href="https://wartaekonomi.co.id/read645702/konsumsi-baja-ri-capai-18-juta-ton-krakatau-posco-soroti-tekanan-produk-china" target="_blank" rel="noopener">Warta Ekonomi, 4 Nov 2026, Krakatau Posco presentation at Minerba Convex 2026</a>).</li>
<li>Krakatau Posco produces about 3 million tonnes of steel a year (2026-11-04, source: <a href="https://wartaekonomi.co.id/read645702/konsumsi-baja-ri-capai-18-juta-ton-krakatau-posco-soroti-tekanan-produk-china" target="_blank" rel="noopener">Warta Ekonomi, 4 Nov 2026, Krakatau Posco presentation at Minerba Convex 2026</a>).</li>
<li>Annual needs of about 5 million tonnes of iron ore (all imported) and 2 million tonnes of metallurgical coal (2026-11-04, source: <a href="https://wartaekonomi.co.id/read645702/konsumsi-baja-ri-capai-18-juta-ton-krakatau-posco-soroti-tekanan-produk-china" target="_blank" rel="noopener">Warta Ekonomi, 4 Nov 2026, Krakatau Posco presentation at Minerba Convex 2026</a>).</li>
<li>30–35% of metallurgical coal comes from Central Kalimantan (Lamandau and Murung Raya) (2026-11-04, source: <a href="https://wartaekonomi.co.id/read645702/konsumsi-baja-ri-capai-18-juta-ton-krakatau-posco-soroti-tekanan-produk-china" target="_blank" rel="noopener">Warta Ekonomi, 4 Nov 2026, Krakatau Posco presentation at Minerba Convex 2026</a>).</li>
<li>Ferromanganese demand about 30,000 tonnes a year, not yet produced in Indonesia (2026-11-04, source: <a href="https://wartaekonomi.co.id/read645702/konsumsi-baja-ri-capai-18-juta-ton-krakatau-posco-soroti-tekanan-produk-china" target="_blank" rel="noopener">Warta Ekonomi, 4 Nov 2026, Krakatau Posco presentation at Minerba Convex 2026</a>).</li>
</ul>
<h2>What Krakatau Posco said</h2>
<p>According to Warta Ekonomi, Haryanto said the national steel market is supplied partly by domestic output and partly by Chinese products. He described the domestic industry as "suffering quite a lot" today. Krakatau Posco produces about 3 million tonnes a year, roughly one sixth of the national consumption he cited.</p>
<h2>Raw materials still depend on imports</h2>
<p>To make that much steel, the mill needs about 5 million tonnes of iron ore and 2 million tonnes of metallurgical coal every year. All the iron ore is imported because domestic ore processing is not yet well developed. Haryanto sees this as an opportunity for local mining companies to replace imports.</p>
<p>For metallurgical coal, about 30–35% already comes from Central Kalimantan, especially Lamandau and Murung Raya. Limestone comes from Rembang in Central Java and Padalarang in West Java. The mill also needs about 30,000 tonnes of ferromanganese a year, yet no processing industry exists in Indonesia even though manganese ore is available in East and West Nusa Tenggara.</p>
<h3>Demand will rise toward 2030</h3>
<p>Haryanto expects the steel industry’s raw-material needs to rise by about 10–20% by 2030 compared with today, partly due to additional steel mills in Morowali, Central Sulawesi. He asked the government to build ports and roads in mining areas so that domestic supply becomes more competitive.</p>
<h2>Why this matters to building-material buyers</h2>
<p>Steel is the base of many construction products: rebar, light steel framing, corrugated roofing, pipes and sections. If iron ore is still imported, local steel costs follow world ore prices, freight and the rupiah. At the same time, cheap imports can make market prices move unevenly between local and imported brands.</p>
<p>The issue also links to existing trade measures, such as anti-dumping duties on Chinese galvanised steel and the planned mandatory SNI for light steel and roofing. These aim to protect quality and domestic industry, but can also affect product choice and shelf prices.</p>
<h2>Tips for buying steel products for a project</h2>
<ul><li><strong>Check the SNI mark and mill label</strong> on rebar, light steel and roofing; do not compare only price per bar or sheet.</li>
<li><strong>Measure thickness and weight</strong> with simple tools on delivery, as cheap products are often thinner.</li>
<li><strong>Ask for written prices with a validity date</strong>: steel prices can move with the exchange rate and raw materials.</li>
<li><strong>Buy in project stages</strong> so steel is not stored too long on a damp site.</li></ul>
<p>homeX is an Indonesian one-stop building-materials and furniture platform with a showroom, warehousing and delivery. We help contractors and homeowners compare steel and roofing products and schedule deliveries to match the project timeline.</p>
<h2>Indonesia steel consumption: related articles and products</h2><ul>
<li><a href="/en/news/354">Anti-dumping duty on Chinese galvanised steel</a></li>
<li><a href="/en/news/368">Planned mandatory SNI for light steel and roofing</a></li>
<li><a href="/en/news/343">Spindo (ISSP) Q3 2026 profit</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much steel does Indonesia consume?</strong> According to Krakatau Posco, about 18 million tonnes, part of it supplied by Chinese products.</p>
<p><strong>How much does Krakatau Posco produce?</strong> About 3 million tonnes of steel a year.</p>
<p><strong>Where does Krakatau Posco get its iron ore?</strong> All of it is still imported; the company is open to local mining suppliers.</p>
<p><strong>Will rebar prices rise?</strong> The presentation gave no official figure. Because raw materials are imported, prices follow global markets and the exchange rate, so ask for written quotes.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://wartaekonomi.co.id/read645702/konsumsi-baja-ri-capai-18-juta-ton-krakatau-posco-soroti-tekanan-produk-china" target="_blank" rel="noopener">Warta Ekonomi, 4 Nov 2026, Krakatau Posco presentation at Minerba Convex 2026</a></em></p>]]></content:encoded></item><item><title>Anodizing Thickness for Aluminium Window Frames: QUALANOD Classes 10, 15 and 20 µm</title><link>https://www.homex.co.id/en/news/395</link><guid isPermaLink="true">https://www.homex.co.id/en/news/395</guid><pubDate>Thu, 05 Nov 2026 09:08:05 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Aluminium frame anodizing thickness follows QUALANOD classes: 10 µm for dry interiors, 15 µm for normal exteriors and 20 µm near the coast. How to choose.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261105-i-anodisasi-aluminium.jpg" alt="Anodizing Thickness for Aluminium Window Frames: QUALANOD Classes 10, 15 and 20 µm"></p><p><strong>Anodizing thickness</strong> is the key number when choosing anodized aluminium frames, windows and facades. According to ADAL recommendations based on QUALANOD classes, dry interiors need class 10 (10 µm), normal rural and urban exteriors at least class 15, and severe urban settings or sites 3–20 km from the coast at least class 20. For Indonesia's humid tropical climate and coastal cities, ask suppliers to state this class in writing.</p>
<h2>Key Facts</h2><ul>
<li>Outdoor exposure data over up to 20 years show anodic coatings 10–25 µm thick losing 0.2–0.4 µm per year in urban areas (2026-11-05, source: <a href="https://www.qualanod.net/architectural-applications.html" target="_blank" rel="noopener">QUALANOD, Architectural applications</a>).</li>
<li>The highest loss recorded was 1.2 µm per year at a heavily polluted site in the middle of a steel-making area (2026-11-05, source: <a href="https://www.qualanod.net/architectural-applications.html" target="_blank" rel="noopener">QUALANOD, Architectural applications</a>).</li>
<li>ADAL recommends at least QUALANOD class 15 for rural and normal urban exteriors, and class 20 for severe urban/industrial sites and buildings 3–20 km from the coast (2026-11-05, source: <a href="https://www.adal-aluminium.fr/quelle-epaisseur-danodisation/" target="_blank" rel="noopener">ADAL, Quelle épaisseur d’anodisation ?</a>).</li>
<li>Coloured anodizing requires a coating thickness of at least 15 µm (2026-11-05, source: <a href="https://www.adal-aluminium.fr/quelle-epaisseur-danodisation/" target="_blank" rel="noopener">ADAL, Quelle épaisseur d’anodisation ?</a>).</li>
</ul>
<h2>What anodizing and QUALANOD classes are</h2>
<p>Anodizing is an electrochemical process that grows an aluminium oxide layer on the profile surface. Unlike paint, the layer grows from the metal itself. QUALANOD, the international quality label for anodizing, describes architectural anodizing as finishes for permanent exterior uses such as window frames and facade cladding, where both appearance and long life matter. Buildings from the late 1930s such as the Montecatini building in Milan still have anodized aluminium in good condition.</p>
<p>A QUALANOD class states the minimum average coating thickness in micrometres: class 10 means 10 µm, class 15 means 15 µm, class 20 means 20 µm, and so on.</p>
<h2>Choosing anodizing thickness by location</h2>
<p>ADAL, the French association for anodized and coated aluminium, bases its recommendations on the exposure categories of standard NF P 24-351:</p>
<ul><li>Interiors with low to medium humidity: at least class 10.</li>
<li>Interiors with high to very high humidity: at least class 15.</li>
<li>Rural and normal urban/industrial exteriors: at least class 15.</li>
<li>Severe urban/industrial exteriors and buildings 3–20 km from the shoreline: at least class 20.</li>
<li>Aggressive environments or sites very close to the sea: a specific study is needed.</li></ul>
<p>For homes in coastal cities such as North Jakarta, Surabaya or Makassar, class 20 is a safe reference for directly exposed frames, but still check the distance to the sea and local pollution.</p>
<h2>Why coating thickness determines service life</h2>
<p>QUALANOD cites outdoor exposure studies of up to 20 years: coatings 10–25 µm thick in urban areas lost 0.2–0.4 µm per year, similar or slightly less in marine areas, and negligible amounts in rural areas. At a heavily polluted steel-making site the loss reached 1.2 µm per year. Put simply, a thicker coating gives more reserve before the base metal is exposed. Sealing quality also matters, because a poorly sealed porous layer dulls faster.</p>
<h2>How to check anodized aluminium frames when buying</h2>
<ul><li>Ask for a specification sheet stating the class or coating thickness in µm, not just the colour.</li>
<li>Coloured anodizing such as bronze or black needs at least 15 µm, according to ADAL.</li>
<li>Where possible, ask for thickness readings with an eddy current gauge at several points on the profile.</li>
<li>Inspect the surface for colour streaks, deep scratches or white stains.</li>
<li>Clean with water and neutral soap; avoid strong acid or alkaline cleaners.</li></ul>
<p>homeX, a one-stop building materials and furniture platform in Indonesia with a showroom, warehousing and delivery, can help compare aluminium profile and glass specifications from several suppliers.</p>
<h2>Anodizing thickness: related articles and products</h2><ul>
<li><a href="/en/news/373">Hot-dip galvanizing thickness ISO 1461</a></li>
<li><a href="/en/news/326">Tempered vs laminated glass</a></li>
<li><a href="/en/news/380">Stainless steel 201, 304 and 316</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What anodizing thickness suits exterior frames?</strong> According to ADAL, at least QUALANOD class 15 (15 µm) for normal exteriors and class 20 (20 µm) for severe urban sites or 3–20 km from the coast.</p>
<p><strong>What does class 20 mean on anodized aluminium?</strong> Class 20 means a minimum average anodic coating thickness of 20 micrometres.</p>
<p><strong>How fast does an anodic coating wear?</strong> QUALANOD data show 0.2–0.4 µm per year in urban areas, up to 1.2 µm per year at heavily polluted industrial sites.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.qualanod.net/architectural-applications.html" target="_blank" rel="noopener">QUALANOD, Architectural applications</a>; <a href="https://www.adal-aluminium.fr/quelle-epaisseur-danodisation/" target="_blank" rel="noopener">ADAL, Quelle épaisseur d’anodisation ?</a></em></p>]]></content:encoded></item><item><title>VOC in Wall Paint: The 30 g/L Limit for Interior Matt Paint and How to Read the Label</title><link>https://www.homex.co.id/en/news/394</link><guid isPermaLink="true">https://www.homex.co.id/en/news/394</guid><pubDate>Thu, 05 Nov 2026 09:08:05 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>EU rules have capped VOC in wall paint for interior matt walls at 30 g/L since 2010. See limits for trim paint, varnish and primers, and how to read labels.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261105-i-voc-cat.jpg" alt="VOC in Wall Paint: The 30 g/L Limit for Interior Matt Paint and How to Read the Label"></p><p><strong>VOC in wall paint</strong> (volatile organic compounds) is easiest to judge in grams per litre of ready-to-use paint. A benchmark widely used by global manufacturers is EU Directive 2004/42/EC: since 1 January 2010, interior matt wall paint has been capped at 30 g/L, whether water-borne or solvent-borne. For bedrooms and living rooms, choose a wall paint with a clearly printed VOC figure on the can or technical data sheet, and ventilate while painting.</p>
<h2>Key Facts</h2><ul>
<li>Directive 2004/42/EC sets VOC limits for decorative paints in two phases: Phase I from 1 January 2007 and Phase II from 1 January 2010 (2026-11-05, source: <a href="https://www.conphora.com/regulations/pvd/" target="_blank" rel="noopener">Conphora, Paints Directive explained</a>).</li>
<li>Phase II: interior matt wall/ceiling coatings (gloss ≤25 at 60°) max 30 g/L for both water-borne and solvent-borne; Phase I was 75 and 400 g/L (2026-11-05, source: <a href="https://www.paintsforlife.eu/en/blog/how-does-eu-regulate-use-architectural-paints-and-paint-ingredients" target="_blank" rel="noopener">Paints for Life (CEPE)</a>).</li>
<li>Trim and cladding paints for wood and metal, Phase II: max 130 g/L water-borne and 300 g/L solvent-borne; varnishes and woodstains 130 and 400 g/L (2026-11-05, source: <a href="https://www.paintsforlife.eu/en/blog/how-does-eu-regulate-use-architectural-paints-and-paint-ingredients" target="_blank" rel="noopener">Paints for Life (CEPE)</a>).</li>
<li>Interior glossy wall coatings max 100 g/L; primers 30 g/L (water) and 350 g/L (solvent); exterior mineral wall coatings 40 g/L (water) (2026-11-05, source: <a href="https://www.conphora.com/regulations/pvd/" target="_blank" rel="noopener">Conphora, Paints Directive explained</a>).</li>
</ul>
<h2>What VOCs are and why they are regulated</h2>
<p>VOCs are organic compounds that evaporate into the air as paint dries. Part of the sharp smell after painting comes from them. The European Union regulates VOC content in decorative paints, varnishes and vehicle refinishing products through Directive 2004/42/EC, whose consolidated text is on EUR-Lex. Limits are stated in grams of VOC per litre of ready-to-use product, including any thinner added as instructed.</p>
<p>Indonesia does not apply this directive, but its g/L figures often appear on technical data sheets of imported paints and global brands, so they are a useful reference when reading labels.</p>
<h2>Phase II limits for wall paint and wood/metal paint</h2>
<p>Summaries by Paints for Life (the European paint industry association's site) and Conphora give the limits most relevant to homes:</p>
<ul><li>Interior matt wall and ceiling coatings: 30 g/L (water and solvent).</li>
<li>Interior glossy wall and ceiling coatings: 100 g/L.</li>
<li>Exterior mineral wall coatings: 40 g/L water-borne, 430 g/L solvent-borne.</li>
<li>Wood and metal paints for frames, doors and railings: 130 g/L water-borne, 300 g/L solvent-borne.</li>
<li>Varnishes and woodstains: 130 g/L and 400 g/L.</li>
<li>Primers: 30 g/L and 350 g/L; binding primers 30 g/L and 750 g/L.</li></ul>
<p>Water-borne paints almost always have much lower limits than solvent-borne ones, which is why emulsion wall paint is the usual choice indoors.</p>
<h2>How to read a VOC label</h2>
<ul><li>Look for a g/L figure on the can or technical data sheet (TDS). A "low VOC" claim without a number is hard to compare.</li>
<li>Make sure the figure is for the ready-to-use product. Solvent thinners add VOC.</li>
<li>Compare against the right category: matt wall paint against 30 g/L, metal paint against 130 or 300 g/L.</li>
<li>Primer, filler and topcoat are counted separately; one paint system may involve several products.</li></ul>
<h2>Tips for painting a home with low VOC paint</h2>
<p>Low VOC paint still needs ventilation: open windows, use an extractor fan if available, and leave time before a room is slept in. For new walls, prepare the surface as the manufacturer instructs, including an alkali-resistant primer on plaster that is dry enough. Store leftover paint tightly closed and away from heat.</p>
<p>homeX, a one-stop building materials and furniture platform in Indonesia with a showroom, warehousing and delivery, helps buyers compare paint data sheets from different brands before ordering.</p>
<h2>VOC in wall paint: related articles and products</h2><ul>
<li><a href="/en/news/301">Alkali-resistant primer for new walls</a></li>
<li><a href="/en/news/387">Formaldehyde emissions of plywood and MDF</a></li>
<li><a href="/en/news/374">Fire classes of building materials EN 13501-1</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What VOC level counts as low for interior wall paint?</strong> As a benchmark, EU Directive 2004/42/EC Phase II caps interior matt wall paint at 30 g/L, in force since 1 January 2010.</p>
<p><strong>Can metal and wood paints have higher VOC?</strong> Yes. The limits are 130 g/L for water-borne and 300 g/L for solvent-borne.</p>
<p><strong>Does the VOC figure include thinner?</strong> EU limits apply to ready-to-use product, so thinner added as instructed is counted.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://eur-lex.europa.eu/eli/dir/2004/42/2021-07-16/eng" target="_blank" rel="noopener">EUR-Lex, Directive 2004/42/EC</a>; <a href="https://www.paintsforlife.eu/en/blog/how-does-eu-regulate-use-architectural-paints-and-paint-ingredients" target="_blank" rel="noopener">Paints for Life (CEPE)</a>; <a href="https://www.conphora.com/regulations/pvd/" target="_blank" rel="noopener">Conphora, Paints Directive explained</a></em></p>]]></content:encoded></item><item><title>Water-Saving Toilets at 4.8 Litres: WaterSense Label, Dual Flush and MaP 350 g Explained</title><link>https://www.homex.co.id/en/news/393</link><guid isPermaLink="true">https://www.homex.co.id/en/news/393</guid><pubDate>Thu, 05 Nov 2026 09:08:05 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>WaterSense water-saving toilets flush at most 4.8 litres and must pass a 350 g MaP test. What the litre figure, dual flush and the label mean when buying.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261105-i-kloset-hemat-air.jpg" alt="Water-Saving Toilets at 4.8 Litres: WaterSense Label, Dual Flush and MaP 350 g Explained"></p><p>When choosing a <strong>water-saving toilet</strong>, the easiest number to check is the flush volume: the US Environmental Protection Agency (EPA) WaterSense label caps it at 1.28 gallons, about 4.8 litres, per flush, and the toilet must still pass a MaP cleaning test of at least 350 grams. A good water-saving toilet is therefore not only low on water but also clears the bowl in one flush. These figures are what to look for in a brochure before buying.</p>
<h2>Key Facts</h2><ul>
<li>WaterSense labeled toilets use 1.28 gallons per flush or less, 20% less than the US federal limit of 1.6 gallons (2026-11-05, source: <a href="https://www.epa.gov/watersense/residential-toilets" target="_blank" rel="noopener">US EPA WaterSense, Residential Toilets</a>).</li>
<li>Old, inefficient toilets can use as much as 6 gallons per flush; toilets account for nearly 30% of indoor household water use (2026-11-05, source: <a href="https://www.epa.gov/watersense/residential-toilets" target="_blank" rel="noopener">US EPA WaterSense, Residential Toilets</a>).</li>
<li>WaterSense tank-type toilets must remove at least 350 grams of test waste including toilet paper in a single flush (MaP threshold) (2026-11-05, source: <a href="https://map-testing.com/watersense/" target="_blank" rel="noopener">MaP Toilet Testing, WaterSense</a>).</li>
<li>WaterSense specification Version 1.2 (2 June 2014) remains in effect; Version 2.0 (May 2024) has been paused by EPA (2026-11-05, source: <a href="https://www.epa.gov/watersense/residential-toilets" target="_blank" rel="noopener">US EPA WaterSense, Residential Toilets</a>).</li>
</ul>
<h2>What 4.8 litres means on a water-saving toilet</h2>
<p>The litre figure on a toilet brochure is the volume of water used in one flush. The US federal limit is 1.6 gallons (about 6 litres), while the WaterSense label requires 1.28 gallons, about 4.8 litres, according to the EPA's official page. Older toilets not designed for efficiency can use up to 6 gallons, roughly four times as much. Because toilets are the largest water user in the home, nearly 30% of indoor use, the difference shows up in water bills and in the load on pumps and septic tanks.</p>
<p>Indonesia does not use the WaterSense label, but many sanitaryware brands sold here state the flush volume in litres, such as 4.8 litres, or 3/6 and 3/4.5 litres for dual flush models. These numbers can be compared directly with the benchmark above.</p>
<h2>Dual flush: two buttons, two volumes</h2>
<p>A dual flush toilet has a full flush button for solid waste and a reduced flush for liquid waste. The EPA notes that a WaterSense labeled dual flush model saves even more water when users choose the reduced mode. Under Version 1.2, now in effect, dual flush toilets are rated by effective flush volume: the average of two reduced flushes and one full flush, which must not exceed 1.28 gallons. Version 2.0, released in May 2024, would cap the full flush itself at 1.28 gallons, but the EPA has paused its effective date.</p>
<h2>The 350 g MaP test: efficient but still clean</h2>
<p>Low-flow toilets of the 1990s were often criticised for needing a double flush, so WaterSense added performance testing. MaP Toilet Testing explains that WaterSense tank-type toilets must completely remove 350 grams of test waste plus toilet paper in a single flush. The EPA lists further tests such as bowl surface cleaning and drainline waste transport. Brands often publish the MaP score in grams; the higher the score, the more flushing reserve the toilet has.</p>
<h2>How to choose and install a water-saving toilet</h2>
<ul><li>Check the flush volume printed in the catalogue or on the product label, not just the words "water saving".</li>
<li>For dual flush models, look at both numbers, reduced and full.</li>
<li>Where available, compare MaP scores in grams and choose well above 350 g for heavily used homes.</li>
<li>Make sure the floor outlet distance (rough-in) matches the toilet model before ordering.</li>
<li>The drain pipe needs enough slope and venting so a small water volume can still carry waste away.</li>
<li>Check for leaks: the EPA says most toilet leaks come from a worn flapper, and household leaks can waste 180 gallons per week.</li></ul>
<p>homeX, a one-stop building materials and furniture platform in Indonesia with a showroom, warehousing and delivery, can help compare toilet specifications from several brands in one quotation request.</p>
<h2>Water-saving toilet: related articles and products</h2><ul>
<li><a href="/en/news/370">American Standard prices 2026: toilets and basins</a></li>
<li><a href="/en/news/312">Household waste pipe sizes under SNI 8153</a></li>
<li><a href="/en/news/258">Bathroom waterproofing flood test</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How many litres makes a toilet water-saving?</strong> The EPA WaterSense benchmark is a maximum of 1.28 gallons, about 4.8 litres, per flush, compared with the US federal limit of 1.6 gallons (about 6 litres).</p>
<p><strong>What does MaP 350 g mean on a toilet?</strong> It is the cleaning threshold: a WaterSense tank-type toilet must remove 350 grams of test waste including paper in one flush.</p>
<p><strong>Does a dual flush toilet save more water?</strong> It can, if the reduced button is used for liquid waste. Under Version 1.2, the average of two reduced and one full flush must not exceed 1.28 gallons.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.epa.gov/watersense/residential-toilets" target="_blank" rel="noopener">US EPA WaterSense, Residential Toilets</a>; <a href="https://map-testing.com/watersense/" target="_blank" rel="noopener">MaP Toilet Testing, WaterSense</a></em></p>]]></content:encoded></item><item><title>AI on an IKN Construction Project: Heavy-Equipment Routing Saves 61,000 Litres of Fuel</title><link>https://www.homex.co.id/en/news/392</link><guid isPermaLink="true">https://www.homex.co.id/en/news/392</guid><pubDate>Thu, 05 Nov 2026 09:07:01 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>AI in construction projects: at the IKN parliament site it cut haul distance 38.5% and saved 61,000+ litres of fuel. Lessons for contractors and logistics.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261105-i-ai-alat-berat-parlemen-ikn.jpg" alt="AI on an IKN Construction Project: Heavy-Equipment Routing Saves 61,000 Litres of Fuel"></p><p>Using <strong>AI in construction projects</strong> at the Nusantara Parliament Complex in IKN has produced real numbers: heavy-haul distance fell 38.5%, site validation time fell 83% and more than 61,000 litres of fuel were saved. The key is regularly updated drone site data, with final decisions still made by engineers.</p>
<h2>Key Facts</h2><ul>
<li>Heavy-haul distance down 38.5%, site validation time down 83%, over 61,000 litres of fuel saved at the IKN Parliament Complex (2026-10-10, source: <a href="https://konstruksitekno.id/berita/ai-optimalkan-rute-alat-berat-di-parlemen-ikn" target="_blank" rel="noopener">KonstruksiTekno.id, 10 Oct 2026</a>).</li>
<li>Hutama Karya is main contractor for five parliament complexes on about 42 hectares; contract signed 4 Dec 2025, completion targeted around end-2027 (2026-10-10, source: <a href="https://konstruksitekno.id/berita/ai-optimalkan-rute-alat-berat-di-parlemen-ikn" target="_blank" rel="noopener">KonstruksiTekno.id, 10 Oct 2026</a>).</li>
<li>70% of 336 Year in Infrastructure 2026 award finalists use AI, according to the Bentley Systems CEO (2026-10-09, source: <a href="https://www.antaranews.com/berita/5778545/akal-imitasi-bantu-optimalkan-jalur-alat-berat-di-proyek-ikn" target="_blank" rel="noopener">ANTARA, 9 Oct 2026</a>).</li>
<li>Ministry of Public Works and Glodon Indonesia launched the AI x 5D BIM Master Challenge 2026 for construction workforce skills (2026-05-26, source: <a href="https://binakonstruksi.pu.go.id/informasi-terkini/sekretariat-direktorat-jenderal/kementerian-pekerjaan-umum-dorong-transformasi-digital-sektor-konstruksi-melalui-peluncuran-ai-x-5d-bim-master-challenge-2026/" target="_blank" rel="noopener">Directorate General of Construction Development, Ministry of Public Works, 26 May 2026</a>).</li>
</ul>
<h2>How AI in construction projects works at the IKN parliament site</h2>
<p>According to ANTARA (9 October 2026), Bentley Systems CEO Nicholas Cumins explained at Year in Infrastructure 2026 in Singapore that the project team uses regularly updated location data to optimise heavy-equipment routes with AI. Each work scenario is validated in SYNCHRO software before it is executed, to avoid clashes on site.</p>
<p>KonstruksiTekno.id adds the details: drones produce a 3D digital twin of the site, and AI then evaluates options for material placement and mobilisation paths. Because earthworks change the site every day, equipment routes must keep adjusting, and automated calculation is faster here than manual planning.</p>
<h2>The results</h2>
<ul><li>Site validation time down 83%.</li>
<li>Heavy-haul travel distance down 38.5%.</li>
<li>More than 61,000 litres of fuel saved.</li></ul>
<p>The project, on about 42 hectares, is built by PT Hutama Karya (Persero) and won Founders' Honors in the Constructioneering category. Elsewhere in the IKN core area, the government also uses sensor-based automatic compactors, for example on the east side of Jalan Sumbu Kebangsaan.</p>
<h2>AI still needs human judgement</h2>
<p>Cumins stressed that AI can generate many design alternatives and optimisations quickly, but decisions on engineering, sustainability and risk still need an engineer's judgement because they affect public safety. He said 70% of this year's 336 award finalists already use AI, while across all submissions the share was 25%.</p>
<h2>Is Indonesia's construction workforce ready?</h2>
<p>The government is pushing these digital skills. On 26 May 2026 the Directorate General of Construction Development at the Ministry of Public Works and Glodon Indonesia launched the AI x 5D BIM Master Challenge 2026, with BIM training, AI use and certification opportunities. KonstruksiTekno.id notes that many road and dam projects still rely on manual daily reports for equipment hours and fuel, so the gap between priority projects and ordinary ones is still wide.</p>
<h2>Lessons for contractors and material logistics</h2>
<ul><li><strong>Start with data</strong>: regular drone imagery and GPS logs from equipment are the foundation before using AI.</li>
<li><strong>Plan stockpile locations</strong>: placing sand, rebar or precast concrete in the right spot cuts haul distance.</li>
<li><strong>Synchronise deliveries</strong>: building material deliveries should follow the work sequence on site so they do not pile up.</li></ul>
<p>homeX, a one-stop building materials and furniture platform with warehousing and delivery, follows these developments to help projects plan material supply schedules.</p>
<h2>AI in construction projects: related articles and products</h2><ul>
<li><a href="/en/news/376">AI and BIM in construction: BuildX 2026 Jakarta</a></li>
<li><a href="/en/news/364">AI architectural design in Bali</a></li>
<li><a href="/en/news/358">GYS steel mill digitalisation with AI</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much did AI save on the IKN parliament project?</strong> Heavy-haul distance fell 38.5%, site validation time fell 83%, and more than 61,000 litres of fuel were saved.</p>
<p><strong>Which technologies were used?</strong> Drones for a 3D digital twin, AI to assess routes and material placement, and SYNCHRO to validate work scenarios.</p>
<p><strong>Does AI replace engineers?</strong> No. The Bentley CEO said engineering and risk decisions still require human judgement.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.antaranews.com/berita/5778545/akal-imitasi-bantu-optimalkan-jalur-alat-berat-di-proyek-ikn" target="_blank" rel="noopener">ANTARA, 9 Oct 2026</a>; <a href="https://konstruksitekno.id/berita/ai-optimalkan-rute-alat-berat-di-parlemen-ikn" target="_blank" rel="noopener">KonstruksiTekno.id, 10 Oct 2026</a>; <a href="https://binakonstruksi.pu.go.id/informasi-terkini/sekretariat-direktorat-jenderal/kementerian-pekerjaan-umum-dorong-transformasi-digital-sektor-konstruksi-melalui-peluncuran-ai-x-5d-bim-master-challenge-2026/" target="_blank" rel="noopener">Directorate General of Construction Development, Ministry of Public Works, 26 May 2026</a></em></p>]]></content:encoded></item><item><title>Keramika Indonesia 2027 at NICE PIK 2: Openings for Chinese Machinery and Raw Materials</title><link>https://www.homex.co.id/en/news/391</link><guid isPermaLink="true">https://www.homex.co.id/en/news/391</guid><pubDate>Thu, 05 Nov 2026 09:07:01 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>The Indonesia ceramics exhibition 2027, Keramika, runs 10–13 June 2027 at NICE PIK 2. Chinese machinery and glaze suppliers should know the tile duty rules.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261105-i-keramika-2027-pemasok-china.jpg" alt="Keramika Indonesia 2027 at NICE PIK 2: Openings for Chinese Machinery and Raw Materials"></p><p>The <strong>Indonesia ceramics exhibition 2027</strong>, the 12th Keramika Indonesia, runs 10–13 June 2027 at NICE, PIK 2, alongside Megabuild Indonesia. For Chinese companies, the biggest opening is probably not selling finished tiles, which face an anti-dumping duty until 2029, but supplying machinery, glazes, raw materials and technology for local factory expansion.</p>
<h2>Key Facts</h2><ul>
<li>Keramika Indonesia 2027: 10–13 June 2027, 10:00–20:00 WIB, NICE PIK 2, organized by PT Panorama Media (2026-11-05, source: <a href="https://keramika.co.id/" target="_blank" rel="noopener">Keramika Indonesia official site (PT Panorama Media), accessed 5 Nov 2026</a>).</li>
<li>Keramika 2026 (4–7 June 2026): 157 exhibitors from 7 countries, 221 brands, 31,839 visitors including Megabuild (2026-11-05, source: <a href="https://keramika.co.id/" target="_blank" rel="noopener">Keramika Indonesia official site (PT Panorama Media), accessed 5 Nov 2026</a>).</li>
<li>Anti-dumping duty on ceramic tiles from China in force 26 Oct 2024 to 25 Oct 2029 (PMK 70/2024) (2024-10-14, source: <a href="https://jdih.kemenkeu.go.id/dok/pmk-70-tahun-2024" target="_blank" rel="noopener">Ministry of Finance legal database, PMK 70/2024</a>).</li>
<li>ASAKI projects installed capacity of 672 million m² a year in 2026 and 701 million m² in 2027, with a planned Rp5 trillion investment (2026-01-14, source: <a href="https://www.antaranews.com/berita/5351137/asaki-siapkan-rencana-investasi-rp5-t-pacu-produksi-industri-keramik" target="_blank" rel="noopener">ANTARA, 14 Jan 2026</a>).</li>
</ul>
<h2>Indonesia ceramics exhibition 2027: dates and format</h2>
<p>According to the organizer's official site, Keramika Indonesia 2027 takes place Thursday to Sunday, 10–13 June 2027, at the Nusantara International Convention Exhibition (NICE), PIK 2, Tangerang Regency. It shares dates and venue with the 24th Megabuild Indonesia, MegaProperty and a first-edition furniture show, so one trip covers tiles, building materials, property and furniture.</p>
<p>The programme includes the exhibition, an ASEAN Ceramic Summit at the opening, the Keramika Conference on the first two days, an ASEAN Ceramic Conference on 2028 colour trends and exports, and business matching between Indonesian makers and ASEAN importers, distributors and project owners. JPNN reported on 6 October 2026 that the organizer is working with partners from Vietnam, Malaysia, the Philippines, Singapore, Thailand and other countries to bring in buyers.</p>
<h2>Why finished Chinese tiles struggle to compete</h2>
<p>Since 26 October 2024 Indonesia has applied an anti-dumping duty to ceramic tile imports from the People's Republic of China under Finance Minister Regulation PMK 70/2024, valid until 25 October 2029. ASAKI also lists safeguards and mandatory SNI certification among the policies behind the domestic recovery. Exporters of finished tiles therefore face extra cost and must hold SNI certification before goods can be sold.</p>
<h2>The more realistic opening: the factory supply chain</h2>
<p>In an ANTARA report of 14 January 2026, ASAKI projected national installed tile capacity of 672 million m² a year in 2026, 701 million m² in 2027 and 720 million m² in 2029. The association is preparing Rp5 trillion of new investment and an expansion of 70 million m² a year. Factories adding lines need kilns, presses, digital printers, glazes, inks and spare parts. The Keramika site says the show features raw material, machinery and technology suppliers alongside tile makers.</p>
<p>Some industry problems also invite solutions: ASAKI cites limited gas supply and clay shortages after mining permits in West Java were revoked. Energy-saving technology and alternative raw material sources are relevant topics to raise with manufacturers.</p>
<h2>Notes for Chinese exhibitors</h2>
<ul><li><strong>Know the rules</strong>: check anti-dumping, safeguard and SNI status for your product before quoting.</li>
<li><strong>Prepare Indonesian-language material</strong>: technical specs, after-sales service and local spare parts stock build trust.</li>
<li><strong>Use business matching</strong>: register early to meet factories and distributors.</li>
<li><strong>Keep origin clean</strong>: ASAKI says it will look into suspected transshipment of Chinese products via Malaysia, so country of origin must be clear.</li></ul>
<h2>What it means for building-material buyers</h2>
<p>For contractors and homeowners, local capacity growth means a wider choice of domestically made tiles. homeX, Indonesia's one-stop building materials and furniture platform with a showroom, warehousing and delivery, follows shows like this to keep its tile catalogue and supplier list current.</p>
<h2>Indonesia ceramics exhibition 2027: related articles and products</h2><ul>
<li><a href="/en/news/362">Megabuild Indonesia 2027 at NICE PIK 2: guide for Chinese suppliers</a></li>
<li><a href="/en/news/33">Indonesia building materials exhibition calendar 2026–2027</a></li>
<li><a href="/en/news/348">Cahayaputra Asa Keramik (CAKK) results</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>When and where is Keramika Indonesia 2027?</strong> 10–13 June 2027, 10:00–20:00 WIB, at NICE PIK 2, Tangerang Regency, together with Megabuild Indonesia.</p>
<p><strong>Are ceramic tiles from China subject to anti-dumping duty?</strong> Yes. PMK 70/2024 imposes an anti-dumping duty on Chinese ceramic tiles from 26 October 2024 to 25 October 2029.</p>
<p><strong>Which Chinese products fit Keramika best?</strong> Production machinery, glazes, inks, raw materials and technology, as local industry plans to add about 70 million m² of capacity a year.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://keramika.co.id/" target="_blank" rel="noopener">Keramika Indonesia official site (PT Panorama Media), accessed 5 Nov 2026</a>; <a href="https://www.jpnn.com/news/pameran-keramika-indonesia-2027-perkuat-posisi-ri-di-industri-keramik-global" target="_blank" rel="noopener">JPNN, 6 Oct 2026</a>; <a href="https://www.antaranews.com/berita/5351137/asaki-siapkan-rencana-investasi-rp5-t-pacu-produksi-industri-keramik" target="_blank" rel="noopener">ANTARA, 14 Jan 2026</a>; <a href="https://jdih.kemenkeu.go.id/dok/pmk-70-tahun-2024" target="_blank" rel="noopener">Ministry of Finance legal database, PMK 70/2024</a></em></p>]]></content:encoded></item><item><title>Arwana (ARNA) Profit Up 22.8% to IDR 375.9 Billion on IDR 2.51 Trillion Tile Sales</title><link>https://www.homex.co.id/en/news/390</link><guid isPermaLink="true">https://www.homex.co.id/en/news/390</guid><pubDate>Thu, 05 Nov 2026 09:06:53 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Arwana profit (ARNA) rose 22.82% to IDR 375.88 billion on IDR 2.51 trillion sales to September 2026. A look at what it says about the local tile market.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261105-i-arwana-arna-q3-2026.jpg" alt="Arwana (ARNA) Profit Up 22.8% to IDR 375.9 Billion on IDR 2.51 Trillion Tile Sales"></p><p><strong>Arwana profit</strong> (PT Arwana Citramulia Tbk, ticker ARNA) rose 22.82% to IDR 375.88 billion in January–September 2026, while net sales grew 15.57% to IDR 2.51 trillion. The tile maker’s margins also improved because cost of sales grew more slowly than sales. For the market, the figures show that demand for local mid-range ceramic tiles is still growing in 2026.</p>
<h2>Key Facts</h2><ul>
<li>Net sales IDR 2,512.4 billion, up 15.57% from IDR 2,173.9 billion (2026-10-21, source: <a href="https://www.kuhuni.com/2026/10/saham-arna-catatkan-penjualan-2-triliun-laba-bersih-369-miliar.html" target="_blank" rel="noopener">Kuhuni.com, ARNA September 2026 financial statement summary, 21 Oct 2026</a>).</li>
<li>Profit for the period IDR 375.88 billion (+22.82%); attributable to owners IDR 369.62 billion (+22.35%) (2026-10-21, source: <a href="https://www.kuhuni.com/2026/10/saham-arna-catatkan-penjualan-2-triliun-laba-bersih-369-miliar.html" target="_blank" rel="noopener">Kuhuni.com, ARNA September 2026 financial statement summary, 21 Oct 2026</a>).</li>
<li>Gross margin up from about 30.35% to 31.69% (2026-10-21, source: <a href="https://www.kuhuni.com/2026/10/saham-arna-catatkan-penjualan-2-triliun-laba-bersih-369-miliar.html" target="_blank" rel="noopener">Kuhuni.com, ARNA September 2026 financial statement summary, 21 Oct 2026</a>).</li>
<li>Operating cash flow IDR 618.38 billion, up 38.03% (2026-10-21, source: <a href="https://www.kuhuni.com/2026/10/saham-arna-catatkan-penjualan-2-triliun-laba-bersih-369-miliar.html" target="_blank" rel="noopener">Kuhuni.com, ARNA September 2026 financial statement summary, 21 Oct 2026</a>).</li>
<li>Inventory IDR 160.49 billion on 30 Sep 2026, up 35.41% from end-2025 (2026-10-21, source: <a href="https://www.kuhuni.com/2026/10/saham-arna-catatkan-penjualan-2-triliun-laba-bersih-369-miliar.html" target="_blank" rel="noopener">Kuhuni.com, ARNA September 2026 financial statement summary, 21 Oct 2026</a>).</li>
</ul>
<h2>Arwana results to Q3 2026</h2>
<p>According to the unaudited consolidated statements to 30 September 2026, also reported by Kontan on 22 October 2026, Arwana booked net sales of IDR 2.51 trillion, about IDR 338.5 billion more than a year earlier. Cost of sales rose 13.35% to IDR 1.72 trillion, slower than sales, so gross profit jumped 20.69% to IDR 796.12 billion.</p>
<p>Operating profit rose 23.40% to IDR 485.30 billion and operating margin improved from about 18.09% to 19.32%. After tax, profit for the period reached IDR 375.88 billion, a net margin of about 14.96%. Earnings per share rose from IDR 42.87 to IDR 53.15.</p>
<h2>Items worth watching</h2>
<p>Not every line moved the same way. Net foreign-exchange loss grew from IDR 6.84 billion to IDR 16.83 billion, reflecting the weaker rupiah that other building-material makers also feel. Cash and equivalents fell 31.21% to IDR 260.00 billion, partly due to IDR 316.15 billion in dividends, IDR 183.13 billion of fixed-asset spending and IDR 35.96 billion of treasury share buybacks.</p>
<p>Inventory rose 35.41% to IDR 160.49 billion and third-party trade receivables rose 84.29% to IDR 152.04 billion. That is not necessarily a problem, but it means more working capital is tied up. Total liabilities rose 9.08% to IDR 1.04 trillion, even as short-term bank loans fell sharply to IDR 1.03 billion.</p>
<h3>Strong operating cash flow</h3>
<p>Operating cash flow rose 38.03% to IDR 618.38 billion, about 1.6 times net profit. Cash received from customers rose to IDR 2.41 trillion. In other words, Arwana's tile sales are not just booked as revenue; most have already turned into cash.</p>
<h2>What it says about the local tile market</h2>
<p>Arwana's results contrast with some other tile makers that are still loss-making this year, such as Cahayaputra Asa Keramik, whose loss narrowed but has not yet turned to profit. The gap suggests that competition in floor and wall tiles is increasingly decided by production cost efficiency, especially energy, and by distribution networks.</p>
<p>For buyers, sales growth at large producers usually means popular sizes stay in stock. Still, the weaker rupiah and energy costs can affect shelf prices.</p>
<h2>Tips for buying tiles for a project</h2>
<ul><li><strong>Order from one production batch</strong>: note the shade and calibre codes on the box so the colour stays uniform.</li>
<li><strong>Add a 5–10% reserve</strong> for cuts and future repairs.</li>
<li><strong>Check grade and specifications</strong>: water absorption, wear resistance and slip rating for each room.</li>
<li><strong>Ask for written quotes</strong> with a validity date, since producers can adjust prices.</li></ul>
<p>homeX is an Indonesian one-stop building-materials and furniture platform with a showroom, warehousing and delivery. Customers can view tile samples in the showroom and schedule delivery to match the installation stages.</p>
<h2>Arwana profit: related articles and products</h2><ul>
<li><a href="/en/news/348">Cahayaputra Asa Keramik (CAKK) loss down 89%</a></li>
<li><a href="/en/news/383">Luxagress tile prices 2026</a></li>
<li><a href="/en/news/350">Tile slip resistance ratings R9–R13</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much did Arwana earn to September 2026?</strong> Profit for the period was IDR 375.88 billion, up 22.82%; IDR 369.62 billion was attributable to owners of the parent.</p>
<p><strong>What were Arwana sales?</strong> Net sales were IDR 2.51 trillion in January–September 2026, up 15.57% from IDR 2.17 trillion.</p>
<p><strong>Why did Arwana cash fall?</strong> Dividends, fixed-asset spending and treasury share purchases exceeded the extra operating cash.</p>
<p><strong>Is this a stock recommendation?</strong> No. The article summarises financial statements to describe the ceramic tile industry.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.kuhuni.com/2026/10/saham-arna-catatkan-penjualan-2-triliun-laba-bersih-369-miliar.html" target="_blank" rel="noopener">Kuhuni.com, ARNA September 2026 financial statement summary, 21 Oct 2026</a>; <a href="https://insight.kontan.co.id/news/arna-mencetak-pertumbuhan-kinerja-di-kuartal-iii-2026" target="_blank" rel="noopener">Kontan Insight, 22 Oct 2026</a></em></p>]]></content:encoded></item><item><title>Indocement (INTP) Earns IDR 1.3 Trillion to September 2026 as Volume Rises 9%</title><link>https://www.homex.co.id/en/news/389</link><guid isPermaLink="true">https://www.homex.co.id/en/news/389</guid><pubDate>Thu, 05 Nov 2026 09:06:52 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Indocement profit (INTP) reached IDR 1.30 trillion to Sep 2026, up 22.5%, on 15.75 million tonnes of cement and clinker. What it means for buyers.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261105-i-indocement-intp-q3-2026.jpg" alt="Indocement (INTP) Earns IDR 1.3 Trillion to September 2026 as Volume Rises 9%"></p><p><strong>Indocement profit</strong> (PT Indocement Tunggal Prakarsa Tbk, ticker INTP) reached IDR 1.30 trillion in the nine months to September 2026, up 22.5% from IDR 1.06 trillion a year earlier. The gain came from cement and clinker volume rising 9.0% to 15.75 million tonnes as domestic demand strengthened. The company itself warns, however, that energy costs and the exchange rate still squeeze margins, which may lead to further price adjustments.</p>
<h2>Key Facts</h2><ul>
<li>Profit for the period IDR 1,301.9 billion, up 22.5% from IDR 1,063.1 billion (2026-11-03, source: <a href="https://www.indocement.co.id/media/post/indocement-press-release-2026q3-bahasa-indonesia-final.pdf" target="_blank" rel="noopener">Indocement, Q3 2026 results press release (accessed 5 Nov 2026)</a>).</li>
<li>Net revenue IDR 14,070.8 billion, up 8.9%; gross margin 32.0% (2026-11-03, source: <a href="https://www.indocement.co.id/media/post/indocement-press-release-2026q3-bahasa-indonesia-final.pdf" target="_blank" rel="noopener">Indocement, Q3 2026 results press release (accessed 5 Nov 2026)</a>).</li>
<li>Cement and clinker volume 15.75 million tonnes (+9.0%): domestic 15.09 million t (+7.6%), export 660 thousand t (+55.9%) (2026-11-03, source: <a href="https://www.indocement.co.id/media/post/indocement-press-release-2026q3-bahasa-indonesia-final.pdf" target="_blank" rel="noopener">Indocement, Q3 2026 results press release (accessed 5 Nov 2026)</a>).</li>
<li>Domestic cement consumption Jan–Sep 2026 up 7.9% to 48.1 million tonnes; September alone 6 million tonnes (2026-10-21, source: <a href="https://id.tradingview.com/news/kontan:6c92b8caa87ea:0/" target="_blank" rel="noopener">Kontan via TradingView, September 2026 cement consumption</a>).</li>
<li>INTP market share in September 2026 was 31.6%, the highest since at least 2021 (2026-10-21, source: <a href="https://id.tradingview.com/news/kontan:6c92b8caa87ea:0/" target="_blank" rel="noopener">Kontan via TradingView, September 2026 cement consumption</a>).</li>
</ul>
<h2>Indocement results to September 2026</h2>
<p>Indocement's official press release of 3 November 2026 shows growth in almost every line. Net revenue rose 8.9% to IDR 14.07 trillion while cost of revenue rose only 7.8%. Gross profit therefore grew faster, by 11.4% to IDR 4.51 trillion, and gross margin improved from 31.3% to 32.0%.</p>
<p>Operating profit rose 18.5% to IDR 1.56 trillion and EBITDA climbed 14.6% to IDR 2.82 trillion, a 20.1% margin. According to IDXChannel, extra support came from net finance income of IDR 20.4 billion, helped by lower interest on PT Semen Grobogan's debt, and from the share of associates' profit, up 109.6% to IDR 49.8 billion. Cash and equivalents stood at IDR 4.7 trillion on 30 September 2026.</p>
<h2>National cement demand is also stronger</h2>
<p>Indocement's volume growth matches the market. Mirae Asset Sekuritas research quoted by Kontan puts domestic cement consumption for January–September 2026 at 48.1 million tonnes, up 7.9% year on year. September alone reached 6 million tonnes, with bulk cement at 1.9 million tonnes (up 8.2% YoY) and bagged cement at 4.2 million tonnes.</p>
<p>Drivers included dry weather, project deadlines and faster year-end budget disbursement. Indocement reported bulk growth of 12.6% and bagged growth of 5.9%. Bulk cement mostly feeds large projects and ready-mix concrete, while bagged cement reflects house building and small renovations.</p>
<h3>Market share competition</h3>
<p>The same research says Indocement's share hit 31.6% in September 2026, the highest since at least 2021, while Semen Indonesia (SIG) slipped to 44%. For the nine-month period Indocement reports a 29.3% domestic share. Analysts now estimate full-year 2026 domestic consumption at about 66.9 million tonnes.</p>
<h2>Energy costs and selling prices</h2>
<p>Indocement's release says the cement industry still faces margin pressure from high energy costs and the exchange rate. The company lists efficiency, alternative fuels and further selling-price adjustments as key steps. Contractors and building-material shops should note this: higher volume does not automatically mean cheaper cement.</p>
<p>Analysts also flag rising interest rates, slower state spending and a weaker rupiah as risks. Cement sales growth for 2027 is projected at only about 2%.</p>
<h2>What it means for cement buyers and contractors</h2>
<ul><li><strong>Lock prices for year-end projects</strong>: demand is seasonally strong from September to December, so ask for written quotes with a clear validity date.</li>
<li><strong>Watch factory price announcements</strong>: producers have openly mentioned possible price adjustments because of energy costs.</li>
<li><strong>Compare bulk and bagged</strong>: for large volumes, bulk cement or ready-mix can be more efficient than bags.</li>
<li><strong>Schedule deliveries before peak rain</strong>: cement must stay dry, so avoid stockpiling on site for too long.</li></ul>
<p>homeX is an Indonesian one-stop building-materials and furniture platform with a showroom, warehousing and delivery. We help customers compare cement and other materials and plan deliveries around each project stage.</p>
<h2>Indocement profit: related articles and products</h2><ul>
<li><a href="/en/news/342">Semen Indonesia nine-month 2026 profit</a></li>
<li><a href="/en/news/385">Solusi Bangun Indonesia (SMCB) profit</a></li>
<li><a href="/en/news/352">Cement transport by rail in 2026</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much did Indocement earn to September 2026?</strong> Profit for the period was IDR 1,301.9 billion, up 22.5% from IDR 1,063.1 billion in the same period of 2025.</p>
<p><strong>What was Indocement sales volume?</strong> Cement and clinker totalled 15.75 million tonnes, up 9.0%; 15.09 million domestic and 660 thousand tonnes exported.</p>
<p><strong>Will cement prices fall?</strong> There is no guarantee. Indocement says energy costs and the exchange rate still pressure margins and mentions possible price adjustments.</p>
<p><strong>Which brands does Indocement make?</strong> Among others Semen Tiga Roda, Semen Rajawali, Mortar Tiga Roda and Semen Grobogan.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.indocement.co.id/media/post/indocement-press-release-2026q3-bahasa-indonesia-final.pdf" target="_blank" rel="noopener">Indocement, Q3 2026 results press release (accessed 5 Nov 2026)</a>; <a href="https://www.idxchannel.com/market-news/indocement-intp-cetak-laba-bersih-rp13-triliun-hingga-kuartal-iii-2026-tumbuh-22-persen" target="_blank" rel="noopener">IDXChannel, 4 Nov 2026</a>; <a href="https://id.tradingview.com/news/kontan:6c92b8caa87ea:0/" target="_blank" rel="noopener">Kontan via TradingView, September 2026 cement consumption</a></em></p>]]></content:encoded></item><item><title>AZKO&#x27;s 29 Distribution Centres and a Merak Bitumen Terminal: Materials Logistics 2026</title><link>https://www.homex.co.id/en/news/388</link><guid isPermaLink="true">https://www.homex.co.id/en/news/388</guid><pubDate>Wed, 04 Nov 2026 09:11:03 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Building materials distribution centres matter more: AZKO relies on 29 DCs from Aceh to Papua for 283 stores, and RPU opened 12,000 m³ bitumen tanks in Merak.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261104-i-pusat-distribusi-azko.jpg" alt="AZKO&#x27;s 29 Distribution Centres and a Merak Bitumen Terminal: Materials Logistics 2026"></p><p>Two October 2026 stories show that the <strong>building materials distribution centre</strong> and storage facilities now decide whether goods are available. AZKO (PT Aspirasi Hidup Indonesia Tbk/ACES) relies on 29 Kawan Lama Group distribution centres from Aceh to Papua for 283 stores, while PT Redeco Petrolin Utama (RPU) opened 12,000 m³ of bitumen tanks in Merak, Banten. The message is the same: stock close to buyers cuts delivery time and cost.</p>
<h2>Key Facts</h2><ul>
<li>AZKO is supported by 29 DCs: 6 in Sumatra, 8 in Java, 5 in Kalimantan, 4 in Sulawesi, 2 in Nusa Tenggara, 2 in Maluku, 2 in Papua (2026-10-16, source: <a href="https://www.cnbcindonesia.com/market/20261015155501-17-776534/infrastruktur-supply-chain-perkuat-skala-bisnis-azko-ini-buktinya" target="_blank" rel="noopener">CNBC Indonesia, &quot;Supply chain infrastructure strengthens AZKO business scale&quot; (16 Oct 2026)</a>).</li>
<li>The network supports 283 AZKO stores in more than 100 cities (2026-10-16, source: <a href="https://www.cnbcindonesia.com/market/20261015155501-17-776534/infrastruktur-supply-chain-perkuat-skala-bisnis-azko-ini-buktinya" target="_blank" rel="noopener">CNBC Indonesia, &quot;Supply chain infrastructure strengthens AZKO business scale&quot; (16 Oct 2026)</a>).</li>
<li>AZKO sales grew 6.5% YTD to July 2026; by September 19 AZKO and 21 NEKA stores had opened (2026-10-16, source: <a href="https://www.cnbcindonesia.com/market/20261015155501-17-776534/infrastruktur-supply-chain-perkuat-skala-bisnis-azko-ini-buktinya" target="_blank" rel="noopener">CNBC Indonesia, &quot;Supply chain infrastructure strengthens AZKO business scale&quot; (16 Oct 2026)</a>).</li>
<li>RPU inaugurated three bitumen tanks of 3,000, 4,000 and 5,000 m³ (12,000 m³ total) in Merak, Banten (2026-10-23, source: <a href="https://chandradaya-investasi.com/id/media/news/rpu-resmikan-fasilitas-tangki-bitumen" target="_blank" rel="noopener">Chandra Daya Investasi, &quot;RPU inaugurates bitumen tank facility&quot; (23 Oct 2026)</a>).</li>
<li>With the addition RPU operates 75 storage tanks (2026-10-23, source: <a href="https://chandradaya-investasi.com/id/media/news/rpu-resmikan-fasilitas-tangki-bitumen" target="_blank" rel="noopener">Chandra Daya Investasi, &quot;RPU inaugurates bitumen tank facility&quot; (23 Oct 2026)</a>).</li>
</ul>
<h2>The 29 distribution centres behind AZKO</h2>
<p>According to CNBC Indonesia (16 October 2026), AZKO product availability is maintained by the supply chain of its parent, Kawan Lama Group. The group runs 29 integrated distribution centres: six in Sumatra (including Batam and Tanjung Morawa), eight in Java, five in Kalimantan, four in Sulawesi, and two each in Nusa Tenggara, Maluku and Papua.</p>
<p>For heavy shipping volumes the company uses a Warehouse Management System (WMS) and Enterprise Resource Planning (ERP) so stock data and distribution flows are fully visible. A fleet of trucks of various types and capacities handles delivery from DCs to stores and customers.</p>
<h2>Store expansion into new cities</h2>
<p>ACES targets 25–30 new AZKO stores and 40–50 NEKA stores in 2026. By September 2026 it had opened 19 AZKO stores, including in Berau, Pasuruan, Timika, Kuningan, Baturaja, Jepara and Mamuju, plus 21 NEKA stores. AZKO sales grew 6.5% year-to-date to July 2026. ACES director Gregory S. Widjaja said the focus is on the product portfolio, a stronger supply chain and the use of digital technology and AI.</p>
<p>The pattern is clear: stores in smaller cities such as Timika or Mamuju only work if a regional warehouse is close enough to restock them regularly.</p>
<h2>A Merak bitumen terminal for road materials</h2>
<p>On the heavy construction side, RPU, a subsidiary of PT Chandra Daya Investasi Tbk (CDI), inaugurated a bitumen tank facility in Merak on 23 October 2026. Three new tanks of 3,000, 4,000 and 5,000 m³ bring RPU's total to 75 tanks for petrochemicals, oil, lubricants and bitumen. The company calls bitumen a key material for building and maintaining roads, and sees synergy with Aster on supply and Chandra Shipping International and SCG Barito Logistics on transport.</p>
<h2>What it means for contractors and project owners</h2>
<ul><li><strong>Lead time</strong>: goods stocked in a regional warehouse can be delivered faster than goods shipped in from Java.</li>
<li><strong>Delivery cost</strong>: the distance from warehouse to site drives cost; ask which warehouse the goods ship from.</li>
<li><strong>Stock certainty</strong>: suppliers using a WMS can usually give more accurate stock information before confirming an order.</li>
<li><strong>Phased delivery</strong>: for large projects, ask for deliveries in stages that follow the work sequence so materials do not pile up and get damaged on site.</li></ul>
<h2>The building materials distribution centre trend</h2>
<p>Both stories match the market direction: retail and logistics players are investing in spread-out warehouses, stock data systems and their own fleets. homeX is building a similar model as a one-stop building materials and furniture platform in Indonesia, combining showroom, warehousing and delivery so project buyers get goods on time.</p>
<h2>building materials distribution centre: related articles and products</h2><ul>
<li><a href="/en/news/332">Jabodetabek warehouse rents Q3 2026</a></li>
<li><a href="/en/news/184">B2B building materials supply model: warehouses and logistics</a></li>
<li><a href="/en/news/28">Building materials warehouses are getting scarce</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How many distribution centres support AZKO?</strong> According to CNBC Indonesia, 29 Kawan Lama Group distribution centres from Aceh to Papua, for 283 AZKO stores.</p>
<p><strong>What is the capacity of RPU's new bitumen tanks in Merak?</strong> 12,000 m³ in total across three tanks of 3,000, 4,000 and 5,000 m³, inaugurated on 23 October 2026.</p>
<p><strong>Why does warehouse location matter for projects?</strong> A nearby warehouse cuts lead time and delivery cost and makes phased deliveries that follow the work schedule easier.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.cnbcindonesia.com/market/20261015155501-17-776534/infrastruktur-supply-chain-perkuat-skala-bisnis-azko-ini-buktinya" target="_blank" rel="noopener">CNBC Indonesia, &quot;Supply chain infrastructure strengthens AZKO business scale&quot; (16 Oct 2026)</a>; <a href="https://chandradaya-investasi.com/id/media/news/rpu-resmikan-fasilitas-tangki-bitumen" target="_blank" rel="noopener">Chandra Daya Investasi, &quot;RPU inaugurates bitumen tank facility&quot; (23 Oct 2026)</a></em></p>]]></content:encoded></item><item><title>Formaldehyde Emission Classes for Plywood and MDF: E1, F4 Star and CARB Phase 2</title><link>https://www.homex.co.id/en/news/387</link><guid isPermaLink="true">https://www.homex.co.id/en/news/387</guid><pubDate>Wed, 04 Nov 2026 09:10:29 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Formaldehyde emission classes explained: E1 (0.1 ppm), Japan F4 Star (0.3 mg/L), CARB Phase 2 limits and the new EU 0.062 mg/m³ rule from August 2026.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261104-i-formaldehida-e1-f4star.jpg" alt="Formaldehyde Emission Classes for Plywood and MDF: E1, F4 Star and CARB Phase 2"></p><p><strong>Formaldehyde emission classes</strong> for plywood, MDF and particleboard differ by country: E1 in Europe (0.1 ppm in a chamber test), F★★★★ in Japan (0.3 mg/L average in a desiccator test) and CARB Phase 2 in the United States (0.05–0.13 ppm depending on panel type). Figures from different test methods cannot be compared directly. For bedrooms and built-in wardrobes, ask for clear emission-class documents before you buy.</p>
<h2>Key Facts</h2><ul>
<li>Japan JAS: F★★★★ average ≤0.3 mg/L (max 0.4), F★★★ ≤0.5 mg/L (max 0.7), F★★ ≤1.5 mg/L (max 2.1), F★ ≤5.0 mg/L (max 7.0) (2026-11-04, source: <a href="https://www.jpic-ew.net/formaldehyde/standard.shtml" target="_blank" rel="noopener">Japan Plywood Inspection Corporation (JPIC) – JAS emission standards</a>).</li>
<li>In many EU countries class E1 is mandatory, with a limit of 0.124 mg/m³ or 0.1 ppm using the EN 717-1 chamber method (2023-07-20, source: <a href="https://www.wki.fraunhofer.de/en/departments/qa/profile/news/certification-reach.html" target="_blank" rel="noopener">Fraunhofer WKI, 20 Jul 2023</a>).</li>
<li>From 6 August 2026, Regulation (EU) 2023/1464 limits emissions from indoor furniture and wood-based articles to ≤0.062 mg/m³ (2023-07-20, source: <a href="https://www.wki.fraunhofer.de/en/departments/qa/profile/news/certification-reach.html" target="_blank" rel="noopener">Fraunhofer WKI, 20 Jul 2023</a>).</li>
<li>CARB Phase 2 limits: hardwood plywood 0.05 ppm, particleboard 0.09 ppm, MDF 0.11 ppm, thin MDF 0.13 ppm (2026-11-04, source: <a href="https://ww2.arb.ca.gov/sites/default/files/classic/toxics/compwood/compwooded2017.pdf" target="_blank" rel="noopener">California Air Resources Board (CARB) – retailer guide</a>).</li>
</ul>
<h2>Why formaldehyde emission classes matter</h2>
<p>Formaldehyde is a colourless gas released mainly from the urea-formaldehyde glues used in plywood, MDF and particleboard. Indonesian manufacturer PT Kayu Lapis Indonesia in Kendal explains that emissions rise when wood is processed with heat and pressure, and boards that use a lot of glue release more. TÜV Rheinland notes that the EU classifies formaldehyde as a category 1B carcinogen. Since wardrobes, kitchen cabinets and bed frames put a lot of board into closed rooms, the emission class is worth checking just like thickness and glue class.</p>
<h2>Reading the three main systems</h2>
<h3>Japan: F★★★★ (F4 Star)</h3>
<p>The JAS system uses a desiccator test: a sample is sealed in a glass vessel with water, and the formaldehyde absorbed in the water is measured in mg/L. The top F★★★★ class was introduced in 2003 when Japan tightened its sick-house rules. More stars mean lower emissions.</p>
<h3>Europe: E1 and the new REACH limit</h3>
<p>E1 is measured in an EN 717-1 test chamber and expressed in mg/m³ or ppm of air. Since 6 August 2026 the EU applies a stricter limit of 0.062 mg/m³ for furniture and wood-based articles, so an E1 label alone is no longer enough for the European market. "E0" is a term traders often use, but it is not a uniform EN 717-1 class; ask for the number and the test method.</p>
<h3>United States: CARB Phase 2 and TSCA Title VI</h3>
<p>California sets limits per panel type in ppm. Hardwood plywood has the strictest limit (0.05 ppm) and thin MDF of 8 mm or less the loosest (0.13 ppm). According to CARB's guide, panels and finished goods must be labelled with the manufacturer name, production date and a compliance statement; the federal TSCA Title VI Compliant label is also accepted by CARB.</p>
<h2>How to check when buying board</h2>
<ul><li>Look for an emission stamp or label on the face or edge of the board, such as F★★★★, E1 or CARB P2, together with the mill name.</li>
<li>Ask for a test report stating the method (JIS/JAS desiccator, EN 717-1 chamber, or a CARB/TSCA-recognised method) and test date.</li>
<li>Do not compare mg/L with mg/m³ directly; the units come from different methods.</li>
<li>For children's rooms and bedrooms, choose the lowest class available and seal every side of the board, including edges, with HPL, edging or paint.</li>
<li>Ventilate the room for a few days after new furniture is installed before using it.</li></ul>
<p>homeX, an integrated building materials and furniture platform in Indonesia with showroom, warehousing and delivery, can help you compare plywood, MDF and furniture by emission class and test documents.</p>
<h2>Formaldehyde emission classes: related articles and products</h2><ul>
<li><a href="/en/news/346">Plywood glue bond classes under EN 314-2</a></li>
<li><a href="/en/news/347">MDF, particleboard and OSB classes</a></li>
<li><a href="/en/news/345">Laminate flooring AC classes</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What does F4 Star mean on plywood?</strong> It is the top class of Japan's JAS standard: average emission ≤0.3 mg/L and maximum 0.4 mg/L in a desiccator test.</p>
<p><strong>Are E1 and F4 Star the same?</strong> No. E1 is measured in an EN 717-1 chamber (≤0.1 ppm) and F4 Star in a desiccator (mg/L). The methods differ, so the numbers cannot be equated.</p>
<p><strong>Is E0 an official standard?</strong> E0 is not a uniform class in EN 717-1. Ask for the emission figure and test method, not just the label.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.jpic-ew.net/formaldehyde/standard.shtml" target="_blank" rel="noopener">Japan Plywood Inspection Corporation (JPIC) – JAS emission standards</a>; <a href="https://www.wki.fraunhofer.de/en/departments/qa/profile/news/certification-reach.html" target="_blank" rel="noopener">Fraunhofer WKI, 20 Jul 2023</a>; <a href="https://ww2.arb.ca.gov/sites/default/files/classic/toxics/compwood/compwooded2017.pdf" target="_blank" rel="noopener">California Air Resources Board (CARB) – retailer guide</a>; <a href="https://pt-kli.com/journal/the-importance-of-low-emitting-wood/" target="_blank" rel="noopener">PT Kayu Lapis Indonesia, 9 Dec 2021</a>; <a href="https://www.tuv.com/regulations-and-standards/en/eu-restriction-of-formaldehyde-and-formaldehyde-releasers-adopted.html" target="_blank" rel="noopener">TÜV Rheinland – EU Restriction of Formaldehyde</a></em></p>]]></content:encoded></item><item><title>Subsidised Housing Stock at 24,868 Units as FLPP Reaches 197,048 of 360,000</title><link>https://www.homex.co.id/en/news/386</link><guid isPermaLink="true">https://www.homex.co.id/en/news/386</guid><pubDate>Wed, 04 Nov 2026 09:09:50 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Ready subsidised housing stock was 24,868 units on 30 Oct 2026, far below the 162,952 FLPP units still to go. Mass signings of 101,000 are planned in December.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261104-i-flpp-november-2026.jpg" alt="Subsidised Housing Stock at 24,868 Units as FLPP Reaches 197,048 of 360,000"></p><p>Ready-to-occupy <strong>subsidised housing stock</strong> stood at 24,868 units on 30 October 2026, while about 162,952 FLPP subsidised mortgages are still needed to meet this year's target. By 2 November 2026, BP Tapera had recorded 197,048 units, or 54.72% of the 360,000-unit target. The gap means developers must speed up construction, and demand for subsidised-housing materials should stay high into early 2027.</p>
<h2>Key Facts</h2><ul>
<li>FLPP disbursement reached 197,048 units worth Rp24.55 trillion as of 2 November 2026 at 14:30 WIB (2026-11-03, source: <a href="https://www.cnbcindonesia.com/news/20261103145116-4-781927/rumah-subsidi-baru-laku-54-ready-stock-ada-24000-unit-lebih" target="_blank" rel="noopener">CNBC Indonesia: ready stock of 24,000 units</a>).</li>
<li>Ready subsidised stock was 24,868 units (22,833 landed houses, 2,035 apartments) plus 2,797 landed houses under construction as of 30 October 2026 (2026-11-03, source: <a href="https://www.cnbcindonesia.com/news/20261103145116-4-781927/rumah-subsidi-baru-laku-54-ready-stock-ada-24000-unit-lebih" target="_blank" rel="noopener">CNBC Indonesia: ready stock of 24,000 units</a>).</li>
<li>October 2026 FLPP disbursement was 29,352 units, about 22% higher than a year earlier (2026-11-03, source: <a href="https://www.cnbcindonesia.com/news/20261103102709-4-781809/2026-kurang-dari-2-bulan-penyaluran-rumah-subsidi-flpp-baru-segini" target="_blank" rel="noopener">CNBC Indonesia: FLPP disbursement</a>).</li>
<li>Mass signings are planned for 71,000 units on 17 December and 30,000 units on 21 December 2026 (2026-11-03, source: <a href="https://www.cnbcindonesia.com/news/20261103102709-4-781809/2026-kurang-dari-2-bulan-penyaluran-rumah-subsidi-flpp-baru-segini" target="_blank" rel="noopener">CNBC Indonesia: FLPP disbursement</a>).</li>
</ul>
<h2>FLPP status in early November 2026</h2>
<p>BP Tapera data cited by CNBC Indonesia show FLPP disbursement at 194,360 units worth Rp24.22 trillion on 30 October 2026, rising by 2,688 units to 197,048 by 2 November. As of 30 October, almost all were landed houses (194,335 units), while apartment mortgages totalled just 25 units. Bank BTN was the largest lender with 85,341 units, followed by Bank Syariah Nasional with 48,286 and BRI with 26,182. West Java led with 44,295 units, followed by Central Java with 17,906 and South Sulawesi with 16,538.</p>
<h2>Subsidised housing stock falls short of the remaining target</h2>
<p>On 30 October, the 24,868 ready units comprised 22,833 landed houses and 2,035 apartment units. Adding 2,797 landed houses still under construction, recorded supply totals 27,665 units, far below the remaining target of almost 163,000. On the demand side, BP Tapera counted 36,780 units at various stages, including 14,169 that had passed subsidy checking and 3,655 already at the credit-signing stage.</p>
<p>To catch up, the government plans mass signings of 71,000 units on 17 December and 30,000 units on 21 December 2026. BP Tapera is optimistic because October disbursement of 29,352 units was about 22% higher than a year earlier.</p>
<h3>Outlook for 2027</h3>
<p>The 2027 draft budget financial note sets aside Rp31 trillion of FLPP funds for 344,800 subsidised homes, slightly below the 2026 target. The indicative budget of the Ministry of Housing and Settlement Areas (PKP) for 2027 rises 8.08% to Rp11.77 trillion, so the subsidised-housing project pipeline continues next year.</p>
<h2>What it means for building-material supply</h2>
<p>Subsidised landed houses generally use standard materials: cement, bricks or lightweight blocks, reinforcing bar, light steel roof trusses, roof tiles, floor tiles, frames and doors, paint, electrical and sanitary installations. If developers accelerate construction ahead of the December signings, demand for these materials in West Java, Central Java and South Sulawesi could rise quickly. Developers should lock in prices and delivery schedules early, and building stores near housing estates can stock fast-moving items.</p>
<p>homeX, a one-stop building materials and furniture platform in Indonesia with showroom, warehousing and delivery, can help developers prepare subsidised-housing material packages in a single order.</p>
<h2>Subsidised housing stock: related articles and products</h2><ul>
<li><a href="/en/news/23">FLPP subsidised mortgages as of 20 October 2026</a></li>
<li><a href="/en/news/320">NabungDP Perumnas–BTN down-payment savings</a></li>
<li><a href="/en/news/323">BSPS home renovation progress</a></li>
<li><a href="/products/232">Gypsum board for ceilings</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How many FLPP mortgages had been disbursed by early November 2026?</strong> BP Tapera recorded 197,048 units worth Rp24.55 trillion as of 2 November 2026, or 54.72% of the 360,000 target.</p>
<p><strong>How much ready subsidised housing stock is there?</strong> As of 30 October 2026 there were 24,868 ready units, plus 2,797 landed houses under construction.</p>
<p><strong>When are the mass mortgage signings?</strong> They are planned for 71,000 units on 17 December and 30,000 units on 21 December 2026.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.cnbcindonesia.com/news/20261103145116-4-781927/rumah-subsidi-baru-laku-54-ready-stock-ada-24000-unit-lebih" target="_blank" rel="noopener">CNBC Indonesia: ready stock of 24,000 units</a>; <a href="https://www.cnbcindonesia.com/news/20261103102709-4-781809/2026-kurang-dari-2-bulan-penyaluran-rumah-subsidi-flpp-baru-segini" target="_blank" rel="noopener">CNBC Indonesia: FLPP disbursement</a>; <a href="https://investortrust.id/macro/113281/anggaran-perumahan-2027-tembus-rp-29-79-t-rumah-subsidi-dapat-rp-31-triliun" target="_blank" rel="noopener">Investortrust</a></em></p>]]></content:encoded></item><item><title>Solusi Bangun Indonesia (SMCB) Earns Rp476.69 Billion, Starts Cement Exports to US</title><link>https://www.homex.co.id/en/news/385</link><guid isPermaLink="true">https://www.homex.co.id/en/news/385</guid><pubDate>Wed, 04 Nov 2026 09:09:33 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Solusi Bangun Indonesia profit (SMCB) for January–September 2026 was Rp476.69 billion on revenue of Rp8.48 trillion, with 300,000+ tonnes exported to the US.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261104-i-laba-smcb-q3.jpg" alt="Solusi Bangun Indonesia (SMCB) Earns Rp476.69 Billion, Starts Cement Exports to US"></p><p><strong>Solusi Bangun Indonesia profit</strong> (SMCB) reached Rp476.69 billion in January–September 2026, slightly above Rp474 billion a year earlier. Revenue rose 7.64% to Rp8.48 trillion and cement and clinker sales volume grew 3.16% to 9.17 million tonnes. With the national cement industry still in overcapacity, the company is relying on efficiency, the domestic market and new exports to the United States.</p>
<h2>Key Facts</h2><ul>
<li>Net profit January–September 2026: Rp476.69 billion, versus Rp474 billion a year earlier (2026-11-02, source: <a href="https://www.idxchannel.com/market-news/jaga-profitabilitas-laba-solusi-bangun-indonesia-smcb-stabil-hingga-september-2026" target="_blank" rel="noopener">IDX Channel, Solusi Bangun Indonesia (SMCB) profit stable through September 2026 (2 Nov 2026)</a>).</li>
<li>Revenue Rp8.48 trillion, up 7.64%; gross profit Rp1.88 trillion, up 7.16% (2026-11-02, source: <a href="https://www.idxchannel.com/market-news/jaga-profitabilitas-laba-solusi-bangun-indonesia-smcb-stabil-hingga-september-2026" target="_blank" rel="noopener">IDX Channel, Solusi Bangun Indonesia (SMCB) profit stable through September 2026 (2 Nov 2026)</a>).</li>
<li>Cement and clinker sales volume including exports: 9.17 million tonnes, up 3.16% (2026-11-02, source: <a href="https://www.idxchannel.com/market-news/jaga-profitabilitas-laba-solusi-bangun-indonesia-smcb-stabil-hingga-september-2026" target="_blank" rel="noopener">IDX Channel, Solusi Bangun Indonesia (SMCB) profit stable through September 2026 (2 Nov 2026)</a>).</li>
<li>Cement exports to the US West Coast passed 300,000 tonnes by September 2026, in partnership with Taiheiyo Cement (2026-10-30, source: <a href="https://opsi.id/pendapatan-solusi-bangun-indonesia-smcb-tembus-rp848-triliun-laba-bersih-sentuh-rp47669-miliar/" target="_blank" rel="noopener">Opsi.id, SMCB revenue reaches Rp8.48 trillion, net profit Rp476.69 billion (30 Oct 2026)</a>).</li>
<li>National domestic cement sales in January–September 2026 reached 49.45 million tonnes, up 8.3% (2026-10-30, source: <a href="https://opsi.id/pendapatan-solusi-bangun-indonesia-smcb-tembus-rp848-triliun-laba-bersih-sentuh-rp47669-miliar/" target="_blank" rel="noopener">Opsi.id, SMCB revenue reaches Rp8.48 trillion, net profit Rp476.69 billion (30 Oct 2026)</a>).</li>
</ul>
<h2>Solusi Bangun Indonesia profit to Q3 2026</h2>
<p>According to reports by IDX Channel and Opsi.id, SMCB's earnings were supported by sales growth, operating cost control and lower interest expense after loan repayments. Gross profit rose 7.16% to Rp1.88 trillion, broadly in line with the 7.64% revenue increase. Net profit was essentially flat.</p>
<p>President Director Rizki Kresno Edhie Hambali said growth is measured not only by volume but by the ability to protect profitability through cost efficiency, financial discipline and new export markets. The challenges he named were tight competition, production overcapacity and pressure from energy and logistics costs.</p>
<h2>Domestic market: Semen Kujang back in West Java</h2>
<p>SMCB's volume grew 3.16%, slower than the domestic cement market, which industry data put at 49.45 million tonnes in January–September 2026, up 8.3%. To strengthen its home market, the company has relaunched the Semen Kujang brand in West Java and deepened partnerships with distributors and shop owners.</p>
<p>SMCB also supplies materials for infrastructure such as ports and toll roads, and for government projects such as Sekolah Rakyat schools and Koperasi Desa Merah Putih village cooperatives in Bangka Belitung, Jakarta, Banten, West Java and Central Java.</p>
<h2>Exports to the United States and green products</h2>
<p>Cement exports began in June 2026 after a dedicated export jetty was completed. By September, specialty cement shipped to the US West Coast had passed 300,000 tonnes through a partnership with Taiheiyo Cement Corporation. The company also says 12 of its products hold Green Label certification from the Green Product Council Indonesia, and sustainable solutions made up 46% of revenue in 2025.</p>
<h2>What it means for cement buyers</h2>
<p>Overcapacity keeps producers competing hard at home, but energy and logistics costs still bite. In regions far from plants, freight and ship availability often matter more to the final price than the factory price.</p>
<ul><li>Compare several cement brands for the same type, for example PCC for general work.</li>
<li>For green-certified projects, ask for the Green Label documents of the products used.</li>
<li>Order cement in line with work stages and store it somewhere dry so it does not harden.</li></ul>
<p>homeX, an Indonesian one-stop platform for building materials and furniture with a showroom, warehousing and delivery, can help prepare cement together with other materials in one delivery to the site.</p>
<h2>Solusi Bangun Indonesia profit: related articles and products</h2><ul>
<li><a href="/news/342">Semen Indonesia nine-month 2026 profit</a></li>
<li><a href="/news/318">Indocement market share September 2026</a></li>
<li><a href="/news/352">Cement transport by rail in 2026</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much did SMCB earn to September 2026?</strong> Solusi Bangun Indonesia posted net profit of Rp476.69 billion in January–September 2026, slightly up from Rp474 billion a year earlier, on revenue of Rp8.48 trillion.</p>
<p><strong>Where does SMCB export cement?</strong> To the US West Coast, starting in June 2026 after its export jetty was finished. By September volume had passed 300,000 tonnes, in partnership with Taiheiyo Cement.</p>
<p><strong>How big were domestic cement sales in 2026?</strong> According to industry data cited by SMCB, domestic cement sales in January–September 2026 reached 49.45 million tonnes, up 8.3% year on year.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.idxchannel.com/market-news/jaga-profitabilitas-laba-solusi-bangun-indonesia-smcb-stabil-hingga-september-2026" target="_blank" rel="noopener">IDX Channel, Solusi Bangun Indonesia (SMCB) profit stable through September 2026 (2 Nov 2026)</a>; <a href="https://opsi.id/pendapatan-solusi-bangun-indonesia-smcb-tembus-rp848-triliun-laba-bersih-sentuh-rp47669-miliar/" target="_blank" rel="noopener">Opsi.id, SMCB revenue reaches Rp8.48 trillion, net profit Rp476.69 billion (30 Oct 2026)</a></em></p>]]></content:encoded></item><item><title>Indonesia Construction Materials Price Index October 2026 Up 9.59% Year on Year</title><link>https://www.homex.co.id/en/news/384</link><guid isPermaLink="true">https://www.homex.co.id/en/news/384</guid><pubDate>Wed, 04 Nov 2026 09:09:33 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Indonesia construction materials price index for October 2026 stood at 111.99, up 0.31% on the month and 9.59% on the year; cables rose, PVC pipe fell.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261104-i-ihpb-oktober-2026.jpg" alt="Indonesia Construction Materials Price Index October 2026 Up 9.59% Year on Year"></p><p>The <strong>Indonesia construction materials price index</strong> (IHPB) for October 2026 stood at 111.99, up 0.31% from September and 9.59% from October 2025, according to BPS data compiled by Databoks. The biggest monthly increases were in sandpaper, power sockets, padlocks, roof tiles and electric cable, while PVC pipe, copper taps and bricks fell. Project budgets should therefore be built item by item rather than with one average increase.</p>
<h2>Key Facts</h2><ul>
<li>Construction materials wholesale price index, October 2026: 111.99, up 0.31% m/m and 9.59% y/y (2026-11-03, source: <a href="https://databoks.katadata.co.id/ekonomi-makro/statistik/3a6719d2aa29da8/indeks-harga-perdagangan-besar-ihpb-bahan-bangunan" target="_blank" rel="noopener">Databoks Katadata, construction materials wholesale price index up 0.31% to 111.99 in October 2026, BPS data (3 Nov 2026)</a>).</li>
<li>Residential and non-residential buildings group: 112.92, up 9.94% y/y (2026-11-03, source: <a href="https://databoks.katadata.co.id/ekonomi-makro/statistik/3a6719d2aa29da8/indeks-harga-perdagangan-besar-ihpb-bahan-bangunan" target="_blank" rel="noopener">Databoks Katadata, construction materials wholesale price index up 0.31% to 111.99 in October 2026, BPS data (3 Nov 2026)</a>).</li>
<li>Electric cable at 144.36, up 1.50% m/m; ordinary roof tiles at 114.93, up 1.78% m/m (2026-11-03, source: <a href="https://databoks.katadata.co.id/ekonomi-makro/statistik/3a6719d2aa29da8/indeks-harga-perdagangan-besar-ihpb-bahan-bangunan" target="_blank" rel="noopener">Databoks Katadata, construction materials wholesale price index up 0.31% to 111.99 in October 2026, BPS data (3 Nov 2026)</a>).</li>
<li>PVC pipe down 0.85% m/m to 106.77; bricks down 0.42% m/m to 110.32 (2026-11-03, source: <a href="https://databoks.katadata.co.id/ekonomi-makro/statistik/3a6719d2aa29da8/indeks-harga-perdagangan-besar-ihpb-bahan-bangunan" target="_blank" rel="noopener">Databoks Katadata, construction materials wholesale price index up 0.31% to 111.99 in October 2026, BPS data (3 Nov 2026)</a>).</li>
<li>A Central Java developer said building a standard house now costs about Rp4 million per m², up from Rp3.5 million (2026-10-20, source: <a href="https://www.kompas.com/properti/read/2026/10/20/100600121/berapa-biaya-bangun-rumah-per-meter-saat-ini-" target="_blank" rel="noopener">Kompas.com, how much does it cost to build a house per metre now? (20 Oct 2026)</a>).</li>
</ul>
<h2>Indonesia construction materials price index by building group</h2>
<p>The wholesale price index (IHPB) for construction materials tracks prices at wholesale level, before goods reach building shops or sites. That makes it an early signal of where material costs are heading. In October 2026 every building group was still up on the year:</p>
<ul><li>Residential and non-residential buildings: 112.92 (up 9.94% y/y; 0.15% m/m).</li>
<li>Roads, bridges and ports: 111.67 (up 9.93% y/y; 0.50% m/m).</li>
<li>Electricity, gas, water and communication installations: 110.11 (up 8.90% y/y; down 0.03% m/m).</li>
<li>Other buildings: 109.34 (up 7.61% y/y).</li>
<li>Public works for agriculture: 111.06 (up 7.33% y/y).</li></ul>
<h2>Materials with the sharpest moves</h2>
<p>On the item-level index (base 2023=100), the highest monthly rises were sandpaper (120.56; up 8.52%), power sockets (113.15; up 4.23%), iron or steel padlocks (106.82; up 2.30%), ordinary roof tiles (114.93; up 1.78%) and electric cable (144.36; up 1.50%). Cable stands out because its level is already 44% above the base year.</p>
<p>The steepest monthly falls were PVC pipe (106.77; down 0.85%), copper water taps (122.36; down 0.47%), bricks (110.32; down 0.42%), aluminium pipe (105.28; down 0.27%) and aluminium door and window frames (140.91; down 0.16%).</p>
<h2>What it means for building and renovation costs</h2>
<p>An annual rise of almost 10% matches what developers see on the ground. Speaking to Kompas.com on 20 October 2026, Yulistyo Ramon Adianto, a housing developer in Demak and Semarang, said a standard house that used to cost Rp3.5 million per square metre to build can now cost Rp4 million. He put this year's increase in material prices at 10–15%, citing cement, PVC pipe, steel and galvalume, on top of higher builder wages.</p>
<p>Keep in mind that IHPB is an index, not a rupiah price. Shop prices still vary by brand, region and delivery cost.</p>
<h2>Tips for material budgets</h2>
<ul><li>Lock in prices for electric cable and roof tiles early if a project runs for several more months.</li>
<li>For PVC pipe and bricks, which are easing, compare several quotes before buying in bulk.</li>
<li>Keep electrical materials separate from structural items in the cost estimate, since their prices are moving differently.</li>
<li>Add a contingency, for example for delivery costs and price gaps between suppliers.</li></ul>
<p>homeX, an Indonesian one-stop platform for building materials and furniture with a showroom, warehousing and delivery, can help compare material quotes from several suppliers in a single request.</p>
<h2>Indonesia construction materials price index: related articles and products</h2><ul>
<li><a href="/news/324">Jakarta building material prices 2026 from the DKI survey</a></li>
<li><a href="/news/365">Cement shortage in Bima and Lombok</a></li>
<li><a href="/products/394">PPR pipe for water installations</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What was the construction materials price index in October 2026?</strong> According to BPS data compiled by Databoks, it stood at 111.99, up 0.31% from September and 9.59% from October 2025.</p>
<p><strong>Which materials rose most in October 2026?</strong> Month on month: sandpaper up 8.52%, power sockets 4.23%, iron padlocks 2.30%, ordinary roof tiles 1.78% and electric cable 1.50%.</p>
<p><strong>Which materials got cheaper?</strong> PVC pipe fell 0.85%, copper taps 0.47%, bricks 0.42%, aluminium pipe 0.27% and aluminium frames 0.16% compared with September.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://databoks.katadata.co.id/ekonomi-makro/statistik/3a6719d2aa29da8/indeks-harga-perdagangan-besar-ihpb-bahan-bangunan" target="_blank" rel="noopener">Databoks Katadata, construction materials wholesale price index up 0.31% to 111.99 in October 2026, BPS data (3 Nov 2026)</a>; <a href="https://www.kompas.com/properti/read/2026/10/20/100600121/berapa-biaya-bangun-rumah-per-meter-saat-ini-" target="_blank" rel="noopener">Kompas.com, how much does it cost to build a house per metre now? (20 Oct 2026)</a></em></p>]]></content:encoded></item><item><title>Luxagress Tile Prices 2026: 30x60 Wall, 40x40 Floor up to 60x120</title><link>https://www.homex.co.id/en/news/383</link><guid isPermaLink="true">https://www.homex.co.id/en/news/383</guid><pubDate>Wed, 04 Nov 2026 09:09:08 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Luxagress tile prices at Mitra10 on 4 Nov 2026: 40x40 floor Rp42k per box, 30x60 wall Rp63k–92k, 60x120 granite (2.16 m² box) Rp315k per box after promo.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261104-i-harga-keramik-luxagress.jpg" alt="Luxagress Tile Prices 2026: 30x60 Wall, 40x40 Floor up to 60x120"></p><p>The <strong>Luxagress tile price</strong> at the official Mitra10 online store on 4 November 2026 was Rp42,000 per box for 40x40 floor tiles, Rp62,800–Rp91,937 per box for 30x60 wall tiles and Rp315,000 per box for the large 60x120 granite (2.16 m² per box), all promotional prices. Regular prices before discount are higher, for example Rp100,500–Rp125,000 for 30x60 wall tiles. Luxagress suits mid-range budgets, especially bathroom and kitchen wall tiles.</p>
<h2>Key Facts</h2><ul>
<li>Luxagress Lancina Brown 40x40 KW1 floor tile (0.96 m², 6 pieces): regular Rp65,500, promo Rp42,000 per box (2026-11-04, source: <a href="https://www.mitra10.com/product/luxagress-ft-kw-i-lancina-brown-40x40-cm" target="_blank" rel="noopener">Mitra10, Luxagress Lancina Brown 40x40 floor tile (accessed 4 Nov 2026)</a>).</li>
<li>Luxagress 50x50 M-Moza Black granite (1 m², 4 pieces): regular Rp91,000, promo Rp80,812 per box (2026-11-04, source: <a href="https://www.mitra10.com/product/luxagress-granite-ft-kw-i-50x50cm-m-moza-black" target="_blank" rel="noopener">Mitra10, Luxagress 50x50 M-Moza Black (accessed 4 Nov 2026)</a>).</li>
<li>Luxagress M-Malino 30x60 Grey glossy KW1 wall tile: regular Rp100,500, promo Rp89,890 per box (2026-11-04, source: <a href="https://www.mitra10.com/product/luxagress-keramik-dinding-m-malino-wt-kw-i-30x60-cm-grey" target="_blank" rel="noopener">Mitra10, Luxagress M-Malino 30x60 Grey wall tile (accessed 4 Nov 2026)</a>).</li>
<li>Luxagress M-Marmora 30x60 Beige wall tile: regular Rp102,800, promo Rp91,937 per box (2026-11-04, source: <a href="https://www.mitra10.com/product/luxagress-keramik-dinding-m-marmora-wt-kw-i-beige-30x60-cm" target="_blank" rel="noopener">Mitra10, Luxagress M-Marmora 30x60 Beige wall tile (accessed 4 Nov 2026)</a>).</li>
<li>Luxagress BB126018 60x120 glazed (2.16 m² per box): regular Rp450,000, promo Rp315,000 per box (2026-11-04, source: <a href="https://www.mitra10.com/product/luxagress-bb126018-60x120cm-dus-2-16m2-glazed" target="_blank" rel="noopener">Mitra10, Luxagress BB126018 60x120 (accessed 4 Nov 2026)</a>).</li>
</ul>
<h2>Luxagress tile price: 30x60 wall tiles</h2>
<p>The 30x60 cm KW1 wall series was the largest Luxagress group at Mitra10 on the check date. Prices fall into two levels:</p>
<ul><li><strong>Regular Rp100,500, promo Rp89,890 per box</strong>: M-Malino Grey, M-Monalisa Grey, M-Marina Blue and Beige, plus the granite-look wall designs M-Martina, M-Malta Grey and M-Maxim Grey.</li>
<li><strong>Regular Rp102,800, promo Rp91,937 per box</strong>: M-Marmora Beige, M-Melawai Beige, M-Magnolia Blue, M-Makedonia Beige, M-Malta Dark Grey and M-Maxim Dark Grey.</li>
<li><strong>Normandy Beige 30x60</strong>: regular Rp125,000 with a promo price of Rp62,800 per box, the lowest in the wall series at the time.</li></ul>
<p>The product description calls these tiles glossy and suitable for bathrooms, kitchens and house walls. The box content for the 30x60 series is not stated on the product page, so ask the store before calculating quantities.</p>
<h2>Luxagress floor tile and granite prices</h2>
<ul><li><strong>40x40 Lancina Brown floor</strong> with wood look: 0.96 m² (6 pieces), regular Rp65,500, promo Rp42,000 per box, about Rp43,750/m².</li>
<li><strong>30x30 Marawis Mocca granite</strong>: regular Rp77,800, promo Rp69,687 per box; described as suitable for bathrooms, terraces and kitchen walls.</li>
<li><strong>50x50 M-Moza Black granite</strong> with mosaic look: 1 m² (4 pieces), regular Rp91,000, promo Rp80,812.</li>
<li><strong>60x120 BB126018 glazed granite</strong>: 2.16 m² per box, regular Rp450,000, promo Rp315,000, about Rp145,800/m².</li></ul>
<h2>How to read Luxagress codes</h2>
<p>Luxagress product names often include <strong>WT</strong> (wall tile) and <strong>FT</strong> (floor tile), followed by <strong>KW.I</strong>, meaning first quality or grade A. Do not use wall tiles on floors: they are not designed for foot traffic loads and abrasion.</p>
<h2>Example quantity for a bathroom</h2>
<p>Take a 1.5x2 m bathroom with wall tiles up to 2.2 m. The perimeter of 7 m x 2.2 m gives 15.4 m², minus about 1.5 m² for the door, so about 14 m² of wall. Add a 10% cutting allowance and you need about 15.4 m². The floor is 3 m²; with 40x40 tiles at 0.96 m² per box you need 4 boxes including spare. For wet floors, pick a matt or textured surface so it is not slippery.</p>
<h2>Tips before buying</h2>
<ul><li>Promo prices follow Mitra10 periods and may differ by branch; the prices above were checked online on 4 November 2026.</li>
<li>Buy all boxes at once from the same batch so the colour matches.</li>
<li>For fragile goods, the Mitra10 page recommends the store's internal courier, which serves up to 20 km from the store with a 2–3 day lead time.</li></ul>
<p>homeX, a one-stop building materials platform with showroom, warehousing and delivery, can help compare Luxagress tiles with other brands such as KIA or Roman before you order.</p>
<h2>Luxagress tile price: related articles and products</h2><ul>
<li><a href="/en/news/80">Kitchen wall tile 30x60 prices 2026</a></li>
<li><a href="/en/news/47">Bathroom wall and floor tile prices</a></li>
<li><a href="/en/news/167">KW1, KW2, KW3 tiles: meaning and checks</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much are Luxagress 30x60 wall tiles?</strong> On 4 Nov 2026 at Mitra10, promo prices were Rp62,800–Rp91,937 per box, with regular prices of Rp100,500–Rp125,000.</p>
<p><strong>What do WT and FT mean on Luxagress tiles?</strong> WT means wall tile and FT means floor tile.</p>
<p><strong>How much does one box of Luxagress 60x120 cover?</strong> According to the Mitra10 product name, one box of BB126018 60x120 covers 2.16 m².</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.mitra10.com/product/luxagress-ft-kw-i-lancina-brown-40x40-cm" target="_blank" rel="noopener">Mitra10, Luxagress Lancina Brown 40x40 floor tile (accessed 4 Nov 2026)</a>; <a href="https://www.mitra10.com/product/luxagress-granite-ft-kw-i-50x50cm-m-moza-black" target="_blank" rel="noopener">Mitra10, Luxagress 50x50 M-Moza Black (accessed 4 Nov 2026)</a>; <a href="https://www.mitra10.com/product/luxagress-keramik-dinding-m-malino-wt-kw-i-30x60-cm-grey" target="_blank" rel="noopener">Mitra10, Luxagress M-Malino 30x60 Grey wall tile (accessed 4 Nov 2026)</a>; <a href="https://www.mitra10.com/product/luxagress-keramik-dinding-m-marmora-wt-kw-i-beige-30x60-cm" target="_blank" rel="noopener">Mitra10, Luxagress M-Marmora 30x60 Beige wall tile (accessed 4 Nov 2026)</a>; <a href="https://www.mitra10.com/product/luxagress-bb126018-60x120cm-dus-2-16m2-glazed" target="_blank" rel="noopener">Mitra10, Luxagress BB126018 60x120 (accessed 4 Nov 2026)</a>; <a href="https://www.mitra10.com/product/granit-lantai-luxagress-30x30-cm-kw-i-motif-marawis-mocca" target="_blank" rel="noopener">Mitra10, Luxagress 30x30 Marawis Mocca (accessed 4 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>Carina Granite Tile Prices 2026: 60x60 Matt &amp; Glossy, 80x80 Polished per Box</title><link>https://www.homex.co.id/en/news/382</link><guid isPermaLink="true">https://www.homex.co.id/en/news/382</guid><pubDate>Wed, 04 Nov 2026 09:09:08 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Carina granite tile prices at Mitra10 on 4 Nov 2026: 60x60 (1.44 m² box) Rp158k–241k after promo, 80x80 (1.92 m² box) Rp257k–342k per box.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261104-i-harga-granit-carina.jpg" alt="Carina Granite Tile Prices 2026: 60x60 Matt &amp; Glossy, 80x80 Polished per Box"></p><p>The <strong>Carina granite tile price</strong> at the official Mitra10 online store on 4 November 2026 ranged from Rp158,400 to Rp241,056 per box for 60x60 cm (1.44 m² per box) and from Rp256,819 to Rp342,144 per box for 80x80 cm (1.92 m² per box), including a promotion of about 10%. Per square metre, Carina 60x60 starts at about Rp110k/m², while 80x80 runs about Rp134k–178k/m². Black and some grey designs cost more than white ones.</p>
<h2>Key Facts</h2><ul>
<li>Carina 60x60 white/bianco glossy: regular Rp178,560, promo Rp158,400 per 1.44 m² box (2026-11-04, source: <a href="https://www.mitra10.com/product/carina-granit-lantai-60x60-cm-1-44m2-freesia-white-glossy" target="_blank" rel="noopener">Mitra10, Carina 60x60 Freesia White Glossy (accessed 4 Nov 2026)</a>).</li>
<li>Carina 60x60 matt (e.g. Fein Matt): regular Rp182,880, promo Rp164,592 per box (2026-11-04, source: <a href="https://www.mitra10.com/product/carina-granit-lantai-60x60-cm-1-44m2-fein-matt" target="_blank" rel="noopener">Mitra10, Carina 60x60 Fein Matt granite tile (accessed 4 Nov 2026)</a>).</li>
<li>Carina 60x60 Fulica Black Glossy: regular Rp267,840, promo Rp241,056 per box (2026-11-04, source: <a href="https://www.mitra10.com/product/carina-granit-lantai-60x60-cm-1-44m2-fulica-black-glossy" target="_blank" rel="noopener">Mitra10, Carina 60x60 Fulica Black Glossy (accessed 4 Nov 2026)</a>).</li>
<li>Carina 80x80 Fresco Grey Glazed Polished: regular Rp291,840, promo Rp262,656 per 1.92 m² box (2026-11-04, source: <a href="https://www.mitra10.com/product/carina-granit-lantai-80x80-cm-1-92m2-fresco-grey-glazed-polished" target="_blank" rel="noopener">Mitra10, Carina 80x80 Fresco Grey Glazed Polished (accessed 4 Nov 2026)</a>).</li>
<li>Carina 80x80 Froid Grey Glazed Polished: regular Rp380,160, promo Rp342,144 per box (2026-11-04, source: <a href="https://www.mitra10.com/product/carina-granit-lantai-80x80-cm-1-92m2-froid-grey-glazed-polished" target="_blank" rel="noopener">Mitra10, Carina 80x80 Froid Grey Glazed Polished (accessed 4 Nov 2026)</a>).</li>
</ul>
<h2>Carina granite tile price: 60x60 per box</h2>
<p>On the check date, Mitra10 listed about 48 Carina 60x60 cm floor tile designs, all packed at 1.44 m² per box (four pieces). Prices fall into groups by design and finish:</p>
<ul><li><strong>White and bianco glossy</strong> (Freesia, Fenice, Fidia, Febri, Flavia and others): regular Rp178,560, promo Rp158,400 per box, about Rp110,000/m².</li>
<li><strong>Grey and beige glossy</strong> (Fosia, Fino, Fiero, Ferina, Felina and others): regular Rp181,440, promo Rp163,296 per box.</li>
<li><strong>Matt</strong> (Fein, Felsen, Fertino, Flecked, Ferzo and others): regular Rp182,880, promo Rp164,592; Fersalt Matt Rp194,400, promo Rp174,960.</li>
<li><strong>Premium grey glossy</strong> (Falco, Fortuna, Fisio): regular Rp231,840, promo Rp208,656.</li>
<li><strong>Fulica black glossy</strong>: regular Rp267,840, promo Rp241,056 per box, about Rp167,400/m².</li></ul>
<p>Some designs were not on promotion, such as Fico Grey Glossy at Rp191,520 per box.</p>
<h2>Carina 80x80 glazed polished prices</h2>
<p>The 80x80 cm size comes at 1.92 m² per box (three pieces). Mitra10 listed about 10 designs in two price groups:</p>
<ul><li><strong>Rp291,840 group</strong> (Fresco Grey, Frosty Cloud, Flaking Stroke, Folia Crème, Flote White): promo Rp256,819–Rp262,656 per box, about Rp134k–137k/m².</li>
<li><strong>Rp380,160 group</strong> (Froid Grey, Fleuria Black, Figure Black, Flare Black, Felsic Stone, Foidite Slate): promo Rp342,144 per box, about Rp178k/m².</li></ul>
<h2>How to work out how many boxes you need</h2>
<p>Measure the floor area, then add a cutting allowance of about 5–10% for rooms with many corners. Example: a 3x4 m room is 12 m². With an 8% allowance you need about 13 m², or 10 boxes of 60x60 (14.4 m²). In 80x80 you need 7 boxes (13.44 m²). Large tiles usually leave more offcuts in small rooms.</p>
<p>Besides the tiles, budget for tile adhesive, grout and labour. 80x80 tiles generally need a suitable adhesive and an installer used to large formats to keep the surface flat.</p>
<h2>Glossy or matt: which to choose</h2>
<ul><li><strong>Glossy/polished</strong>: makes rooms look larger and is easy to wipe; good for living rooms and bedrooms. Avoid it in bathrooms or on terraces because it is slippery when wet.</li>
<li><strong>Matt</strong>: safer for kitchens and areas that often get wet, and hides dust and footprints.</li>
<li><strong>Dark colours</strong>: look luxurious, but dust and fine scratches show more easily.</li></ul>
<h2>Notes before buying</h2>
<p>The prices above are Mitra10 online prices on 4 November 2026; they may differ by branch or change when the promotion ends. When buying in quantity, make sure all boxes share the same production code (shade and calibre) so colour and size match. Open one box to check before accepting the whole delivery. homeX, a one-stop building materials platform with showroom, warehousing and delivery, can help compare Carina tiles with other brands for your project.</p>
<h2>Carina granite tile price: related articles and products</h2><ul>
<li><a href="/en/news/88">80x80 granite tile prices per box 2026</a></li>
<li><a href="/en/news/37">60x60 floor tile and granite prices by brand</a></li>
<li><a href="/en/news/111">Granite vs ceramic tiles: differences and price per m²</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much does one box of Carina 60x60 cover?</strong> According to the Mitra10 product names, a box of Carina 60x60 covers 1.44 m² and a box of 80x80 covers 1.92 m².</p>
<p><strong>What is the Carina granite price per square metre?</strong> On 4 Nov 2026, promo prices were about Rp110,000–Rp167,400/m² for 60x60 and about Rp134,000–Rp178,200/m² for 80x80.</p>
<p><strong>Is glossy Carina tile suitable for bathrooms?</strong> Not for wet floors, because it is slippery. Choose a matt design or a tile with a slip resistance rating.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.mitra10.com/product/carina-granit-lantai-60x60-cm-1-44m2-fein-matt" target="_blank" rel="noopener">Mitra10, Carina 60x60 Fein Matt granite tile (accessed 4 Nov 2026)</a>; <a href="https://www.mitra10.com/product/carina-granit-lantai-60x60-cm-1-44m2-freesia-white-glossy" target="_blank" rel="noopener">Mitra10, Carina 60x60 Freesia White Glossy (accessed 4 Nov 2026)</a>; <a href="https://www.mitra10.com/product/carina-granit-lantai-60x60-cm-1-44m2-fulica-black-glossy" target="_blank" rel="noopener">Mitra10, Carina 60x60 Fulica Black Glossy (accessed 4 Nov 2026)</a>; <a href="https://www.mitra10.com/product/carina-granit-lantai-80x80-cm-1-92m2-fresco-grey-glazed-polished" target="_blank" rel="noopener">Mitra10, Carina 80x80 Fresco Grey Glazed Polished (accessed 4 Nov 2026)</a>; <a href="https://www.mitra10.com/product/carina-granit-lantai-80x80-cm-1-92m2-froid-grey-glazed-polished" target="_blank" rel="noopener">Mitra10, Carina 80x80 Froid Grey Glazed Polished (accessed 4 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>Gypsum Board Types Under EN 520: What A, H1, F, D, I and R Mean</title><link>https://www.homex.co.id/en/news/381</link><guid isPermaLink="true">https://www.homex.co.id/en/news/381</guid><pubDate>Wed, 04 Nov 2026 09:08:41 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Gypsum board types EN 520 explained: A standard, H1–H3 moisture-resistant, F fire, D, I and R, with water-absorption limits and how to choose.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261104-i-gypsum-en520.jpg" alt="Gypsum Board Types Under EN 520: What A, H1, F, D, I and R Mean"></p><p><strong>Gypsum board types under EN 520</strong> are marked with letters: A for standard board, H1/H2/H3 for reduced water absorption, F for a core that holds together at high temperature, plus D, I, R, E and P for special functions. Letters can be combined, for example DFH2IR. For bathroom and kitchen ceilings choose at least H1 or H2, but remember that moisture-resistant board is still not waterproof.</p>
<h2>Key Facts</h2><ul>
<li>EN 520 defines types A, H (H1, H2, H3), E, F, P, D, R and I; several performances can be combined in one board by listing all the letters (2026-11-04, source: <a href="https://cdn.standards.iteh.ai/samples/33605/9778d6a1a3b042238a64d39451890d1c/SIST-EN-520-2005-A1-2009.pdf" target="_blank" rel="noopener">EN 520:2004+A1:2009 (iTeh preview)</a>).</li>
<li>Total water absorption limits: H1 at most 5%, H2 at most 10%, H3 at most 25% by weight (2026-11-04, source: <a href="https://binaaline.com/en/kb/gypsum-board/" target="_blank" rel="noopener">Binaaline – Gypsum board types under EN 520</a>).</li>
<li>Type D means controlled density of at least 800 kg/m³, about 10 kg/m² for a 12.5 mm board; H2 also limits surface absorption to ≤180 g/m² (2016-10-26, source: <a href="https://media.hornbach.at/cms/de/hornbach-gipsplatten-typen-nach-normen-261016.pdf" target="_blank" rel="noopener">HORNBACH – Plasterboard types under DIN EN 520 (2016)</a>).</li>
<li>Product example: Gyproc FRMR Board is declared to meet EN 520:2004 Type F and H1 and ASTM C473/C1396 Type X (2026-11-04, source: <a href="https://www.gyproc.in/pdf/PB04_Gyproc%C2%AE%20FRMR%20Board.pdf" target="_blank" rel="noopener">Gyproc (Saint-Gobain) – FRMR Board product data sheet</a>).</li>
</ul>
<h2>What each letter means in gypsum board types EN 520</h2>
<p>EN 520 is the European standard for paper-faced gypsum plasterboard. It does not group boards by brand but by performance. Each performance has a letter, and one board may meet several at once.</p>
<ul><li><strong>A</strong> – standard board with a face that can take plaster or decoration. This is the everyday ceiling and partition board.</li>
<li><strong>H1, H2, H3</strong> – boards with additives that reduce water absorption. A lower number means lower absorption.</li>
<li><strong>F</strong> – core with mineral fibres or additives so that it holds together at high temperature. Used in fire-resistant systems.</li>
<li><strong>D</strong> – controlled density, useful for acoustics and strength.</li>
<li><strong>I</strong> – harder surface, suitable for corridors and impact-prone areas.</li>
<li><strong>R</strong> – higher longitudinal and transverse breaking strength.</li>
<li><strong>E</strong> – sheathing board for external walls, not for decoration and not for permanent weather exposure.</li>
<li><strong>P</strong> – base board intended to receive gypsum plaster.</li></ul>
<h3>Reading combined codes</h3>
<p>A code such as DFH2 means the board has controlled density, holds together at high temperature and absorbs at most 10% water. DFH2IR adds a hard surface and higher strength. On data sheets the code usually appears next to the standard number.</p>
<h2>Moisture-resistant is not waterproof</h2>
<p>H boards (often green) only slow down water uptake. Guidance summarised by Binaaline stresses that they are not enough for the direct spray zone of a shower; for tiled shower walls, cement board or fibre-cement board with a waterproofing layer is safer. For bathroom ceilings, H1/H2 boards are commonly used together with good ventilation.</p>
<h2>Fire boards: a system, not just a board</h2>
<p>Type F boards, or Type X under the American standard ASTM C1396, are designed for fire-resistant systems. But a fire rating such as 60 minutes is the result of testing the whole system: board, framing, screws, number of layers and joints. If a garage wall or electrical room needs fire resistance, follow the manufacturer's system detail instead of simply swapping the board.</p>
<h2>How to choose for a home project</h2>
<ul><li>Bedrooms, living rooms, general ceilings: Type A.</li>
<li>Bathroom and kitchen ceilings and humid enclosed terraces: H1 or H2.</li>
<li>Garage separation or rooms needing fire protection: Type F in a tested system.</li>
<li>Shophouse corridors, schools and impact-prone areas: Type I or a DFH2IR combination.</li></ul>
<p>When comparing quotations, ask for a technical data sheet showing the EN 520 or ASTM C1396 type and board thickness. homeX, an integrated building materials and furniture platform in Indonesia with showroom, warehousing and delivery, can help prepare gypsum board options and accessories for your project.</p>
<h2>Gypsum board types EN 520: related articles and products</h2><ul>
<li><a href="/en/news/25">Gypsum ceilings: SNI &amp; ASTM, board thickness, framing spacing</a></li>
<li><a href="/en/news/44">Gypsum board prices per sheet 2026</a></li>
<li><a href="/en/news/374">Fire classes of building materials under EN 13501-1</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What is the difference between standard and moisture-resistant gypsum board?</strong> Standard board is Type A. Moisture-resistant board is Type H1, H2 or H3, with total water absorption limits of 5%, 10% or 25%.</p>
<p><strong>Can H1 board be used on shower walls?</strong> Not recommended in the direct spray zone. Use cement or fibre-cement board with waterproofing.</p>
<p><strong>What does DFH2IR mean?</strong> Controlled density (D), high-temperature core cohesion (F), water absorption ≤10% (H2), hard surface (I) and higher strength (R).</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://cdn.standards.iteh.ai/samples/33605/9778d6a1a3b042238a64d39451890d1c/SIST-EN-520-2005-A1-2009.pdf" target="_blank" rel="noopener">EN 520:2004+A1:2009 (iTeh preview)</a>; <a href="https://media.hornbach.at/cms/de/hornbach-gipsplatten-typen-nach-normen-261016.pdf" target="_blank" rel="noopener">HORNBACH – Plasterboard types under DIN EN 520 (2016)</a>; <a href="https://binaaline.com/en/kb/gypsum-board/" target="_blank" rel="noopener">Binaaline – Gypsum board types under EN 520</a>; <a href="https://www.gyproc.in/pdf/PB04_Gyproc%C2%AE%20FRMR%20Board.pdf" target="_blank" rel="noopener">Gyproc (Saint-Gobain) – FRMR Board product data sheet</a></em></p>]]></content:encoded></item><item><title>Stainless Steel 201 vs 304 vs 316: Nickel, Molybdenum, Magnet Test and Where to Use Each</title><link>https://www.homex.co.id/en/news/380</link><guid isPermaLink="true">https://www.homex.co.id/en/news/380</guid><pubDate>Wed, 04 Nov 2026 09:08:41 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Stainless steel 201 vs 304 vs 316: chromium, nickel and molybdenum limits under ASTM A240, why a magnet test misleads, and which grade suits coastal homes.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261104-i-stainless-201-304-316.jpg" alt="Stainless Steel 201 vs 304 vs 316: Nickel, Molybdenum, Magnet Test and Where to Use Each"></p><p>In short, <strong>stainless steel 201 vs 304 vs 316</strong> comes down to nickel and molybdenum. Grade 201 cuts nickel to 3.5–5.5% and replaces it with manganese, 304 is the all-round grade with 8–10.5% nickel, and 316 adds 2–3% molybdenum for better resistance to chloride corrosion such as sea air. For railings, kitchen sinks and bathroom accessories in an ordinary home, 304 is usually enough; near the coast, 316 is the safer choice.</p>
<h2>Key Facts</h2><ul>
<li>ASTM A240 composition: grade 201 (UNS S20100) Cr 16–18%, Ni 3.5–5.5%, Mn 5.5–7.5%; grade 304 (S30400) Cr 18–20%, Ni 8–10.5% (2026-11-04, source: <a href="https://www.ssina.com/education/technical-resources/composition-properties/" target="_blank" rel="noopener">SSINA – Composition/Properties (ASTM A240 tables)</a>).</li>
<li>Grade 316 (S31600) contains Cr 16–18%, Ni 10–14% and Mo 2–3%; its main advantage is resistance to pitting and crevice corrosion in chloride environments (2026-11-04, source: <a href="https://www.assda.asn.au/stainless-steel/grade-selection/316-the-first-step-up" target="_blank" rel="noopener">ASSDA – 316: The First Step Up</a>).</li>
<li>Minimum yield strength for sheet under ASTM A240: 260 MPa for grade 201; 205 MPa for grade 316, with 515 MPa minimum tensile strength (2026-11-04, source: <a href="https://www.ssina.com/education/technical-resources/composition-properties/" target="_blank" rel="noopener">SSINA – Composition/Properties (ASTM A240 tables)</a>).</li>
<li>Austenitic 304 and 316 are generally non-magnetic when annealed but can be attracted to a magnet after cold work, because part of the austenite transforms to martensite (2026-11-04, source: <a href="https://www.assda.asn.au/publications/technical-faqs/magnetic-effects-of-stainless-steels" target="_blank" rel="noopener">ASSDA – Magnetic Effects of Stainless Steels</a>).</li>
</ul>
<h2>Stainless steel 201 vs 304 vs 316 by composition</h2>
<p>All three are austenitic stainless steels. Their rust resistance comes from chromium, which forms a thin oxide film on the surface. The difference lies in the supporting elements. Nickel stabilises the austenitic structure and helps corrosion resistance, but it is expensive. Grade 201 therefore uses much less nickel and raises manganese and nitrogen to keep the structure austenitic.</p>
<p>Grade 304 is the most common grade in building products and kitchenware. Grade 316 has broadly the same mechanical properties and fabrication behaviour as 304, but its 2–3% molybdenum improves resistance to pitting and crevice corrosion, especially where chlorides are present: sea air, brackish water and some cleaning chemicals.</p>
<h3>Quick choice by location</h3>
<ul><li><strong>Dry interiors</strong> (decorative trims, furniture frames, kick plates): 201 is often used because it costs less; keep surfaces clean.</li>
<li><strong>Kitchens and bathrooms</strong> (sinks, racks, shower poles, grab bars): 304 is a safe choice for homes.</li>
<li><strong>Coastal exteriors</strong> (balcony railings, gates, outdoor fixings): 316 is more suitable. ASSDA notes 316 is often chosen for sea-front buildings.</li></ul>
<h2>Why the magnet test is not proof</h2>
<p>Many buyers hold a magnet to a product to tell 201 from 304. This is unreliable. According to ASSDA, annealed 304 and 316 are hardly attracted to a magnet, but cold working such as bending, rolling or tube drawing can turn part of the structure into magnetic martensite. A bent corner on a 304 railing may therefore pull slightly on a magnet, while annealed 201 may not pull at all. A magnet gives a rough hint, not proof of grade.</p>
<h3>More reliable checks</h3>
<ul><li>Ask for the mill certificate showing heat number, standard (for example ASTM A240 for sheet) and chemical analysis.</li>
<li>For project purchases, request an XRF/PMI composition test on site or in a laboratory, and write the grade into the contract.</li>
<li>Check marks on the product or packaging; a "SUS 304" or "AISI 304" label means little without documents.</li>
<li>Compare actual wall thickness with the specification, since thin tube dents easily even when the grade is right.</li></ul>
<h2>Care that keeps stainless clean</h2>
<p>Even 316 can stain if left dirty in salty air. Rinse outdoor surfaces with clean water regularly, avoid ordinary steel brushes that leave iron particles, and do not use strong chlorine-based cleaners. After welding, the weld area should be cleaned so that the passive film can re-form.</p>
<p>homeX, an integrated building materials and furniture platform in Indonesia with showroom, warehousing and delivery, can help you compare sinks, railings and stainless accessories by grade and supporting documents.</p>
<h2>Stainless steel 201 vs 304 vs 316: related articles and products</h2><ul>
<li><a href="/en/news/120">Stair railing prices per metre: iron, stainless and glass</a></li>
<li><a href="/en/news/63">Kitchen sink prices by brand</a></li>
<li><a href="/en/news/373">Hot-dip galvanizing thickness under ISO 1461</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>Will 201 stainless always rust?</strong> Not necessarily. 201 is still stainless steel, but its lower nickel makes it better suited to dry interiors with regular cleaning.</p>
<p><strong>Is 304 stainless never magnetic?</strong> It is nearly non-magnetic when annealed, but bent or cold-rolled parts can attract a magnet slightly. A magnet test does not prove the grade.</p>
<p><strong>When do I need 316?</strong> For exterior parts near the sea or in chloride environments, because 2–3% molybdenum improves pitting resistance.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.ssina.com/education/technical-resources/composition-properties/" target="_blank" rel="noopener">SSINA – Composition/Properties (ASTM A240 tables)</a>; <a href="https://www.assda.asn.au/stainless-steel/grade-selection/316-the-first-step-up" target="_blank" rel="noopener">ASSDA – 316: The First Step Up</a>; <a href="https://www.assda.asn.au/publications/technical-faqs/magnetic-effects-of-stainless-steels" target="_blank" rel="noopener">ASSDA – Magnetic Effects of Stainless Steels</a></em></p>]]></content:encoded></item><item><title>Cement Coal Supply Shortfall: SIG Loses 1.7 Million Tonnes of Output</title><link>https://www.homex.co.id/en/news/379</link><guid isPermaLink="true">https://www.homex.co.id/en/news/379</guid><pubDate>Wed, 04 Nov 2026 09:08:16 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Cement coal supply shortfall: SIG kilns stopped more than ten times in 2026, losing 1.7 million tonnes of potential output. What it means for cement buyers.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261104-i-sig-batubara-kiln.jpg" alt="Cement Coal Supply Shortfall: SIG Loses 1.7 Million Tonnes of Output"></p><p>A <strong>cement coal supply</strong> shortfall has cost PT Semen Indonesia (Persero) Tbk (SIG) about 1.7 million tonnes of potential cement output in 2026, after kilns at several plants stopped more than ten times. SIG Human Capital Director Hadi Setiadi said so at the Minerba Convex event on 3 November 2026. Because national capacity far exceeds demand, there is no nationwide cement shortage, but regional supply may become uneven.</p>
<h2>Key Facts</h2><ul>
<li>SIG lost about 1.7 million tonnes of potential cement output this year because coal deliveries were late or unavailable (2026-11-03, source: <a href="https://industri.kontan.co.id/news/pasokan-batubara-seret-sig-kehilangan-potensi-produksi-semen-17-juta-ton" target="_blank" rel="noopener">Kontan</a>).</li>
<li>The cement industry needs about 15 million tonnes of coal a year, versus about 40 million tonnes for PLN power plants (2026-11-03, source: <a href="https://industri.kontan.co.id/news/pasokan-batubara-seret-sig-kehilangan-potensi-produksi-semen-17-juta-ton" target="_blank" rel="noopener">Kontan</a>).</li>
<li>National cement capacity is about 120 million tonnes a year, while domestic demand is about 62 million tonnes (2026-11-03, source: <a href="https://industri.kontan.co.id/news/pasokan-batubara-seret-sig-kehilangan-potensi-produksi-semen-17-juta-ton" target="_blank" rel="noopener">Kontan</a>).</li>
<li>Asperssi: coal stocks at most cement plants last only 2–3 days; non-state plants pay market prices up 39–40%, raising production costs by up to 20% (2026-09-18, source: <a href="https://www.suar.id/semen/industri-semen-terancam-krisis-pasokan-batu-bara/" target="_blank" rel="noopener">Suar.id</a>).</li>
</ul>
<h2>Why cement coal supply is stalling</h2>
<p>According to Hadi, the issue is not a national coal shortage but the price gap. He cited 4,200 GAR coal under the domestic market obligation (DMO) scheme for certain industries at around US$47 per tonne, while export or commercial prices can exceed US$78 per tonne. Once miners have met their obligation to PLN, the remaining supply to cement plants is often neglected because the spread is too wide. As a result, SIG plants in various regions have shut down more than ten times this year.</p>
<p>Similar complaints surfaced in September. Lilik Unggul Raharjo, chairman of the Indonesian Cement Companies Association (Asperssi), said then that coal stocks at most plants lasted only two to three days. Non-state plants buying at market prices faced increases of 39–40%, lifting cement production costs by up to 20%. At that time the lost potential clinker output was put at 1.2 million tonnes, and clinker exports to Bangladesh were being taken over by Vietnam. Drought and drying rivers in Kalimantan also slowed coal barges.</p>
<h2>Overcapacity keeps prices from rising</h2>
<p>Installed national cement capacity is about 120 million tonnes a year, while domestic demand is about 62 million tonnes. Output lost at one plant can usually be covered by other plants or brands. However, producers carry rising operating costs on thin margins, and repeatedly stopping and restarting kilns adds energy use and maintenance costs.</p>
<h3>What it means for contractors, stores and homeowners</h3>
<ul><li><strong>Local supply may be uneven.</strong> Disruptions hit specific plants, so certain brands or bag sizes may arrive late in the areas those plants serve.</li>
<li><strong>Line up alternative brands.</strong> PCC cement from several producers generally meets the same SNI standard; consult the designer if the project specification names a brand.</li>
<li><strong>Plan pour schedules.</strong> For large projects, order early and ask the distributor for written delivery dates.</li>
<li><strong>Watch prices in remote areas.</strong> Regions relying on inter-island shipping are more exposed when plant supply is disrupted.</li></ul>
<p>SIG is calling for better-synchronised coal governance so that the cement industry's energy needs are met, noting that cement supports infrastructure, housing and government programmes such as the free nutritious meals kitchens.</p>
<p>homeX, a one-stop building materials and furniture platform in Indonesia with showroom, warehousing and delivery, helps buyers plan cement and other material purchases with clear delivery schedules.</p>
<h2>Cement coal supply: related articles and products</h2><ul>
<li><a href="/en/news/342">Semen Indonesia nine-month 2026 profit</a></li>
<li><a href="/en/news/365">Cement shortage in Bima and Lombok</a></li>
<li><a href="/en/news/318">Indocement market share and energy costs</a></li>
<li><a href="/products/232">Gypsum board for ceilings and partitions</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much cement output did SIG lose because of coal?</strong> SIG said about 1.7 million tonnes of potential cement output was lost in 2026 as kilns stopped more than ten times.</p>
<p><strong>Why are miners reluctant to supply cement plants?</strong> According to SIG, DMO coal of 4,200 GAR for industry sells at about US$47 per tonne, far below export prices that can exceed US$78 per tonne.</p>
<p><strong>Will cement prices rise?</strong> No price increase has been announced; capacity of 120 million tonnes far exceeds demand of 62 million tonnes, but supply in some regions may be disrupted.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://industri.kontan.co.id/news/pasokan-batubara-seret-sig-kehilangan-potensi-produksi-semen-17-juta-ton" target="_blank" rel="noopener">Kontan</a>; <a href="https://www.suar.id/semen/industri-semen-terancam-krisis-pasokan-batu-bara/" target="_blank" rel="noopener">Suar.id</a></em></p>]]></content:encoded></item><item><title>Construction Indonesia 2027 at JIExpo, 15–18 Sep: A Guide for Chinese Suppliers</title><link>https://www.homex.co.id/en/news/378</link><guid isPermaLink="true">https://www.homex.co.id/en/news/378</guid><pubDate>Wed, 04 Nov 2026 09:08:16 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Construction Indonesia 2027 runs 15–18 September 2027 at JIExpo Kemayoran. The 2026 edition, part of IEE Series, had 2,000+ firms from 39 countries.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261104-i-construction-indonesia-2027.jpg" alt="Construction Indonesia 2027 at JIExpo, 15–18 Sep: A Guide for Chinese Suppliers"></p><p><strong>Construction Indonesia 2027</strong> is scheduled for 15–18 September 2027 at Jakarta International Expo (JIExpo), Kemayoran, according to the official site of organiser PT Pamerindo Indonesia, checked on 4 November 2026. It will be the 27th edition of this construction, building technology, engineering, procurement and equipment show. For Chinese factories and exporters, it suits heavy equipment, concrete, structural and project materials better than interior-design fairs do.</p>
<h2>Key Facts</h2><ul>
<li>The official site lists Construction Indonesia 2027 on 15–18 September 2027 at JIExpo Kemayoran, Jakarta (2026-11-04, source: <a href="https://www.constructionindo.com/" target="_blank" rel="noopener">Construction Indonesia (Pamerindo)</a>).</li>
<li>The 2026 edition ran on 9–12 September 2026 at JIExpo as part of IEE Series Engineering Week 2026 (2026-09-07, source: <a href="https://www.constructionindo.com/2026/09/07/iee-series-engineering-week-2026-hadirkan-2-000-perusahaan-untuk-dorong-transformasi-industri-berkelanjutan/" target="_blank" rel="noopener">Construction Indonesia: IEE Series Engineering Week 2026</a>).</li>
<li>IEE Series Engineering Week 2026 covered 108,000 m² with more than 2,000 companies from 39 countries and regions, targeting over 75,000 visitors (2026-09-07, source: <a href="https://www.constructionindo.com/2026/09/07/iee-series-engineering-week-2026-hadirkan-2-000-perusahaan-untuk-dorong-transformasi-industri-berkelanjutan/" target="_blank" rel="noopener">Construction Indonesia: IEE Series Engineering Week 2026</a>).</li>
<li>The 2027 draft state budget sets aside Rp31 trillion of FLPP funds to finance 344,800 subsidised homes (2026-11-04, source: <a href="https://investortrust.id/macro/113281/anggaran-perumahan-2027-tembus-rp-29-79-t-rumah-subsidi-dapat-rp-31-triliun" target="_blank" rel="noopener">Investortrust</a>).</li>
</ul>
<h2>Construction Indonesia 2027 dates and venue</h2>
<p>The constructionindo.com home page gives 15–18 September 2027 and JIExpo Kemayoran, the large exhibition centre in Central Jakarta. The show calls itself "The 27th International Construction Structure, Building Technology, Engineering Procurement and Equipment Exhibition". It is run by Pamerindo Indonesia, part of the Informa group, with sales contacts in Jakarta and Singapore. Details such as the 2027 exhibitor list, country pavilions and seminar programme had not been announced as of 4 November 2026, so prospective exhibitors should watch the official site and contact the organiser directly.</p>
<h2>The 2026 edition: scale of the IEE Series</h2>
<p>In 2026, Construction Indonesia ran on 9–12 September under IEE Series Engineering Week, themed "Sustainability for Industrial Transformation". The series combines shows for construction, mining, energy, wastewater, disaster management, concrete and metallurgy. According to the organiser's release, the total area reached 108,000 m² with more than 2,000 companies from 39 countries and regions. Construction Indonesia itself featured modern construction technology, infrastructure engineering and building-material innovation. Supporting associations included the Indonesian Precast and Prestressed Concrete Association (AP3I), relevant to suppliers of precast systems and moulds.</p>
<h2>Why Construction Indonesia 2027 matters for Chinese suppliers</h2>
<p>First, visitors tend to be contractors, consultants, developers and project procurement teams rather than retail shoppers. Suitable products include heavy equipment and construction machinery, formwork, scaffolding, precast concrete systems, structural steel, wall panels, metal roofing, pipes and material-testing equipment.</p>
<p>Second, housing demand continues. BP Tapera data cited by CNBC Indonesia show 197,048 FLPP subsidised mortgages disbursed by 2 November 2026, and the 2027 draft budget allocates Rp31 trillion in FLPP funds for 344,800 units. Subsidised housing needs large volumes of standard materials: light steel framing, roof tiles, ceramic tiles, frames, doors and sanitary ware.</p>
<p>Third, regulation must be prepared early. Many building materials in Indonesia require mandatory SNI certification, and some steel and glass products are tightly controlled. Chinese suppliers should prepare SNI certificates, local-content (TKDN) documents if they target government projects, and catalogues and labels in Indonesian.</p>
<h3>Practical preparation before the show</h3>
<ul><li>Define the target: state-owned contractors, housing developers, regional distributors or building-material retailers.</li>
<li>Prepare FOB/CIF price lists and an estimate of landed cost in Jakarta, including import duty and 11% VAT.</li>
<li>Bring physical samples and test data; project buyers usually ask for technical data sheets and certificates.</li>
<li>Plan follow-up after the show: project visits, sample shipments and trial orders.</li></ul>
<p>homeX is a one-stop building materials and furniture platform in Indonesia with showroom, warehousing and delivery. For suppliers who want to test the market before or after the show, homeX can be a channel to present products to contractors and project owners.</p>
<h2>Construction Indonesia 2027: related articles and products</h2><ul>
<li><a href="/en/news/333">BDExpo Indonesia 2026 at JIExpo: opportunities for Chinese suppliers</a></li>
<li><a href="/en/news/362">Megabuild Indonesia 2027 at NICE PIK 2</a></li>
<li><a href="/en/news/368">Planned mandatory SNI for light steel and corrugated roofing</a></li>
<li><a href="/products/224">Structural adhesive for construction</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>When and where is Construction Indonesia 2027?</strong> According to the official constructionindo.com site, the show takes place on 15–18 September 2027 at JIExpo Kemayoran, Jakarta.</p>
<p><strong>Who organises Construction Indonesia?</strong> PT Pamerindo Indonesia, part of the Informa group; the 2026 edition was part of IEE Series Engineering Week.</p>
<p><strong>Which Chinese products fit the show?</strong> Heavy equipment, formwork, scaffolding, precast concrete, structural steel, panels and metal roofing, pipes and testing equipment, ideally with SNI certificates ready.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.constructionindo.com/" target="_blank" rel="noopener">Construction Indonesia (Pamerindo)</a>; <a href="https://www.constructionindo.com/2026/09/07/iee-series-engineering-week-2026-hadirkan-2-000-perusahaan-untuk-dorong-transformasi-industri-berkelanjutan/" target="_blank" rel="noopener">Construction Indonesia: IEE Series Engineering Week 2026</a>; <a href="https://www.cnbcindonesia.com/news/20261103145116-4-781927/rumah-subsidi-baru-laku-54-ready-stock-ada-24000-unit-lebih" target="_blank" rel="noopener">CNBC Indonesia</a>; <a href="https://investortrust.id/macro/113281/anggaran-perumahan-2027-tembus-rp-29-79-t-rumah-subsidi-dapat-rp-31-triliun" target="_blank" rel="noopener">Investortrust</a></em></p>]]></content:encoded></item><item><title>Builders Needed for Jakarta Home Renovation: 10,300 Houses, 20,600 Workers</title><link>https://www.homex.co.id/en/news/377</link><guid isPermaLink="true">https://www.homex.co.id/en/news/377</guid><pubDate>Wed, 04 Nov 2026 09:06:45 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Home renovation builders needed in Jakarta: about 20,600 for 10,300 houses, while in NTB stalled housing projects leave builders and day labourers without work.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261104-i-bedah-rumah-tukang-jakarta.jpg" alt="Builders Needed for Jakarta Home Renovation: 10,300 Houses, 20,600 Workers"></p><p>The number of <strong>home renovation builders needed</strong> in Jakarta is estimated at around 20,600. Housing and Settlements Minister Maruarar Sirait said each renovated house needs about two builders, against a target of 10,300 houses in Jakarta. In West Nusa Tenggara (NTB), meanwhile, stalled housing projects are leaving day labourers and builders without work, so demand for construction labour differs sharply between regions.</p>
<h2>Key Facts</h2><ul>
<li>Jakarta renovation target is 10,300 houses; each needs about 2 builders, around 20,600 workers in total (2026-11-01, source: <a href="https://mili.id/baca-28184-pemerintah-siapkan-bedah-rumah-dan-bantuan-modal-untuk-warga-kampung-boncos-20-ribu-tukang-berpotensi-terserap" target="_blank" rel="noopener">Mili.id, home renovation and business capital for Kampung Boncos, 20,000 builders could be absorbed (1 Nov 2026)</a>).</li>
<li>The Jakarta renovation programme involves 333 facilitators (2026-11-01, source: <a href="https://mili.id/baca-28184-pemerintah-siapkan-bedah-rumah-dan-bantuan-modal-untuk-warga-kampung-boncos-20-ribu-tukang-berpotensi-terserap" target="_blank" rel="noopener">Mili.id, home renovation and business capital for Kampung Boncos, 20,000 builders could be absorbed (1 Nov 2026)</a>).</li>
<li>KUR housing loan quota raised from Rp36 trillion to Rp50 trillion; 6% a year for loans under Rp100 million with no collateral (2026-11-01, source: <a href="https://mili.id/baca-28184-pemerintah-siapkan-bedah-rumah-dan-bantuan-modal-untuk-warga-kampung-boncos-20-ribu-tukang-berpotensi-terserap" target="_blank" rel="noopener">Mili.id, home renovation and business capital for Kampung Boncos, 20,000 builders could be absorbed (1 Nov 2026)</a>).</li>
<li>NTB target of 11,000 houses in 2026; only about 2,000 built by October (2026-11-03, source: <a href="https://ekbisntb.com/03/11/2026/sektor-properti-anjlok-kspsi-ntb-khawatir-pengangguran-dan-phk-makin-parah/" target="_blank" rel="noopener">Ekbis NTB, property slump: KSPSI NTB worried about unemployment and layoffs (3 Nov 2026)</a>).</li>
</ul>
<h2>Jakarta renovation: two builders per house</h2>
<p>Minister of Housing and Settlements (PKP) Maruarar Sirait made the estimate while visiting a resident's home in Kampung Boncos, Palmerah, West Jakarta, on Saturday 31 October 2026. The house he inspected was judged unsafe, with damaged walls, roof, floor and foundations. He said physical repairs must go together with stronger household finances so renovated homes stay maintained.</p>
<p>Besides builders, the work also drives building material shops, material delivery services and the building materials industry. The materials mentioned include cement, sand, paint, ceramic tiles and glass.</p>
<h2>Financing: PNM and KUR housing loans</h2>
<p>The government is offering two schemes. The first is financing from Permodalan Nasional Madani (PNM), including its Mekaar programme, whose rate the minister said has fallen from 22% to 8%. The second is the KUR housing loan at 6% a year for loans under Rp100 million with no collateral, with the quota raised from Rp36 trillion to Rp50 trillion.</p>
<h2>Home renovation builders needed: a regional split</h2>
<p>The picture in West Nusa Tenggara is the opposite. The central government targets 11,000 houses in NTB in 2026, but only about 2,000 had been built by October. REI NTB chair Hery Athmaja said developers are still waiting for land certainty, in particular the designation of protected food farmland (LP2B) on paddy land. KSPSI NTB chair Yustinus Habur warned that when projects stall, day labourers and builders lose their income straight away.</p>
<p>So in one region a renovation programme can absorb thousands of builders, while in another builders sit idle because land permits are unclear. For homeowners and contractors this affects both labour availability and schedules.</p>
<h2>Tips for homeowners and contractors</h2>
<ul><li>Book builders early if your area is running a large renovation programme, as labour demand will rise.</li>
<li>Prepare a full material list, from cement and sand to paint, tiles and glass, before work starts so paid days are not lost waiting for goods.</li>
<li>Have materials delivered in the order of the work: structure and foundations first, then walls and roof, then floors and finishing.</li>
<li>Keep material receipts and wage records as proof of cost, especially when using financing such as the KUR housing loan.</li></ul>
<p>homeX, an Indonesian one-stop platform for building materials and furniture with a showroom, warehousing and delivery, can help prepare renovation materials in one order and deliver them to match the builders' schedule.</p>
<h2>Home renovation builders needed: related articles and products</h2><ul>
<li><a href="/news/353">Renovation builder wages and regional builder demand</a></li>
<li><a href="/news/369">Shortage of certified construction workers</a></li>
<li><a href="/news/323">Progress of the 2026 BSPS home renovation programme</a></li>
<li><a href="/products/228">Gypsum mesh tape for ceiling repairs</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How many builders does the Jakarta renovation programme need?</strong> Minister Maruarar Sirait estimated about two builders per house. With a target of 10,300 houses, that is around 20,600 workers, plus 333 facilitators.</p>
<p><strong>What is the KUR housing loan rate?</strong> According to the minister, the KUR housing loan costs 6% a year for loans under Rp100 million with no collateral, and its quota has risen from Rp36 trillion to Rp50 trillion.</p>
<p><strong>Why are builders in NTB losing work?</strong> Of the 11,000 houses targeted for 2026, only about 2,000 had been built by October because developers are waiting for LP2B land certainty, so projects and builder demand are on hold.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://mili.id/baca-28184-pemerintah-siapkan-bedah-rumah-dan-bantuan-modal-untuk-warga-kampung-boncos-20-ribu-tukang-berpotensi-terserap" target="_blank" rel="noopener">Mili.id, home renovation and business capital for Kampung Boncos, 20,000 builders could be absorbed (1 Nov 2026)</a>; <a href="https://ekbisntb.com/03/11/2026/sektor-properti-anjlok-kspsi-ntb-khawatir-pengangguran-dan-phk-makin-parah/" target="_blank" rel="noopener">Ekbis NTB, property slump: KSPSI NTB worried about unemployment and layoffs (3 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>AI and BIM in Construction: BuildX 2026 Jakarta Puts Project Data in Focus</title><link>https://www.homex.co.id/en/news/376</link><guid isPermaLink="true">https://www.homex.co.id/en/news/376</guid><pubDate>Wed, 04 Nov 2026 09:06:45 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>AI and BIM in construction took centre stage at BuildX 2026 in Jakarta on 28 October, where 200+ architects, contractors and suppliers discussed project data.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261104-i-buildx-ai-bim.jpg" alt="AI and BIM in Construction: BuildX 2026 Jakarta Puts Project Data in Focus"></p><p><strong>AI and BIM in construction</strong> are now being discussed as practical tools for project decisions rather than as buzzwords. At BuildX 2026 in Jakarta on 28 October 2026, more than 200 architects, interior designers, consultants, contractors, developers and building material suppliers looked at how data can guide choices on facades, materials and green building. For suppliers the message is clear: clean product data will increasingly decide whether a material gets specified.</p>
<h2>Key Facts</h2><ul>
<li>BuildX 2026 was held in Jakarta on Wednesday 28 October 2026 under the theme Merging Construction, Culture, & Intelligence (2026-11-03, source: <a href="https://ekbis.sindonews.com/read/1767861/34/buildx-2026-bahas-peran-ai-dan-data-dalam-keputusan-proyek-konstruksi-1793697086" target="_blank" rel="noopener">SindoNews, BuildX 2026 discusses the role of AI and data in construction project decisions (3 Nov 2026)</a>).</li>
<li>The event drew more than 200 participants and featured 11 speakers (2026-11-03, source: <a href="https://ekbis.sindonews.com/read/1767861/34/buildx-2026-bahas-peran-ai-dan-data-dalam-keputusan-proyek-konstruksi-1793697086" target="_blank" rel="noopener">SindoNews, BuildX 2026 discusses the role of AI and data in construction project decisions (3 Nov 2026)</a>).</li>
<li>Its Intelligence pillar covered the use of AI, BIM and data for project decisions (2026-11-03, source: <a href="https://ekbis.sindonews.com/read/1767861/34/buildx-2026-bahas-peran-ai-dan-data-dalam-keputusan-proyek-konstruksi-1793697086" target="_blank" rel="noopener">SindoNews, BuildX 2026 discusses the role of AI and data in construction project decisions (3 Nov 2026)</a>).</li>
<li>The Ministry of Public Works and Glodon Indonesia launched the AI x 5D BIM Master Challenge 2026 at AEC Connect Day 2026 (2026-05-26, source: <a href="https://binakonstruksi.pu.go.id/informasi-terkini/sekretariat-direktorat-jenderal/kementerian-pekerjaan-umum-dorong-transformasi-digital-sektor-konstruksi-melalui-peluncuran-ai-x-5d-bim-master-challenge-2026/" target="_blank" rel="noopener">Directorate General of Construction Development, Ministry of Public Works, launch of the AI x 5D BIM Master Challenge 2026 (26 May 2026)</a>).</li>
</ul>
<h2>What BuildX 2026 covered</h2>
<p>BuildX 2026 was organised by Vastu Chatra Asia, Ivosights and Diginex conXperience. According to SindoNews, the programme was built around three questions. The Construction pillar asked whether buildings perform, through facades, climate, materials and green building. The Culture pillar asked whether buildings fit their place, treating Nusantara architecture as design knowledge. The Intelligence pillar asked whether the building process can learn, through AI, BIM and data.</p>
<p>Event chair and Vastu Chatra Asia co-founder Bagas D. Bawono described BuildX as a journey of ideas: understanding people and place, turning that into high-performing buildings, and then using intelligence to keep improving them. The event was backed by IAI Jakarta, HDII, Perkindo, PERAFI and SAMA Indonesia, and sponsored by dozens of companies, including makers of paint, aluminium, door hardware and facade panels.</p>
<h2>AI and BIM in construction: from model to decision</h2>
<p>BIM keeps building information in one model: geometry, quantities, specifications and schedules. When that model is complete, AI and data analysis can compare design options, estimate material quantities or detect clashes between trades before work starts on site. Everything depends on the quality of the input. If material data is incomplete, for example with unclear sizes, weights, grades or certificates, the analysis cannot be trusted.</p>
<p>The government is pushing in the same direction on the skills side. In May 2026 the Directorate General of Construction Development at the Ministry of Public Works and Glodon Indonesia launched the AI x 5D BIM Master Challenge 2026. Kimron Manik, Director of Construction Workforce Competence and Productivity, said Indonesian construction players have to keep up with digital technology, which makes upgrading workforce skills essential. The challenge focuses on project cost management, the fifth dimension of BIM.</p>
<h2>What it means for material suppliers and buyers</h2>
<p>For suppliers, digitalisation means technical specifications must be ready for designers to use. Data sheets, drawings, SNI certificates, unit weights and packaging details should be available in a format that can go straight into a model or a bill of quantities. Products with complete data are easier for consultants to compare and propose.</p>
<p>For contractors and owners, the benefit lies in more accurate quantities and better-planned procurement. Materials can be ordered in stages to match the work schedule, so site storage does not overflow and the risk of running short falls.</p>
<ul><li>Ask for technical data sheets and certificates before a material is specified.</li>
<li>Use the same units in the BIM model, the cost estimate and supplier quotes.</li>
<li>Record supplier lead times and stock capacity as procurement data.</li></ul>
<p>homeX, an Indonesian one-stop platform for building materials and furniture with a showroom, warehousing and delivery, organises product and cost data from many suppliers so buyers can compare material options for their projects faster.</p>
<h2>AI and BIM in construction: related articles and products</h2><ul>
<li><a href="/news/334">Public Works BIM on Sekolah Rakyat phase II</a></li>
<li><a href="/news/364">AI architectural design in Bali: IGNITE BIM &amp; AI 2026</a></li>
<li><a href="/news/363">Building material product data is still fragmented</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>When and where was BuildX 2026 held?</strong> BuildX 2026 took place in Jakarta on Wednesday 28 October 2026, with more than 200 participants and 11 speakers.</p>
<p><strong>How do AI and BIM relate to material selection?</strong> At BuildX 2026 the Intelligence pillar covered AI, BIM and data for project decisions, while the Construction pillar dealt with facades, materials and green building. A model with complete data makes it easier to compare material options.</p>
<p><strong>What is the AI x 5D BIM Master Challenge 2026?</strong> A competition launched in May 2026 by the Ministry of Public Works construction directorate and Glodon Indonesia to build digital construction skills, including project cost management.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://ekbis.sindonews.com/read/1767861/34/buildx-2026-bahas-peran-ai-dan-data-dalam-keputusan-proyek-konstruksi-1793697086" target="_blank" rel="noopener">SindoNews, BuildX 2026 discusses the role of AI and data in construction project decisions (3 Nov 2026)</a>; <a href="https://binakonstruksi.pu.go.id/informasi-terkini/sekretariat-direktorat-jenderal/kementerian-pekerjaan-umum-dorong-transformasi-digital-sektor-konstruksi-melalui-peluncuran-ai-x-5d-bim-master-challenge-2026/" target="_blank" rel="noopener">Directorate General of Construction Development, Ministry of Public Works, launch of the AI x 5D BIM Master Challenge 2026 (26 May 2026)</a></em></p>]]></content:encoded></item><item><title>Indocement Merges Its Shipping Subsidiaries to Streamline Cement Distribution</title><link>https://www.homex.co.id/en/news/375</link><guid isPermaLink="true">https://www.homex.co.id/en/news/375</guid><pubDate>Tue, 03 Nov 2026 09:18:33 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Indocement shipping merger: Lintas Bahana Abadi joined Bahana Indonor on 29 Sep 2026, combined assets Rp400.8bn, aimed at efficient cement distribution.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261103-i-merger-pelayaran-indocement.jpg" alt="Indocement Merges Its Shipping Subsidiaries to Streamline Cement Distribution"></p><p>The <strong>Indocement shipping merger</strong> took effect when the deed was signed on 29 September 2026: PT Lintas Bahana Abadi (LBA) merged into PT Bahana Indonor (BI). The combined company has total assets of Rp400.8 billion and the deal was funded internally. Indocement, maker of Tiga Roda cement, says the move is about synergy and more efficient distribution, with no specific impact on its operations or finances.</p>
<h2>Key Facts</h2><ul>
<li>LBA merged into BI, with BI as the surviving entity (2026-09-29, source: <a href="https://www.indocement.co.id/id/news-events/informasi-penggabungan-usaha-pt-lintas-bahana-abadi-dan-pt-bahana-indonor-september-2026" target="_blank" rel="noopener">Indocement, merger information LBA into BI (29 Sep 2026)</a>).</li>
<li>Total assets after the merger Rp400.8 billion, all funded internally (2026-10-01, source: <a href="https://www.indocement.co.id/id/news-events/indocement-umumkan-penggabungan-usaha-lba-dan-bi-untuk-perkuat-distribusi" target="_blank" rel="noopener">Indocement, news release on the LBA–BI merger (1 Oct 2026)</a>).</li>
<li>Not a material transaction and not an affiliated transaction under OJK rules (2026-10-01, source: <a href="https://www.indocement.co.id/id/news-events/indocement-umumkan-penggabungan-usaha-lba-dan-bi-untuk-perkuat-distribusi" target="_blank" rel="noopener">Indocement, news release on the LBA–BI merger (1 Oct 2026)</a>).</li>
<li>INTP shares closed up 0.81% at Rp5,000 on the day of disclosure but were down 32.43% year to date (2026-09-29, source: <a href="https://www.idnfinancials.com/id/news/69606/dua-anak-usaha-intp-merger-total-aset-capai-rp400-8-miliar" target="_blank" rel="noopener">IDNFinancials, two INTP subsidiaries merge (29 Sep 2026)</a>).</li>
<li>Transport and warehousing grew 5.65% year on year in Q2 2026 (BPS data) (2026-11-01, source: <a href="https://mediaindonesia.com/nusantara/951014/bidik-pasar-pergudangan-dua-fasilitas-logistik-dibangun-di-bandung-dan-purwokerto" target="_blank" rel="noopener">Media Indonesia, KAI Logistik warehouses and BPS data (1 Nov 2026)</a>).</li>
</ul>
<h2>What Indocement merged</h2>
<p>PT Indocement Tunggal Prakarsa Tbk (INTP) has two shipping subsidiaries, PT Lintas Bahana Abadi and PT Bahana Indonor, both of which support the company's distribution. In a disclosure on 29 September 2026, Indocement said LBA would merge into BI, leaving BI as the surviving company. Its news release on 1 October 2026 added that the merger aims to create synergy and more efficient, integrated distribution.</p>
<p>INTP corporate secretary Dani Handajani, quoted by IDNFinancials, said combining the two companies creates synergy and efficiency in the company's distribution activities.</p>
<h2>Key numbers of the Indocement shipping merger</h2>
<ul><li><strong>Total assets after the merger</strong>: Rp400.8 billion.</li>
<li><strong>Funding</strong>: internal funds of the parties.</li>
<li><strong>Transaction status</strong>: not material, and not an affiliated or conflict-of-interest transaction under OJK rules.</li>
<li><strong>Impact</strong>: according to the company, no specific impact on operations, legal matters, financial condition or business continuity.</li></ul>
<p>The market reaction was muted. On 29 September 2026 INTP shares rose 0.81% to Rp5,000, but they had already fallen 32.43% since the start of 2026.</p>
<h2>Why shipping matters for cement distribution</h2>
<p>Cement is heavy and low-margin, so freight cost has a big effect on the shop price. Outside Java, part of the supply has to be shipped between islands. When shipments are disrupted, the effect shows quickly: homeX recently reported cement shortages in Bima and Lombok with prices of Rp72,000–85,000 per bag. That is why large producers try to organise their fleets and logistics subsidiaries for more coordinated deliveries.</p>
<p>The merger does not change Indocement's plant capacity, but it simplifies two shipping companies into one. Buyers may benefit from better-coordinated distribution; however, the company has not announced any cost or delivery-time targets, so the effect on prices cannot yet be measured.</p>
<h2>Context: warehousing and logistics keep growing</h2>
<p>This reorganisation comes as Indonesia's transport and warehousing sector grew 5.65% year on year in Q2 2026, according to BPS data cited by Media Indonesia. Logistics operators are also adding warehouses in secondary cities; KAI Logistik, for example, is building facilities in Bandung (1,115 m²) and Purwokerto (1,570 m²), due for completion at the end of 2026.</p>
<h2>What it means for contractors and building-material shops</h2>
<ul><li><strong>Watch seasonal stock</strong>: for projects outside Java, order cement early before bad weather or long holidays.</li>
<li><strong>Compare delivery routes</strong>: cement prices on other islands reflect shipping and handling costs, not just the factory price.</li>
<li><strong>Keep alternative brands ready</strong>: if one brand is late, check another brand with the same cement type.</li></ul>
<p>homeX, a one-stop building-materials and furniture platform with a showroom, warehousing and delivery, can help projects plan the supply of cement and other materials so work does not stop for lack of stock.</p>
<h2>Indocement shipping merger: related articles and products</h2><ul>
<li><a href="/news/365">Cement shortage in Bima and Lombok</a></li>
<li><a href="/news/352">Cement rail transport reaches 1.83 million tonnes</a></li>
<li><a href="/news/316">Inter-island cement shipping: lessons from Khatulistiwa 8</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>Which companies are in the Indocement shipping merger?</strong> PT Lintas Bahana Abadi (LBA) merged into PT Bahana Indonor (BI). BI is the surviving entity, and the deed was signed on 29 September 2026.</p>
<p><strong>What are the assets after the merger?</strong> The combined entity has total assets of Rp400.8 billion, funded internally.</p>
<p><strong>Will the merger lower Tiga Roda cement prices?</strong> That is not certain. Indocement only cites synergy and distribution efficiency, with no cost or price target.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.indocement.co.id/id/news-events/indocement-umumkan-penggabungan-usaha-lba-dan-bi-untuk-perkuat-distribusi" target="_blank" rel="noopener">Indocement, news release on the LBA–BI merger (1 Oct 2026)</a>; <a href="https://www.idnfinancials.com/id/news/69606/dua-anak-usaha-intp-merger-total-aset-capai-rp400-8-miliar" target="_blank" rel="noopener">IDNFinancials, two INTP subsidiaries merge (29 Sep 2026)</a>; <a href="https://www.indocement.co.id/id/news-events/informasi-penggabungan-usaha-pt-lintas-bahana-abadi-dan-pt-bahana-indonor-september-2026" target="_blank" rel="noopener">Indocement, merger information LBA into BI (29 Sep 2026)</a>; <a href="https://mediaindonesia.com/nusantara/951014/bidik-pasar-pergudangan-dua-fasilitas-logistik-dibangun-di-bandung-dan-purwokerto" target="_blank" rel="noopener">Media Indonesia, KAI Logistik warehouses and BPS data (1 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>Reaction-to-Fire Classes A1, A2, B-s1,d0: What Euroclass EN 13501-1 Means</title><link>https://www.homex.co.id/en/news/374</link><guid isPermaLink="true">https://www.homex.co.id/en/news/374</guid><pubDate>Tue, 03 Nov 2026 09:18:26 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Reaction to fire class EN 13501-1: A1 is non-combustible, A2 to F are increasingly combustible, s1–s3 rate smoke and d0–d2 flaming droplets. Codes explained.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261103-i-euroclass-api.jpg" alt="Reaction-to-Fire Classes A1, A2, B-s1,d0: What Euroclass EN 13501-1 Means"></p><p>A <strong>reaction to fire class</strong> in the Euroclass system of EN 13501-1 shows how much a material contributes to a fire, not how long a wall resists it. A1 is non-combustible, then A2, B, C, D, E and F are increasingly combustible. Extra codes s1–s3 rate smoke and d0–d2 rate flaming droplets, so B-s1,d0 means limited combustibility, low smoke and no flaming droplets. These codes often appear on brochures for imported boards, panels and insulation.</p>
<h2>Key Facts</h2><ul>
<li>Class A1 requires EN ISO 1182 (temperature rise ≤ 30 °C, mass loss ≤ 50%, no sustained flaming) and an EN ISO 1716 calorific value below 2.0 MJ/kg (2026-02-27, source: <a href="https://measurlabs.com/blog/en-13501-1-fire-classification-performance-classes-and-criteria/" target="_blank" rel="noopener">Measurlabs, EN 13501-1 fire classification (updated 27 Feb 2026)</a>).</li>
<li>Mineral wool, cement, glass and ceramics with < 1% organic content can be classed A1 without testing (2026-02-27, source: <a href="https://measurlabs.com/blog/en-13501-1-fire-classification-performance-classes-and-criteria/" target="_blank" rel="noopener">Measurlabs, EN 13501-1 fire classification (updated 27 Feb 2026)</a>).</li>
<li>Classes A2 and B (non-flooring) require the EN 13823 SBI test: fire growth rate ≤ 120 W/s and total heat release in 600 s ≤ 7.5 MJ (2026-02-27, source: <a href="https://measurlabs.com/blog/en-13501-1-fire-classification-performance-classes-and-criteria/" target="_blank" rel="noopener">Measurlabs, EN 13501-1 fire classification (updated 27 Feb 2026)</a>).</li>
<li>Smoke s1: growth rate ≤ 30 m²/s² and total in 600 s ≤ 50 m²; d0: no flaming particles within 600 s (2026-02-27, source: <a href="https://measurlabs.com/blog/en-13501-1-fire-classification-performance-classes-and-criteria/" target="_blank" rel="noopener">Measurlabs, EN 13501-1 fire classification (updated 27 Feb 2026)</a>).</li>
</ul>
<h2>Reaction to fire, not fire resistance</h2>
<p>EN 13501-1 assesses <em>reaction to fire</em>: whether a material ignites easily, how fast flame spreads and how much heat it releases. This differs from fire resistance (for example a 60-minute wall), which is covered by other parts of the EN 13501 series. In the EU these classes appear in the declaration of performance and CE marking; the class required for each use is set by national building rules.</p>
<p>The standard has three product groups: general products (A1–F), floorings with the suffix "fl" (A1fl–Ffl), and linear pipe insulation with the suffix "L".</p>
<h2>What each main class means</h2>
<ul><li><strong>A1</strong>: non-combustible, no contribution to fire.</li>
<li><strong>A2</strong>: very limited combustibility; EN ISO 1182 (rise ≤ 50 °C, flaming ≤ 20 s) or calorific value ≤ 3.0 MJ/kg, plus the SBI test.</li>
<li><strong>B</strong>: combustible but very limited contribution; passes SBI and the EN ISO 11925-2 small-flame test (spread ≤ 150 mm within 60 s).</li>
<li><strong>C</strong>: limited contribution; fire growth rate ≤ 250 W/s and total heat ≤ 15 MJ.</li>
<li><strong>D</strong>: medium contribution; growth rate ≤ 750 W/s.</li>
<li><strong>E</strong>: passes only the small-flame test (spread ≤ 150 mm within 20 s).</li>
<li><strong>F</strong>: fails class E or not tested; considered easily flammable.</li></ul>
<h2>Smoke (s) and droplet (d) codes</h2>
<p>Classes A2, B, C and D must carry smoke and droplet codes:</p>
<ul><li><strong>s1</strong>: smoke growth ≤ 30 m²/s² and total ≤ 50 m² in 600 s; <strong>s2</strong>: ≤ 180 m²/s² and ≤ 200 m²; <strong>s3</strong>: fails s1/s2.</li>
<li><strong>d0</strong>: no flaming particles within 600 s; <strong>d1</strong>: none lasting over 10 s; <strong>d2</strong>: fails d0/d1.</li></ul>
<p>Class E can only receive d2, and A1 carries no suffix. For floorings, smoke is only s1 or s2 and there is no droplet code.</p>
<h2>Using this when buying</h2>
<ul><li>For ceilings, partitions and escape routes, choose the highest practical class (A1 or A2-s1,d0) as the designer and local rules require.</li>
<li>Ask for the laboratory classification report, not just a "fire resistant" claim in a brochure. Check that the class applies to the same thickness and installation method.</li>
<li>Do not confuse reaction-to-fire classes (A1, B-s1,d0) with fire resistance in minutes (EI 60 and so on).</li>
<li>For floors, look for the "fl" suffix, for example Bfl-s1.</li></ul>
<p>homeX, an integrated building materials and furniture platform in Indonesia with showroom, warehousing and delivery services, can help compare technical documents for boards, panels and insulation across brands.</p>
<h2>Reaction to fire class: related articles and products</h2><ul>
<li><a href="/en/news/304">Kalsi fibre cement board</a></li>
<li><a href="/en/news/25">Gypsum ceiling guide</a></li>
<li><a href="/en/news/347">MDF, particleboard and OSB classes</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What does A2-s1,d0 mean?</strong> Very limited combustibility (A2), low smoke (s1) and no flaming droplets or particles during the 600-second test (d0).</p>
<p><strong>Is class A1 the same as 2-hour fire resistance?</strong> No. A1 is a material reaction-to-fire class; fire resistance in minutes is assessed for complete constructions under a different classification.</p>
<p><strong>Which materials are A1 without testing?</strong> Under the European Commission list, mineral wool, cement, glass, ceramics and their products with under 1% organic content can be classed A1 without testing.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://measurlabs.com/blog/en-13501-1-fire-classification-performance-classes-and-criteria/" target="_blank" rel="noopener">Measurlabs, EN 13501-1 fire classification (updated 27 Feb 2026)</a>; <a href="https://www.promat.com/en/construction/your-project/expert-area/145210/combustibility-groups-and-classes/" target="_blank" rel="noopener">Promat, Combustibility groups and classes (accessed 3 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>Hot-Dip Galvanizing Thickness Under ISO 1461: 85 µm, 70 µm and How to Check</title><link>https://www.homex.co.id/en/news/373</link><guid isPermaLink="true">https://www.homex.co.id/en/news/373</guid><pubDate>Tue, 03 Nov 2026 09:18:26 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>ISO 1461 hot-dip galvanizing thickness for steel over 6 mm is a mean of at least 85 µm, 70 µm for 3–6 mm. Learn how it is measured, sampled and repaired.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261103-i-galvanis-iso1461.jpg" alt="Hot-Dip Galvanizing Thickness Under ISO 1461: 85 µm, 70 µm and How to Check"></p><p><strong>Hot-dip galvanizing thickness</strong> on fabricated steel is set by EN ISO 1461:2022 and depends on the steel thickness. For steel over 6 mm, the mean zinc coating must be at least 85 µm with no reference area below 70 µm; for 3–6 mm steel, 70 µm and 55 µm. Checking takes only a magnetic gauge, so buyers of fences, canopies or steel frames can ask for it at handover.</p>
<h2>Key Facts</h2><ul>
<li>Steel > 6 mm: local minimum 70 µm, mean minimum 85 µm; steel > 3 to 6 mm: 55 µm and 70 µm (non-centrifuged articles) (2024-10, source: <a href="https://www.wedge-galv.co.uk/wp-content/uploads/2024/10/4b-HDG-to-EN-1461-2024.pdf" target="_blank" rel="noopener">Galvanizers Association, HDG Datasheet 4b EN ISO 1461:2022 (Oct 2024, accessed 3 Nov 2026)</a>).</li>
<li>Steel > 1.5 to 3 mm: 45 µm and 55 µm; steel < 1.5 mm: 35 µm and 45 µm (2024-10, source: <a href="https://www.wedge-galv.co.uk/wp-content/uploads/2024/10/4b-HDG-to-EN-1461-2024.pdf" target="_blank" rel="noopener">Galvanizers Association, HDG Datasheet 4b EN ISO 1461:2022 (Oct 2024, accessed 3 Nov 2026)</a>).</li>
<li>Centrifuged threaded articles > 6 mm: 40 µm local and 50 µm mean; ≤ 6 mm: 20 µm and 25 µm (2024-10, source: <a href="https://www.wedge-galv.co.uk/wp-content/uploads/2024/10/4b-HDG-to-EN-1461-2024.pdf" target="_blank" rel="noopener">Galvanizers Association, HDG Datasheet 4b EN ISO 1461:2022 (Oct 2024, accessed 3 Nov 2026)</a>).</li>
<li>Uncoated areas may be repaired if each is ≤ 10 cm² and the total is ≤ 0.5% of surface area, with repair coating at least 100 µm thick (2024-10, source: <a href="https://www.wedge-galv.co.uk/wp-content/uploads/2024/10/4b-HDG-to-EN-1461-2024.pdf" target="_blank" rel="noopener">Galvanizers Association, HDG Datasheet 4b EN ISO 1461:2022 (Oct 2024, accessed 3 Nov 2026)</a>).</li>
</ul>
<h2>What ISO 1461 covers</h2>
<p>EN ISO 1461:2022 applies to hot-dip galvanizing of fabricated steel, sections and castings dipped in molten zinc of at least 98% zinc content. It excludes products coated in automated or semi-automated lines, such as sheet, wire and tube. So for zinc-coated roofing or factory galvanized pipe, the reference is each product's own standard, not ISO 1461.</p>
<p>The standard covers surface requirements, post-galvanizing inspection, coating uniformity, limits on uncoated areas and their repair, adhesion, acceptance criteria and the declaration of compliance.</p>
<h2>Local and mean: two different numbers</h2>
<p><strong>Local</strong> thickness is the average of readings in one reference area. <strong>Mean</strong> thickness applies to the whole article. No reference area may fall below the local figure, and the whole article must reach the mean figure. Example: an 8 mm canopy base plate needs a mean of at least 85 µm with no reference area below 70 µm.</p>
<h3>How many samples are tested</h3>
<ul><li>Lots of 1–3 items: all tested.</li>
<li>4–500 items: at least 3.</li>
<li>501–1,200: 5; 1,201–3,200: 8; 3,201–10,000: 13; over 10,000: 20.</li></ul>
<p>If the sample fails, a sample twice the size is tested. If that passes, the lot is accepted; if it fails again, the lot is rejected.</p>
<h2>How to check on site</h2>
<ul><li>Use a magnetic coating thickness gauge (ISO 2178), the non-destructive method the standard encourages. The gravimetric test (ISO 1460) remains the referee method in disputes.</li>
<li>Inspect visually: the coating should be continuous, reasonably smooth and free of flux staining on accessible surfaces. The standard has no aesthetic requirements, so dull or patchy colour is not grounds for rejection.</li>
<li>White wet storage stain from damp is also not grounds for rejection as long as local thickness is still met.</li>
<li>Uncoated areas up to 10 cm² may be repaired with zinc-rich paint, low-melting zinc sticks or thermal zinc spray (ISO 2063). Larger areas should normally be regalvanized.</li>
<li>Bending after galvanizing is not normal handling and can damage the coating.</li></ul>
<h2>Tips for ordering galvanizing work</h2>
<p>Write "hot-dip galvanized to EN ISO 1461" on the purchase order, state the steel thickness and ask for a declaration of compliance (ISO 10474) if needed. Some steels with very low silicon (≤ 0.01%) and aluminium above 0.035% struggle to reach the minimum, so the standard allows the next lower thickness category provided it is recorded in the declaration.</p>
<p>homeX, an integrated building materials and furniture platform in Indonesia with showroom, warehousing and delivery services, can help source steel materials and galvanized fencing to project specifications.</p>
<h2>Hot-dip galvanizing thickness: related articles and products</h2><ul>
<li><a href="/en/news/327">BMT vs TCT light steel and AZ100</a></li>
<li><a href="/en/news/354">Anti-dumping on Chinese zinc-coated steel</a></li>
<li><a href="/en/news/90">Galvanized hollow steel prices 2026</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What is the standard hot-dip galvanizing thickness?</strong> Under EN ISO 1461:2022, steel over 6 mm needs a mean of at least 85 µm (70 µm local); 3–6 mm steel needs a 70 µm mean (55 µm local).</p>
<p><strong>Does factory galvanized pipe follow ISO 1461?</strong> No. ISO 1461 excludes sheet, wire and tube coated in automated or semi-automated lines; those follow their own product standards.</p>
<p><strong>Should dull or patchy galvanizing be rejected?</strong> No. ISO 1461 has no aesthetic requirements; what matters is continuity of the coating and thickness per the table.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.wedge-galv.co.uk/wp-content/uploads/2024/10/4b-HDG-to-EN-1461-2024.pdf" target="_blank" rel="noopener">Galvanizers Association, HDG Datasheet 4b EN ISO 1461:2022 (Oct 2024, accessed 3 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>Gambir TOD Apartments to Follow Manggarai: 8 Towers and Material Demand</title><link>https://www.homex.co.id/en/news/372</link><guid isPermaLink="true">https://www.homex.co.id/en/news/372</guid><pubDate>Tue, 03 Nov 2026 09:17:40 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Gambir TOD apartments are being explored after Manggarai, with about 3,740 units in 8 towers. Project data and what it means for material supply.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261103-i-rusun-tod-gambir-manggarai.jpg" alt="Gambir TOD Apartments to Follow Manggarai: 8 Towers and Material Demand"></p><p>The government has begun exploring <strong>Gambir TOD apartments</strong> in Central Jakarta as a follow-up to the apartment project near Manggarai Station. Housing Minister Maruarar Sirait was set to inspect Gambir with state railway KAI and BRI in early November 2026. The Manggarai project alone covers about 3,740 units in eight towers, making transit-oriented vertical housing a new source of demand for concrete, steel, walling, tiles and sanitaryware.</p>
<h2>Key Facts</h2><ul>
<li>The Housing Ministry is pushing owner-occupied TOD apartments in Gambir with KAI and BRI, following a similar project in Manggarai (2026-11-02, source: <a href="https://ekonomi.bisnis.com/read/20261102/47/2017381/usai-manggarai-menteri-pkp-dorong-pembangunan-rusun-tod-di-gambir" target="_blank" rel="noopener">Bisnis.com, 2 Nov 2026</a>).</li>
<li>Manggarai apartments (Maraya Residence) are built by KAI Properti with BTN financing on 21,939 m² of land: Block G 6,925 m² and Block F 15,014 m² (2026-11-02, source: <a href="https://www.detik.com/properti/berita/d-8735262/usai-manggarai-tanah-abang-rusun-subsidi-juga-bakal-dibangun-di-gambir" target="_blank" rel="noopener">detikProperti, 2 Nov 2026</a>).</li>
<li>Block G has 3 towers with 1,232 units and Block F 5 towers with 2,508 units; unit types are 21, 36 and 45 m² (2026-11-02, source: <a href="https://www.detik.com/properti/berita/d-8735262/usai-manggarai-tanah-abang-rusun-subsidi-juga-bakal-dibangun-di-gambir" target="_blank" rel="noopener">detikProperti, 2 Nov 2026</a>).</li>
<li>KAI targets completing Manggarai within 18 months, around mid-2028; the site is 300 metres from Manggarai Station (2026-11-02, source: <a href="https://ekonomi.bisnis.com/read/20261102/47/2017381/usai-manggarai-menteri-pkp-dorong-pembangunan-rusun-tod-di-gambir" target="_blank" rel="noopener">Bisnis.com, 2 Nov 2026</a>).</li>
</ul>
<h2>From Manggarai to Gambir</h2>
<p>The Manggarai apartments are a transit-oriented development (TOD) vertical housing project on land owned by KAI. Groundbreaking took place in August 2026, attended by the Housing Minister, the Deputy Minister of Agrarian Affairs, Housing Task Force chair Hashim Djojohadikusumo and KAI President Director Bobby Rasyidin. KAI Properti is the developer, while BTN is the mortgage bank.</p>
<p>According to Minister Maruarar, public interest in the Manggarai units was strong, so the government wants to repeat the model, this time in Gambir, Central Jakarta, with BRI as the banking partner. Unit numbers, land area and a timeline for Gambir have not been announced, so the figures in this article refer to Manggarai.</p>
<h2>Scale of the Manggarai project</h2>
<p>According to detikProperti, Block G will be built first with three towers: Tower A with 418 units, Tower B with 506 and Tower C with 308. Block F has five towers with 572, 572, 528, 308 and 528 units. The total is about 3,740 units. The 21 m² type is a studio, while the 36 and 45 m² types have two bedrooms, one bathroom, a living room, kitchen and dining area. KAI also plans a pedestrian link to the station, about 300 metres away.</p>
<h2>Why it matters for the building materials industry</h2>
<p>Thousands of apartment units mean material demand in large packages on tight schedules. Every unit needs walling, flooring, a bathroom, doors, windows and plumbing and electrical work, on top of the concrete and steel structure of each tower. Because units are standardised, procurement is usually done by unit type and by floor, so consistent quality, stock availability and on-time delivery decide who wins.</p>
<p>Government policy direction also matters. When announcing apartment technology cooperation with China in September 2026, the Housing Minister stressed that qualifying Indonesian products would be given priority, as would local labour and small businesses. Suppliers that prepare SNI certificates and local content documents will be better placed when project procurement packages open.</p>
<h3>What suppliers and contractors can prepare</h3>
<ul><li>A standard product list for 21, 36 and 45 m² units, such as floor tiles, toilets, basins, taps and doors.</li>
<li>SNI proof for mandatory products such as cement, reinforcing bar and ceramic tiles.</li>
<li>A warehousing and staged delivery plan for dense city-centre sites, where on-site storage is limited.</li>
<li>Written quotations with a clear validity period, since the project runs for about 18 months.</li></ul>
<p>homeX, an integrated building materials and furniture platform in Indonesia with a showroom, warehousing and delivery, can help contractors put together material packages per unit type and schedule staged deliveries.</p>
<h2>Gambir TOD apartments: related articles and products</h2><ul>
<li><a href="/en/news/10">3 Million Homes Programme reaches 1.79 million units</a></li>
<li><a href="/en/news/214">FLPP subsidised mortgages 2026 and building materials</a></li>
<li><a href="/en/news/320">NabungDP down-payment savings by Perumnas and BTN</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>When will the Gambir TOD apartments be built?</strong> There is no official schedule yet. As of 2 November 2026, the Housing Minister had only scheduled a site visit with KAI and BRI.</p>
<p><strong>How many units does the Manggarai project have?</strong> About 3,740 units: 1,232 in three Block G towers and 2,508 in five Block F towers, in 21, 36 and 45 m² types.</p>
<p><strong>Who are the developer and bank for Manggarai?</strong> KAI Properti is the developer on KAI land, with BTN as the mortgage bank.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://ekonomi.bisnis.com/read/20261102/47/2017381/usai-manggarai-menteri-pkp-dorong-pembangunan-rusun-tod-di-gambir" target="_blank" rel="noopener">Bisnis.com, 2 Nov 2026</a>; <a href="https://www.detik.com/properti/berita/d-8735262/usai-manggarai-tanah-abang-rusun-subsidi-juga-bakal-dibangun-di-gambir" target="_blank" rel="noopener">detikProperti, 2 Nov 2026</a>; <a href="https://ekonomi.bisnis.com/read/20260910/47/2003013/ri-gandeng-cina-kembangkan-teknologi-rusun-untuk-program-3-juta-rumah" target="_blank" rel="noopener">Bisnis.com, 10 Sep 2026</a></em></p>]]></content:encoded></item><item><title>Dekkson Prices 2026: Window Locks, Hinges, Cylinders, Floor Springs, Smart Locks</title><link>https://www.homex.co.id/en/news/371</link><guid isPermaLink="true">https://www.homex.co.id/en/news/371</guid><pubDate>Tue, 03 Nov 2026 09:16:38 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Dekkson prices on 3 Nov 2026 at Mitra10 and Depo Bangunan: window lock Rp17,632, hinge Rp32,000, floor spring Rp917,700, smart locks Rp1.5–3 million.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261103-i-harga-dekkson.jpg" alt="Dekkson Prices 2026: Window Locks, Hinges, Cylinders, Floor Springs, Smart Locks"></p><p><strong>Dekkson prices</strong> at the Mitra10 and Depo Bangunan online stores on 3 November 2026 ranged from Rp17,632 for the CH-425 aluminium window lock, Rp32,000–330,300 for door hinges and Rp128,877–448,904 for lock cylinders, up to Rp917,700–1,632,176 for glass-door floor springs and Rp1.5–3 million for digital locks. Many Dekkson items at Mitra10 carry special prices far below the normal price, so check promotion dates before you budget.</p>
<h2>Key Facts</h2><ul>
<li>Dekkson CH-425-L aluminium window lock Rp17,632 at Mitra10 (normal Rp32,000) (2026-11-03, source: <a href="https://www.mitra10.com/product/dekkson-kunci-jendela-aluminium-ch-425-l-hitam" target="_blank" rel="noopener">Mitra10, Dekkson CH-425-L aluminium window lock (accessed 3 Nov 2026)</a>).</li>
<li>Dekkson 4NR 2 mm 4x3 inch door hinge Rp32,000 at Depo Bangunan (2026-11-03, source: <a href="https://www.depobangunan.co.id/dekkson-engsel-pintu-4nr-2mm-es-ir-silver-4x3-inci.html" target="_blank" rel="noopener">Depo Bangunan, Dekkson 4NR 2 mm 4x3 inch hinge (accessed 3 Nov 2026)</a>).</li>
<li>Dekkson TC HC DL 40 mm lock cylinder Rp128,877 at Mitra10 (normal Rp238,000) (2026-11-03, source: <a href="https://www.mitra10.com/product/dekkson-kunci-silinder-tc-hc-dl40mm-satin-nickel" target="_blank" rel="noopener">Mitra10, Dekkson TC HC DL 40 mm cylinder (accessed 3 Nov 2026)</a>).</li>
<li>Dekkson FH 211 stainless floor spring Rp917,700 at Mitra10 (normal Rp1,725,000) (2026-11-03, source: <a href="https://www.mitra10.com/product/dekkson-floor-spring-fh-211-stainless-steel" target="_blank" rel="noopener">Mitra10, Dekkson FH 211 floor spring (accessed 3 Nov 2026)</a>).</li>
<li>Dekkson EL D21 digital lock Rp1,700,092 at Depo Bangunan (2026-11-03, source: <a href="https://www.depobangunan.co.id/dekkson-digital-lock-aluminium-el-d21-black-sn.html" target="_blank" rel="noopener">Depo Bangunan, Dekkson EL D21 digital lock (accessed 3 Nov 2026)</a>).</li>
</ul>
<h2>Dekkson window lock and window stay prices</h2>
<p>For aluminium windows and timber frames, Dekkson sells small locks at low prices. On 3 November 2026 at Mitra10:</p>
<ul><li><strong>CH-425 aluminium window lock (left/right)</strong>: Rp17,632 each (normal Rp32,000), in black, white, brown and natural anodised. At Depo Bangunan the CH425 right-hand cost Rp18,000.</li>
<li><strong>CH-423</strong>: Rp18,183; <strong>CH-428</strong>: Rp24,795.</li>
<li><strong>CWH ZC 104/105 SQ window stays</strong>: Rp74,385 (satin nickel) to Rp92,568 (black).</li>
<li><strong>CWH 104 SQ satin nickel</strong>: Rp282,112.</li></ul>
<h2>Dekkson door hinge prices</h2>
<p>Dekkson hinge prices depend mainly on plate thickness, size and the number of ball bearings (BB):</p>
<ul><li><strong>4NR 2 mm 4x3 inch hinge</strong>: Rp32,000 at Depo Bangunan.</li>
<li><strong>Bremen ESS 4x3x3 mm 4BB hinge</strong>: Rp51,300 at Mitra10 (normal Rp111,500); the 5x3x3 mm size Rp66,150.</li>
<li><strong>S4BB 3 mm NRP Deluxe hinge</strong>: Rp160,372 at Depo Bangunan.</li>
<li><strong>NRP ESS 316 4x3x4 4BB hinge</strong>: Rp302,850, and the 5x3x4 mm size Rp330,300 at Mitra10.</li>
<li><strong>Casement hinges</strong> for windows: 8 inch Rp110,000 and 12 inch Rp134,000 at Depo Bangunan.</li></ul>
<p>Heavy solid-timber doors usually need thicker hinges with bearings, while light bedroom doors can use standard hinges.</p>
<h2>Dekkson lock cylinder and door lock prices</h2>
<ul><li><strong>TC HC DL 40 mm cylinder</strong>: Rp128,877.</li>
<li><strong>TC DL 100 mm cylinder</strong>: Rp323,276; 120 mm Rp363,888; 150 mm Rp394,212; 180 mm Rp448,904.</li>
<li><strong>Door knob locks</strong>: from about Rp115,340 (HC DL 40 mm) to Rp223,098 (DC KK DL 70 mm matt black).</li></ul>
<p>Cylinder length must match the door leaf thickness; long cylinders are used for thick or decorated doors.</p>
<h2>Patch fitting and floor spring prices for glass doors</h2>
<p>For tempered glass doors in shophouses, offices and showrooms, Dekkson offers dedicated fittings:</p>
<ul><li><strong>PT 10 polished stainless patch fitting</strong>: Rp514,083; PT 30 Rp527,307; PT 40 Rp841,377.</li>
<li><strong>Matt black patch fittings</strong>: PT 10 and PT 20 Rp603,345, PT 30 Rp644,119, PT 40 Rp999,514.</li>
<li><strong>US 10 patch fitting + cylinder</strong>: Rp949,373 (stainless) to Rp1,128,448 (matt black).</li>
<li><strong>FH 211 stainless floor spring</strong>: Rp917,700; <strong>FH 84 black</strong>: Rp1,632,176 (normal Rp3,068,000).</li></ul>
<h2>Dekkson digital lock prices</h2>
<ul><li><strong>EL D21</strong>: Rp1,699,999 at Mitra10 and Rp1,700,092 at Depo Bangunan.</li>
<li><strong>ELC 9318 W17 (Tuya)</strong>: Rp1,503,901 at Mitra10, Rp1,499,986 at Depo Bangunan.</li>
<li><strong>ELC 9318 W37</strong>: about Rp1,950,000.</li>
<li><strong>ELP 9519 (fingerprint, 3D)</strong>: Rp2,999,997 at both stores.</li></ul>
<h2>Tips for comparing Dekkson prices</h2>
<p>Write down the full code, the finish (satin nickel, matt black, stainless) and whether the door opens left or right, since prices and stock differ by variant. For projects with many doors and windows, make a list by door type so hinges, locks and accessories match. homeX can help prepare a door-hardware list, compare brands and deliver goods to the project site. All prices above are public online store prices on 3 November 2026 and may change.</p>
<h2>Dekkson prices: related articles and products</h2><ul>
<li><a href="/news/108">Door hinge and lock prices 2026: Paloma, Dekkson, Zehn</a></li>
<li><a href="/news/222">Door closer, bolt and door stopper prices 2026</a></li>
<li><a href="/news/143">Smart door lock prices 2026</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much is a Dekkson door hinge?</strong> On 3 November 2026 the 4NR 2 mm 4x3 inch hinge cost Rp32,000 at Depo Bangunan, the Bremen 4BB hinge Rp51,300 at Mitra10, and NRP ESS 316 hinges Rp302,850–330,300.</p>
<p><strong>How much is a Dekkson floor spring?</strong> At Mitra10 the FH 211 stainless floor spring cost Rp917,700 and the FH 84 black Rp1,632,176.</p>
<p><strong>How much is a Dekkson digital lock?</strong> The EL D21 cost about Rp1.7 million, the ELC 9318 W17 about Rp1.5 million and the ELP 9519 Rp2,999,997 at both Mitra10 and Depo Bangunan.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.mitra10.com/product/dekkson-kunci-jendela-aluminium-ch-425-l-hitam" target="_blank" rel="noopener">Mitra10, Dekkson CH-425-L aluminium window lock (accessed 3 Nov 2026)</a>; <a href="https://www.mitra10.com/product/c-dekkson-hinge-bremen-ess-4x3x3mm-4bb-sss" target="_blank" rel="noopener">Mitra10, Dekkson Bremen ESS 4x3x3 mm 4BB hinge (accessed 3 Nov 2026)</a>; <a href="https://www.mitra10.com/product/dekkson-kunci-silinder-tc-hc-dl40mm-satin-nickel" target="_blank" rel="noopener">Mitra10, Dekkson TC HC DL 40 mm cylinder (accessed 3 Nov 2026)</a>; <a href="https://www.mitra10.com/product/dekkson-patch-fitting-pt-10-polish-stainless-steel" target="_blank" rel="noopener">Mitra10, Dekkson PT 10 patch fitting (accessed 3 Nov 2026)</a>; <a href="https://www.mitra10.com/product/dekkson-floor-spring-fh-211-stainless-steel" target="_blank" rel="noopener">Mitra10, Dekkson FH 211 floor spring (accessed 3 Nov 2026)</a>; <a href="https://www.depobangunan.co.id/dekkson-digital-lock-aluminium-el-d21-black-sn.html" target="_blank" rel="noopener">Depo Bangunan, Dekkson EL D21 digital lock (accessed 3 Nov 2026)</a>; <a href="https://www.depobangunan.co.id/dekkson-engsel-pintu-4nr-2mm-es-ir-silver-4x3-inci.html" target="_blank" rel="noopener">Depo Bangunan, Dekkson 4NR 2 mm 4x3 inch hinge (accessed 3 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>American Standard Prices 2026: Squat, Close-Coupled, Touchless Toilets &amp; Basins</title><link>https://www.homex.co.id/en/news/370</link><guid isPermaLink="true">https://www.homex.co.id/en/news/370</guid><pubDate>Tue, 03 Nov 2026 09:16:38 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>American Standard prices at Mitra10 and Depo Bangunan on 3 Nov 2026: squat toilet Rp249k, two-piece toilets Rp1.49–1.89m, touchless toilets Rp3.6–5.1m.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261103-i-harga-american-standard.jpg" alt="American Standard Prices 2026: Squat, Close-Coupled, Touchless Toilets &amp; Basins"></p><p><strong>American Standard prices</strong> in Indonesia (the brand is often listed as Amstad) at the Mitra10 and Depo Bangunan online stores on 3 November 2026 start at Rp249,000 for the Rapi EX squat toilet, Rp1.49–1.89 million for the My Winston, Newton and Luxia two-piece toilets, and Rp3.6–6.1 million for touchless sensor and one-piece toilets. Wall-hung basins start at Rp349,700. Prices for the same item can differ by hundreds of thousands of rupiah between stores, so compare exact product codes.</p>
<h2>Key Facts</h2><ul>
<li>Amstad Rapi EX CWR012N1 white squat toilet Rp249,000 at Mitra10 (2026-11-03, source: <a href="https://www.mitra10.com/product/amstad-cwr012n1-1cact0000-rapiex-white-squat-set" target="_blank" rel="noopener">Mitra10, Amstad Rapi EX CWR012N1 squat toilet (accessed 3 Nov 2026)</a>).</li>
<li>My Winston dual-flush two-piece toilet Rp1,639,000 at Mitra10 (2026-11-03, source: <a href="https://www.mitra10.com/product/american-standard-kloset-duduk-my-winston-dual-flush-toilet" target="_blank" rel="noopener">Mitra10, Amstad My Winston dual-flush toilet (accessed 3 Nov 2026)</a>).</li>
<li>My Winston DF CCST white Rp1,510,500 at Depo Bangunan (normal price Rp1,917,000) (2026-11-03, source: <a href="https://www.depobangunan.co.id/amstad-mywinston-df-ccst-white.html" target="_blank" rel="noopener">Depo Bangunan, Amstad My Winston DF CCST White (accessed 3 Nov 2026)</a>).</li>
<li>NEO two-piece touchless sensor toilet Rp3,615,000 at Mitra10 (2026-11-03, source: <a href="https://www.mitra10.com/product/american-standard-neo-modern-kloset-duduk-touchless-sensor-tanpa-sentuh" target="_blank" rel="noopener">Mitra10, Amstad NEO Modern touchless toilet (accessed 3 Nov 2026)</a>).</li>
<li>Studio 45 wall-hung basin (45 cm) Rp349,700 at Mitra10 (2026-11-03, source: <a href="https://www.mitra10.com/product/american-standard-wastafel-studio-45-white-wallhung-lavatory-clu032i3-1cactlw00" target="_blank" rel="noopener">Mitra10, Amstad Studio 45 wall-hung basin (accessed 3 Nov 2026)</a>).</li>
</ul>
<h2>American Standard squat toilet prices</h2>
<p>Squat toilets remain the most searched item for landed houses, boarding houses and housing projects. On 3 November 2026:</p>
<ul><li><strong>Rapi EX CWR012N1 white</strong>: Rp249,000 at Mitra10.</li>
<li><strong>Rapi EX Squat white</strong>: Rp298,480 at Depo Bangunan (normal Rp328,000); ivory Rp311,600.</li>
<li><strong>Rapi C Squat</strong>: Rp546,250 at Depo Bangunan (normal Rp575,000).</li></ul>
<p>These prices cover the toilet unit only. Pipes, traps and installation labour are extra.</p>
<h2>American Standard two-piece toilet prices</h2>
<p>Two-piece toilets, with the cistern separate from the bowl, are the usual choice for home bathroom renovation.</p>
<ul><li><strong>My Winston dual flush</strong>: Rp1,639,000 at Mitra10; at Depo Bangunan the My Winston DF CCST costs Rp1,510,500 (normal Rp1,917,000).</li>
<li><strong>My Winston single flush (SF CCST)</strong>: Rp1,486,000 at Depo Bangunan.</li>
<li><strong>Newton dual flush</strong> and <strong>Luxia dual flush</strong>: Rp1,890,000 each at Mitra10.</li>
<li><strong>My Winston dual flush + Duostix jet shower + stop valve bundle</strong>: Rp1,799,490 at Depo Bangunan (normal Rp3,157,000).</li></ul>
<p>A bundle with accessories can be cheaper than buying the toilet, jet shower and valve separately, as long as the contents match what you need.</p>
<h2>Touchless sensor and one-piece toilets</h2>
<p>The upper end of the American Standard range at Mitra10 is made up of touchless sensor toilets:</p>
<ul><li><strong>NEO two-piece, sensor</strong>: Rp3,615,000.</li>
<li><strong>Flexio one-piece, sensor</strong>: Rp4,625,000.</li>
<li><strong>NEO Modern one-piece, sensor</strong>: Rp5,145,000.</li>
<li><strong>Acacia SupaSleek one-piece</strong>: Rp6,128,500.</li></ul>
<p>Sensor toilets need power or batteries according to the maker's specification, so check the installation requirements before buying.</p>
<h2>American Standard basin and jet shower prices</h2>
<ul><li><strong>Studio 45 wall-hung basin</strong>: Rp349,700 at Mitra10, Rp387,600 at Depo Bangunan (normal Rp408,000).</li>
<li><strong>My Winston wall-hung basin</strong>: Rp441,700 at Mitra10.</li>
<li><strong>Loven W550ID hanging basin</strong>: Rp541,100 at Mitra10, Rp532,950 at Depo Bangunan (normal Rp561,000).</li>
<li><strong>Duostix jet shower</strong>: Rp259,000 (glossy white) and Rp299,000 (white or black) at Mitra10.</li></ul>
<h2>How to compare American Standard prices</h2>
<p>First, match the product code, not just the series name; one series can have single-flush, dual-flush and bundle versions. Second, note the difference between normal and promotional prices, since online discounts change often. Third, measure the distance from the waste outlet to the wall before ordering a close-coupled toilet. For projects with many bathrooms, homeX can help prepare a sanitary-ware list, compare several brands and arrange delivery from its warehouse to the site.</p>
<p>All prices above are public online store prices on 3 November 2026 and may change without notice.</p>
<h2>American Standard prices: related articles and products</h2><ul>
<li><a href="/news/54">Toilet prices in Indonesia 2026 by brand</a></li>
<li><a href="/news/62">Washbasin prices 2026: TOTO, American Standard, DBS</a></li>
<li><a href="/news/87">Jet shower and bidet prices 2026</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much is an American Standard squat toilet?</strong> On 3 November 2026 the Rapi EX CWR012N1 cost Rp249,000 at Mitra10, while the Rapi EX at Depo Bangunan cost Rp298,480 and the Rapi C Rp546,250.</p>
<p><strong>How much is the American Standard My Winston toilet?</strong> The My Winston dual flush cost Rp1,639,000 at Mitra10 and Rp1,510,500 at Depo Bangunan; the single-flush version cost Rp1,486,000 at Depo Bangunan.</p>
<p><strong>How much is an American Standard sensor toilet?</strong> At Mitra10 the NEO two-piece sensor toilet cost Rp3,615,000, the Flexio one-piece Rp4,625,000 and the NEO Modern one-piece Rp5,145,000.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.mitra10.com/product/amstad-cwr012n1-1cact0000-rapiex-white-squat-set" target="_blank" rel="noopener">Mitra10, Amstad Rapi EX CWR012N1 squat toilet (accessed 3 Nov 2026)</a>; <a href="https://www.mitra10.com/product/american-standard-kloset-duduk-my-winston-dual-flush-toilet" target="_blank" rel="noopener">Mitra10, Amstad My Winston dual-flush toilet (accessed 3 Nov 2026)</a>; <a href="https://www.depobangunan.co.id/amstad-mywinston-df-ccst-white.html" target="_blank" rel="noopener">Depo Bangunan, Amstad My Winston DF CCST White (accessed 3 Nov 2026)</a>; <a href="https://www.mitra10.com/product/american-standard-neo-modern-kloset-duduk-touchless-sensor-tanpa-sentuh" target="_blank" rel="noopener">Mitra10, Amstad NEO Modern touchless toilet (accessed 3 Nov 2026)</a>; <a href="https://www.mitra10.com/product/amstad-closet-duduk-satu-bagian-acacia-supasleek-op-ri305-106271sh00-putih" target="_blank" rel="noopener">Mitra10, Amstad Acacia SupaSleek one-piece toilet (accessed 3 Nov 2026)</a>; <a href="https://www.mitra10.com/product/american-standard-wastafel-studio-45-white-wallhung-lavatory-clu032i3-1cactlw00" target="_blank" rel="noopener">Mitra10, Amstad Studio 45 wall-hung basin (accessed 3 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>Construction Worker Shortage: 12 Million Certified Needed, 41,824 Trained</title><link>https://www.homex.co.id/en/news/369</link><guid isPermaLink="true">https://www.homex.co.id/en/news/369</guid><pubDate>Tue, 03 Nov 2026 09:16:30 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Construction worker shortage: Indonesia needs an estimated 12 million certified workers, while the Public Works Ministry had certified 41,824 by October 2026.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261103-i-kebutuhan-tenaga-konstruksi.jpg" alt="Construction Worker Shortage: 12 Million Certified Needed, 41,824 Trained"></p><p>A <strong>construction worker shortage</strong> is no longer a local complaint. Konstruksi News reported on 1 November 2026 that the need for competent, certified construction workers is estimated at 12 million by contractor associations, while the Public Works Ministry had trained and certified 41,824 people by 22 October 2026. In places like Buleleng, projects have even had to bring in workers from outside Bali.</p>
<h2>Key Facts</h2><ul>
<li>The Public Works Ministry trained and certified 41,824 construction workers by 22 October 2026; the need is estimated at 12 million (2026-11-01, source: <a href="https://konstruksinews.id/hari-inovasi-indonesia-jadi-momentum-mendorong-konstruksi-yang-efisien-dan-berkelanjutan/" target="_blank" rel="noopener">Konstruksi News, Indonesian Innovation Day and construction (1 Nov 2026)</a>).</li>
<li>Construction grew 6.68% in Q2 2026, above economic growth of 5.29% (2026-11-01, source: <a href="https://konstruksinews.id/hari-inovasi-indonesia-jadi-momentum-mendorong-konstruksi-yang-efisien-dan-berkelanjutan/" target="_blank" rel="noopener">Konstruksi News, Indonesian Innovation Day and construction (1 Nov 2026)</a>).</li>
<li>BPS: 9.29 million households do not own a home and about 18.01 million do not live in adequate housing (2026-11-01, source: <a href="https://konstruksinews.id/hari-inovasi-indonesia-jadi-momentum-mendorong-konstruksi-yang-efisien-dan-berkelanjutan/" target="_blank" rel="noopener">Konstruksi News, Indonesian Innovation Day and construction (1 Nov 2026)</a>).</li>
<li>East Belitung holds free certification tests for nine construction job titles on 9–11 November 2026 (2026-10-11, source: <a href="https://dpuprp2rkp.beltim.go.id/berita/pendaftaran-uji-sertifikasi-kompetensi-kerja-konstruksi-2026" target="_blank" rel="noopener">East Belitung Public Works Office, 2026 construction competency certification (11 Oct 2026)</a>).</li>
<li>206 Fakfak State Polytechnic students took construction OHS competency tests on 27 and 29 October and 4 November 2026 (2026-11-03, source: <a href="https://papuabarat.tribunnews.com/fakfak/67335/polinef-sertifikasi-206-mahasiswa-dalam-uji-kompetensi-k3-konstruksi" target="_blank" rel="noopener">Tribun Papua Barat, Polinef certifies 206 students in construction OHS (accessed 3 Nov 2026)</a>).</li>
</ul>
<h2>The gap between 12 million and 41,824</h2>
<p>In a piece marking Indonesian Innovation Day on 1 November, Konstruksi News named labour as one of the sector's biggest tasks. Construction grew 6.68% in the second quarter of 2026, faster than the national economy at 5.29%. Housing need is also large: according to BPS, 9.29 million households do not own a home and about 18.01 million do not live in adequate housing.</p>
<p>The number of certified workers has not kept up. By 22 October 2026 the Public Works Ministry had trained 41,824 construction workers, far from the 12 million estimated by contractor associations. The article suggested certification closer to project sites, field schools for builders, vocational curricula designed with industry, and linking certificates to pay so the trade appeals to young people.</p>
<h2>Construction worker shortage in the regions: the Buleleng case</h2>
<p>The Buleleng Regency Manpower, Transmigration and Energy Office wrote that builders are increasingly hard to find, to the point that projects bring in workers from outside Bali. Causes it listed include:</p>
<ul><li>Young people choose tourism, trade, services or migrant work, seen as offering steadier income.</li>
<li>Building work is paid daily or per job, so income goes up and down.</li>
<li>Workers move to other sectors during harvests or when other projects are busy.</li>
<li>Building work needs specific skills, and training does not happen quickly.</li></ul>
<p>As a result, many projects run late, wages may rise because of scarcity, and costs grow when workers are brought from elsewhere. The office called for training at vocational centres (BLK), more competitive pay, better job protection and renewal through training local youth.</p>
<h2>Certification tests now under way</h2>
<p>Local governments and colleges keep opening certification routes. In East Belitung, free construction competency tests are scheduled for 9–11 November 2026. Nine job titles are tested, including Construction OHS Officer level 3, Building Draughtsman level 4, and Building and Road Site Supervisor level 6.</p>
<p>In West Papua, 206 students of Fakfak State Polytechnic took construction OHS competency tests in three rounds on 27 October, 29 October and 4 November 2026. Level 5 is for diploma students in electrical and civil engineering, and level 6 for applied bachelor students in road and bridge engineering. Certificates are issued through BNSP, usually three to five working days after the test.</p>
<h2>What it means for homeowners and contractors</h2>
<ul><li><strong>Book builders early</strong>, especially before busy seasons, because skilled labour is limited.</li>
<li><strong>Ask for competency certificates</strong> for risky work such as structure and electrical.</li>
<li><strong>Have materials ready on time</strong>. When builders are scarce, days lost waiting for materials cost more.</li>
<li><strong>Choose materials that are easy to install</strong> and meet standards, so results depend less on rare skills.</li></ul>
<p>homeX, a one-stop building materials and furniture platform with a showroom, warehousing and delivery, helps project owners prepare materials to match builders' schedules so site time is not wasted.</p>
<h2>construction worker shortage: related articles and products</h2><ul>
<li><a href="/en/news/321">Construction workforce certification 2026: 41,824 people</a></li>
<li><a href="/en/news/353">Home renovation builder wages and the need for thousands of builders</a></li>
<li><a href="/en/news/272">Daily builder wages 2026</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>Why are builders getting harder to find?</strong> According to the Buleleng manpower office, young people choose sectors with steadier income, builders' earnings fluctuate and skills training is slow.</p>
<p><strong>How many certified construction workers does Indonesia need?</strong> Konstruksi News cited a contractor association estimate of 12 million, while the Public Works Ministry had trained 41,824 by 22 October 2026.</p>
<p><strong>Where are free construction certification tests in November 2026?</strong> One is in East Belitung on 9–11 November 2026 for nine job titles, although registration closed on 31 October.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://konstruksinews.id/hari-inovasi-indonesia-jadi-momentum-mendorong-konstruksi-yang-efisien-dan-berkelanjutan/" target="_blank" rel="noopener">Konstruksi News, Indonesian Innovation Day and construction (1 Nov 2026)</a>; <a href="https://disnakertransesdm.bulelengkab.go.id/informasi/detail/artikel/60_tukang-sulit-dicari-proyek-terhambat-krisis-tenaga-kerja-bangunan-di-buleleng-dari-sudut-pandang-ketenagakerjaan" target="_blank" rel="noopener">Buleleng Regency Manpower Office, construction labour crisis (26 Jun 2026)</a>; <a href="https://dpuprp2rkp.beltim.go.id/berita/pendaftaran-uji-sertifikasi-kompetensi-kerja-konstruksi-2026" target="_blank" rel="noopener">East Belitung Public Works Office, 2026 construction competency certification (11 Oct 2026)</a>; <a href="https://papuabarat.tribunnews.com/fakfak/67335/polinef-sertifikasi-206-mahasiswa-dalam-uji-kompetensi-k3-konstruksi" target="_blank" rel="noopener">Tribun Papua Barat, Polinef certifies 206 students in construction OHS (accessed 3 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>Planned Mandatory SNI for Light Steel Profiles and Corrugated Roofing: SNI 8399 and 9374</title><link>https://www.homex.co.id/en/news/368</link><guid isPermaLink="true">https://www.homex.co.id/en/news/368</guid><pubDate>Tue, 03 Nov 2026 09:16:05 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Mandatory SNI light steel rules are planned: SNI 8399:2025 for profiles and SNI 9374:2025 for corrugated roofing. What buyers should prepare now.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261103-i-sni-wajib-atap-baja-ringan.jpg" alt="Planned Mandatory SNI for Light Steel Profiles and Corrugated Roofing: SNI 8399 and 9374"></p><p><strong>Mandatory SNI light steel</strong> rules are getting closer in Indonesia. A plan to make SNI compulsory for light steel profiles (SNI 8399:2025) and for corrugated roofing and wall sheets made of metal-coated steel (SNI 9374:2025) was presented to manufacturers, distributors and importers in October 2026. We have not found an effective date in an official regulation yet, but contractors and building supply stores should start checking certificates and product markings now.</p>
<h2>Key Facts</h2><ul>
<li>A national outreach webinar on the planned mandatory SNI for SNI 9374:2025 (corrugated roofing and wall sheets of metal-coated steel) and SNI 8399:2025 (light steel profiles) was held on 2 October 2026 (2026-09-15, source: <a href="https://vertexglobal.id/article_content?article_id=2816fbad54&name=sosialisasipenerapansniwajib" target="_blank" rel="noopener">Vertex Global Indonesia, 15 Sep 2026 (outreach webinar)</a>).</li>
<li>SNI 8399:2025 covers C, U, Z and TH profiles with a minimum nominal thickness of 0.40 mm and SNI-certified coated steel as base material (2026-06-15, source: <a href="https://batik.go.id/index.php/post/read/beberapa_aspek_yang_diatur_dalam_sni_8399_2025_profil_baja_ringan_0" target="_blank" rel="noopener">BBSPJIKB, Ministry of Industry, 15 Jun 2026</a>).</li>
<li>Mandatory SNI for a number of steel products took effect on 20 May 2026; IISIA asked for mandatory SNI to extend to roofing, wall sheets, light steel and floordeck (2026-05-13, source: <a href="https://iisia.or.id/news/iisia-dukung-penerapan-sni-wajib-untuk-perkuat-industri-baja-nasional" target="_blank" rel="noopener">IISIA, 13 May 2026</a>).</li>
<li>SNI for zinc-coated steel has been mandatory since 2008 and for aluminium-zinc-coated steel since 2009; the ministry counted 11 active SNI certificates for domestic and 7 for imported products (2026-02-23, source: <a href="https://www.antaranews.com/berita/5431862/kemenperin-perkuat-penerapan-sni-baja-guna-jaga-keamanan-konstruksi" target="_blank" rel="noopener">ANTARA, 23 Feb 2026</a>).</li>
</ul>
<h2>What is being planned</h2>
<p>The raw material of light steel, zinc-coated (BjLS) and aluminium-zinc-coated (BjLAS) steel sheet, has long been under mandatory SNI. According to ANTARA, the Ministry of Industry says BjLS has been mandatory since 2008 and BjLAS since 2009, updated by Ministerial Regulation 67/2024 issued in November 2024. Finished products such as roof truss profiles and corrugated roofing sheets, however, have remained under voluntary SNI.</p>
<p>That gap is what the plan aims to close. On 13 May 2026 the steel industry association IISIA welcomed mandatory SNI for several steel products from 20 May 2026 and called for standards to be harmonised from upstream to downstream, including roofing, wall sheets, light steel and floordeck that still lack mandatory SNI. Certification body Vertex Global Indonesia then held an outreach webinar on the "Planned Mandatory SNI" for SNI 9374:2025 and SNI 8399:2025 on 2 October 2026.</p>
<p>The push is not new. In 2024 the Indonesian Roll Former Association (ARFI) urged that the light steel profile SNI be made mandatory after a classroom roof at SMPN 2 Greged in Cirebon collapsed and injured six students.</p>
<h2>Key points of SNI 8399:2025</h2>
<p>The Ministry of Industry's BBSPJIKB centre summarises the main points of the standard:</p>
<ul><li>Four profile shapes: C for roof, wall and floor framing; U for wall framing; Z and TH (top hat) for roof systems.</li>
<li>Base material must be BjLS, BjLAS, BjLAM or BjLSAM steel meeting SNI, proven by a certificate.</li>
<li>Minimum nominal thickness of 0.40 mm, plus rules on coating type and minimum coating mass.</li>
<li>Dimensional and shape tolerances (bow, twist, camber) and minimum weight per metre.</li>
<li>Markings must show the brand, profile code, profile height, nominal thickness, and coating type and mass.</li></ul>
<p>We have not read the full text of SNI 9374:2025, so its technical details are not described here.</p>
<h2>Impact on contractors and building supply stores</h2>
<p>If mandatory SNI light steel rules are enacted, uncertified profiles and roofing would no longer be allowed on the market after a transition period. Older stock usually gets time to sell through, as with other steel rules, but the details depend on the ministerial regulation. Steps to take now:</p>
<ul><li>Ask suppliers for the SNI certificate of the base steel and, where available, an SNI 8399 certificate for the profile.</li>
<li>Check the print on each length: profile code, thickness and coating mass should be clearly legible.</li>
<li>Write the agreed thickness into the written quotation so BMT and TCT are not confused.</li>
<li>Watch the Ministry of Industry website for the official regulation number and date.</li></ul>
<p>homeX, an integrated building materials and furniture platform in Indonesia with a showroom, warehousing and delivery, helps buyers compare light steel and roofing specifications from several suppliers before ordering.</p>
<h2>Mandatory SNI light steel: related articles and products</h2><ul>
<li><a href="/en/news/327">BMT vs TCT light steel and checking SNI 8399</a></li>
<li><a href="/en/news/354">Antidumping duty on Chinese zinc-coated steel</a></li>
<li><a href="/en/news/288">Mandatory SNI building materials list 2026</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>Is SNI for light steel mandatory as of November 2026?</strong> We have not found an official regulation setting an effective date. What has happened is outreach on the planned mandatory SNI for SNI 8399:2025 and SNI 9374:2025 in October 2026.</p>
<p><strong>What is the minimum thickness of light steel profiles under SNI 8399:2025?</strong> A minimum nominal thickness of 0.40 mm, according to the BBSPJIKB summary.</p>
<p><strong>What must be printed on an SNI-compliant light steel profile?</strong> The brand and specification symbols, including profile code, profile height, nominal thickness, and coating type and mass.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://vertexglobal.id/article_content?article_id=2816fbad54&name=sosialisasipenerapansniwajib" target="_blank" rel="noopener">Vertex Global Indonesia, 15 Sep 2026 (outreach webinar)</a>; <a href="https://batik.go.id/index.php/post/read/beberapa_aspek_yang_diatur_dalam_sni_8399_2025_profil_baja_ringan_0" target="_blank" rel="noopener">BBSPJIKB, Ministry of Industry, 15 Jun 2026</a>; <a href="https://iisia.or.id/news/iisia-dukung-penerapan-sni-wajib-untuk-perkuat-industri-baja-nasional" target="_blank" rel="noopener">IISIA, 13 May 2026</a>; <a href="https://www.antaranews.com/berita/5431862/kemenperin-perkuat-penerapan-sni-baja-guna-jaga-keamanan-konstruksi" target="_blank" rel="noopener">ANTARA, 23 Feb 2026</a>; <a href="https://www.liputan6.com/news/read/5564299/marak-ruang-kelas-ambruk-pemerintah-diminta-wajibkan-sni-untuk-profil-rangka-baja-ringan" target="_blank" rel="noopener">Liputan6, 1 Apr 2024</a></em></p>]]></content:encoded></item><item><title>IndoBuildTech UrbanHouse 2027 at Senayan City, 7–16 May: A Guide for Chinese Brands</title><link>https://www.homex.co.id/en/news/367</link><guid isPermaLink="true">https://www.homex.co.id/en/news/367</guid><pubDate>Tue, 03 Nov 2026 09:16:04 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>IndoBuildTech UrbanHouse 2027 runs 7–16 May 2027 at Senayan City, Jakarta, on 585.5 m². What the curated format means for Chinese building brands.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261103-i-indobuildtech-urbanhouse-2027.jpg" alt="IndoBuildTech UrbanHouse 2027 at Senayan City, 7–16 May: A Guide for Chinese Brands"></p><p><strong>IndoBuildTech UrbanHouse 2027</strong> will run from 7 to 16 May 2027 at Senayan City, Jakarta, according to the organiser's official IndoBuildTech Expo page. Unlike the large shows at ICE BSD or NICE PIK 2, UrbanHouse is a curated 585.5 m² showcase focused on design, materials and interior experience. For Chinese building material and furniture brands, the format suits building a premium image rather than hunting for distributor volume.</p>
<h2>Key Facts</h2><ul>
<li>IndoBuildTech UrbanHouse is scheduled for 7–16 May 2027 at Senayan City, Jakarta, with 585.5 m² of exhibition space (2026-11-03, source: <a href="https://indobuildtech.com/urban-house/" target="_blank" rel="noopener">IndoBuildTech Expo, UrbanHouse page (accessed 3 Nov 2026)</a>).</li>
<li>The 2026 IndoBuildTech series lists 55,000 m² of space, 137,229 visitors, 550+ brands and 13 countries (2026-11-03, source: <a href="https://indobuildtech.com/" target="_blank" rel="noopener">IndoBuildTech Expo official site (accessed 3 Nov 2026)</a>).</li>
<li>IndoBuildTech Part 2 runs 25–29 November 2026 at NICE PIK 2, focused on distributors, retailers, B2B links and export-import (2026-11-03, source: <a href="https://indobuildtech.com/" target="_blank" rel="noopener">IndoBuildTech Expo official site (accessed 3 Nov 2026)</a>).</li>
<li>Indonesia and China agreed to form a joint technical team on apartment construction technology for the 3 Million Homes Programme, with local products and labour prioritised (2026-09-10, source: <a href="https://ekonomi.bisnis.com/read/20260910/47/2003013/ri-gandeng-cina-kembangkan-teknologi-rusun-untuk-program-3-juta-rumah" target="_blank" rel="noopener">Bisnis.com, 10 Sep 2026</a>).</li>
</ul>
<h2>What IndoBuildTech UrbanHouse is</h2>
<p>The organiser describes UrbanHouse as an evolution of IndoBuildTech, the building, architecture and interior expo it bills as Indonesia's largest. The theme is "Living with Intention": a home is treated as a reflection of lifestyle, so each space is designed to let visitors experience materials and function in context instead of simply walking past rows of booths.</p>
<p>The programme differs from a normal trade fair. Design Afterhours is a design talk session for industry players, designers and media; The Intimate Hour lets each brand personally present its booth concept and details; The Card is a consultation deck built on Mood, Material, Energy and Function; and Archi-Lab Indonesia is an experimental space designed by an Indonesian architect.</p>
<h2>Where it sits in Indonesia's exhibition calendar</h2>
<p>On its official site, IndoBuildTech 2026 appears as four editions: Bandung (7–10 May 2026), ICE BSD City (8–12 July 2026), Grand City Convex Surabaya (17–20 September 2026) and Part 2 at NICE PIK 2 (25–29 November 2026). Part 1 in BSD is the full-scale show for architects, developers, contractors and interior designers. Part 2 in PIK 2 leans towards distributors, retailers and export-import, with an international product showcase.</p>
<p>UrbanHouse fills a different gap: a shopping-centre venue in South Jakarta, a ten-day run and a far smaller footprint. That means a limited number of exhibitors and a more filtered audience, mainly upper-middle-class homeowners, designers and consultants.</p>
<h2>Market trends that matter for Chinese brands</h2>
<p>Indonesian building material demand is currently driven largely by government housing programmes. In September 2026 the Ministry of Housing and Settlement Areas (PKP) announced cooperation with China on apartment construction technology for the 3 Million Homes Programme. Minister Maruarar Sirait stressed the technology would be adapted to Indonesian conditions and that qualifying Indonesian products would be given priority. For Chinese suppliers the message is clear: the biggest opportunities lie in technology, design and partnerships with local manufacturers or distributors, not just shipping finished goods.</p>
<p>In the premium housing segment, buyers care more and more about experience and product story. A curated format like UrbanHouse gives room to show large-format tiles, wall panels, sanitaryware, lighting or furniture inside realistic rooms.</p>
<h2>Preparation tips for Chinese exhibitors</h2>
<ul><li>Make sure products under mandatory SNI, such as ceramic tiles, cement or coated steel, are certified before they are marketed.</li>
<li>Prepare materials in Indonesian and English, including specifications and installation examples.</li>
<li>Line up a local partner for warehousing, delivery and after-sales service before the show.</li>
<li>Contact the organiser through the official site for booth terms and fees; these are not published on the UrbanHouse page.</li></ul>
<p>homeX, an integrated building materials and furniture platform in Indonesia with a showroom, warehousing and delivery services, is open to talking with suppliers who want to test the Indonesian market step by step.</p>
<h2>IndoBuildTech UrbanHouse 2027: related articles and products</h2><ul>
<li><a href="/en/news/14">IndoBuildTech 25–29 November 2026 at NICE PIK 2</a></li>
<li><a href="/en/news/333">BDExpo Indonesia 2026 at JIExpo</a></li>
<li><a href="/en/news/362">Megabuild Indonesia 2027 at NICE PIK 2</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>When and where is IndoBuildTech UrbanHouse 2027?</strong> According to the organiser's official site, 7–16 May 2027 at Senayan City, Jakarta, with 585.5 m² of exhibition space.</p>
<p><strong>How is UrbanHouse different from IndoBuildTech in BSD or PIK 2?</strong> UrbanHouse is a small curated design and interior experience, while the BSD and PIK 2 editions are large trade shows for contractors, developers, distributors and export-import.</p>
<p><strong>Can Chinese brands take part?</strong> The UrbanHouse page does not restrict brand origin, but products under mandatory SNI must still be certified to be sold in Indonesia. Exhibitor terms should be confirmed directly with the organiser.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://indobuildtech.com/urban-house/" target="_blank" rel="noopener">IndoBuildTech Expo, UrbanHouse page (accessed 3 Nov 2026)</a>; <a href="https://indobuildtech.com/" target="_blank" rel="noopener">IndoBuildTech Expo official site (accessed 3 Nov 2026)</a>; <a href="https://ekonomi.bisnis.com/read/20260910/47/2003013/ri-gandeng-cina-kembangkan-teknologi-rusun-untuk-program-3-juta-rumah" target="_blank" rel="noopener">Bisnis.com, 10 Sep 2026</a></em></p>]]></content:encoded></item><item><title>Bolt Grades 4.6, 8.8, 10.9 and 12.9: What the Head Marking Means Under ISO 898-1</title><link>https://www.homex.co.id/en/news/366</link><guid isPermaLink="true">https://www.homex.co.id/en/news/366</guid><pubDate>Tue, 03 Nov 2026 09:15:08 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Bolt grade 8.8 means at least 800 MPa tensile and 640 MPa yield strength. Learn what 4.6 to 12.9 head markings mean under ISO 898-1 and how to choose.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261103-i-kelas-baut-iso898.jpg" alt="Bolt Grades 4.6, 8.8, 10.9 and 12.9: What the Head Marking Means Under ISO 898-1"></p><p>The <strong>bolt grade</strong> stamped on a bolt head, such as 8.8 or 10.9, is a strength code defined by ISO 898-1. The first number times 100 gives the nominal tensile strength in MPa, and the second number gives the ratio of yield to tensile strength. So an 8.8 bolt has at least 800 MPa tensile and 640 MPa yield strength. For structural joints, the grade must follow the drawings rather than simply picking the strongest bolt.</p>
<h2>Key Facts</h2><ul>
<li>Class 4.6: minimum tensile 400 MPa, minimum yield 240 MPa, nominal proof stress 225 MPa (2026-10-27, source: <a href="https://www.hexvaro.com/resources/iso-898-1-bolt-property-classes/" target="_blank" rel="noopener">HEXVARO, ISO 898-1:2013 property class table (reviewed 27 Oct 2026, accessed 3 Nov 2026)</a>).</li>
<li>Class 8.8: minimum tensile 800 MPa for d ≤ 16 mm and 830 MPa for d > 16 mm; minimum Rp0.2 yield 640/660 MPa (2026-10-27, source: <a href="https://www.hexvaro.com/resources/iso-898-1-bolt-property-classes/" target="_blank" rel="noopener">HEXVARO, ISO 898-1:2013 property class table (reviewed 27 Oct 2026, accessed 3 Nov 2026)</a>).</li>
<li>Class 10.9: minimum tensile 1,040 MPa, minimum yield 940 MPa; class 12.9: 1,220 MPa and 1,100 MPa (2026-10-27, source: <a href="https://www.hexvaro.com/resources/iso-898-1-bolt-property-classes/" target="_blank" rel="noopener">HEXVARO, ISO 898-1:2013 property class table (reviewed 27 Oct 2026, accessed 3 Nov 2026)</a>).</li>
<li>Hexagon head bolts with d ≥ 5 mm must carry the property class symbol and the manufacturer mark; the dot may be omitted (2026-10-27, source: <a href="https://www.hexvaro.com/resources/iso-898-1-bolt-property-classes/" target="_blank" rel="noopener">HEXVARO, ISO 898-1:2013 property class table (reviewed 27 Oct 2026, accessed 3 Nov 2026)</a>).</li>
</ul>
<h2>How to read a bolt grade</h2>
<p>ISO 898-1:2013 sets the mechanical properties of bolts, screws and studs made of carbon steel and alloy steel. The class code has two numbers separated by a dot:</p>
<ul><li><strong>First number</strong> × 100 = nominal tensile strength (MPa). An 8 means about 800 MPa.</li>
<li><strong>Second number</strong> × 10 = yield as a percentage of tensile strength. An 8 means yield is about 80% of tensile, i.e. 640 MPa.</li></ul>
<p>Another example: 4.6 means 400 MPa tensile and 60% yield, or 240 MPa. Class 10.9 means a nominal 1,000 MPa with a 90% yield ratio; in the standard's table the tested minimums are 1,040 MPa tensile and 940 MPa yield.</p>
<h2>Quick table of ISO 898-1 classes</h2>
<ul><li><strong>4.6</strong>: tensile 400 MPa, yield 240 MPa, hardness 120–220 HV.</li>
<li><strong>5.6</strong>: tensile 500 MPa, yield 300 MPa, hardness 155–220 HV.</li>
<li><strong>8.8</strong>: tensile 800/830 MPa, yield 640/660 MPa, hardness 250–320 / 255–335 HV (d ≤16 / >16 mm).</li>
<li><strong>10.9</strong>: tensile 1,040 MPa, yield 940 MPa, hardness 320–380 HV.</li>
<li><strong>12.9</strong>: tensile 1,220 MPa, yield 1,100 MPa, hardness 385–435 HV.</li></ul>
<p>The 8.8 values are split by diameter because larger bolts are tested to slightly higher figures. Proof stress is the load a bolt must carry without permanent deformation; for 8.8 it is 580/600 MPa.</p>
<h2>Where the marking goes</h2>
<p>For hexagon and hexalobular head bolts of 5 mm diameter and above, the head must show the manufacturer's mark and the class symbol. It is usually on top of the head, or indented on the side. The dot may be left out, so "88" or "109" is also common. A bolt without a class marking cannot be assumed to meet any particular class.</p>
<h3>Do not judge by colour</h3>
<p>Black, yellow or silver only indicates the surface finish, not strength. An 8.8 bolt can be galvanized, and an unrated bolt can look shiny. What counts is the head marking and the manufacturer's test documents.</p>
<h2>Choosing a bolt grade for renovation</h2>
<ul><li>For light work such as shelving, fences or timber brackets, 4.6 or 5.6 is usually enough unless the designer asks for more.</li>
<li>For structural steel joints, canopies, steel stairs or machine bases, follow the grade on the drawings; 8.8 is widely used.</li>
<li>Classes 10.9 and 12.9 are for high loads and need controlled tightening. A higher grade is not automatically better, because harder bolts tend to be less ductile.</li>
<li>Pair bolts with nuts and washers of a matching class; nut classes are covered by a separate standard, ISO 898-2.</li>
<li>When buying in volume, ask for a test certificate (mill certificate) for each lot.</li></ul>
<p>homeX, an integrated building materials and furniture platform in Indonesia with showroom, warehousing and delivery services, can help source bolts, nuts and steel accessories to project specifications.</p>
<h2>Bolt grade: related articles and products</h2><ul>
<li><a href="/en/news/210">Nail and screw prices 2026</a></li>
<li><a href="/en/news/327">BMT vs TCT light steel</a></li>
<li><a href="/en/news/330">Rebar weight per metre SNI 2052</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What does 8.8 on a bolt head mean?</strong> It is the ISO 898-1 property class: minimum tensile strength 800 MPa (830 MPa above 16 mm diameter) and minimum yield 640 MPa.</p>
<p><strong>Which is stronger, 10.9 or 12.9?</strong> Class 12.9 is stronger, with minimum tensile 1,220 MPa versus 1,040 MPa for 10.9. Selection should still follow the designer and product standard.</p>
<p><strong>Can unmarked bolts be used for structures?</strong> Better not. ISO 898-1 requires the class and manufacturer marks on hexagon bolts of 5 mm and above, so an unmarked bolt cannot be confirmed to any class.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.hexvaro.com/resources/iso-898-1-bolt-property-classes/" target="_blank" rel="noopener">HEXVARO, ISO 898-1:2013 property class table (reviewed 27 Oct 2026, accessed 3 Nov 2026)</a>; <a href="https://cdn.standards.iteh.ai/samples/60610/e211f7b6697643f192d041ceceb1f2be/ISO-898-1-2013.pdf" target="_blank" rel="noopener">ISO 898-1:2013, official sample via iTeh Standards (accessed 3 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>Cement Shortage in Bima and Lombok: Retail Prices Rise to Rp72,000–85,000 a Bag</title><link>https://www.homex.co.id/en/news/365</link><guid isPermaLink="true">https://www.homex.co.id/en/news/365</guid><pubDate>Tue, 03 Nov 2026 09:15:08 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Cement shortage in NTB: a 2 Nov 2026 inspection in Bima found Tiga Roda, Tonasa, Bosowa and Conch cement scarce, with shop prices up to Rp72,000–85,000 per bag.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261103-i-kelangkaan-semen-ntb.jpg" alt="Cement Shortage in Bima and Lombok: Retail Prices Rise to Rp72,000–85,000 a Bag"></p><p>A <strong>cement shortage</strong> is now being felt in West Nusa Tenggara (NTB). A spot inspection by the Bima City Cooperatives, Industry and Trade Office (Diskoperindag) on Monday, 2 November 2026, found several cement brands limited or out of stock in shops, with retail prices rising to roughly Rp72,000–85,000 per bag. A month earlier, West Lombok had already reported prices of up to Rp80,000–87,000 per bag. For homeowners and contractors in NTB, concrete pours and budgets now need more careful planning.</p>
<h2>Key Facts</h2><ul>
<li>Brands reported hard to find in Bima City: Tiga Roda, Tonasa, Bosowa and Conch (2026-11-02, source: <a href="https://koperindag.bimakota.go.id/web/detail-berita/347/pantau-stok-dan-harga-semen-diskoperindag-kota-bima-lakukan-sidak-ke-distributor-dan-toko-bangunan" target="_blank" rel="noopener">Bima City Trade &amp; Industry Office (Diskoperindag), 2 Nov 2026</a>).</li>
<li>At one Bima shop, Tiga Roda and Tonasa rose from about Rp80,000 to Rp85,000 per bag; at another, Tiga Roda rose from Rp61,000–70,000 to about Rp72,000 (2026-11-02, source: <a href="https://koperindag.bimakota.go.id/web/detail-berita/347/pantau-stok-dan-harga-semen-diskoperindag-kota-bima-lakukan-sidak-ke-distributor-dan-toko-bangunan" target="_blank" rel="noopener">Bima City Trade &amp; Industry Office (Diskoperindag), 2 Nov 2026</a>).</li>
<li>One Bima shop normally receives about 200 bags a day each of Tiga Roda and Tonasa, but deliveries now sell out immediately (2026-11-02, source: <a href="https://koperindag.bimakota.go.id/web/detail-berita/347/pantau-stok-dan-harga-semen-diskoperindag-kota-bima-lakukan-sidak-ke-distributor-dan-toko-bangunan" target="_blank" rel="noopener">Bima City Trade &amp; Industry Office (Diskoperindag), 2 Nov 2026</a>).</li>
<li>In West Lombok, retail prices rose to Rp80,000–87,000 per bag from about Rp65,000; the shortage began in late July–early August 2026 (2026-10-01, source: <a href="https://www.detik.com/bali/bisnis/d-8688536/semen-langka-di-lombok-barat-harga-tembus-rp-87-ribu-per-sak" target="_blank" rel="noopener">detikBali, 1 Oct 2026</a>).</li>
</ul>
<h2>What the Bima inspection found</h2>
<p>The inspection was led by H. Sodik, head of the office's industry and trade division, and covered distributors and building material shops. Availability of several brands remained limited. According to the office, the problem is not simply that distribution has stopped. Some shops still receive cement, but volumes are below demand, so stock sells out at once. Other shops reported late deliveries, reduced quotas and some brands with no stock at all.</p>
<p>Prices moved as well. Besides the Tiga Roda and Tonasa increases, Tonasa at another shop was recorded at Rp75,000–78,000 per bag. Bosowa cement (spelled "Bosoa" in the office's release) had sold for Rp65,000–67,000 per bag before it ran out. The office stressed that prices differ between shops depending on purchase price, distribution cost and the supply each receives.</p>
<h2>Causes: ships, fuel and no return cargo</h2>
<p>From a survey of businesses on 30 October 2026, the office listed several suspected causes of the shortage in Bima:</p>
<ul><li>Higher sea freight costs as ship fuel prices rose.</li>
<li>Difficulty finding affordable vessels.</li>
<li>Ships reluctant to carry cement to Bima because there is no return cargo.</li>
<li>Limited supply from plants, with Mataram also short, so distribution was temporarily prioritised for Lombok island.</li>
<li>Truck queues at distributor warehouses and limited transport.</li></ul>
<h3>West Lombok felt it first</h3>
<p>Bima is not the only place hit by this cement shortage in Indonesia's eastern islands.</p>
<p>On 1 October 2026, detikBali reported that Lale Widiani, head of trade at the West Lombok Trade Office, had checked the Tiga Roda, Bosowa and Tonasa distributors. She said the shortage began in late July to early August and worsened in September. Distributors pointed to disrupted supplies of production energy, namely diesel and coal. She also said distributor-to-shop prices had not risen; the increase happened at retail level. Distributors said nothing similar happened the previous year.</p>
<h2>Practical steps for buyers in NTB</h2>
<p>A regional cement shortage in Indonesia like this hurts most on jobs that need large volumes in a short time, such as slab or column pours. Some sensible steps:</p>
<ul><li>Work out cement needs per stage, order early and get written confirmation of quantity and delivery date.</li>
<li>Ask about several equivalent brands of the same type (for example PCC for general work) so you do not depend on one brand.</li>
<li>Compare prices at several shops, since the office's data shows sizeable gaps between them.</li>
<li>Store cement dry and off the floor, and use older stock first.</li>
<li>For large jobs, consider ready-mix concrete where it is available locally.</li></ul>
<p>The Bima city government says it will keep monitoring stock and prices and urged distributors to coordinate on distribution fixes. homeX, an integrated building materials and furniture platform in Indonesia with showroom, warehousing and delivery services, follows supply developments like these to help customers plan material purchases.</p>
<h2>Cement shortage: related articles and products</h2><ul>
<li><a href="/en/news/352">Cement transport by rail in 2026</a></li>
<li><a href="/en/news/342">Semen Indonesia 9M 2026 results</a></li>
<li><a href="/en/news/324">Jakarta building material prices 2026</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>Which cement brands are scarce in Bima?</strong> According to the Bima Diskoperindag inspection on 2 November 2026, brands that were hard to get included Tiga Roda, Tonasa, Bosowa and Conch.</p>
<p><strong>What did cement cost in Bima in early November 2026?</strong> The office recorded roughly Rp72,000–85,000 per bag for Tiga Roda and Tonasa, depending on the shop.</p>
<p><strong>What is causing the cement shortage in NTB?</strong> The office cited higher ship costs from fuel prices, scarce vessels, no return cargo, limited plant supply and queues at distributor warehouses. In West Lombok, distributors also mentioned disrupted diesel and coal supplies.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://koperindag.bimakota.go.id/web/detail-berita/347/pantau-stok-dan-harga-semen-diskoperindag-kota-bima-lakukan-sidak-ke-distributor-dan-toko-bangunan" target="_blank" rel="noopener">Bima City Trade &amp; Industry Office (Diskoperindag), 2 Nov 2026</a>; <a href="https://www.detik.com/bali/bisnis/d-8688536/semen-langka-di-lombok-barat-harga-tembus-rp-87-ribu-per-sak" target="_blank" rel="noopener">detikBali, 1 Oct 2026</a></em></p>]]></content:encoded></item><item><title>AI in Architectural Design in Bali: IGNITE BIM &amp; AI 2026 and Warmadewa Study</title><link>https://www.homex.co.id/en/news/364</link><guid isPermaLink="true">https://www.homex.co.id/en/news/364</guid><pubDate>Tue, 03 Nov 2026 09:14:38 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>AI in architectural design at IGNITE BIM &amp; AI 2026 in Bali (28 Oct): BIM cuts revisions, while a Warmadewa–Curtin study says AI images still need architects.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261103-i-bim-ai-konstruksi-bali.jpg" alt="AI in Architectural Design in Bali: IGNITE BIM &amp; AI 2026 and Warmadewa Study"></p><p><strong>AI in architectural design</strong> is starting to be used by Bali's construction players, but people still make the decisions. At the IGNITE BIM & AI Conference 2026 on 28 October in Badung, practitioners said BIM cuts revisions and staffing needs, while research by Universitas Warmadewa and Curtin University released on 2 November 2026 shows AI-generated images still need correcting by architects.</p>
<h2>Key Facts</h2><ul>
<li>IGNITE BIM & AI Conference 2026 was held by AppliCAD Indonesia and Graphisoft on 28 October 2026 at Renaissance Bali Uluwatu, Badung (2026-11-02, source: <a href="https://www.baliekbis.com/bim-dan-ai-dinilai-pangkas-revisi-proyek-pelaku-konstruksi-bali-mulai-beradaptasi/" target="_blank" rel="noopener">Bali Ekbis, IGNITE BIM &amp; AI Conference 2026 (2 Nov 2026)</a>).</li>
<li>RIBA AI Report 2026 cited at the event: 74% of architecture practices use AI, up from 59% (2025) and 41% (2024) (2026-11-02, source: <a href="https://www.baliekbis.com/bim-dan-ai-dinilai-pangkas-revisi-proyek-pelaku-konstruksi-bali-mulai-beradaptasi/" target="_blank" rel="noopener">Bali Ekbis, IGNITE BIM &amp; AI Conference 2026 (2 Nov 2026)</a>).</li>
<li>G70 Asia: with BIM, work that needed five people can be handled by about three and a half (2026-11-02, source: <a href="https://www.baliekbis.com/bim-dan-ai-dinilai-pangkas-revisi-proyek-pelaku-konstruksi-bali-mulai-beradaptasi/" target="_blank" rel="noopener">Bali Ekbis, IGNITE BIM &amp; AI Conference 2026 (2 Nov 2026)</a>).</li>
<li>Warmadewa–Curtin study: AI image suitability score rose from 2.70 (K1 sketch) to 4.50 (K4 sketch) on a five-point scale (2026-11-02, source: <a href="https://dppm.warmadewa.ac.id/berita/riset-warmadewacurtin-ai-bantu-desain-arsitektur-bali-arsitek-tetap-pegang-kendali" target="_blank" rel="noopener">DPPM Universitas Warmadewa, Warmadewa–Curtin research (2 Nov 2026)</a>).</li>
<li>Respondents scored 4.50 out of 5 that AI output still needs manual correction by an architect (2026-11-02, source: <a href="https://dppm.warmadewa.ac.id/berita/riset-warmadewacurtin-ai-bantu-desain-arsitektur-bali-arsitek-tetap-pegang-kendali" target="_blank" rel="noopener">DPPM Universitas Warmadewa, Warmadewa–Curtin research (2 Nov 2026)</a>).</li>
</ul>
<h2>IGNITE BIM & AI 2026: one model, one team</h2>
<p>The conference, organised by PT Indonesia AppliCAD with Graphisoft, the developer of Archicad, brought together architects, engineers, contractors, developers and academics. The theme was "One Model. One Team. One Standard." It was AppliCAD's third year running in Bali.</p>
<p>The main message was that BIM is no longer just a tool for 3D models. It is becoming a single source of information linking every discipline, so coordination is tidier, design revisions fall and handover comes sooner. One example shown was the Isleren housing project in Aargau, Switzerland, with 17 buildings and 270 apartments, whose construction documentation was produced by the Alex Ladda Architecture team in Bali.</p>
<p>Tobin Halim, Managing Director of G70 Asia, said BIM lets work that used to need five people be handled by about three and a half, freeing some staff for other projects.</p>
<h2>How widely AI in architectural design is used</h2>
<p>Speakers cited the RIBA AI Report 2026, a Royal Institute of British Architects survey of more than 1,100 respondents. It found 74% of architecture practices now use AI, up from 59% in 2025 and 41% in 2024, and 75% of respondents said AI improves productivity. The data come from the UK and several other countries, not Indonesia specifically, but they show where the industry is heading.</p>
<h2>Warmadewa–Curtin research: from sketch to image</h2>
<p>On the academic side, Universitas Warmadewa and Australia's Curtin University tested sketch-to-image technology, where AI turns a sketch into an architectural image. The work was led by Gde Bagus Andhika Wicaksana with Ida Bagus Gede Parama Putra and Camilo Idarraga Javela.</p>
<ul><li>Four sketch categories were tested, from the simplest K1 to K4 with colour and material.</li>
<li>The average suitability score as a concept design rose from 2.70 (K1) to 4.50 (K4) on a five-point scale.</li>
<li>The gain from K3 to K4 was small, so a medium-detail sketch may be the best balance.</li>
<li>Balinese roof forms scored well, but ornament and the main room layout remained weak.</li></ul>
<p>The researchers caution that only 10 respondents rated the images and the differences between categories were not significant after statistical adjustment. A realistic image is not necessarily faithful to the design, since AI may change the layout or add ornament. The next stage is a simple 3D model evaluated in virtual reality.</p>
<h2>What it means for project owners and material choice</h2>
<ul><li><strong>AI images are a communication tool</strong>, not working drawings. Material specifications still need to be written clearly.</li>
<li><strong>A clean BIM model</strong> makes it easier to calculate quantities of tiles, paint, roofing and sanitaryware, so purchasing is more precise.</li>
<li><strong>Fewer revisions</strong> also mean less risk of ordering the wrong materials.</li></ul>
<p>The trend reaches the supply chain too. When designs and material lists are structured from the start, suppliers such as homeX, a one-stop building materials and furniture platform with a showroom, warehousing and delivery, can prepare quotes and delivery schedules more accurately.</p>
<h2>AI in architectural design: related articles and products</h2><ul>
<li><a href="/en/news/30">BIM and AI in Indonesian construction: INKINDO DKI–I2MI MoU</a></li>
<li><a href="/en/news/334">Public Works Ministry BIM for Sekolah Rakyat Phase II</a></li>
<li><a href="/en/news/169">Indonesian construction AI: WIKA Gedung and Hutama Karya</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>Can AI replace architects in house design?</strong> The Warmadewa–Curtin study says no. Respondents scored 4.50 out of 5 that AI output still needs manual correction, especially for ornament and room layout.</p>
<p><strong>What kind of sketch gives the best AI image?</strong> Sketches with colour and material (K4) scored 4.50, but the gap from K3 was small, so medium detail is already efficient.</p>
<p><strong>What are the benefits of BIM according to IGNITE 2026?</strong> Speakers said BIM reduces design revisions, speeds up coordination and lets work for five people be done by about three and a half.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.baliekbis.com/bim-dan-ai-dinilai-pangkas-revisi-proyek-pelaku-konstruksi-bali-mulai-beradaptasi/" target="_blank" rel="noopener">Bali Ekbis, IGNITE BIM &amp; AI Conference 2026 (2 Nov 2026)</a>; <a href="https://dppm.warmadewa.ac.id/berita/riset-warmadewacurtin-ai-bantu-desain-arsitektur-bali-arsitek-tetap-pegang-kendali" target="_blank" rel="noopener">DPPM Universitas Warmadewa, Warmadewa–Curtin research (2 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>Building Materials Product Data Is Still Fragmented: 2026 Supply Chain Research</title><link>https://www.homex.co.id/en/news/363</link><guid isPermaLink="true">https://www.homex.co.id/en/news/363</guid><pubDate>Tue, 03 Nov 2026 09:14:37 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Mitra Material research (Oct 2026) finds building materials product data loses meaning between factory and shop, so stock is still confirmed by phone and chat.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261103-i-fragmentasi-data-bahan-bangunan.jpg" alt="Building Materials Product Data Is Still Fragmented: 2026 Supply Chain Research"></p><p>The main problem in digitalising Indonesian building materials distribution is no longer whether apps exist. According to Mitra Material research updated on 13 October 2026, <strong>building materials product data</strong> is already kept in ERP, WMS, POS and catalogues, but its meaning does not survive the trip from factory to distributor, shop and customer. As a result, a stock figure on screen is still confirmed by phone before a shop dares to promise it to a buyer.</p>
<h2>Key Facts</h2><ul>
<li>Mitra Material research published 21 September 2026 and updated 13 October 2026, covering product work since 2022 (2026-10-13, source: <a href="https://mitramaterial.com/research/mengapa-digitalisasi-industri-bahan-bangunan-tetap-terfragmentasi" target="_blank" rel="noopener">Mitra Material Bangunan, research &quot;Why Building Materials Digitalisation Remains Fragmented&quot; (published 21 Sep 2026, updated 13 Oct 2026)</a>).</li>
<li>Example in the research: one tile is called "white marble" by the customer, Nouville Light Gris by the shop and G60NVL-LGS by the distributor and factory (2026-10-13, source: <a href="https://mitramaterial.com/research/mengapa-digitalisasi-industri-bahan-bangunan-tetap-terfragmentasi" target="_blank" rel="noopener">Mitra Material Bangunan, research &quot;Why Building Materials Digitalisation Remains Fragmented&quot; (published 21 Sep 2026, updated 13 Oct 2026)</a>).</li>
<li>The research proposes a Time to Trusted Answer measure: the time until a stock answer is reliable enough to promise (2026-10-13, source: <a href="https://mitramaterial.com/research/mengapa-digitalisasi-industri-bahan-bangunan-tetap-terfragmentasi" target="_blank" rel="noopener">Mitra Material Bangunan, research &quot;Why Building Materials Digitalisation Remains Fragmented&quot; (published 21 Sep 2026, updated 13 Oct 2026)</a>).</li>
<li>A study at PT Siam Cement Group Yogyakarta found the blockchain-based RMC NET system improved visibility and traceability but did not directly build supplier trust (2026-10-21, source: <a href="https://goldenratio.id/index.php/grmilf/article/view/2674" target="_blank" rel="noopener">Golden Ratio of Mapping Idea and Literature Format, blockchain study at PT Siam Cement Group Yogyakarta (21 Oct 2026)</a>).</li>
<li>The Gudang 731 marketplace launched in Gorontalo on 26 July 2026 to connect distributors, hardware stores, contractors and small firms (2026-07-26, source: <a href="https://dizen.id/berita/langkah-baru-mendorong-transformasi-digital-perdagangan-bahan-bangunan/" target="_blank" rel="noopener">Dizen.id, launch of the Gudang 731 marketplace (26 Jul 2026)</a>).</li>
</ul>
<h2>Building materials product data: the tech exists, the information breaks</h2>
<p>The research titled "Why Building Materials Digitalisation Remains Fragmented" rejects the idea that the industry has not adopted technology. Its thesis: technology is used locally, but the information does not stay interoperable. Factories run ERP and quality systems, distributors run WMS, shops run POS and customers use chat. Each works well inside its own organisation, but data does not connect between them. The research calls this pattern "digital islands".</p>
<p>The authors also note that a group owning factories, distribution and retail at once does not automatically have integrated data. Information can still break between head office and branches, or between the warehouse and sales.</p>
<h2>One product, many names</h2>
<p>The example will be familiar to tile buyers. A customer arrives with a photo and asks for "white marble". The shop knows it as Nouville Light Gris, while the distributor and factory use the code G60NVL-LGS. An experienced person knows all three are the same item, but a computer sees three different things.</p>
<p>The research separates three tasks that are often confused: confirming two names refer to the same product, finding similar products, and judging whether another product can be a substitute. Similar patterns may differ in size, surface, shade or batch.</p>
<h2>Six ways information changes on the way</h2>
<ul><li><strong>Name changes</strong>: the factory name becomes a warehouse abbreviation, then a shop nickname.</li>
<li><strong>Unit changes</strong>: the factory records boxes, the shop sells pieces, the project counts square metres.</li>
<li><strong>Lost time</strong>: a stock figure is visible but not when it was confirmed.</li>
<li><strong>No access</strong>: the receiver only gets a screenshot.</li>
<li><strong>Lost origin</strong>: it is unclear who reported it and for which warehouse.</li>
<li><strong>Must be confirmed</strong>: digital data still ends in a phone call.</li></ul>
<p>An example from the research: a file says 400 boxes are available, but not when it was updated, which warehouse holds them or whether they are already allocated. The number is precise; the certainty is not. The authors therefore propose a Time to Trusted Answer measure. A system may reply in eight seconds, but if a promise is only safe after a confirmation twelve minutes later, the time that matters is twelve minutes.</p>
<p>The research is open about its limits. It is a retrospective note from a company that also builds the technology, not a survey representing the whole industry, and its hypotheses have not yet been field tested.</p>
<h2>Not only a technology problem</h2>
<p>Another study at PT Siam Cement Group Yogyakarta, published on 21 October 2026, looked at the blockchain-based RMC NET system. Visibility, traceability and decision speed improved. Supplier trust, however, depended more on track record, consistency and direct communication. This matches the Mitra Material view that barriers can be technical, institutional or economic.</p>
<p>New platforms also keep appearing. The Gudang 731 marketplace was launched in Gorontalo on 26 July 2026 to bring distributors, suppliers, hardware stores, contractors and small businesses into one digital catalogue.</p>
<h2>What it means for buyers and contractors</h2>
<ul><li>When you get stock information, ask when it was checked and from which warehouse.</li>
<li>Record the factory product code, not only the shop's trade name, especially for tiles and granite.</li>
<li>For large orders, ask for one batch and shade in a single delivery.</li>
<li>Agree on units from the start: boxes, pieces or square metres.</li></ul>
<p>homeX, a one-stop building materials and furniture platform with a showroom, warehousing and delivery, faces the same challenge, so clear product codes, units and stock status are an important part of the service.</p>
<h2>building materials product data: related articles and products</h2><ul>
<li><a href="/en/news/29">B2B building materials platforms and supply chain digitalisation</a></li>
<li><a href="/en/news/317">Cement supply chain digitalisation: AksesToko and 63,000 shops</a></li>
<li><a href="/en/news/358">Steel mill digitalisation: e-ordering and AI</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>Why is stock in a hardware store app often still checked by phone?</strong> According to the Mitra Material research, stock figures often lack the update time, warehouse location and allocation status, so shops confirm with someone they trust before promising.</p>
<p><strong>What is Time to Trusted Answer?</strong> A measure proposed by the research: the time from a question until the answer is reliable enough to commit to, not just until it appears on screen.</p>
<p><strong>Does blockchain automatically make suppliers more trusted?</strong> The SCG Yogyakarta study found it does not directly. Blockchain improved visibility, but trust depended more on track record, consistency and communication.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://mitramaterial.com/research/mengapa-digitalisasi-industri-bahan-bangunan-tetap-terfragmentasi" target="_blank" rel="noopener">Mitra Material Bangunan, research &quot;Why Building Materials Digitalisation Remains Fragmented&quot; (published 21 Sep 2026, updated 13 Oct 2026)</a>; <a href="https://goldenratio.id/index.php/grmilf/article/view/2674" target="_blank" rel="noopener">Golden Ratio of Mapping Idea and Literature Format, blockchain study at PT Siam Cement Group Yogyakarta (21 Oct 2026)</a>; <a href="https://dizen.id/berita/langkah-baru-mendorong-transformasi-digital-perdagangan-bahan-bangunan/" target="_blank" rel="noopener">Dizen.id, launch of the Gudang 731 marketplace (26 Jul 2026)</a></em></p>]]></content:encoded></item><item><title>Megabuild Indonesia 2027 at NICE PIK 2, 10–13 June: A Guide for Chinese Suppliers</title><link>https://www.homex.co.id/en/news/362</link><guid isPermaLink="true">https://www.homex.co.id/en/news/362</guid><pubDate>Mon, 02 Nov 2026 09:25:25 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Megabuild Indonesia 2027 and Keramika run 10–13 June 2027 at NICE PIK 2. The 2026 edition drew 31,839 visitors and 412 brands; key notes for Chinese suppliers.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261102-i-megabuild-keramika-2027.jpg" alt="Megabuild Indonesia 2027 at NICE PIK 2, 10–13 June: A Guide for Chinese Suppliers"></p><p><strong>Megabuild Indonesia 2027</strong>, the 24th edition of the building materials, architecture, construction and interior design show, will run on 10–13 June 2027 at the Nusantara International Convention Exhibition (NICE), PIK 2, Tangerang Regency, alongside the 12th Keramika Indonesia. The dates are already published on the official site of organiser PT Panorama Media. For Chinese suppliers it is a gateway to Indonesian distributors and contractors, but the local ceramics market is protected by anti-dumping duties and tighter SNI rules.</p>
<h2>Key Facts</h2><ul>
<li>Megabuild (24th edition) and Keramika Indonesia (12th edition) run 10–13 June 2027, 10:00–20:00 WIB, at NICE PIK 2 (2026-11-02, source: <a href="https://panoramamedia.co.id/events/megabuild/megabuild-indonesia-2027" target="_blank" rel="noopener">Panorama Media, Megabuild Indonesia 2027 (accessed 2 Nov 2026)</a>).</li>
<li>The 2026 edition (4–7 June, NICE PIK 2) recorded 412 brands from 7 countries, 31,839 visitors, over 30,000 m² of space and 7,269 B2B meetings (2026-11-02, source: <a href="https://megabuild.co.id/" target="_blank" rel="noopener">Megabuild Indonesia official site (accessed 2 Nov 2026)</a>).</li>
<li>Keramika 2026 had 157 exhibitors from 7 countries with 221 brands (2026-11-02, source: <a href="https://keramika.co.id/" target="_blank" rel="noopener">Keramika Indonesia official site (accessed 2 Nov 2026)</a>).</li>
<li>Indonesia's installed ceramic capacity reached 686 million m² in 2026; ceramics from China already face anti-dumping import duties (2026-10-28, source: <a href="https://www.industriproperti.com/nasional/industri-keramik-nasional-2/" target="_blank" rel="noopener">IndustriProperti, 28 Oct 2026 (Ministry of Industry &amp; ASAKI)</a>).</li>
<li>The Industry Minister said ceramic industry utilisation fell to around 60% because gas supply is limited by quota (2026-10-26, source: <a href="https://wartaekonomi.co.id/read643540/industri-berharap-tambahan-gas-masuk-skema-hgbt-utilisasi-keramik-tertekan" target="_blank" rel="noopener">Warta Ekonomi, 26 Oct 2026</a>).</li>
</ul>
<h2>Show dates and format</h2>
<p>According to the official site, Megabuild 2027 runs for four days, Thursday to Sunday, 10–13 June 2027, from 10:00 to 20:00 WIB. Sharing the venue and dates are Keramika Indonesia (tiles, sanitaryware, raw materials and ceramic machinery), the 2nd MegaProperty Expo and the first MegaFurniture Indonesia. Supporting programmes include Business Matching, which books meetings with importers, developers, contractors and project owners before the show, a Building Materials & Construction Leaders Forum, and a Product Innovation Showcase for exhibitors with booths of 81 m² or more.</p>
<p>The product categories listed by the organiser are broad: cement and mortar, lightweight concrete, roofing and ceilings, wall panels, flooring, doors and windows, glass and aluminium, steel, waterproofing, paints, adhesives, pipes, sanitaryware, and green building and smart home products.</p>
<h2>Who attends: 2026 edition data</h2>
<p>The post-show report quoted on the official site gives the 2026 visitor profile: homeowners and the general public 18.9%, contractors 11.71%, interior designers 8.2%, architects 7.7% and purchasing staff 4.73%. By industry, distributors and wholesalers made up 12%, agents, dealers and retailers 10%, and importers and OEM brands 2%. In other words, the show is better suited to building distributor and project networks than to retail selling.</p>
<h2>Indonesia's ceramics market heading into 2027</h2>
<p>Market context matters for Chinese exporters. The Ministry of Industry says ceramics from China already face anti-dumping duties and imports are tightened through SNI, although selective relaxation is open for ceramic types not yet made locally. The ceramics association ASAKI reports installed capacity of 686 million m² in 2026, a second expansion phase of 110 million m² worth about Rp12 trillion in 2026–2028, and Indonesia is now the world's fifth-largest ceramic producer after China, India, Brazil and Vietnam. At the same time, the average gas price paid by ceramic makers reached US$11 per MMBTU in October 2026 and utilisation fell to around 60%.</p>
<p>For Chinese suppliers, the more realistic openings lie in raw materials, glazes, machinery and spare parts for ceramic plants, plus building materials beyond tiles such as aluminium, glass, sanitary fittings, pipes and construction chemicals.</p>
<h3>Preparation for exhibitors from China</h3>
<ul><li>Make sure products under mandatory SNI hold an SPPT SNI certificate before they are marketed in Indonesia.</li>
<li>Prepare catalogues and price lists in Indonesian or English, plus a local distributor scheme.</li>
<li>Register for Business Matching so meetings are booked before the doors open.</li></ul>
<p>homeX, a one-stop building materials and furniture platform in Indonesia with showroom, warehousing and delivery, follows this show to widen its supplier network for project customers in Indonesia.</p>
<h2>Megabuild Indonesia 2027: related articles and products</h2><ul>
<li><a href="/en/news/33">Indonesia building materials exhibition calendar 2026–2027</a></li>
<li><a href="/en/news/333">BDExpo Indonesia 2026 at JIExpo</a></li>
<li><a href="/en/news/122">SNI certification steps for imported building materials</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>When and where is Megabuild Indonesia 2027?</strong> The show runs 10–13 June 2027, 10:00–20:00 WIB, at NICE PIK 2 in Tangerang Regency, together with Keramika Indonesia.</p>
<p><strong>How many people visited Megabuild 2026?</strong> The 2026 edition with Keramika recorded 31,839 visitors, 412 brands from 7 countries and 7,269 B2B meetings.</p>
<p><strong>Do Chinese ceramics face anti-dumping duties in Indonesia?</strong> Yes. According to the Ministry of Industry in October 2026, ceramics from China already face anti-dumping duties and imports are also tightened through SNI.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://megabuild.co.id/" target="_blank" rel="noopener">Megabuild Indonesia official site (accessed 2 Nov 2026)</a>; <a href="https://panoramamedia.co.id/events/megabuild/megabuild-indonesia-2027" target="_blank" rel="noopener">Panorama Media, Megabuild Indonesia 2027 (accessed 2 Nov 2026)</a>; <a href="https://keramika.co.id/" target="_blank" rel="noopener">Keramika Indonesia official site (accessed 2 Nov 2026)</a>; <a href="https://www.industriproperti.com/nasional/industri-keramik-nasional-2/" target="_blank" rel="noopener">IndustriProperti, 28 Oct 2026 (Ministry of Industry &amp; ASAKI)</a>; <a href="https://wartaekonomi.co.id/read643540/industri-berharap-tambahan-gas-masuk-skema-hgbt-utilisasi-keramik-tertekan" target="_blank" rel="noopener">Warta Ekonomi, 26 Oct 2026</a></em></p>]]></content:encoded></item><item><title>Kansai Paint Price 2026: Property, Rubymatt, Diamond Shield and Ftalit</title><link>https://www.homex.co.id/en/news/361</link><guid isPermaLink="true">https://www.homex.co.id/en/news/361</guid><pubDate>Mon, 02 Nov 2026 09:25:25 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Kansai paint price on 2 Nov 2026: Property 25 kg Rp707,100, Rubymatt 2.5 L Rp210,400, Diamond Shield 2.5 L Rp355,800 and Ftalit 1 kg Rp62,000–96,100.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261102-i-harga-cat-kansai.jpg" alt="Kansai Paint Price 2026: Property, Rubymatt, Diamond Shield and Ftalit"></p><p>The <strong>Kansai paint price</strong> at the Mitra10 and Depo Bangunan online stores on 2 November 2026 ranged from Rp148,800 for Kansai Property 5 kg to Rp1,740,100 for Plaster Primer 20 litres. The budget interior paint Kansai Property 25 kg sold for Rp707,100, while the premium exterior Diamond Shield 2.5 litres cost Rp355,800. Store gaps were large: the same Ftalit 1 kg tin cost Rp62,000 at Mitra10 and Rp96,100 at Depo Bangunan.</p>
<h2>Key Facts</h2><ul>
<li>Kansai Property 581-075 White Ballroom 25 kg at Mitra10 cost Rp707,100 (5 kg Rp148,800) (2026-11-02, source: <a href="https://www.mitra10.com/product/cat-tembok-interior-kansai-property-581-075-white-ballroom-25kg" target="_blank" rel="noopener">Mitra10: Kansai Property 25 kg (2 Nov 2026)</a>).</li>
<li>Kansai Diamondshield 685-301 Emperor White 2.5 L at Depo Bangunan cost Rp355,800 (2026-11-02, source: <a href="https://www.depobangunan.co.id/kansai-diamondshield-685-301-emperor-white-2-5lt.html" target="_blank" rel="noopener">Depo Bangunan: Kansai Diamondshield 2.5 L (2 Nov 2026)</a>).</li>
<li>Kansai Plaster Primer 20 L cost Rp1,147,100 at Mitra10 and Rp1,740,100 at Depo Bangunan (2026-11-02, source: <a href="https://www.depobangunan.co.id/kansai-plaster-primer-20lt.html" target="_blank" rel="noopener">Depo Bangunan: Kansai Plaster Primer 20 L (2 Nov 2026)</a>).</li>
<li>Ftalit 115-731 Super White 1 kg cost Rp62,000 at Mitra10 and Rp96,100 at Depo Bangunan (2026-11-02, source: <a href="https://www.depobangunan.co.id/ftalit-cat-gloss-115-731-super-white-1kg.html" target="_blank" rel="noopener">Depo Bangunan: Ftalit 115-731 1 kg (2 Nov 2026)</a>).</li>
<li>Kansai Paint Indonesia: Diamond Shield theoretical coverage 12–14 m² per litre, 12-year warranty (2026-11-02, source: <a href="https://kansaipaint.id/produk/cat-tembok-eksterior-kansai-diamond-shield-12-in-1" target="_blank" rel="noopener">Kansai Paint Indonesia: Diamond Shield 12-in-1 (2 Nov 2026)</a>).</li>
</ul>
<h2>Kansai paint price list 2026 by product</h2>
<p>Prices were checked on Mitra10 and Depo Bangunan product pages on 2 November 2026 and may vary by branch. Tinted colours usually cost more than standard white.</p>
<ul><li><strong>Kansai Property (interior, anti-germ):</strong> 581-075 White Ballroom 5 kg Rp148,800 and 25 kg Rp707,100 at Mitra10, or about Rp28,300 per kg in the large pack.</li>
<li><strong>Kansai Rubymatt (premium interior):</strong> 595-204 White Diamond 2.5 L Rp210,400 at Mitra10.</li>
<li><strong>Kansai Diamond Shield 12-in-1 (premium exterior):</strong> 685-301 Emperor White 2.5 L Rp355,800 at Depo Bangunan.</li>
<li><strong>Kansai Plaster Primer (undercoat):</strong> 2.5 L Rp154,000 and 20 L Rp1,147,100 at Mitra10; 20 L Rp1,740,100 at Depo Bangunan.</li>
<li><strong>Ftalit (wood and metal enamel):</strong> standard colours 1 kg Rp60,000–62,000 at Mitra10; at Depo Bangunan gloss 1 kg Rp96,100 and Super White 20 kg Rp1,770,700.</li></ul>
<h2>Kansai paint price per m²</h2>
<p>According to Kansai Paint Indonesia technical data, Diamond Shield has a theoretical coverage of 12–14 m² per litre depending on colour, with at least two coats recommended. At Rp355,800 per 2.5 litres, the top coat costs about Rp10,000–12,000 per m² per coat. Plaster Primer covers 8–11 m² per litre per coat; in the Mitra10 20 L pail it costs about Rp57,400 per litre, or Rp5,200–7,200 per m².</p>
<h3>When to choose Property, Rubymatt or Diamond Shield</h3>
<p>Kansai Property suits interiors on a tight budget: 8–10 m² per litre, a matt finish and silver-ion technology that the maker says stops up to 99.9% of germs. Rubymatt and Diamond Shield are premium lines covered by Kansai's 12-year warranty programme, subject to online registration and use of Plaster Primer. For exterior walls exposed to rain and sun, Diamond Shield offers a semi-gloss finish and Singapore Green Label certification.</p>
<h3>Ftalit for wood and metal</h3>
<p>Ftalit is Kansai's synthetic enamel for wood and metal, available in three gloss levels and heat resistant up to 80°C. Coverage is about 12 m² per litre, with at least 4 hours between coats. The Rp34,100 gap per 1 kg tin between two stores is worth checking before buying for fences or grilles.</p>
<p>homeX, a one-stop building materials and furniture platform in Indonesia with showroom, warehousing and delivery, can prepare paint together with other renovation materials in a single delivery. The prices above are public official-store prices, not homeX prices.</p>
<h2>Kansai paint price: related articles and products</h2><ul>
<li><a href="/en/news/107">Wall paint prices per pail 2026</a></li>
<li><a href="/en/news/94">Wall primer prices 2026</a></li>
<li><a href="/en/news/91">Wood and metal paint prices 2026</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much is Kansai Property 25 kg?</strong> At Mitra10 on 2 November 2026, Kansai Property 581-075 White Ballroom 25 kg cost Rp707,100.</p>
<p><strong>Is Ftalit a Kansai product?</strong> Yes. The Kansai Paint Indonesia site lists KANSAI FTALIT as its synthetic paint for wood and metal.</p>
<p><strong>How many litres of Diamond Shield for 100 m² of wall?</strong> At 12–14 m² per litre and two coats, a 100 m² wall needs about 15–17 litres, or seven 2.5-litre cans.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.mitra10.com/product/cat-tembok-interior-kansai-property-581-075-white-ballroom-5-kg" target="_blank" rel="noopener">Mitra10: Kansai Property 5 kg (2 Nov 2026)</a>; <a href="https://www.mitra10.com/product/cat-tembok-interior-kansai-property-581-075-white-ballroom-25kg" target="_blank" rel="noopener">Mitra10: Kansai Property 25 kg (2 Nov 2026)</a>; <a href="https://www.mitra10.com/product/rubymatt-595-204-white-diamond-2-5lt" target="_blank" rel="noopener">Mitra10: Kansai Rubymatt 2.5 L (2 Nov 2026)</a>; <a href="https://www.depobangunan.co.id/kansai-diamondshield-685-301-emperor-white-2-5lt.html" target="_blank" rel="noopener">Depo Bangunan: Kansai Diamondshield 2.5 L (2 Nov 2026)</a>; <a href="https://www.mitra10.com/product/cat-dasar-tembok-interior-eksterior-kansai-plaster-primer-2-5lt" target="_blank" rel="noopener">Mitra10: Kansai Plaster Primer 2.5 L (2 Nov 2026)</a>; <a href="https://www.mitra10.com/product/cat-dasar-tembok-interior-eksterior-kansai-plaster-primer-20lt" target="_blank" rel="noopener">Mitra10: Kansai Plaster Primer 20 L (2 Nov 2026)</a>; <a href="https://www.depobangunan.co.id/kansai-plaster-primer-20lt.html" target="_blank" rel="noopener">Depo Bangunan: Kansai Plaster Primer 20 L (2 Nov 2026)</a>; <a href="https://www.mitra10.com/product/ftalit-115-731-std-super-white-1kg" target="_blank" rel="noopener">Mitra10: Ftalit 115-731 1 kg (2 Nov 2026)</a>; <a href="https://www.depobangunan.co.id/ftalit-cat-gloss-115-731-super-white-1kg.html" target="_blank" rel="noopener">Depo Bangunan: Ftalit 115-731 1 kg (2 Nov 2026)</a>; <a href="https://www.depobangunan.co.id/ftalit-cat-gloss-115-731-superwhite-20kg.html" target="_blank" rel="noopener">Depo Bangunan: Ftalit 115-731 20 kg (2 Nov 2026)</a>; <a href="https://kansaipaint.id/produk/cat-tembok-eksterior-kansai-diamond-shield-12-in-1" target="_blank" rel="noopener">Kansai Paint Indonesia: Diamond Shield 12-in-1 (2 Nov 2026)</a>; <a href="https://kansaipaint.id/produk/kansai-plaster-primer" target="_blank" rel="noopener">Kansai Paint Indonesia: Plaster Primer (2 Nov 2026)</a>; <a href="https://kansaipaint.id/produk/kansai-ftalit" target="_blank" rel="noopener">Kansai Paint Indonesia: Ftalit (2 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>Aquaproof Price 2026: 1 kg, 4 kg, 20 kg and Aquaproof Pro at Mitra10</title><link>https://www.homex.co.id/en/news/360</link><guid isPermaLink="true">https://www.homex.co.id/en/news/360</guid><pubDate>Mon, 02 Nov 2026 09:25:25 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Aquaproof price at Mitra10 on 2 Nov 2026: 1 kg Rp51,600–66,800, 4 kg Rp197,600–245,000, 20 kg Rp898,000–1,111,000; Aquaproof Pro 20 kg Rp1.59 million.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261102-i-harga-aquaproof.jpg" alt="Aquaproof Price 2026: 1 kg, 4 kg, 20 kg and Aquaproof Pro at Mitra10"></p><p>The <strong>Aquaproof price</strong> at the Mitra10 online store on 2 November 2026 ranged from Rp51,600–66,800 for a 1 kg tin, Rp197,600–245,000 for 4 kg and Rp898,000–1,111,000 for 20 kg, depending on colour. The premium Aquaproof Pro was listed at special prices of Rp350,000 (4 kg) and Rp1,585,001 (20 kg). Because the official coverage is 1 kg per m² for two coats, the material cost of this anti-leak coating works out at roughly Rp44,900–66,800 per m².</p>
<h2>Key Facts</h2><ul>
<li>Aquaproof 1 kg at Mitra10 cost Rp51,600 (white, red, orange, terracotta) and Rp66,800 (light grey, grey, black, blue, cream) (2026-11-02, source: <a href="https://www.mitra10.com/product/aquaproof-waterproofing-grey-1kg-cat-pelapis-anti-bocor" target="_blank" rel="noopener">Mitra10: Aquaproof Grey 1 kg (2 Nov 2026)</a>).</li>
<li>Aquaproof 20 kg in white, grey, red, orange, mocca and terracotta cost Rp898,000; cream, blue and light grey cost Rp1,111,000 (regular price Rp1,160,900) (2026-11-02, source: <a href="https://www.mitra10.com/product/aquaproof-waterproofing-cream-20kg-cat-pelapis-anti-bocor" target="_blank" rel="noopener">Mitra10: Aquaproof Cream 20 kg (2 Nov 2026)</a>).</li>
<li>Aquaproof Pro white or grey 20 kg cost Rp1,585,001 (regular Rp1,791,700) (2026-11-02, source: <a href="https://www.mitra10.com/product/aquaproof-pro-putih-20kg-cat-pelapis-anti-bocor" target="_blank" rel="noopener">Mitra10: Aquaproof Pro 20 kg (2 Nov 2026)</a>).</li>
<li>Official Aquaproof site: coverage 1 kg per m² for two coats without adding water, touch dry in about 50 minutes, 24 colours available (2026-11-02, source: <a href="https://aquaproof.co.id/product/aquaproof/your-home-solution" target="_blank" rel="noopener">Aquaproof.co.id: Aquaproof (2 Nov 2026)</a>).</li>
</ul>
<h2>Aquaproof price list 2026 by pack size</h2>
<p>Prices were checked on Mitra10 and Depo Bangunan product pages on 2 November 2026 and may change, especially special prices.</p>
<ul><li><strong>Aquaproof 1 kg:</strong> Rp51,600 (white, red, orange, terracotta) to Rp66,800 (light grey, grey, black, blue, cream).</li>
<li><strong>Aquaproof 4 kg:</strong> Rp197,600 (white, grey, red, orange) to a special price of Rp245,000 (light grey, black, blue, cream, terracotta; regular Rp253,600).</li>
<li><strong>Aquaproof 20 kg:</strong> Rp898,000 (white, grey, red, orange, mocca, terracotta) to Rp1,111,000 (cream, blue, light grey, plus the newer Abu Grafit and Abu Lava shades whose regular price is Rp1,370,600).</li>
<li><strong>Aquaproof Pro 4 kg:</strong> Rp350,000 (regular Rp383,300), in white and grey.</li>
<li><strong>Aquaproof Pro 20 kg:</strong> Rp1,585,001 (regular Rp1,791,700).</li>
<li><strong>Aquaproof polyester mesh (fibre tape):</strong> 5 cm wide Rp13,900 and 10 cm wide Rp17,700.</li></ul>
<p>For comparison, Depo Bangunan listed Aquaproof 045 Merah Delima 4 kg at Rp299,600 on the same day.</p>
<h2>Aquaproof price per kg and per m²</h2>
<p>The 20 kg pail is the most economical. For the basic colours, Rp898,000 per 20 kg is about Rp44,900 per kg, compared with Rp51,600 per kg in the 1 kg tin. According to the official Aquaproof site, 1 kg covers 1 m² with two coats without adding water. A 20 m² concrete deck therefore needs about 20 kg plus a 10% reserve. Choose the colour first, because prices vary by colour, and for wide cracks lay polyester mesh on the first coat while it is still wet.</p>
<h3>Standard Aquaproof or Aquaproof Pro?</h3>
<p>Standard Aquaproof is a thixotropic synthetic polymer coating for roofs and exterior walls, with 500–600% elongation according to the official technical data. Aquaproof Pro is based on polyurethane acrylate, is UV resistant and is described as having good water-ponding resistance, which suits flat concrete decks. Aquaproof Pro costs about Rp79,250 per kg in the 20 kg pail, so use it mainly on decks where water pools.</p>
<p>homeX, a one-stop building materials and furniture platform in Indonesia with showroom, warehousing and delivery, can prepare anti-leak coatings together with other renovation materials in a single delivery. The prices above are public official-store prices, not homeX prices.</p>
<h2>Aquaproof price: related articles and products</h2><ul>
<li><a href="/en/news/52">Anti-leak paint prices 2026 by brand</a></li>
<li><a href="/en/news/340">No Drop paint price 2026 by pack size</a></li>
<li><a href="/en/news/227">Waterproofing price per kg 2026</a></li>
<li><a href="/products/217">Elastic sealant for joints</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much is Aquaproof 20 kg at Mitra10?</strong> On 2 November 2026, Aquaproof 20 kg cost Rp898,000 in white, grey, red, orange, mocca and terracotta, and Rp1,111,000 in cream, blue and light grey.</p>
<p><strong>How many square metres does 1 kg of Aquaproof cover?</strong> The official Aquaproof site states 1 kg covers 1 m² with two coats, without adding water.</p>
<p><strong>What is the difference between Aquaproof and Aquaproof Pro?</strong> Aquaproof Pro uses polyurethane acrylate, resists UV and ponding water and suits concrete decks; it cost Rp1,585,001 per 20 kg at Mitra10, more than standard Aquaproof.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.mitra10.com/product/aquaproof-waterproofing-white-1kg-cat-pelapis-anti-bocor" target="_blank" rel="noopener">Mitra10: Aquaproof White 1 kg (2 Nov 2026)</a>; <a href="https://www.mitra10.com/product/aquaproof-waterproofing-grey-1kg-cat-pelapis-anti-bocor" target="_blank" rel="noopener">Mitra10: Aquaproof Grey 1 kg (2 Nov 2026)</a>; <a href="https://www.mitra10.com/product/aquaproof-waterproofing-blue-4kg-cat-pelapis-anti-bocor" target="_blank" rel="noopener">Mitra10: Aquaproof Blue 4 kg (2 Nov 2026)</a>; <a href="https://www.mitra10.com/product/aquaproof-waterproofing-cream-20kg-cat-pelapis-anti-bocor" target="_blank" rel="noopener">Mitra10: Aquaproof Cream 20 kg (2 Nov 2026)</a>; <a href="https://www.mitra10.com/product/aquaproof-waterproofing-abu-grafit-20kg" target="_blank" rel="noopener">Mitra10: Aquaproof Abu Grafit 20 kg (2 Nov 2026)</a>; <a href="https://www.mitra10.com/product/aquaproof-pro-putih-20kg-cat-pelapis-anti-bocor" target="_blank" rel="noopener">Mitra10: Aquaproof Pro 20 kg (2 Nov 2026)</a>; <a href="https://www.mitra10.com/product/aquaproof-polyester-mesh-10cmx10m-pelapis-anti-bocor" target="_blank" rel="noopener">Mitra10: Aquaproof Polyester Mesh (2 Nov 2026)</a>; <a href="https://www.depobangunan.co.id/aquaproof-045-merah-delima-4kg.html" target="_blank" rel="noopener">Depo Bangunan: Aquaproof 4 kg (2 Nov 2026)</a>; <a href="https://aquaproof.co.id/product/aquaproof/your-home-solution" target="_blank" rel="noopener">Aquaproof.co.id: Aquaproof (2 Nov 2026)</a>; <a href="https://www.aquaproof.co.id/product/aquaproof-pro/your-home-solution" target="_blank" rel="noopener">Aquaproof.co.id: Aquaproof Pro (2 Nov 2026)</a>; <a href="https://www.mitra10.com/product/aquaproof-waterproofing-white-4kg" target="_blank" rel="noopener">Mitra10: Aquaproof White 4 kg (2 Nov 2026)</a>; <a href="https://www.mitra10.com/product/aquaproof-pro-putih-4kg-cat-pelapis-anti-bocor" target="_blank" rel="noopener">Mitra10: Aquaproof Pro 4 kg (2 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>Rp710 Billion Precast Pile Plant Opens in Kendal Special Economic Zone</title><link>https://www.homex.co.id/en/news/359</link><guid isPermaLink="true">https://www.homex.co.id/en/news/359</guid><pubDate>Mon, 02 Nov 2026 09:20:44 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>A Rp710 billion precast pile plant by PT HSG Material Indonesia opened in KEK Kendal, targeting 3 million metres of piles a year and up to 400 jobs.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261102-i-pabrik-tiang-pancang-kendal.jpg" alt="Rp710 Billion Precast Pile Plant Opens in Kendal Special Economic Zone"></p><p>A <strong>precast pile plant</strong> owned by PT HSG Material Indonesia, worth Rp710 billion in investment, was inaugurated in the Kendal Special Economic Zone (KEK Kendal), Central Java, on Saturday 10 October 2026, according to ANTARA and Investor.id. The plant makes pipe piles, square piles and precast concrete and is expected to employ up to 400 people. Closer local supply could speed up construction and housing projects in Central Java.</p>
<h2>Key Facts</h2><ul>
<li>PT HSG Material Indonesia invested Rp710 billion in KEK Kendal and is expected to employ up to 400 workers (2026-10-10, source: <a href="https://www.antaranews.com/berita/5779921/hsg-material-investasi-rp710-miliar-di-kek-kendal-serap-400-pekerja" target="_blank" rel="noopener">ANTARA, 10 Oct 2026</a>).</li>
<li>The facility makes prefabricated pipe piles, prefabricated square piles and precast concrete (2026-10-10, source: <a href="https://www.antaranews.com/berita/5779921/hsg-material-investasi-rp710-miliar-di-kek-kendal-serap-400-pekerja" target="_blank" rel="noopener">ANTARA, 10 Oct 2026</a>).</li>
<li>Target annual sales capacity is 3 million metres of prefabricated concrete piles and 150,000 square metres of ready concrete (2026-10-10, source: <a href="https://www.antaranews.com/berita/5779921/hsg-material-investasi-rp710-miliar-di-kek-kendal-serap-400-pekerja" target="_blank" rel="noopener">ANTARA, 10 Oct 2026</a>).</li>
<li>The plant was inaugurated on Saturday 10 October 2026 (2026-10-11, source: <a href="https://investor.id/business/457482/pabrik-material-konstruksi-beroperasi-dikek-kendal-nilai-investasi-rp710-miliar" target="_blank" rel="noopener">Investor.id, 11 Oct 2026</a>).</li>
<li>Groundbreaking took place on 27 April 2025, with about 250 workers planned initially, rising to 400 (2026-10-12, source: <a href="https://konstruksitekno.id/berita/airlangga-resmikan-pabrik-tiang-pancang-rp710-miliar-di-kek-kendal" target="_blank" rel="noopener">KonstruksiTekno, 12 Oct 2026</a>).</li>
</ul>
<h2>Profile of the HSG precast pile plant in Kendal</h2>
<p>HSG Material Indonesia is part of China's Fujian Hongsheng Material Technology. The investment falls under the Indonesia–China industrial park cooperation called Two Countries, Twin Parks (TCTP), which aims to drive investment, technology transfer and supply chain integration. Coordinating Minister for Economic Affairs Airlangga Hartarto described the opening as part of efforts to strengthen manufacturing capacity and regional economic growth.</p>
<p>Based on the company's initial plan, annual sales capacity is targeted at 3 million metres of prefabricated concrete piles and 150,000 square metres of ready concrete. Output is aimed at infrastructure, industrial estates and domestic construction projects, with export potential to Southeast Asia.</p>
<h3>From groundbreaking to production</h3>
<p>KonstruksiTekno noted that construction began with a groundbreaking on 27 April 2025. At the time the company expected about 250 workers in the first phase, rising to 400. Nearby construction projects and housing programmes are expected to get local piles faster, while reducing reliance on imported precast components.</p>
<h2>Why precast concrete matters to the industry</h2>
<p>Piles and precast elements are made in a factory using moulds and quality control, then shipped to site for installation. Compared with casting in place, this cuts on-site curing time and dependence on weather. Because the products are long and heavy, the distance from plant to project strongly affects transport costs. A new plant in Central Java shortens that distance for projects along Java's northern corridor.</p>
<p>KEK Kendal was developed from the Kendal Industrial Park, which opened on 14 November 2016. Economic affairs ministry spokesperson Haryo Limanseto stressed the importance of turning investment commitments into productive business activity.</p>
<h2>What it means for home builders and contractors</h2>
<ul><li>For houses on soft ground, mini pile or bored foundations are usually specified by a structural engineer; get the specification in writing before buying.</li>
<li>Compare product cost and transport cost separately, since plant distance matters a lot.</li>
<li>Schedule the piling rig and pile delivery together so you do not pay for idle equipment.</li></ul>
<p>Industrialised materials like these fit the direction of homeX, an integrated building materials and furniture platform in Indonesia with showroom, warehousing and delivery services that links factory supply with customers' renovation and project needs.</p>
<h2>Precast pile plant: related articles and products</h2><ul>
<li><a href="/en/news/339">WIKA Beton results and the precast concrete market</a></li>
<li><a href="/en/news/307">Giant Sea Wall on Java north coast starts in Demak</a></li>
<li><a href="/en/news/147">IKN 2026–2028 budget and supplier opportunities</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>Where is the HSG Material Indonesia precast pile plant?</strong> It is in the Kendal Special Economic Zone (KEK Kendal), Central Java, and was inaugurated on 10 October 2026.</p>
<p><strong>What does the plant produce?</strong> Prefabricated pipe piles, prefabricated square piles and precast concrete.</p>
<p><strong>What is the capacity of the Kendal precast pile plant?</strong> Target annual sales capacity is 3 million metres of prefabricated concrete piles and 150,000 square metres of ready concrete.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.antaranews.com/berita/5779921/hsg-material-investasi-rp710-miliar-di-kek-kendal-serap-400-pekerja" target="_blank" rel="noopener">ANTARA, 10 Oct 2026</a>; <a href="https://investor.id/business/457482/pabrik-material-konstruksi-beroperasi-dikek-kendal-nilai-investasi-rp710-miliar" target="_blank" rel="noopener">Investor.id, 11 Oct 2026</a>; <a href="https://konstruksitekno.id/berita/airlangga-resmikan-pabrik-tiang-pancang-rp710-miliar-di-kek-kendal" target="_blank" rel="noopener">KonstruksiTekno, 12 Oct 2026</a></em></p>]]></content:encoded></item><item><title>Steel Mill Digitalisation: How Garuda Yamato Steel Uses E-Ordering and AI</title><link>https://www.homex.co.id/en/news/358</link><guid isPermaLink="true">https://www.homex.co.id/en/news/358</guid><pubDate>Mon, 02 Nov 2026 09:20:44 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Steel mill digitalisation at Garuda Yamato Steel in Cikarang helps buyers find and order steel and keeps stock visible, from e-ordering to the AIKO assistant.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261102-i-digitalisasi-pabrik-baja.jpg" alt="Steel Mill Digitalisation: How Garuda Yamato Steel Uses E-Ordering and AI"></p><p><strong>Steel mill digitalisation</strong> is essential, according to PT Garuda Yamato Steel (GYS) Director of Information Technology Felix Sugianto, speaking on CNBC Indonesia on 29 October 2026. He said digital systems make it easier for customers to find and order steel and help ensure stock is available. The case matters for the building materials supply chain, because steel sections are heavy items that often delay projects when stock and sizes are unclear.</p>
<h2>Key Facts</h2><ul>
<li>Felix Sugianto said digitalisation helps customers find and order steel, ensures stock, keeps raw material supply steady and makes plant operations more efficient (2026-10-29, source: <a href="https://www.cnbcindonesia.com/tech/20261029095520-39-780472/video-digitalisasi-pabrik-baja-produksi-efisien-hemat-logistik" target="_blank" rel="noopener">CNBC Indonesia, 29 Oct 2026</a>).</li>
<li>The GYS plant in Cikarang, Bekasi, has steel production capacity of 1.2 million tonnes a year and rolling capacity of about 900,000 tonnes a year (2026-10-10, source: <a href="https://www.antaranews.com/berita/5779506/garuda-yamato-steel-perkuat-pasokan-baja-struktural-untuk-infrastruktur-nasional" target="_blank" rel="noopener">ANTARA, 10 Oct 2026</a>).</li>
<li>The GYS Steel Service Center offers CNC sawing, CNC drilling, cutting, straightening and cut-to-length beyond the standard 6, 9 and 12 metres (2026-10-10, source: <a href="https://www.antaranews.com/berita/5779506/garuda-yamato-steel-perkuat-pasokan-baja-struktural-untuk-infrastruktur-nasional" target="_blank" rel="noopener">ANTARA, 10 Oct 2026</a>).</li>
<li>GYS runs an E-Ordering System, an Online Documents System (ODS) and E-Certificate for printing mill certificates on demand (2026-11-02, source: <a href="https://www.garudayamatosteel.com/id/services/" target="_blank" rel="noopener">Garuda Yamato Steel, Services page, accessed 2 Nov 2026</a>).</li>
<li>The GYS AI sales assistant was renamed AIKO and integrates with the sales system for real-time price and availability information (2025-03-04, source: <a href="https://www.garudayamatosteel.com/id/news/gys-ai-sales-assistant-resmi-berganti-nama-menjadi-aiko/" target="_blank" rel="noopener">Garuda Yamato Steel, 4 Mar 2025</a>).</li>
</ul>
<h2>Steel mill digitalisation from order to production</h2>
<p>On CNBC Indonesia's Profit programme, Felix Sugianto described two sides of the benefit. For customers, digital systems make products easier to find and order, and show whether stock is available. For operations, technology helps secure raw material supply, makes the plant more efficient and supports lower-emission operations. He added that digital investment in a steel plant follows a business framework covering information technology (IT) and operational technology (OT), from the logistics supply chain to adjusting production when markets shift.</p>
<h3>A short profile of the plant</h3>
<p>GYS was founded in 2024 as a collaboration of Yamato Kogyo, Siam Yamato Steel, PT Hanwa Indonesia and PT Gunung Raja Paksi Tbk. The Cikarang plant uses an electric arc furnace (EAF) and makes H-beams, IWF, U channels and equal angles for factories, buildings, warehouses, bridges and infrastructure. President Director Tony Taniwan said the company has developed SN490B seismic-grade steel marketed as GYS Tahan Gempa Plus, while stressing that earthquake resistance also depends on design, connections, welding, fabrication and supervision.</p>
<h2>The digital tools in use</h2>
<ul><li><strong>E-Ordering System</strong> for domestic and international orders.</li>
<li><strong>Online Documents System (ODS)</strong>, giving overseas customers real-time access to trade documents.</li>
<li><strong>E-Certificate</strong>, letting customers print mill certificates on demand.</li>
<li><strong>AIKO</strong>, an AI sales assistant linked to the sales system that answers price and availability questions and processes orders automatically.</li></ul>
<p>A Steel Service Center of more than 40,500 square metres complements these tools. Cutting to the requested length helps contractors reduce offcuts and on-site work.</p>
<h2>Lessons for the building materials supply chain</h2>
<p>For buyers, the most common problems are unknown stock, waiting for quotes and late quality documents. Digitalisation addresses all three. A few practices contractors and homeowners can adopt:</p>
<ul><li>Ask for written confirmation of stock and sizes before booking welders or frame installers.</li>
<li>Request mill certificates for structural steel, especially in earthquake-prone areas.</li>
<li>Order pieces cut to your working drawings where available to reduce waste.</li></ul>
<p>homeX, an integrated building materials and furniture platform in Indonesia with showroom, warehousing and delivery services, is building in the same direction: product and stock data in one AI-assisted system, so buyers can request quotes for many materials at once.</p>
<h2>Steel mill digitalisation: related articles and products</h2><ul>
<li><a href="/en/news/29">Building materials B2B platforms and supply chain digitalisation</a></li>
<li><a href="/en/news/317">SIG cement supply chain digitalisation</a></li>
<li><a href="/en/news/343">Spindo Q3 2026 profit and steel pipe demand</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How does steel mill digitalisation help buyers?</strong> According to GYS, it makes it easier for customers to find and order steel and helps ensure stock is available.</p>
<p><strong>What is AIKO from Garuda Yamato Steel?</strong> AIKO is the name of the GYS AI sales assistant, integrated with the sales system for real-time price and availability information and automatic order processing.</p>
<p><strong>What is the capacity of the Garuda Yamato Steel plant?</strong> The Cikarang plant has production capacity of 1.2 million tonnes a year and rolling capacity of about 900,000 tonnes a year.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.cnbcindonesia.com/tech/20261029095520-39-780472/video-digitalisasi-pabrik-baja-produksi-efisien-hemat-logistik" target="_blank" rel="noopener">CNBC Indonesia, 29 Oct 2026</a>; <a href="https://www.antaranews.com/berita/5779506/garuda-yamato-steel-perkuat-pasokan-baja-struktural-untuk-infrastruktur-nasional" target="_blank" rel="noopener">ANTARA, 10 Oct 2026</a>; <a href="https://www.garudayamatosteel.com/id/services/" target="_blank" rel="noopener">Garuda Yamato Steel, Services page, accessed 2 Nov 2026</a>; <a href="https://www.garudayamatosteel.com/id/news/gys-ai-sales-assistant-resmi-berganti-nama-menjadi-aiko/" target="_blank" rel="noopener">Garuda Yamato Steel, 4 Mar 2025</a></em></p>]]></content:encoded></item><item><title>Depo Bangunan Profit Up 16.4% in 9M 2026; Mitra10 Parent CSAP Jumps 140%</title><link>https://www.homex.co.id/en/news/357</link><guid isPermaLink="true">https://www.homex.co.id/en/news/357</guid><pubDate>Mon, 02 Nov 2026 09:20:30 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Depo Bangunan profit rose 16.4% to Rp58.7 billion in 9M 2026, though operating profit fell 21.9%. Mitra10 parent CSAP reported a 140% profit jump.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261102-i-laba-depo-bangunan-mitra10.jpg" alt="Depo Bangunan Profit Up 16.4% in 9M 2026; Mitra10 Parent CSAP Jumps 140%"></p><p><strong>Depo Bangunan profit</strong> rose in the first nine months of 2026, even though its core business earned less. PT Caturkarda Depo Bangunan Tbk (DEPO) reported net profit of Rp58.7 billion as of 30 September 2026, up 16.4% from Rp50.4 billion a year earlier, while operating profit fell 21.9%. Around the same time, PT Catur Sentosa Adiprana Tbk (CSAP), parent of the Mitra10 chain, reported a profit jump of about 140%. Together the two filings give a picture of Indonesian building materials retail heading into year end.</p>
<h2>Key Facts</h2><ul>
<li>DEPO booked net profit of Rp58.7 billion for 9M 2026, up 16.4% from Rp50.4 billion; earnings per share were Rp8.65 versus Rp7.43 (2026-10-30, source: <a href="https://the-signal.id/berita/depo-laba-bersih-naik-16-tapi-laba-usaha-susut-22.html" target="_blank" rel="noopener">The Signal, 30 Oct 2026 (DEPO financial statements)</a>).</li>
<li>DEPO operating profit fell 21.9% to Rp29.2 billion from Rp37.4 billion, with selling expenses of Rp320.7 billion and G&A of Rp77.2 billion (2026-10-30, source: <a href="https://the-signal.id/berita/depo-laba-bersih-naik-16-tapi-laba-usaha-susut-22.html" target="_blank" rel="noopener">The Signal, 30 Oct 2026 (DEPO financial statements)</a>).</li>
<li>Other income rose to Rp47.9 billion from Rp27.0 billion, lifting pre-tax profit 25.2% to Rp72.3 billion (2026-10-30, source: <a href="https://the-signal.id/berita/depo-laba-bersih-naik-16-tapi-laba-usaha-susut-22.html" target="_blank" rel="noopener">The Signal, 30 Oct 2026 (DEPO financial statements)</a>).</li>
<li>Short-term bank loans rose from Rp5.0 billion to Rp29.8 billion; total liabilities reached Rp998.2 billion (up 9.8%) (2026-10-30, source: <a href="https://the-signal.id/berita/depo-laba-bersih-naik-16-tapi-laba-usaha-susut-22.html" target="_blank" rel="noopener">The Signal, 30 Oct 2026 (DEPO financial statements)</a>).</li>
</ul>
<h2>Flat sales, squeezed operating profit</h2>
<p>According to the financial statements submitted to OJK on 28 October 2026 and summarised by The Signal, DEPO's net sales for January–September 2026 were about Rp2.11 trillion, roughly flat on the same period last year. With little sales growth, costs decided the result. Selling expenses reached Rp320.7 billion and general and administrative expenses Rp77.2 billion, so operating profit shrank to Rp29.2 billion from Rp37.4 billion.</p>
<p>The rise in net profit came mainly from outside the core business. Other income climbed to Rp47.9 billion from Rp27.0 billion, pushing pre-tax profit up 25.2% to Rp72.3 billion. In other words, the 16.4% profit growth does not yet reflect better store margins.</p>
<h3>Cash up as time deposits were drawn down</h3>
<p>DEPO's cash jumped to Rp246.0 billion from Rp39.1 billion. The Signal notes this tracked a fall in time deposits from Rp292 billion to Rp86 billion, so it was not purely operating cash flow. Short-term bank loans rose to Rp29.8 billion from Rp5.0 billion, and total liabilities increased 9.8% to Rp998.2 billion. Dividends paid fell to Rp10.185 billion from Rp28.518 billion, while equity grew 3.6% to Rp1.41 trillion.</p>
<p>DEPO also runs a subsidiary, PT Megadepo Indonesia in Sidoarjo, operating since 2004 with assets of about Rp967 billion. The company is led by President Director Henryanto Komala.</p>
<h2>Mitra10: parent CSAP's profit surges</h2>
<p>Separately, a summary of CSAP's financial statements published by RisetSaham on 29 October 2026 puts profit for the period at about Rp161.35 billion, up about 140.4%, on revenue of about Rp14.33 trillion, up about 11.4%. The summary is generated automatically from Indonesia Stock Exchange documents, so detailed figures should be checked against the official report. According to EmitenNews coverage from 2023, CSAP operates in building materials and consumer goods distribution and in modern retail through Mitra10 and Atria.</p>
<h2>What it means for building materials buyers</h2>
<p>The two reports suggest demand for building materials in modern retail is holding up, while competition and operating costs squeeze margins. For contractors and homeowners, conditions like these usually bring more frequent promotions and price programmes. Some practical steps:</p>
<ul><li>Compare prices of the same product across several stores and check promotion validity dates.</li>
<li>For project purchases, ask for a written quotation that includes delivery costs.</li>
<li>Record brand, size and date so price comparisons stay fair.</li></ul>
<p>homeX, an integrated building materials and furniture platform in Indonesia with showroom, warehousing and delivery services, can help put together quotation comparisons for many items at once.</p>
<h2>Depo Bangunan profit: related articles and products</h2><ul>
<li><a href="/en/news/314">Wasser faucet prices 2026 at Depo Bangunan</a></li>
<li><a href="/en/news/313">Infiniti granite tile prices 2026 at Mitra10</a></li>
<li><a href="/en/news/338">Avia Avian Q3 2026 results</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much profit did Depo Bangunan make through September 2026?</strong> DEPO booked net profit of Rp58.7 billion for the first nine months of 2026, up 16.4% from Rp50.4 billion a year earlier.</p>
<p><strong>Why did DEPO operating profit fall while net profit rose?</strong> Sales were roughly flat while selling and administrative costs stayed high, cutting operating profit 21.9%. Net profit rose because other income increased to Rp47.9 billion.</p>
<p><strong>How is Mitra10 related to CSAP?</strong> Mitra10 is the building materials retail chain of PT Catur Sentosa Adiprana Tbk (CSAP), which also runs Atria and a distribution business.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://the-signal.id/berita/depo-laba-bersih-naik-16-tapi-laba-usaha-susut-22.html" target="_blank" rel="noopener">The Signal, 30 Oct 2026 (DEPO financial statements)</a>; <a href="https://www.risetsaham.id/disclosure/csap/lapkeu-1883" target="_blank" rel="noopener">RisetSaham, 29 Oct 2026 (CSAP filing summary)</a>; <a href="https://www.emitennews.com/news/laba-semester-i-tergerus-catur-sentosa-csap-tetap-lakukan-ekspansi-toko-mitra10" target="_blank" rel="noopener">EmitenNews, 2023 (CSAP segment profile)</a></em></p>]]></content:encoded></item><item><title>MCB Trip Curve B, C, D Explained: Ratings, 6000 Marking and SNI</title><link>https://www.homex.co.id/en/news/356</link><guid isPermaLink="true">https://www.homex.co.id/en/news/356</guid><pubDate>Mon, 02 Nov 2026 09:18:31 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>The MCB trip curve B, C or D sets the instant trip at 3–5, 5–10 or 10–20 times rated current. Learn what the 6000 marking means and the SNI 8528-1 rule.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261102-i-mcb-kurva-bcd.jpg" alt="MCB Trip Curve B, C, D Explained: Ratings, 6000 Marking and SNI"></p><p>The <strong>MCB trip curve</strong> B, C or D tells you how much current makes a breaker trip instantly during a short circuit: type B at 3–5 times rated current, C at 5–10 times and D at 10–20 times. For home sockets and lighting, type B or C is the most common. In Indonesia, household MCBs must also meet SNI 8528-1:2018.</p>
<h2>Key Facts</h2><ul>
<li>Instant tripping per IEC/EN 60898-1 Table 2: B = 3–5 × In, C = 5–10 × In, D = 10–20 × In (2026-11-02, source: <a href="https://cache.industry.siemens.com/dl/files/304/109482304/att_866617/v1/MiniatureCircuitBreakers_primer_EN_201601250852395217.pdf" target="_blank" rel="noopener">Siemens, SENTRON Miniature Circuit Breakers Technology Primer (accessed 2 Nov 2026)</a>).</li>
<li>Test currents: no trip within 1 hour at 1.13 × In; trip within 1 hour at 1.45 × In (In ≤ 63 A) (2026-11-02, source: <a href="https://cache.industry.siemens.com/dl/files/304/109482304/att_866617/v1/MiniatureCircuitBreakers_primer_EN_201601250852395217.pdf" target="_blank" rel="noopener">Siemens, SENTRON Miniature Circuit Breakers Technology Primer (accessed 2 Nov 2026)</a>).</li>
<li>The 6000 marking means a rated breaking capacity Icn of 6 kA; the 3 below it means energy limitation class 3 (2026-11-02, source: <a href="https://cache.industry.siemens.com/dl/files/304/109482304/att_866617/v1/MiniatureCircuitBreakers_primer_EN_201601250852395217.pdf" target="_blank" rel="noopener">Siemens, SENTRON Miniature Circuit Breakers Technology Primer (accessed 2 Nov 2026)</a>).</li>
<li>Cable rule: Ib ≤ In ≤ Iz and I2 ≤ 1.45 × Iz (IEC 60364-4-43) (2026-11-02, source: <a href="https://library.e.abb.com/public/114371fcc8e0456096db42d614bead67/2CDC400002D0201_view.pdf" target="_blank" rel="noopener">ABB, comparison of MCB tripping characteristics B, C, D, K, Z (accessed 2 Nov 2026)</a>).</li>
<li>Permen ESDM No. 7/2021 requires household MCBs to meet SNI 8528-1:2018 (IEC 60898-1:2015, MOD) (2021-04-01, source: <a href="https://jdih.esdm.go.id/dokumen/download?id=Permen+ESDM+No.+7+Tahun+2021.pdf" target="_blank" rel="noopener">JDIH of the Indonesian Energy Ministry, Permen ESDM No. 7 of 2021 (accessed 2 Nov 2026)</a>).</li>
</ul>
<h2>What MCB types B, C and D mean</h2>
<p>An MCB (miniature circuit breaker) has two releases. The thermal release reacts slowly to overload, and the magnetic release trips instantly on a short circuit. The letter B, C or D sets the range of that magnetic release:</p>
<ul><li><strong>B</strong>: 3–5 × In. Siemens calls it universal for socket and lighting circuits.</li>
<li><strong>C</strong>: 5–10 × In. Suited to lamp and motor circuits with higher starting currents.</li>
<li><strong>D</strong>: 10–20 × In. For equipment with high pulses, such as transformers or solenoid valves.</li></ul>
<p>Worked example: a 16 A breaker trips instantly at 48–80 A as type B, 80–160 A as type C and 160–320 A as type D. K and Z characteristics also exist, but they fall under another standard, IEC/EN 60947-2.</p>
<h2>MCB trip curve behaviour under overload</h2>
<p>For overload, the rule is the same for all types. At 1.13 × In the breaker must not trip within 1 hour. At 1.45 × In it must trip within 1 hour. At 2.55 × In it must trip between 1 and 60 seconds for In up to 32 A. So a 16 A breaker does not cut out the moment the load goes slightly above 16 A.</p>
<h2>What the 6000 and the boxed 3 on the breaker mean</h2>
<p>The boxed 6000 is the rated breaking capacity Icn of 6 kA, the largest short-circuit current the device can still break safely. The 3 below it is energy limitation class 3. Siemens notes that German homes may only use MCBs of at least 6 kA with energy class 3. That rule does not apply automatically in Indonesia, but it is a useful benchmark.</p>
<h2>Choosing the MCB type and cable size</h2>
<p>The breaker current must sit between the load current (Ib) and the cable's current-carrying capacity (Iz). ABB gives an example: an S201-B16 at a 6 kA short circuit lets through about 20,000 A²s, well below the 29,700 A²s limit of a 1.5 mm² PVC copper cable. So never raise the breaker rating without changing the cable. If a breaker trips often when a load is switched on, ask an electrician whether type C is a better match.</p>
<h2>SNI 8528-1 is mandatory in Indonesia</h2>
<p>Permen ESDM No. 7 of 2021 requires MCBs for household and similar installations to meet SNI 8528-1:2018. The scope covers MCBs up to 440 V between phases, rated current up to 125 A and short-circuit capacity up to 25,000 A. When buying, check the SNI mark, curve type, amperage and Icn figure on the breaker. homeX can help source MCBs and panel accessories from several brands for your project.</p>
<h2>MCB trip curve: related articles and products</h2><ul>
<li><a href="/en/news/112">Switch, socket and MCB prices 2026</a></li>
<li><a href="/en/news/115">Electrical installation cost per point 2026</a></li>
<li><a href="/en/news/296">PUIL and RCD guide for homes</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>Which MCB type is used in homes?</strong> For socket and lighting circuits, Siemens calls type B universal. Type C is used where loads have high starting currents.</p>
<p><strong>Is a type C MCB safer than type B?</strong> No. Type C only trips instantly at a higher current, 5–10 × In. The choice depends on the load and the cable.</p>
<p><strong>What does 6000 on an MCB mean?</strong> It means a rated breaking capacity of 6 kA under IEC/EN 60898-1.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://cache.industry.siemens.com/dl/files/304/109482304/att_866617/v1/MiniatureCircuitBreakers_primer_EN_201601250852395217.pdf" target="_blank" rel="noopener">Siemens, SENTRON Miniature Circuit Breakers Technology Primer (accessed 2 Nov 2026)</a>; <a href="https://library.e.abb.com/public/114371fcc8e0456096db42d614bead67/2CDC400002D0201_view.pdf" target="_blank" rel="noopener">ABB, comparison of MCB tripping characteristics B, C, D, K, Z (accessed 2 Nov 2026)</a>; <a href="https://jdih.esdm.go.id/dokumen/download?id=Permen+ESDM+No.+7+Tahun+2021.pdf" target="_blank" rel="noopener">JDIH of the Indonesian Energy Ministry, Permen ESDM No. 7 of 2021 (accessed 2 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>Mulia Industrindo Results 2026: Rp162.8 Billion Loss as a Float Glass Furnace Is Rebuilt</title><link>https://www.homex.co.id/en/news/355</link><guid isPermaLink="true">https://www.homex.co.id/en/news/355</guid><pubDate>Mon, 02 Nov 2026 09:18:22 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Mulia Industrindo results for Jan–Sep 2026 show a Rp162.77 billion loss as gross profit halved; Muliaglass is rebuilding one of its three float glass furnaces.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261102-i-mlia-rugi-kaca-lembaran.jpg" alt="Mulia Industrindo Results 2026: Rp162.8 Billion Loss as a Float Glass Furnace Is Rebuilt"></p><p><strong>Mulia Industrindo results</strong> for January–September 2026 swung to a Rp162.77 billion net loss from a Rp20.90 billion profit a year earlier, according to the interim financial statements summarised by The Signal on 28 October 2026. Gross profit more than halved because production costs barely fell as revenue weakened. Meanwhile its subsidiary PT Muliaglass began rebuilding one of its three float glass furnaces on 20 October 2026 to cut gas costs amid an oversupplied glass market.</p>
<h2>Key Facts</h2><ul>
<li>MLIA nine-month 2026 revenue was Rp2.99 trillion (2025: Rp3.07 trillion); net loss Rp162.77 billion versus a Rp20.90 billion profit (2026-10-28, source: <a href="https://the-signal.id/berita/mlia-rugi-rp162-8-miliar-di-kuartal-iii-2026-kas-susut-tajam.html" target="_blank" rel="noopener">The Signal, 28 Oct 2026 (MLIA financial statements)</a>).</li>
<li>Gross profit fell from Rp490.30 billion to Rp236.23 billion; finance costs rose to Rp57.00 billion (2026-10-28, source: <a href="https://the-signal.id/berita/mlia-rugi-rp162-8-miliar-di-kuartal-iii-2026-kas-susut-tajam.html" target="_blank" rel="noopener">The Signal, 28 Oct 2026 (MLIA financial statements)</a>).</li>
<li>Cash and equivalents fell to Rp218.74 billion at 30 September 2026 from Rp508.26 billion at end-2025, while fixed-asset spending was Rp339.41 billion (2026-10-28, source: <a href="https://the-signal.id/berita/mlia-rugi-rp162-8-miliar-di-kuartal-iii-2026-kas-susut-tajam.html" target="_blank" rel="noopener">The Signal, 28 Oct 2026 (MLIA financial statements)</a>).</li>
<li>PT Muliaglass began a slow rebuild of one of three float glass furnaces from 20 October 2026 because of lower gas allocation and abundant glass supply (2026-10-21, source: <a href="https://www.idxchannel.com/market-news/mulia-mlia-pangkas-operasional-muliaglass-bidik-efisiensi-biaya-gas" target="_blank" rel="noopener">IDXChannel, 21 Oct 2026</a>).</li>
</ul>
<h2>Why Mulia Industrindo results came under pressure</h2>
<p>MLIA's revenue decline was small, about 2.5%. The real problem was margin: cost of revenue barely fell, so gross profit dropped from Rp490.30 billion to Rp236.23 billion. After selling, administrative and interest expenses, the company booked a pre-tax loss of Rp199.01 billion. A tax benefit of Rp36.24 billion reduced the net loss to Rp162.77 billion, or Rp24.61 per share.</p>
<p>The balance sheet shifted too. Inventories rose to Rp1.28 trillion from Rp1.13 trillion, short-term bank loans rose to Rp390.34 billion and trade payables to third parties rose to Rp482.55 billion. Operating cash flow fell to Rp75.52 billion, while investing activities used Rp359.00 billion. Equity fell to Rp5.24 trillion. Subsidiary PT Muliaglass, 99.99% owned, reported total assets of Rp7.14 trillion.</p>
<h2>Muliaglass rebuilds a float glass furnace</h2>
<p>In a disclosure dated 21 October 2026, Director and Corporate Secretary Linda Halim explained that the furnace being rebuilt had entered the final year of its operating life. Lower gas allocation has pushed up the average gas price, while the market is oversupplied with sheet glass and competition is tight. The company says the step is meant to protect Muliaglass's financial position and ease selling pressure.</p>
<p>Muliaglass says it will keep running its other two furnaces at optimal levels and believes their output can meet the needs of distributors, processors and other customers. It expects a full positive cash flow effect from 2027, mainly because less gas will be bought at market prices.</p>
<h2>What it means for building glass buyers</h2>
<p>For contractors, glass shops and homeowners, the news does not signal a glass shortage; the company itself describes an oversupplied market. Still, gas costs are a key factor in glass making, just as in ceramics. Sensible steps:</p>
<ul><li>For large projects, request quotes for float glass and processed glass (tempered or laminated) from more than one processor.</li>
<li>State thickness, cut size and glass type clearly in the request so quotes can be compared.</li>
<li>Keep the planned mandatory SNI for building safety glass in mind when choosing tempered and laminated glass.</li></ul>
<p>homeX, an integrated building materials and furniture platform in Indonesia with showroom, warehousing and delivery services, helps buyers compare glass and other materials in a single quotation request.</p>
<h2>Mulia Industrindo results: related articles and products</h2><ul>
<li><a href="/en/news/218">Glass factories in Indonesia: Asahimas and Muliaglass</a></li>
<li><a href="/en/news/24">Mandatory SNI for tempered and laminated safety glass</a></li>
<li><a href="/en/news/128">Glass price per m² in 2026</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much did Mulia Industrindo lose up to September 2026?</strong> MLIA booked a net loss of Rp162.77 billion for January–September 2026 on revenue of Rp2.99 trillion, a loss of Rp24.61 per share.</p>
<p><strong>Why is Muliaglass rebuilding a float glass furnace?</strong> The furnace is in the last year of its operating life, lower gas allocation has raised the average gas price, and the sheet glass market is oversupplied.</p>
<p><strong>Will sheet glass supply fall?</strong> Muliaglass keeps its other two furnaces running and says their output is enough for distributors and processors.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://the-signal.id/berita/mlia-rugi-rp162-8-miliar-di-kuartal-iii-2026-kas-susut-tajam.html" target="_blank" rel="noopener">The Signal, 28 Oct 2026 (MLIA financial statements)</a>; <a href="https://www.idxchannel.com/market-news/mulia-mlia-pangkas-operasional-muliaglass-bidik-efisiensi-biaya-gas" target="_blank" rel="noopener">IDXChannel, 21 Oct 2026</a>; <a href="https://www.emitennews.com/news/genjot-penjualan-entitas-mlia-kebut-pembangunan-tungku-kaca-lembaran" target="_blank" rel="noopener">EmitenNews, 20 Oct 2026</a></em></p>]]></content:encoded></item><item><title>Galvanized Steel Anti-Dumping Probe in Indonesia: What It Means for Roofing and Light Steel</title><link>https://www.homex.co.id/en/news/354</link><guid isPermaLink="true">https://www.homex.co.id/en/news/354</guid><pubDate>Mon, 02 Nov 2026 09:18:22 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>A galvanized steel anti-dumping probe into Chinese imports opened in Indonesia on 15 Sep 2026. China supplies 81% of imports; duties no earlier than mid-Nov.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261102-i-antidumping-baja-lapis-seng.jpg" alt="Galvanized Steel Anti-Dumping Probe in Indonesia: What It Means for Roofing and Light Steel"></p><p>Indonesia's <strong>galvanized steel anti-dumping</strong> investigation into zinc-coated steel (BJLS) from China was opened by the Indonesian Anti-Dumping Committee (KADI) on 15 September 2026, following a petition from PT Tata Metal Lestari and PT ArcelorMittal Nippon Steel Indonesia. As of early November 2026 no duty applies, but the 60-day window for provisional measures closes around mid-November. Contractors and hardware stores should watch prices of metal roofing, light steel trusses and galvanized wall cladding.</p>
<h2>Key Facts</h2><ul>
<li>KADI opened an anti-dumping investigation into BJLS imports from China covering nine HS codes, including 7210.49.11 and 7212.30.12 (2026-09-15, source: <a href="https://kadi.kemendag.go.id/berita/kadi-inisiasi-penyelidikan-antidumping-impor-baja-lapis-seng-asal-tiongkok" target="_blank" rel="noopener">KADI, Ministry of Trade, 15 Sep 2026</a>).</li>
<li>Indonesia imported 2,562,407 tonnes of BJLS in 2023–2025, of which 2,075,801 tonnes (about 81%) came from China (2026-09-15, source: <a href="https://kadi.kemendag.go.id/berita/kadi-inisiasi-penyelidikan-antidumping-impor-baja-lapis-seng-asal-tiongkok" target="_blank" rel="noopener">KADI, Ministry of Trade, 15 Sep 2026</a>).</li>
<li>According to SMM, Chinese material supplied about 52% of national BJLS consumption in 2025, while domestic selling prices fell 21% against a 14% fall in cost of goods sold over 2023–2025 (2026-10-01, source: <a href="https://news.metal.com/id/newscontent/104143171-smm-analysis-indonesia-selidiki-dugaan-dumping-koil-gi-asal-tiongkok-impor-murah-kuasai-52-permintaan-menggerus-harga-lokal" target="_blank" rel="noopener">Shanghai Metals Market (SMM), 1 Oct 2026</a>).</li>
<li>The investigation lasts up to 12 months, extendable to 18; provisional duties could apply no earlier than about 14 November 2026 (2026-10-01, source: <a href="https://news.metal.com/id/newscontent/104143171-smm-analysis-indonesia-selidiki-dugaan-dumping-koil-gi-asal-tiongkok-impor-murah-kuasai-52-permintaan-menggerus-harga-lokal" target="_blank" rel="noopener">Shanghai Metals Market (SMM), 1 Oct 2026</a>).</li>
</ul>
<h2>What the galvanized steel anti-dumping case covers</h2>
<p>Zinc-coated steel is carbon steel with a zinc layer that protects it from rust. In construction it is the base material for light steel roof trusses, metal roofing, wall cladding and gutters. Trade measures on BJLS therefore reach hardware stores quickly, even though the case covers sheets and coils rather than finished products.</p>
<p>KADI said its review of preliminary evidence found rising BJLS imports from China that caused injury to the domestic industry. The legal basis is Government Regulation No. 34 of 2011.</p>
<h3>Price and volume evidence in the petition</h3>
<p>An analysis by Shanghai Metals Market (SMM) published on 1 October 2026 summarises the case. The petitioners and supporting companies are said to represent about 76% of domestic output. Over 2023–2025, domestic selling prices fell faster than production costs, so local producers' margins narrowed every year. Chinese material was cheaper than local product in every year of the review period. SMM also notes that a rise in consumption of about 165,000 tonnes was filled almost entirely by Chinese imports.</p>
<h2>Timeline: when a duty could apply</h2>
<p>Under WTO rules cited by SMM, provisional measures cannot be applied earlier than 60 days after an investigation opens, so a provisional anti-dumping duty could start around 14 November 2026 at the earliest, and only after an affirmative preliminary finding. A final duty is set by a Minister of Finance Regulation (PMK) after KADI sends its recommendation to the Minister of Trade. Until a PMK is issued, imported BJLS carries no extra tariff.</p>
<h2>What it means for roofing and light steel buyers</h2>
<p>In the short term, SMM expects Chinese galvanized steel to remain available. In the longer term, if dumping is proven and duties are imposed, imports would fall and local producers are expected to raise output. Store prices could move as a result, but by how much is not yet known. Practical steps for year-end projects:</p>
<ul><li>For projects with large roofing and truss volumes, lock in quotations with a clear validity period before mid-November.</li>
<li>Compare local and imported brands on the same specification: BMT thickness, coating class and the SNI mark on the finished product.</li>
<li>Keep dated records of prices per length or per sheet so changes are easy to compare if a tariff arrives.</li></ul>
<p>homeX, an integrated building materials and furniture platform in Indonesia with showroom, warehousing and delivery services, helps contractors compare light steel, metal roofing and other materials in a single quotation request.</p>
<h2>Galvanized steel anti-dumping: related articles and products</h2><ul>
<li><a href="/en/news/21">Indonesia steel imports hit 7 million tonnes by August 2026</a></li>
<li><a href="/en/news/16">Light steel trusses: SNI 8399:2017 and AZ100 coating</a></li>
<li><a href="/en/news/327">BMT vs TCT thickness in light steel</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>Is there already an anti-dumping duty on Chinese galvanized steel in Indonesia?</strong> Not yet. KADI opened the investigation on 15 September 2026; a provisional duty could apply around 14 November 2026 at the earliest, and a final duty needs a PMK.</p>
<p><strong>Who filed the BJLS anti-dumping petition?</strong> PT Tata Metal Lestari and PT ArcelorMittal Nippon Steel Indonesia, on behalf of the domestic industry.</p>
<p><strong>How much galvanized steel does Indonesia import from China?</strong> In 2023–2025, about 2,075,801 tonnes of total imports of 2,562,407 tonnes, or 81%, came from China.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://kadi.kemendag.go.id/berita/kadi-inisiasi-penyelidikan-antidumping-impor-baja-lapis-seng-asal-tiongkok" target="_blank" rel="noopener">KADI, Ministry of Trade, 15 Sep 2026</a>; <a href="https://news.metal.com/id/newscontent/104143171-smm-analysis-indonesia-selidiki-dugaan-dumping-koil-gi-asal-tiongkok-impor-murah-kuasai-52-permintaan-menggerus-harga-lokal" target="_blank" rel="noopener">Shanghai Metals Market (SMM), 1 Oct 2026</a>; <a href="https://www.idxchannel.com/economics/banjiri-pasar-ri-kadi-inisiasi-penyelidikan-antidumping-impor-baja-lapis-seng-asal-china" target="_blank" rel="noopener">IDXChannel, 16 Sep 2026</a></em></p>]]></content:encoded></item><item><title>BSPS Builder Wages: Rp2.5 Million per Home as Regions Hunt for Tukang</title><link>https://www.homex.co.id/en/news/353</link><guid isPermaLink="true">https://www.homex.co.id/en/news/353</guid><pubDate>Mon, 02 Nov 2026 09:16:54 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>BSPS builder wages are Rp2.5 million per home within Rp20 million aid. With 400,000 homes targeted, regions are scrambling to find thousands of tukang.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261102-i-tukang-bedah-rumah.jpg" alt="BSPS Builder Wages: Rp2.5 Million per Home as Regions Hunt for Tukang"></p><p><strong>BSPS builder wages</strong> in Indonesia's 2026 self-help housing stimulus programme (Bantuan Stimulan Perumahan Swadaya) are set at Rp2.5 million per home, part of Rp20 million in aid per house, Bisnis.com reported on 1 November 2026. With 400,000 homes targeted this year, the biggest challenge is not only materials but finding enough tukang (builders) to work at the same time before the late-December deadline.</p>
<h2>Key Facts</h2><ul>
<li>BSPS 2026 aid is Rp20 million per home: Rp17.5 million for building materials and Rp2.5 million for builder wages (2026-11-01, source: <a href="https://ekonomi.bisnis.com/read/20261101/47/2017378/penghuni-kontrakan-bisa-dapat-bantuan-bedah-rumah-ini-syaratnya" target="_blank" rel="noopener">Bisnis.com, 1 Nov 2026</a>).</li>
<li>The BSPS 2026 target is 400,000 homes, up from 45,000 in 2025 (2026-11-01, source: <a href="https://ekonomi.bisnis.com/read/20261101/47/2017378/penghuni-kontrakan-bisa-dapat-bantuan-bedah-rumah-ini-syaratnya" target="_blank" rel="noopener">Bisnis.com, 1 Nov 2026</a>).</li>
<li>In the Riau Islands, 3,804 homes involve about 7,608 builders and 154 field facilitators (2026-10-02, source: <a href="https://sijorikepri.com/tanjung-pinang/b-291788/7-608-tukang-terlibat-dalam-program-bedah-rumah-kepri/" target="_blank" rel="noopener">Sijori Kepri, 2 Oct 2026</a>).</li>
<li>The housing ministry listed labour availability as an obstacle; Bandung Regency had built 334 of its 3,047-home allocation (2026-10-13, source: <a href="https://pkp.go.id/berita/detail/menteri-pkp-dorong-percepatan-program-bedah-rumah-perkuat-koordinasi-dengan-kepala-daerah" target="_blank" rel="noopener">Ministry of Housing and Settlements (PKP), 13 Oct 2026</a>).</li>
<li>Stage I builder wages in Tawangrejo, Madiun City, were paid at Rp1,250,000 per recipient on 28 October 2026 (2026-10-30, source: <a href="https://kelurahan-tawangrejo.madiunkota.go.id/index.php/2026/10/30/pencairan-upah-tukang-tahap-i-program-bsps-rabu-28-oktober-2026-kelurahan-tawangrejo-menjadi-tempat-pelaksanaan-kegiatan-pencairan-upah-tukang-tahap-i-dalam-rangka-program-bantuan-stimulan-perum/" target="_blank" rel="noopener">Tawangrejo Village, Madiun City, 30 Oct 2026</a>).</li>
</ul>
<h2>How BSPS builder wages are structured in 2026</h2>
<p>Of the Rp20 million per home, the larger share of Rp17.5 million goes to building materials and Rp2.5 million to builder wages. A payout in Madiun shows wages are paid in stages: stage I of Rp1,250,000 per recipient was disbursed on 28 October 2026, half of the wage allocation. Staged payments tie builders' pay to work progress.</p>
<p>The programme has also widened. According to Bisnis.com, renters, especially in Jakarta, can now take part if the owner agrees to let them stay three years with no rent increase. Housing minister Maruarar Sirait called the last two months of the year a period of hard work to reach the target.</p>
<h2>Regions short of builders</h2>
<p>Jumping from 45,000 to 400,000 homes means the need for builders rises sharply in a short time. In the Riau Islands, 3,804 homes require about 7,608 builders, roughly two per house, plus 154 facilitators. Moving workers between islands is difficult, and the rainy season starts in November while physical work must finish by 31 December 2026.</p>
<p>At a coordination meeting on 13 October, the housing ministry named labour availability as one of the obstacles. Bandung Regency, with 3,047 homes allocated, had built 334 and absorbed Rp19.28 billion, or 31.64%, and said it would address its labour shortage. In Jakarta, each city area received 2,000 homes, while only a few dozen per area had been built. Local governments were asked to provide builders so homes could be built simultaneously.</p>
<h3>Effects on the renovation labour market</h3>
<p>When thousands of builders are absorbed by a government programme in November and December, homeowners planning private renovations may find it harder to book builders, and schedules may slip. The rains also slow roofing, wall and concrete work.</p>
<h2>Tips for homeowners and small contractors</h2>
<ul><li>Book builders early for December jobs and agree on staged payments tied to progress.</li>
<li>Have materials on site before builders arrive so working days are not lost waiting for deliveries.</li>
<li>Prioritise roof and gutter work before the peak of the rains.</li>
<li>Choose materials that are quick to install, such as light steel roof frames or ready-to-fit panels, to save labour hours.</li></ul>
<p>homeX, an integrated building materials and furniture platform in Indonesia with showroom, warehousing and delivery services, supplies renovation materials and works with tukang for installation, so materials and labour can be scheduled together.</p>
<h2>BSPS builder wages: related articles and products</h2><ul>
<li><a href="/en/news/323">BSPS 2026 progress and home repairs completed</a></li>
<li><a href="/en/news/272">Daily builder wages in 2026 across cities</a></li>
<li><a href="/en/news/321">Construction worker certification</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much are BSPS builder wages in 2026?</strong> Of the Rp20 million aid per home, Rp2.5 million is allocated to builder wages and Rp17.5 million to building materials.</p>
<p><strong>Are BSPS builder wages paid in one go?</strong> Not always. In Tawangrejo, Madiun, stage I wages of Rp1,250,000 per recipient were paid on 28 October 2026.</p>
<p><strong>How many builders does each home need?</strong> In the Riau Islands, 3,804 homes involve about 7,608 builders, or roughly two per house.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://ekonomi.bisnis.com/read/20261101/47/2017378/penghuni-kontrakan-bisa-dapat-bantuan-bedah-rumah-ini-syaratnya" target="_blank" rel="noopener">Bisnis.com, 1 Nov 2026</a>; <a href="https://sijorikepri.com/tanjung-pinang/b-291788/7-608-tukang-terlibat-dalam-program-bedah-rumah-kepri/" target="_blank" rel="noopener">Sijori Kepri, 2 Oct 2026</a>; <a href="https://pkp.go.id/berita/detail/menteri-pkp-dorong-percepatan-program-bedah-rumah-perkuat-koordinasi-dengan-kepala-daerah" target="_blank" rel="noopener">Ministry of Housing and Settlements (PKP), 13 Oct 2026</a>; <a href="https://kelurahan-tawangrejo.madiunkota.go.id/index.php/2026/10/30/pencairan-upah-tukang-tahap-i-program-bsps-rabu-28-oktober-2026-kelurahan-tawangrejo-menjadi-tempat-pelaksanaan-kegiatan-pencairan-upah-tukang-tahap-i-dalam-rangka-program-bantuan-stimulan-perum/" target="_blank" rel="noopener">Tawangrejo Village, Madiun City, 30 Oct 2026</a></em></p>]]></content:encoded></item><item><title>Cement Rail Freight in Indonesia Reaches 1.83 Million Tonnes by September 2026</title><link>https://www.homex.co.id/en/news/352</link><guid isPermaLink="true">https://www.homex.co.id/en/news/352</guid><pubDate>Mon, 02 Nov 2026 09:16:54 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>KAI cement rail freight reached 1.83 million tonnes of cement and clinker in Jan–Sep 2026, about a fifth of non-coal cargo. What it means for supply.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261102-i-angkutan-semen-kereta-api.jpg" alt="Cement Rail Freight in Indonesia Reaches 1.83 Million Tonnes by September 2026"></p><p>Indonesian <strong>cement rail freight</strong> run by state railway PT Kereta Api Indonesia (KAI) reached 1,829,352 tonnes of cement and clinker in January–September 2026, according to a KAI release dated 14 October 2026. That is roughly a fifth of all KAI non-coal cargo. For hardware stores, contractors and homeowners renovating, rail has become one of the main routes that keeps cement on distributor shelves.</p>
<h2>Key Facts</h2><ul>
<li>KAI carried 1,829,352 tonnes of cement and clinker in January–September 2026, out of 9,148,571 tonnes of non-coal cargo (2026-10-14, source: <a href="https://www.kai.id/publikasi/artikel-berita/angkutan-semen-dan-klinker-kai-tembus-183-juta-ton-dukung-distribusi-industri" target="_blank" rel="noopener">KAI, 14 Oct 2026</a>).</li>
<li>KAI total non-coal freight rose 2.6% compared with the same period last year (2026-10-14, source: <a href="https://www.kai.id/publikasi/artikel-berita/angkutan-semen-dan-klinker-kai-tembus-183-juta-ton-dukung-distribusi-industri" target="_blank" rel="noopener">KAI, 14 Oct 2026</a>).</li>
<li>KAI Regional Division IV Tanjungkarang carried 153,360 tonnes of bagged cement and 44,072 tonnes of bulk cement up to September 2026 (2026-10-13, source: <a href="https://www.liputan6.com/bisnis/read/8312463/kai-tanjungkarang-angkut-296-ribu-ton-semen-dan-bbm-hingga-september-2026" target="_blank" rel="noopener">Liputan6, 13 Oct 2026</a>).</li>
<li>By the end of July 2026 KAI cement freight stood at 1,357,524 tonnes, with revenue of Rp82.51 billion (2026-08-12, source: <a href="https://www.kai.id/publikasi/artikel-berita/distribusi-semen-makin-lancar-kai-angkut-136-juta-ton-hingga-juli-2026" target="_blank" rel="noopener">KAI, 12 Aug 2026</a>).</li>
</ul>
<h2>Cement rail freight grows across Java and Sumatra</h2>
<p>The September figure extends a mid-year trend. At the end of July 2026, KAI had moved 1,357,524 tonnes of cement, around 19.4% of its non-coal cargo at that point. That means about 471,000 tonnes were added in August and September alone. Averaged since January, the railway moved roughly 6,700 tonnes of cement and clinker every day.</p>
<p>KAI VP of Corporate Communication Anne Purba said rail offers high-volume shipments, measurable schedules and less pressure on roads. The service runs on several corridors in Java and Sumatra.</p>
<h3>Examples from Sumatra</h3>
<p>In South Sumatra, trains carry Semen Baturaja clinker to its grinding plant in Palembang and haul bulk cement in capsule wagons. In West Sumatra, Semen Padang clinker travels on the Indarung–Bukit Putus line to Teluk Bayur port before going on by sea. Around Lampung, KAI Regional Division IV Tanjungkarang recorded 296,232 tonnes of cement and fuel freight up to September, working with Semen Baturaja, KAI Logistik and Pertamina.</p>
<h2>Why rail matters for cement prices and stock</h2>
<p>Cement is heavy and low-margin, so transport costs weigh heavily on the shelf price. An example from West Java shows the difference. When the Kretek station freight terminal was reactivated in early 2025, KAI Logistik said moving cement from the Palimanan plant in Cirebon to a warehouse in Wangon took about 10–12 hours by truck but only about 5 hours by train. The terminal targeted 1,280 tonnes a day and also cut the number of over-dimension, overloaded (ODOL) trucks on the road.</p>
<p>More predictable transit times let distributors keep leaner warehouse stock without running out. For home projects, that means a lower risk of work stopping because cement arrives late, especially near year end when many projects race deadlines.</p>
<h2>What it means for building material buyers</h2>
<ul><li>Main shipments from plants to distributor warehouses increasingly go by rail and sea; the weak point is the last leg from warehouse to site.</li>
<li>In the rainy season, truck access to sites can be disrupted. Schedule cement deliveries early and store bags dry on pallets.</li>
<li>For projects outside Java, ask which warehouse the goods come from and the expected delivery time before ordering in bulk.</li></ul>
<p>Warehouses close to customers plus a delivery fleet is the model homeX is building as an integrated building materials and furniture platform in Indonesia with showroom, warehousing and delivery services. Renovation materials can be ordered in one quotation request and delivered from the warehouse to the site.</p>
<h2>Cement rail freight: related articles and products</h2><ul>
<li><a href="/en/news/316">Inter-island cement shipping and vessel constraints</a></li>
<li><a href="/en/news/170">National logistics costs and building materials</a></li>
<li><a href="/en/news/291">Truck restrictions and material delivery schedules</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much cement did KAI carry by rail in 2026?</strong> KAI carried 1,829,352 tonnes of cement and clinker in January–September 2026, out of 9.15 million tonnes of non-coal cargo.</p>
<p><strong>Where is cement moved by rail in Indonesia?</strong> On several corridors in Java and Sumatra, such as Semen Baturaja traffic in South Sumatra and Semen Padang clinker on the Indarung–Bukit Putus line to Teluk Bayur.</p>
<p><strong>Is rail faster than trucks for cement?</strong> On the Palimanan–Wangon route, KAI Logistik said trucks took about 10–12 hours while trains took about 5 hours.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.kai.id/publikasi/artikel-berita/angkutan-semen-dan-klinker-kai-tembus-183-juta-ton-dukung-distribusi-industri" target="_blank" rel="noopener">KAI, 14 Oct 2026</a>; <a href="https://www.liputan6.com/bisnis/read/8312463/kai-tanjungkarang-angkut-296-ribu-ton-semen-dan-bbm-hingga-september-2026" target="_blank" rel="noopener">Liputan6, 13 Oct 2026</a>; <a href="https://www.kai.id/publikasi/artikel-berita/distribusi-semen-makin-lancar-kai-angkut-136-juta-ton-hingga-juli-2026" target="_blank" rel="noopener">KAI, 12 Aug 2026</a>; <a href="https://aboutcirebon.id/kai-logistik-tingkatkan-layanan-angkutan-semen-dengan-reaktivasi-terminal-barang-stasiun-kretek/" target="_blank" rel="noopener">aboutcirebon.id, 23 Jan 2025</a></em></p>]]></content:encoded></item><item><title>Bathroom IP Rating Explained: IP44, IP65, IPX7 and IEC Zones 0, 1, 2</title><link>https://www.homex.co.id/en/news/351</link><guid isPermaLink="true">https://www.homex.co.id/en/news/351</guid><pubDate>Mon, 02 Nov 2026 09:16:18 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Bathroom IP rating rules decide which lights and sockets are safe: at least IPX4 in zones 1 and 2 and IPX7 in zone 0. Learn what the two IP digits mean.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261102-i-kode-ip-kamar-mandi.jpg" alt="Bathroom IP Rating Explained: IP44, IP65, IPX7 and IEC Zones 0, 1, 2"></p><p>A <strong>bathroom IP rating</strong> shows how well a light, switch or socket resists dust and water. Under IEC 60364-7-701:2019, equipment in zones 1 and 2 must be at least IPX4, in zone 0 at least IPX7, and anything hit by cleaning water jets at least IPX5. An IP44 light is fine for splash areas, but not for a shower floor where water collects.</p>
<h2>Key Facts</h2><ul>
<li>First digit 0–6 for solids; 4 = objects over 1 mm, 6 = dust-tight (2026-11-02, source: <a href="https://en.wikipedia.org/wiki/IP_code" target="_blank" rel="noopener">Wikipedia, IP code (summary of IEC 60529, accessed 2 Nov 2026)</a>).</li>
<li>IPX4 = splashing from any direction; IPX5 = jets from a 6.3 mm nozzle at 12.5 litres/min; IPX7 = immersion up to 1 m for 30 minutes (2026-11-02, source: <a href="https://en.wikipedia.org/wiki/IP_code" target="_blank" rel="noopener">Wikipedia, IP code (summary of IEC 60529, accessed 2 Nov 2026)</a>).</li>
<li>Water ratings are not cumulative beyond IPX6: an IPX7 device does not necessarily pass IPX5 or IPX6 (2026-11-02, source: <a href="https://en.wikipedia.org/wiki/IP_code" target="_blank" rel="noopener">Wikipedia, IP code (summary of IEC 60529, accessed 2 Nov 2026)</a>).</li>
<li>IEC 60364-7-701:2019: zone 0 at least IPX7 with SELV up to 12 V AC; zones 1 and 2 at least IPX4 (2026-11-02, source: <a href="https://cdn.standards.iteh.ai/samples/23637/b686a82d669541109302676be8ecd23b/IEC-60364-7-701-2019.pdf" target="_blank" rel="noopener">IEC 60364-7-701:2019, official preview via iTeh Standards (accessed 2 Nov 2026)</a>).</li>
<li>Zone 1 reaches 225 cm high; shower zones extend 120 cm from the shower head; bathroom circuits need an RCD of up to 30 mA (2026-11-02, source: <a href="https://cdn.standards.iteh.ai/samples/23637/b686a82d669541109302676be8ecd23b/IEC-60364-7-701-2019.pdf" target="_blank" rel="noopener">IEC 60364-7-701:2019, official preview via iTeh Standards (accessed 2 Nov 2026)</a>).</li>
</ul>
<h2>What the two digits in an IP code mean</h2>
<p>The IP (Ingress Protection) code comes from IEC 60529. The letters IP are followed by two digits. The first, 0 to 6, shows protection against solid objects and dust. The second, 0 to 9, shows protection against water. If one was not tested, it is replaced by X, as in IPX4.</p>
<ul><li><strong>IP2X</strong>: protected against fingers or objects over 12.5 mm.</li>
<li><strong>IP4X</strong>: protected against objects over 1 mm, such as thin wires.</li>
<li><strong>IP5X</strong>: dust-protected; a little dust may enter as long as it does not affect operation.</li>
<li><strong>IP6X</strong>: fully dust-tight.</li></ul>
<p>For water, IPX4 resists splashing from any direction, IPX5 resists jets from a 6.3 mm nozzle, IPX6 resists powerful jets from a 12.5 mm nozzle, and IPX7 survives immersion up to 1 metre for 30 minutes. Note that water ratings are not cumulative beyond IPX6. A device that passes the IPX7 immersion test may not pass the jet test. If it passes both, the label reads, for example, IPX5/IPX7.</p>
<h2>Bathroom zones under IEC 60364-7-701</h2>
<p>The installation standard IEC 60364-7-701:2019 divides a bathroom into zones by distance from water:</p>
<ul><li><strong>Zone 0</strong>: the inside of the bathtub; for showers, 10 cm above the finished floor within 120 cm of the shower head.</li>
<li><strong>Zone 1</strong>: above zone 0 up to 225 cm from the floor, or to the height of the fixed shower head if that is higher.</li>
<li><strong>Zone 2</strong>: for bathtubs only, a 60 cm band outside zone 1. Showers have no zone 2.</li></ul>
<p>Fixed walls and shower doors that are closed during use can limit the zones, but shower curtains may not be used as a boundary.</p>
<h2>Minimum bathroom IP rating per zone</h2>
<ul><li><strong>Zone 0</strong>: only fixed equipment suitable for that zone, at least IPX7, on SELV of up to 12 V AC or 30 V DC with the supply outside zones 0 and 1.</li>
<li><strong>Zone 1</strong>: fixed equipment suitable per the maker's instructions, or SELV/PELV equipment up to 25 V AC; at least IPX4.</li>
<li><strong>Zone 2</strong>: fixed equipment and accessories at least IPX4. Sockets only on SELV or PELV circuits.</li>
<li><strong>Exposed to cleaning jets</strong>: at least IPX5.</li></ul>
<p>When a light spans two zones, the stricter zone applies. Circuits serving the bathroom must also have an RCD with a residual current of no more than 30 mA. Wiring buried in walls that bound a zone must sit at least 6 cm deep unless extra protection is used.</p>
<h2>How to choose bathroom lights and sockets</h2>
<ul><li><strong>Downlights above a shower</strong>: choose at least IP44; IP65 adds dust-tightness and jet resistance.</li>
<li><strong>Lights inside a water-filled area</strong>: must be IPX7 and low-voltage SELV, with the transformer outside zones 0 and 1.</li>
<li><strong>Sockets and switches</strong>: place them outside the wet zones; use covered models near the basin.</li>
<li><strong>Check the label</strong>: the IP code should be printed on the product or packaging, not just "waterproof".</li></ul>
<p>In Indonesia, home installations follow PUIL 2020 and should be done by a competent installer. homeX supplies lights, switches and electrical fittings from several brands for your bathroom renovation.</p>
<h2>bathroom IP rating: related articles and products</h2><ul>
<li><a href="/en/news/296">PUIL 2020 for homes: 30 mA RCD in bathrooms</a></li>
<li><a href="/en/news/191">LED downlight and panel prices 2026</a></li>
<li><a href="/en/news/26">Home electrical cables: NYA, NYM, NYY</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>Can an IP44 light go above a shower?</strong> Yes, because zone 1 requires at least IPX4. Make sure the light is fixed and the circuit has a 30 mA RCD.</p>
<p><strong>What is the difference between IP44 and IP65?</strong> IP44 resists objects over 1 mm and splashing water. IP65 is dust-tight and resists jets from a 6.3 mm nozzle.</p>
<p><strong>Is IPX7 better than IPX5 in every case?</strong> Not always. Water ratings are not cumulative beyond IPX6, so an IPX7 device may not pass the IPX5 jet test.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://en.wikipedia.org/wiki/IP_code" target="_blank" rel="noopener">Wikipedia, IP code (summary of IEC 60529, accessed 2 Nov 2026)</a>; <a href="https://cdn.standards.iteh.ai/samples/23637/b686a82d669541109302676be8ecd23b/IEC-60364-7-701-2019.pdf" target="_blank" rel="noopener">IEC 60364-7-701:2019, official preview via iTeh Standards (accessed 2 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>Tile Slip Resistance Ratings R9–R13 and A, B, C: Meaning and How to Choose</title><link>https://www.homex.co.id/en/news/350</link><guid isPermaLink="true">https://www.homex.co.id/en/news/350</guid><pubDate>Mon, 02 Nov 2026 09:16:18 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Tile slip resistance ratings R9–R13 come from a shod ramp test from 6° to over 35°, while A, B and C are for bare feet. Learn what they mean before you buy.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261102-i-keramik-anti-slip-r10.jpg" alt="Tile Slip Resistance Ratings R9–R13 and A, B, C: Meaning and How to Choose"></p><p>A <strong>tile slip resistance rating</strong> from R9 to R13 is the result of a ramp test with shoes on an oiled surface: R9 means an angle of 6–10°, while R13 is above 35°. Wet barefoot areas use a separate scale of A, B and C. The two systems cannot be converted into each other, so choose the class according to how the room is used.</p>
<h2>Key Facts</h2><ul>
<li>R9 = 6–10°, R10 = >10–19°, R11 = >19–27°, R12 = >27–35°, R13 = >35° in the shod ramp test (2026-11-02, source: <a href="https://villeroy-boch-tiles.com/wp-content/uploads/2025/02/VB_Technical_Information_Slip_Resistance_2025-01-01_EN.pdf" target="_blank" rel="noopener">Villeroy &amp; Boch Tiles, Slip Resistance technical information, status 1 Jan 2025 (accessed 2 Nov 2026)</a>).</li>
<li>Barefoot classes: A from 12°, B above 18°, C above 24° (2026-11-02, source: <a href="https://villeroy-boch-tiles.com/wp-content/uploads/2025/02/VB_Technical_Information_Slip_Resistance_2025-01-01_EN.pdf" target="_blank" rel="noopener">Villeroy &amp; Boch Tiles, Slip Resistance technical information, status 1 Jan 2025 (accessed 2 Nov 2026)</a>).</li>
<li>DIN EN 16165 (December 2021) combines the DIN 51130, DIN 51097 and DIN 51131 methods (2026-11-02, source: <a href="https://villeroy-boch-tiles.com/wp-content/uploads/2025/02/VB_Technical_Information_Slip_Resistance_2025-01-01_EN.pdf" target="_blank" rel="noopener">Villeroy &amp; Boch Tiles, Slip Resistance technical information, status 1 Jan 2025 (accessed 2 Nov 2026)</a>).</li>
<li>German ASR A1.5 examples: toilets R9, changing and washrooms R10, outdoor entrances R11 or R10 with V4 (2026-11-02, source: <a href="https://villeroy-boch-tiles.com/wp-content/uploads/2025/02/VB_Technical_Information_Slip_Resistance_2025-01-01_EN.pdf" target="_blank" rel="noopener">Villeroy &amp; Boch Tiles, Slip Resistance technical information, status 1 Jan 2025 (accessed 2 Nov 2026)</a>).</li>
<li>R classes cannot be converted into A/B/C, pendulum (PTV) or DCOF values (2026-11-02, source: <a href="https://www.gruppobardelli.com/en/pages/academy-antiscivolo" target="_blank" rel="noopener">Gruppo Bardelli Academy, R9–R11 guide and test reports (accessed 2 Nov 2026)</a>).</li>
</ul>
<h2>What the R9–R13 tile slip resistance rating means</h2>
<p>The R code comes from the German test method DIN 51130, which in December 2021 became Annex B of the European standard DIN EN 16165. A tester in work shoes walks on an oiled sample while the ramp is tilted until he starts to slip. The average angle at that point sets the class.</p>
<ul><li><strong>R9</strong>: 6–10°, the lowest class.</li>
<li><strong>R10</strong>: above 10° up to 19°.</li>
<li><strong>R11</strong>: above 19° up to 27°.</li>
<li><strong>R12</strong>: above 27° up to 35°.</li>
<li><strong>R13</strong>: above 35°.</li></ul>
<p>Deeply profiled tiles may also carry V4, V6, V8 or V10. The number is the volume of the cavity below the walking surface, from 4 to 10 cm³ per dm². This space holds water, oil or dirt so it does not sit directly under the sole of the shoe.</p>
<h2>A, B and C classes for wet barefoot areas</h2>
<p>In bathrooms, showers and pools, people walk without shoes. A different method applies here, formerly DIN 51097 and now DIN EN 16165 Annex A. The test uses bare feet on a wet inclined surface.</p>
<ul><li><strong>A</strong>: from 12°, for barefoot corridors and mostly dry sanitary areas.</li>
<li><strong>B</strong>: above 18°, for showers, pool surrounds and steam rooms among others.</li>
<li><strong>C</strong>: above 24°, for steps into pools, foot basins and sloping pool edges.</li></ul>
<h2>Examples from German workplace rules</h2>
<p>The ASR A1.5 list quoted by Villeroy & Boch covers workplaces, not private homes. It is still a useful reference:</p>
<ul><li>Toilets: R9. Changing rooms and washrooms: R10.</li>
<li>Showers and pool surrounds (with shoes): R10.</li>
<li>Outdoor entrances and paths: R11, or R10 with a V4 cavity.</li>
<li>Restaurant and hotel kitchens: R12.</li></ul>
<p>Villeroy & Boch also notes that private areas such as home bathrooms are not regulated, but it recommends barefoot-rated tiles for floor-level showers.</p>
<h2>How to choose a slip rating for a home</h2>
<ul><li><strong>Bathrooms and showers</strong>: look for class B, or at least R10 if only an R rating is given.</li>
<li><strong>Terraces, carports and outdoor paths</strong>: these get rain and soil, so R11 is safer than R9.</li>
<li><strong>Pool surrounds</strong>: prefer class B, and class C for pool steps.</li>
<li><strong>Living rooms and bedrooms</strong>: slip class matters less; focus on PEI and water absorption.</li></ul>
<p>Do not judge by looks alone. Bardelli notes that a stone texture or rough surface does not by itself prove an anti-slip class. Slip resistance is also different from PEI, which measures surface wear.</p>
<h2>What to check in the shop and at handover</h2>
<p>Ask for the data sheet or test report, then check the method and the size and finish that were tested. A result for one size or colour does not automatically apply to other variants. During installation, slope the floor toward the drain so water does not pool. homeX can help compare anti-slip tiles from several brands for your renovation project.</p>
<h2>tile slip resistance rating: related articles and products</h2><ul>
<li><a href="/en/news/195">Anti-slip bathroom floor tile prices 2026</a></li>
<li><a href="/en/news/17">How to choose floor tiles: PEI and water absorption</a></li>
<li><a href="/en/news/299">Bathroom waterproofing flood test</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>Is an R10 tile enough for a home bathroom?</strong> For shod areas, German rules use R10 for showers and washrooms. For bare feet, it is better to look for class B.</p>
<p><strong>What is the difference between R11 and class B?</strong> R11 comes from a shod test on oil at above 19° up to 27°, while B comes from a barefoot test on a wet surface above 18°. They cannot be converted.</p>
<p><strong>What does V4 on a tile mean?</strong> V4 means a cavity volume below the walking surface of at least 4 cm³ per dm², to hold liquids or dirt.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://villeroy-boch-tiles.com/wp-content/uploads/2025/02/VB_Technical_Information_Slip_Resistance_2025-01-01_EN.pdf" target="_blank" rel="noopener">Villeroy &amp; Boch Tiles, Slip Resistance technical information, status 1 Jan 2025 (accessed 2 Nov 2026)</a>; <a href="https://www.gruppobardelli.com/en/pages/academy-antiscivolo" target="_blank" rel="noopener">Gruppo Bardelli Academy, R9–R11 guide and test reports (accessed 2 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>2,200 Special Houses in Highland Papua From January 2027: Materials Are Key</title><link>https://www.homex.co.id/en/news/349</link><guid isPermaLink="true">https://www.homex.co.id/en/news/349</guid><pubDate>Sun, 01 Nov 2026 09:24:07 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Highland Papua special houses: 2,200 units planned across 132 districts, starting January 2027. Moving materials to Wamena is a key challenge.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261101-i-rumah-papua-pegunungan.jpg" alt="2,200 Special Houses in Highland Papua From January 2027: Materials Are Key"></p><p>The Ministry of Housing and Settlements (PKP) is preparing 2,200 <strong>Highland Papua special houses</strong> across 132 districts in eight regencies, and Governor John Tabo says construction will start in early January 2027. The province also received 3,689 Bedah Rumah renovation units in 2026. The ministry itself lists moving materials from Jayapura to Wamena as one of the field obstacles.</p>
<h2>Key Facts</h2><ul>
<li>The 2,200-unit plan: 2,000 type-45 houses for low-income families and 200 type-90 houses for community leaders, in 132 districts (2026-10-16, source: <a href="https://pkp.go.id/berita/detail/kementerian-pkp-siapkan-bedah-rumah-3689-unit-dan-pembangunan-2200-rumah-khusus-di-papua-pegunungan" target="_blank" rel="noopener">Ministry of Housing and Settlements (PKP), 16 Oct 2026</a>).</li>
<li>2026 Bedah Rumah allocation in Highland Papua: 3,689 units in eight regencies (2026-10-16, source: <a href="https://pkp.go.id/berita/detail/kementerian-pkp-siapkan-bedah-rumah-3689-unit-dan-pembangunan-2200-rumah-khusus-di-papua-pegunungan" target="_blank" rel="noopener">Ministry of Housing and Settlements (PKP), 16 Oct 2026</a>).</li>
<li>As of 7 Oct 2026, 664 special houses had passed technical verification and 1,336 had not started (2026-10-16, source: <a href="https://pkp.go.id/berita/detail/kementerian-pkp-siapkan-bedah-rumah-3689-unit-dan-pembangunan-2200-rumah-khusus-di-papua-pegunungan" target="_blank" rel="noopener">Ministry of Housing and Settlements (PKP), 16 Oct 2026</a>).</li>
<li>The construction budget is expected to be allocated in 2027 in one tranche (2026-10-16, source: <a href="https://pkp.go.id/berita/detail/kementerian-pkp-siapkan-bedah-rumah-3689-unit-dan-pembangunan-2200-rumah-khusus-di-papua-pegunungan" target="_blank" rel="noopener">Ministry of Housing and Settlements (PKP), 16 Oct 2026</a>).</li>
<li>The Highland Papua governor says construction will begin in early January 2027 (2026-10-12, source: <a href="https://papua.antaranews.com/berita/769029/rumah-bantuan-presiden-di-papua-pegunungan-mulai-dikerjakan-awal-januari-2027" target="_blank" rel="noopener">ANTARA News Papua, 12 Oct 2026</a>).</li>
</ul>
<h2>The Highland Papua special houses programme</h2>
<p>According to a progress briefing from the Ministry of Housing and Settlements (PKP) on 12 October 2026, the 2,200-unit plan consists of 2,000 type-45 houses for low-income families and 200 type-90 houses for community leaders. They are spread across 132 districts in eight regencies: Jayawijaya, Lanny Jaya, Tolikara, Mamberamo Tengah, Pegunungan Bintang, Yalimo, Yahukimo and Nduga.</p>
<p>As of 7 October 2026, 664 units had passed technical verification, 200 were in process and 1,336 had not started. The plan has been discussed by the housing minister, the home affairs minister and the heads of BPKP, LKPP and BPS. One proposal is to channel funds directly to the provincial government.</p>
<h3>Bedah Rumah in 2026</h3>
<p>Besides the special houses, the province received 3,689 Bedah Rumah units in the 2026 budget. Jayawijaya received 600, Pegunungan Bintang 589, Lanny Jaya, Mamberamo Tengah and Yalimo 500 each, Yahukimo 377, Nduga 361 and Tolikara 262. A total of 1,656 units had passed verification and 553 had been confirmed by the commitment officer's decree.</p>
<h2>Material and logistics challenges</h2>
<p>The ministry lists several challenges: spatial planning, customary land titles, security, accessibility and basic infrastructure such as clean water, electricity and drainage. Some proposed sites are still in forest areas.</p>
<p>For a school flats project in Jayawijaya, the ministry noted difficulty moving materials from Jayapura to Wamena. The contractor responded by ordering more materials locally and using stock from building shops in Wamena. Thousands of special houses will likely need the same approach.</p>
<h2>What it means for suppliers and contractors</h2>
<ul><li><strong>Volume planning</strong>: standard house types make it easier to estimate cement, steel, roofing and frames per unit.</li>
<li><strong>Intermediate warehouses</strong>: stock in hub towns reduces the risk of delays when weather or access is disrupted.</li>
<li><strong>Staged delivery</strong>: delivery schedules that follow the work sequence lower the risk of materials being damaged on site.</li></ul>
<p>Timelines and funding schemes may still change with government decisions. homeX, a building materials platform with warehousing and delivery, is following this housing programme for project procurement needs.</p>
<h2>Highland Papua special houses: related articles and products</h2><ul>
<li><a href="/en/news/293">Construction cost index 2026: Papua 260.15</a></li>
<li><a href="/en/news/10">The 3 million homes programme</a></li>
<li><a href="/en/news/288">Mandatory SNI for building materials 2026</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How many special houses are planned in Highland Papua?</strong> 2,200 units: 2,000 type-45 for low-income families and 200 type-90 for community leaders.</p>
<p><strong>When does construction start?</strong> The Highland Papua governor says construction begins in early January 2027.</p>
<p><strong>What are the main field obstacles?</strong> Customary land titles, security, access, basic infrastructure and moving materials to Wamena, among others.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://pkp.go.id/berita/detail/kementerian-pkp-siapkan-bedah-rumah-3689-unit-dan-pembangunan-2200-rumah-khusus-di-papua-pegunungan" target="_blank" rel="noopener">Ministry of Housing and Settlements (PKP), 16 Oct 2026</a>; <a href="https://papua.antaranews.com/berita/769029/rumah-bantuan-presiden-di-papua-pegunungan-mulai-dikerjakan-awal-januari-2027" target="_blank" rel="noopener">ANTARA News Papua, 12 Oct 2026</a></em></p>]]></content:encoded></item><item><title>Cahayaputra Asa Keramik (CAKK) Cuts 9M 2026 Loss 89% as Revenue Doubles</title><link>https://www.homex.co.id/en/news/348</link><guid isPermaLink="true">https://www.homex.co.id/en/news/348</guid><pubDate>Sun, 01 Nov 2026 09:24:07 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>CAKK loss for 9M 2026 fell 89% to Rp3.39 billion as revenue more than doubled to Rp505.4 billion, while receivables and bank debt rose sharply.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261101-i-rugi-cakk-9m26.jpg" alt="Cahayaputra Asa Keramik (CAKK) Cuts 9M 2026 Loss 89% as Revenue Doubles"></p><p><strong>CAKK loss</strong> (PT Cahayaputra Asa Keramik Tbk) for the first nine months of 2026 shrank 89% to Rp3.39 billion from Rp30.22 billion a year earlier, according to financial statements summarised by The Signal on 28 October 2026. Net revenue more than doubled to Rp505.4 billion and operating profit turned positive. But trade receivables and bank debt also rose sharply.</p>
<h2>Key Facts</h2><ul>
<li>CAKK net loss for Jan–Sep 2026 was Rp3.39 billion, down from Rp30.22 billion (2026-10-28, source: <a href="https://the-signal.id/berita/cakk-pangkas-rugi-89-persen-di-kuartal-iii-tapi-utang-naik-tajam.html" target="_blank" rel="noopener">The Signal, 28 Oct 2026 (IDX disclosure)</a>).</li>
<li>Net revenue was Rp505.4 billion, up from Rp238.9 billion (2026-10-28, source: <a href="https://the-signal.id/berita/cakk-pangkas-rugi-89-persen-di-kuartal-iii-tapi-utang-naik-tajam.html" target="_blank" rel="noopener">The Signal, 28 Oct 2026 (IDX disclosure)</a>).</li>
<li>Gross profit was Rp35.8 billion and operating profit Rp10.6 billion, reversing an operating loss of Rp13.6 billion (2026-10-28, source: <a href="https://the-signal.id/berita/cakk-pangkas-rugi-89-persen-di-kuartal-iii-tapi-utang-naik-tajam.html" target="_blank" rel="noopener">The Signal, 28 Oct 2026 (IDX disclosure)</a>).</li>
<li>Short-term bank loans rose to Rp182.5 billion; third-party receivables reached Rp173.1 billion (2026-10-28, source: <a href="https://the-signal.id/berita/cakk-pangkas-rugi-89-persen-di-kuartal-iii-tapi-utang-naik-tajam.html" target="_blank" rel="noopener">The Signal, 28 Oct 2026 (IDX disclosure)</a>).</li>
<li>Net operating cash flow fell to Rp6.4 billion from Rp23 billion (2026-10-28, source: <a href="https://the-signal.id/berita/cakk-pangkas-rugi-89-persen-di-kuartal-iii-tapi-utang-naik-tajam.html" target="_blank" rel="noopener">The Signal, 28 Oct 2026 (IDX disclosure)</a>).</li>
</ul>
<h2>Breaking down CAKK loss for 9M 2026</h2>
<p>Cahayaputra Asa Keramik is a ceramic and building materials maker listed on the Indonesia Stock Exchange. In its unaudited third-quarter 2026 report, cost of revenue was Rp469.6 billion, lifting gross profit to Rp35.8 billion from only Rp4.1 billion a year earlier. Operating profit came to Rp10.6 billion.</p>
<p>Finance costs of Rp11.2 billion and other expenses left the company with a pre-tax loss of about Rp3.4 billion. Loss per share narrowed from Rp25.12 to Rp2.82, with shares outstanding unchanged at 1,203,300,219.</p>
<h3>Balance sheet and cash flow</h3>
<p>Total assets rose to Rp646 billion from Rp496.8 billion at the end of 2025, mainly because of receivables. Third-party receivables rose from Rp66.2 billion to Rp173.1 billion, and related-party receivables from Rp37.9 billion to Rp59.9 billion. Total liabilities climbed to Rp504 billion, including new trade payables to related parties of Rp97.9 billion. Equity dipped to Rp142 billion.</p>
<p>Operating cash flow fell to Rp6.4 billion even as sales jumped, which means part of the sales were still invoices that had not yet turned into cash. The company also spent Rp13.8 billion on fixed assets.</p>
<h2>What it means for the tile market</h2>
<p>CAKK's revenue growth comes while the national ceramic industry still faces gas supply issues, plant utilisation pressure and import competition. One company report is not enough to call the direction of shop prices, but it shows some local producers are able to grow sales volume.</p>
<p>For contractors and project owners, a few points still matter when buying tiles:</p>
<ul><li><strong>Batch consistency</strong>: order from one production code so colour and size match.</li>
<li><strong>Stock and delivery timing</strong>: for large projects, confirm stock before floor work starts.</li>
<li><strong>Grade and SNI documents</strong>: check the quality grade on the box and keep the supplier's SNI documents.</li>
<li><strong>Payment terms</strong>: compare cash and credit prices, because a supplier's cost of capital affects its quote.</li></ul>
<h2>Note</h2>
<p>The report is unaudited and will be confirmed in the 2026 annual report. For project tiles and granite, homeX offers a showroom, warehousing and delivery, and can help compare quotes across several brands.</p>
<h2>CAKK loss: related articles and products</h2><ul>
<li><a href="/en/news/325">HGBT gas for the ceramic industry and plant utilisation</a></li>
<li><a href="/en/news/315">Ceramic industry utilisation falls below 70%</a></li>
<li><a href="/en/news/34">Ceramic and granite factories in Indonesia</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How large was CAKK loss through September 2026?</strong> The loss attributable to owners was Rp3.39 billion, down 89% from Rp30.22 billion.</p>
<p><strong>Why is CAKK still loss-making with positive operating profit?</strong> Finance costs of Rp11.2 billion and other expenses exceeded the Rp10.6 billion operating profit.</p>
<p><strong>Is the report audited?</strong> No. The Q3 2026 report is unaudited.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://the-signal.id/berita/cakk-pangkas-rugi-89-persen-di-kuartal-iii-tapi-utang-naik-tajam.html" target="_blank" rel="noopener">The Signal, 28 Oct 2026 (IDX disclosure)</a>; <a href="https://www.idx.co.id/StaticData/NewsAndAnnouncement/ANNOUNCEMENTSTOCK/From_EREP/202610/20261028112201-65111-0/Laporan%20Keuangan%20Q3%2026%20-%20CAKK.pdf" target="_blank" rel="noopener">CAKK Q3 2026 financial statements, IDX</a></em></p>]]></content:encoded></item><item><title>MDF, Particleboard and OSB Classes: What P1–P7, MDF.H and OSB/3 Mean</title><link>https://www.homex.co.id/en/news/347</link><guid isPermaLink="true">https://www.homex.co.id/en/news/347</guid><pubDate>Sun, 01 Nov 2026 09:19:34 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>MDF and particleboard classes, plus OSB codes, show dry or humid use and load-bearing ability. Learn the EN 312, EN 622-5 and EN 300 codes before buying.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261101-i-mdf-partikel-kelas.jpg" alt="MDF, Particleboard and OSB Classes: What P1–P7, MDF.H and OSB/3 Mean"></p><p><strong>MDF and particleboard classes</strong>, along with OSB classes, are written as short codes in European standards that show the conditions of use and load-bearing ability. Particleboard uses P1–P7 (EN 312), MDF uses MDF, MDF.H, MDF.LA and MDF.HLS (EN 622-5), and OSB uses OSB/1–OSB/4 (EN 300). The letter H means humid conditions, not waterproof.</p>
<h2>Key Facts</h2><ul>
<li>EN 312 splits particleboard into P1–P7; P2 is for dry interior fitments and furniture, P3 for non-load-bearing humid use (2026-11-01, source: <a href="http://www.greenspec.co.uk/building-design/wood-panels-6-technical-classes/" target="_blank" rel="noopener">GreenSpec, technical classes of wood panels (accessed 1 Nov 2026)</a>).</li>
<li>EN 622-5: MDF general dry, MDF.H general humid, MDF.LA load-bearing dry, MDF.HLS load-bearing humid (2026-11-01, source: <a href="http://www.greenspec.co.uk/building-design/wood-panels-6-technical-classes/" target="_blank" rel="noopener">GreenSpec, technical classes of wood panels (accessed 1 Nov 2026)</a>).</li>
<li>EN 300: OSB/2 load-bearing dry, OSB/3 load-bearing humid, OSB/4 heavy-duty load-bearing humid (2026-11-01, source: <a href="http://www.greenspec.co.uk/building-design/wood-panels-6-technical-classes/" target="_blank" rel="noopener">GreenSpec, technical classes of wood panels (accessed 1 Nov 2026)</a>).</li>
<li>Exterior and fire-retardant MDF exist but are not covered by the European standards system (2026-11-01, source: <a href="http://www.greenspec.co.uk/building-design/wood-panels-6-technical-classes/" target="_blank" rel="noopener">GreenSpec, technical classes of wood panels (accessed 1 Nov 2026)</a>).</li>
<li>Particleboard is widely used for kitchen units and worktops with a veneered or laminated finish (2026-11-01, source: <a href="https://europanels.org/the-wood-based-panel-industry/types-of-wood-based-panels-economic-impact/particleboard/" target="_blank" rel="noopener">European Panel Federation (EPF), Particleboard page (accessed 1 Nov 2026)</a>).</li>
</ul>
<h2>Why MDF and particleboard class codes matter</h2>
<p>Kitchen sets, wardrobes and partitions in Indonesia rely heavily on engineered wood panels. From the outside, boards faced with HPL or melamine can look identical while their cores differ. Class codes help you judge whether a board suits dry rooms, humid rooms or load-bearing parts.</p>
<h2>Particleboard (EN 312)</h2>
<p>Particleboard is made from wood particles mixed with resin and hot-pressed. The European Panel Federation says it is widely used for kitchen units, worktops and bedroom furniture with a veneered or laminated finish.</p>
<ul><li><strong>P1</strong>: general purpose, dry conditions.</li>
<li><strong>P2</strong>: interior fitments and furniture, dry conditions.</li>
<li><strong>P3</strong>: non-load-bearing, humid conditions.</li>
<li><strong>P4 and P5</strong>: load-bearing, dry and humid respectively.</li>
<li><strong>P6 and P7</strong>: heavy-duty load-bearing, dry and humid respectively.</li></ul>
<h2>MDF (EN 622-5)</h2>
<p>MDF is medium-density fibreboard. The basic codes are MDF for general dry use, MDF.H for general humid use, MDF.LA for load-bearing dry use and MDF.HLS for load-bearing humid use. Lighter L-MDF and UL-MDF variants also exist. GreenSpec notes that exterior MDF and fire-retardant MDF are sold but are not covered by the European standards system, so ask the mill for test data.</p>
<h2>OSB (EN 300)</h2>
<p>OSB is made of oriented flat wood strands. OSB/1 is for general use and furniture in dry conditions, OSB/2 is load-bearing in dry conditions, OSB/3 is load-bearing in humid conditions and OSB/4 is heavy-duty load-bearing in humid conditions. OSB/3 is a common choice for framed walls, roof decking and raised floors.</p>
<h2>Tips for tropical climates</h2>
<p>For base kitchen cabinets and vanity units, choose a humid-class board such as P3 or MDF.H, or class 2 plywood. Remember that humid class does not mean it can sit in water: seal every cut edge with edging, and use sealant around sinks. Ask suppliers to state the class code, thickness, density and formaldehyde emission class on the quotation. homeX can help compare board quotes from several suppliers at once.</p>
<h2>MDF and particleboard classes: related articles and products</h2><ul>
<li><a href="/en/news/260">Plywood and MDF factories in Indonesia</a></li>
<li><a href="/en/news/197">Kitchen set and cabinet prices</a></li>
<li><a href="/en/news/100">Kitchen renovation cost per m²</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>Which board suits a cabinet under the sink?</strong> Choose a humid class such as P3, MDF.H or class 2 plywood, and seal every cut edge.</p>
<p><strong>Is MDF.H waterproof?</strong> No. MDF.H is designed for humid conditions, not for soaking or constant contact with water.</p>
<p><strong>What is the difference between OSB/2 and OSB/3?</strong> Both are load-bearing; OSB/2 is for dry conditions and OSB/3 for humid conditions.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="http://www.greenspec.co.uk/building-design/wood-panels-6-technical-classes/" target="_blank" rel="noopener">GreenSpec, technical classes of wood panels (accessed 1 Nov 2026)</a>; <a href="https://europanels.org/the-wood-based-panel-industry/types-of-wood-based-panels-economic-impact/particleboard/" target="_blank" rel="noopener">European Panel Federation (EPF), Particleboard page (accessed 1 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>Plywood Bonding Classes Under EN 314-2: Dry, Humid, Exterior and How to Choose</title><link>https://www.homex.co.id/en/news/346</link><guid isPermaLink="true">https://www.homex.co.id/en/news/346</guid><pubDate>Sun, 01 Nov 2026 09:19:34 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Plywood bonding classes under EN 314-2 come in three: class 1 dry interior, class 2 humid interior, class 3 exterior. Also check EN 636 and E1.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261101-i-plywood-en314.jpg" alt="Plywood Bonding Classes Under EN 314-2: Dry, Humid, Exterior and How to Choose"></p><p><strong>Plywood bonding classes</strong> under the European standard EN 314-2 come in three levels: class 1 for dry interiors, class 2 for humid interiors and class 3 for exterior use. The class decides whether a board can cope with kitchens, bathrooms or the outdoors. When buying, also check the EN 636 use class and the E1 formaldehyde class.</p>
<h2>Key Facts</h2><ul>
<li>EN 314-2 sets the bonding tests: class 1 dry interior, class 2 humid interior, class 3 exterior (2026-11-01, source: <a href="https://europanels.org/the-wood-based-panel-industry/types-of-wood-based-panels-economic-impact/plywood/" target="_blank" rel="noopener">European Panel Federation (EPF), Plywood page (accessed 1 Nov 2026)</a>).</li>
<li>Typical adhesives: urea-formaldehyde for class 1, melamine-urea-formaldehyde for class 2, MUF or phenol-formaldehyde for class 3 (2026-11-01, source: <a href="https://europanels.org/the-wood-based-panel-industry/types-of-wood-based-panels-economic-impact/plywood/" target="_blank" rel="noopener">European Panel Federation (EPF), Plywood page (accessed 1 Nov 2026)</a>).</li>
<li>Class E1 means formaldehyde release below 0.1 ppm under EN 717-1 (2026-11-01, source: <a href="https://europanels.org/the-wood-based-panel-industry/types-of-wood-based-panels-economic-impact/plywood/" target="_blank" rel="noopener">European Panel Federation (EPF), Plywood page (accessed 1 Nov 2026)</a>).</li>
<li>EN 636-1, EN 636-2 and EN 636-3 cover dry, humid and exterior conditions (2026-11-01, source: <a href="http://www.greenspec.co.uk/building-design/wood-panels-6-technical-classes/" target="_blank" rel="noopener">GreenSpec, technical classes of wood panels (accessed 1 Nov 2026)</a>).</li>
<li>Film-faced spruce plywood usually uses phenolic films of 120, 170 or 220 g/m² (2026-11-01, source: <a href="https://europanels.org/the-wood-based-panel-industry/types-of-wood-based-panels-economic-impact/plywood/" target="_blank" rel="noopener">European Panel Federation (EPF), Plywood page (accessed 1 Nov 2026)</a>).</li>
</ul>
<h2>What plywood bonding classes are</h2>
<p>Plywood is made from thin veneers glued with the grain of each layer at right angles and pressed with heat. Much of a board's performance depends on the adhesive. EN 314-2 defines the tests a glue line must pass for a panel to qualify as class 1, 2 or 3. The tests check whether the plies stay bonded after dry, humid or weather-like exposure.</p>
<ul><li><strong>Class 1, dry interior</strong>: wardrobes, partitions and furniture in air-conditioned rooms. The usual adhesive is urea-formaldehyde (UF).</li>
<li><strong>Class 2, humid interior</strong>: kitchen cabinets, areas near sinks and damp rooms. The usual adhesive is melamine-urea-formaldehyde (MUF).</li>
<li><strong>Class 3, exterior</strong>: canopies, concrete formwork, truck floors and areas exposed to rain. The usual adhesive is MUF or phenol-formaldehyde (PF).</li></ul>
<h2>How it differs from EN 636 and E1</h2>
<p>EN 314-2 rates only the bond. EN 636 is the product standard that combines bond, wood species and end use: EN 636-1 for dry, EN 636-2 for humid and EN 636-3 for exterior conditions. The European Panel Federation notes that some species are not naturally resistant enough to fungi for outdoor use unless treated, so a class 3 glue line alone is not enough.</p>
<p>Class E1 covers formaldehyde release, set at below 0.1 ppm under EN 717-1. For bedrooms, children's rooms and furniture in closed spaces, ask for E1 or equivalent documents.</p>
<h2>How to choose plywood for projects in Indonesia</h2>
<h3>Ask for the class, not just a trade name</h3>
<p>Shops often use labels such as MR or WBP. These trade terms are not always consistent between mills. Ask suppliers to state the EN 314-2 or EN 636 class, adhesive type, thickness, number of plies and emission class on the quotation.</p>
<h3>Formwork and film-faced boards</h3>
<p>For concrete formwork that will be reused, choose exterior-grade plywood with a phenolic film. Common film weights are 120, 170 or 220 g/m²; heavier films usually last longer through repeated pours. Seal the edges with paint after cutting.</p>
<h3>Store it properly</h3>
<p>Plywood of any class can warp if it sits on a wet floor or gets rained on. Stack it flat on bearers, keep it covered and away from walls. For orders with many sizes, homeX can help collect quotes from several suppliers and arrange staged delivery to site.</p>
<h2>plywood bonding classes: related articles and products</h2><ul>
<li><a href="/en/news/260">Plywood factories in Indonesia: KTI, KLI and SGS addresses</a></li>
<li><a href="/en/news/197">Kitchen set and cabinet prices</a></li>
<li><a href="/en/news/175">Fox glue prices: PVAC, contact and HPL glue</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>Which plywood class is right for kitchen cabinets?</strong> At least class 2 (humid interior) under EN 314-2, with E1 formaldehyde emission.</p>
<p><strong>Is class 3 plywood always weatherproof?</strong> Not always. Species, treatment, finishing and installation also decide outdoor durability.</p>
<p><strong>What does E1 mean on plywood?</strong> E1 means formaldehyde release below 0.1 ppm under the EN 717-1 test.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://europanels.org/the-wood-based-panel-industry/types-of-wood-based-panels-economic-impact/plywood/" target="_blank" rel="noopener">European Panel Federation (EPF), Plywood page (accessed 1 Nov 2026)</a>; <a href="http://www.greenspec.co.uk/building-design/wood-panels-6-technical-classes/" target="_blank" rel="noopener">GreenSpec, technical classes of wood panels (accessed 1 Nov 2026)</a></em></p>]]></content:encoded></item><item><title>Laminate Flooring AC Ratings Explained: AC1–AC5, Classes 21–33, How to Choose</title><link>https://www.homex.co.id/en/news/345</link><guid isPermaLink="true">https://www.homex.co.id/en/news/345</guid><pubDate>Sun, 01 Nov 2026 09:19:34 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Laminate flooring AC ratings show wear resistance under EN 13329. AC3 suits most homes, AC4 kitchens and hallways, AC5 busy commercial floors.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261101-i-lantai-laminate-ac.jpg" alt="Laminate Flooring AC Ratings Explained: AC1–AC5, Classes 21–33, How to Choose"></p><p><strong>Laminate flooring AC ratings</strong> are the wear-resistance classes of the European standard EN 13329, running from AC1 to AC6. For homes, AC3 is usually enough, while kitchens, hallways and pet households are safer with AC4. The AC rating does not measure water resistance, so check that specification separately.</p>
<h2>Key Facts</h2><ul>
<li>The Abrasion Class AC1–AC6 comes from the European standard EN 13329 for laminate wear resistance (2026-11-01, source: <a href="https://cdn.mediavalet.com/usva/rwbrands/4M0nP1GlNkiFa8zZEb7GOQ/24I9sVK7IUumpkxbNYB_bQ/Original/NALFA%20AC%20Rating%20Paper.pdf" target="_blank" rel="noopener">NALFA, AC Rating white paper (accessed 1 Nov 2026)</a>).</li>
<li>The abrasion (Taber) test runs until the decor layer starts to wear through (2026-11-01, source: <a href="https://cdn.mediavalet.com/usva/rwbrands/4M0nP1GlNkiFa8zZEb7GOQ/24I9sVK7IUumpkxbNYB_bQ/Original/NALFA%20AC%20Rating%20Paper.pdf" target="_blank" rel="noopener">NALFA, AC Rating white paper (accessed 1 Nov 2026)</a>).</li>
<li>NALFA certification tests 14 quality criteria, and its stain test uses 15 chemicals (2026-11-01, source: <a href="https://cdn.mediavalet.com/usva/rwbrands/4M0nP1GlNkiFa8zZEb7GOQ/24I9sVK7IUumpkxbNYB_bQ/Original/NALFA%20AC%20Rating%20Paper.pdf" target="_blank" rel="noopener">NALFA, AC Rating white paper (accessed 1 Nov 2026)</a>).</li>
<li>Common mapping: AC1 = class 21, AC2 = 22, AC3 = 23, AC4 = 32, AC5 = 33 (2026-05, source: <a href="https://www.leicesterflooringandcarpet.com/modern-laminate-flooring/ac-ratings-explained/" target="_blank" rel="noopener">Leicester Flooring, AC ratings guide (updated May 2026)</a>).</li>
<li>AC ratings do not measure water resistance or dent resistance (2026-05, source: <a href="https://www.leicesterflooringandcarpet.com/modern-laminate-flooring/ac-ratings-explained/" target="_blank" rel="noopener">Leicester Flooring, AC ratings guide (updated May 2026)</a>).</li>
</ul>
<h2>What laminate flooring AC ratings measure</h2>
<p>AC stands for Abrasion Class. A laminate sample is ground by abrasive wheels under controlled pressure until the decor layer starts to fail. The more cycles it survives, the higher its class. The test imitates footsteps, grit carried in on shoes and chairs dragged across the floor over many years.</p>
<p>A white paper from NALFA, the North American laminate flooring association, warns that the AC number covers only one side of quality. Stain, impact, dent and moisture resistance are tested with other methods, so an AC5 floor is not automatically safe against standing water.</p>
<h2>AC classes and use classes</h2>
<ul><li><strong>AC1 (class 21)</strong>: very light residential use, such as a rarely used guest room. Rarely produced today.</li>
<li><strong>AC2 (class 22)</strong>: general residential use with moderate traffic, such as bedrooms.</li>
<li><strong>AC3 (class 23)</strong>: heavy residential and light commercial use; suits most rooms in a house.</li>
<li><strong>AC4 (class 32)</strong>: general commercial use; a safe choice for kitchens, hallways, stairs and homes with dogs.</li>
<li><strong>AC5 (class 33)</strong>: heavy commercial use such as shops, lobbies and short-stay rentals.</li></ul>
<p>The two-digit class is the older European system. The first digit shows the type of use (2 for residential, 3 for commercial) and the second shows the traffic level.</p>
<h2>How to choose for homes and projects in Indonesia</h2>
<h3>Match the class to the room</h3>
<p>Bedrooms and home offices with a chair mat can use AC3. Busy family rooms, kitchens and hallways are better with AC4. For cafés, open offices, shophouses or rental apartments, consider AC4 or AC5. If one design runs through the whole house, choose the highest class needed by the busiest room.</p>
<h3>Do not confuse it with thickness or warranty</h3>
<p>An 8 mm or 12 mm plank thickness is not an AC rating. Thicker boards feel more solid, but scratch resistance still depends on the top layer. A long warranty on AC2 flooring also often carries broad exclusions, for example no cover in kitchens.</p>
<h3>Plan for humid climates</h3>
<p>The core of laminate is usually HDF fibreboard, which is sensitive to water. In tropical homes, make sure the subfloor is dry and level, use an underlay with a vapour barrier, leave expansion gaps at the walls and avoid bathrooms. For wet areas, SPC flooring or ceramic tiles are usually a better fit.</p>
<h2>Documents to ask for</h2>
<p>Ask for a technical data sheet showing the AC class, use class, test standard, thickness and warranty terms. When two brands are both AC4, compare thickness, core type and other test results. For larger projects, homeX can help compare quotes from several flooring suppliers and arrange delivery from its warehouse to site.</p>
<h2>laminate flooring AC ratings: related articles and products</h2><ul>
<li><a href="/en/news/72">Vinyl and SPC flooring prices per m²</a></li>
<li><a href="/en/news/273">SPC flooring installation labour cost per m²</a></li>
<li><a href="/en/news/17">How to choose floor tiles: PEI and water absorption</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>Which AC rating is right for a home?</strong> AC3 covers most rooms. AC4 is safer for kitchens, hallways, stairs and pet households.</p>
<p><strong>Is AC4 laminate waterproof?</strong> Not necessarily. The AC rating measures wear only; water resistance is a separate specification.</p>
<p><strong>What does class 32 on a laminate box mean?</strong> It is the older European use class; class 32 usually corresponds to AC4 for general commercial use.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://cdn.mediavalet.com/usva/rwbrands/4M0nP1GlNkiFa8zZEb7GOQ/24I9sVK7IUumpkxbNYB_bQ/Original/NALFA%20AC%20Rating%20Paper.pdf" target="_blank" rel="noopener">NALFA, AC Rating white paper (accessed 1 Nov 2026)</a>; <a href="https://www.leicesterflooringandcarpet.com/modern-laminate-flooring/ac-ratings-explained/" target="_blank" rel="noopener">Leicester Flooring, AC ratings guide (updated May 2026)</a></em></p>]]></content:encoded></item><item><title>Impack Pratama (IMPC) Earns Rp640 Billion in Jan–Sep 2026, Beating 2025</title><link>https://www.homex.co.id/en/news/344</link><guid isPermaLink="true">https://www.homex.co.id/en/news/344</guid><pubDate>Sun, 01 Nov 2026 09:11:46 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Impack Pratama profit hit Rp640 billion in Jan–Sep 2026, above all of 2025; IMPC lifted its target above Rp800 billion and flagged Q4 cost pressure.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261101-i-laba-impc-q3.jpg" alt="Impack Pratama (IMPC) Earns Rp640 Billion in Jan–Sep 2026, Beating 2025"></p><p><strong>Impack Pratama profit</strong> (PT Impack Pratama Industri Tbk, ticker IMPC) reached Rp640 billion by the end of September 2026, already above its full-year 2025 profit of Rp620 billion, Metro TV News reported on 27 October 2026. The plastic building materials maker raised its 2026 profit target to above Rp800 billion. Management warned, however, that Q4 margins could be squeezed by raw materials, the exchange rate, logistics and weaker purchasing power.</p>
<h2>Key Facts</h2><ul>
<li>IMPC net profit for January–September 2026 was Rp640 billion, above 2025 profit of Rp620 billion (2026-10-27, source: <a href="https://www.metrotvnews.com/read/koGCg75X-emiten-impc-raup-laba-bersih-rp640-miliar-hingga-september-2026" target="_blank" rel="noopener">Metro TV News, 27 Oct 2026</a>).</li>
<li>Q3 2026 profit was Rp194 billion, up 13.9% from Rp170 billion (2026-10-27, source: <a href="https://www.metrotvnews.com/read/koGCg75X-emiten-impc-raup-laba-bersih-rp640-miliar-hingga-september-2026" target="_blank" rel="noopener">Metro TV News, 27 Oct 2026</a>).</li>
<li>Q3 2026 revenue rose 12% to Rp1.3 trillion from Rp1.1 trillion (2026-10-27, source: <a href="https://www.metrotvnews.com/read/koGCg75X-emiten-impc-raup-laba-bersih-rp640-miliar-hingga-september-2026" target="_blank" rel="noopener">Metro TV News, 27 Oct 2026</a>).</li>
<li>An interim dividend of Rp273.4 billion, or Rp5 per share, was announced in October 2026 (2026-10-27, source: <a href="https://www.metrotvnews.com/read/koGCg75X-emiten-impc-raup-laba-bersih-rp640-miliar-hingga-september-2026" target="_blank" rel="noopener">Metro TV News, 27 Oct 2026</a>).</li>
</ul>
<h2>Breaking down Impack Pratama profit in 2026</h2>
<p>Impack Pratama is known as a maker of plastic building materials. Its official website features brands such as Alderon (uPVC roofing), Twinlite and Solartuff (polycarbonate sheets), widely used for house roofs, canopies, carports and industrial buildings. That makes IMPC's results a useful indicator of demand for roofing and plastic sheets in Indonesia.</p>
<p>In Q3 2026, IMPC's net profit was Rp194 billion, up 13.9% from Rp170 billion a year earlier. Net revenue for the quarter rose 12% to Rp1.3 trillion. The full-year profit target had already been raised from above Rp700 billion to above Rp800 billion, an adjustment first announced in July 2026.</p>
<h2>Watching Q4 cost pressure</h2>
<p>President Director Haryanto Tjiptodihardjo said the company is watching several challenges that could squeeze gross margin in Q4 2026: renewed increases in raw material prices, a weaker rupiah, higher logistics costs for domestic distribution and exports, and higher interest rates combined with weaker consumer purchasing power. The company said it will optimise operating efficiency to protect profitability.</p>
<h3>What it means for roofing and canopy buyers</h3>
<p>A manufacturer's comments on raw materials, currency and logistics are a signal buyers should note. They are not a price increase announcement, but they show that production and delivery costs are rising. Practical steps for year-end projects:</p>
<ul><li>Calculate roofing needs per metre or per sheet in detail, including ridges, screws and accessories.</li>
<li>Ask for written quotations that state how long prices are valid and the delivery cost.</li>
<li>For projects outside Java, allow for longer delivery times.</li>
<li>Compare thickness, warranty and UV coating between products, not just price.</li></ul>
<h2>Building materials market context</h2>
<p>IMPC's results are in line with other building material companies' Q3 2026 reports showing improving demand towards the end of the year. Alongside its results, the company announced an interim dividend of Rp273.4 billion, or Rp5 per share, in October 2026. homeX, an integrated building materials and furniture platform in Indonesia with showroom, warehousing and delivery, helps buyers compare uPVC roofing, polycarbonate and other materials in a single quotation request.</p>
<h2>Impack Pratama profit: related articles and products</h2><ul>
<li><a href="/en/news/77">Alderon uPVC roofing prices per metre</a></li>
<li><a href="/en/news/78">Twinlite, Solarflat and Solartuff polycarbonate prices</a></li>
<li><a href="/en/news/338">Avia Avian Q3 2026 results</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much profit did Impack Pratama make up to September 2026?</strong> IMPC booked net profit of Rp640 billion for January–September 2026, higher than its full-year 2025 profit of Rp620 billion.</p>
<p><strong>What products does Impack Pratama make?</strong> Impack's official website features Alderon uPVC roofing and Twinlite and Solartuff polycarbonate sheets.</p>
<p><strong>What risks did IMPC flag for Q4 2026?</strong> Higher raw material prices, a weaker rupiah, logistics costs, interest rates and weaker purchasing power.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.metrotvnews.com/read/koGCg75X-emiten-impc-raup-laba-bersih-rp640-miliar-hingga-september-2026" target="_blank" rel="noopener">Metro TV News, 27 Oct 2026</a>; <a href="https://www.impack-pratama.com/" target="_blank" rel="noopener">Impack Pratama official website, accessed 1 Nov 2026</a></em></p>]]></content:encoded></item><item><title>Spindo (ISSP) Q3 2026 Profit Hits Record Rp234 Billion, Up 50%</title><link>https://www.homex.co.id/en/news/343</link><guid isPermaLink="true">https://www.homex.co.id/en/news/343</guid><pubDate>Sun, 01 Nov 2026 09:11:46 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Spindo ISSP profit in Q3 2026 reached a record Rp234 billion, up 50% year on year, on revenue of about Rp1.7 trillion and a 23% gross margin.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261101-i-laba-issp-q3.jpg" alt="Spindo (ISSP) Q3 2026 Profit Hits Record Rp234 Billion, Up 50%"></p><p><strong>Spindo ISSP profit</strong> (PT Steel Pipe Industry of Indonesia Tbk) reached Rp234 billion in the third quarter of 2026, up 50% year on year and 44% quarter on quarter, according to a Stockbit Investment Research brief published on 27 October 2026. It is the highest quarterly profit in the company's history. Growth was driven by revenue of about Rp1.7 trillion and a gross margin that widened to 23%.</p>
<h2>Key Facts</h2><ul>
<li>ISSP Q3 2026 net profit was Rp234 billion, up 50% YoY and 44% QoQ (2026-10-27, source: <a href="https://snips.stockbit.com/stockbit-research/issp-brief-result-3q26-laba-bersih-naik-signifikan-50-yoy-cetak-laba-kuartalan-tertinggi" target="_blank" rel="noopener">Stockbit Snips, 27 Oct 2026 (ISSP financial statements)</a>).</li>
<li>Nine-month 2026 net profit was Rp475 billion, up 29% YoY (2026-10-27, source: <a href="https://snips.stockbit.com/stockbit-research/issp-brief-result-3q26-laba-bersih-naik-signifikan-50-yoy-cetak-laba-kuartalan-tertinggi" target="_blank" rel="noopener">Stockbit Snips, 27 Oct 2026 (ISSP financial statements)</a>).</li>
<li>Q3 revenue was about Rp1.7 trillion, up 9% YoY and 4% QoQ (2026-10-27, source: <a href="https://snips.stockbit.com/stockbit-research/issp-brief-result-3q26-laba-bersih-naik-signifikan-50-yoy-cetak-laba-kuartalan-tertinggi" target="_blank" rel="noopener">Stockbit Snips, 27 Oct 2026 (ISSP financial statements)</a>).</li>
<li>Q3 gross margin was 23%, versus 19% in Q3 2025 and 24% in Q2 2026 (2026-10-27, source: <a href="https://snips.stockbit.com/stockbit-research/issp-brief-result-3q26-laba-bersih-naik-signifikan-50-yoy-cetak-laba-kuartalan-tertinggi" target="_blank" rel="noopener">Stockbit Snips, 27 Oct 2026 (ISSP financial statements)</a>).</li>
</ul>
<h2>Breaking down Spindo ISSP profit in Q3 2026</h2>
<p>Steel Pipe Industry of Indonesia, known by its Spindo brand, is one of Indonesia's large steel pipe makers. Its products are used for water installations, building frames, fences, canopies and industrial projects. According to Stockbit, nine-month 2026 net profit of Rp475 billion already equals 84% of Stockbit's full-year 2026 estimate.</p>
<p>Two main factors drove the third-quarter increase. First, revenue rose to about Rp1.7 trillion. Second, gross margin widened to 23% from 19% a year earlier. That margin is slightly below the 24% of Q2 2026 but still well above last year. The company scheduled a nine-month earnings call for 28 October 2026.</p>
<h3>Why margins matter to buyers</h3>
<p>A higher gross margin can come from better selling prices, lower raw material costs or a more profitable product mix. The Stockbit brief does not say which factor was largest, so buyers should not conclude that store prices for pipe will definitely rise or fall. What can be read is that steel pipe demand is strong enough to support sales volumes.</p>
<h2>What it means for projects and steel pipe buyers</h2>
<p>For contractors and homeowners, a healthy producer usually means steadier supply. But store prices for steel pipe and hollow sections still depend on global steel prices, the rupiah exchange rate and delivery costs. Points to check when buying:</p>
<ul><li><strong>Wall thickness</strong>: ask for the thickness printed on the label or mill document, not just the diameter.</li>
<li><strong>Galvanised coating</strong>: for outdoor and wet areas, galvanised pipe resists rust better than black pipe.</li>
<li><strong>SNI documents</strong>: for steel products that require SNI, keep a copy of the supplier's certificate.</li>
<li><strong>Length and delivery</strong>: 6-metre pipes need a suitable vehicle, so ask about delivery costs early.</li></ul>
<p>For projects with many pipe sizes, list requirements by diameter and thickness, then request quotations from several suppliers at once. This makes it easier to compare prices per length and per kilogram.</p>
<h2>Steel and construction context</h2>
<p>ISSP's results come during the year-end work season, when many projects race against deadlines. Other building material companies reporting for the same period also showed improving demand, although some are wary of cost pressure in Q4. homeX, an integrated building materials and furniture platform in Indonesia with showroom, warehousing and delivery, helps buyers compare pipe, hollow sections and other steel materials from several suppliers.</p>
<h2>Spindo ISSP profit: related articles and products</h2><ul>
<li><a href="/en/news/294">Steel pipe factories in Indonesia: Spindo, Bakrie Pipe and addresses</a></li>
<li><a href="/en/news/90">Galvanised and black hollow steel prices per length</a></li>
<li><a href="/en/news/339">WIKA Beton Q3 2026 profit</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much profit did Spindo ISSP make in Q3 2026?</strong> ISSP booked net profit of Rp234 billion in Q3 2026, up 50% YoY, and Rp475 billion for the first nine months.</p>
<p><strong>What is ISSP?</strong> ISSP is the stock code of PT Steel Pipe Industry of Indonesia Tbk, a steel pipe producer that uses the Spindo brand.</p>
<p><strong>Will steel pipe prices rise?</strong> Profit reports do not set store prices directly. Prices still follow steel costs, exchange rates and freight, so compare fresh quotes from several suppliers.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://snips.stockbit.com/stockbit-research/issp-brief-result-3q26-laba-bersih-naik-signifikan-50-yoy-cetak-laba-kuartalan-tertinggi" target="_blank" rel="noopener">Stockbit Snips, 27 Oct 2026 (ISSP financial statements)</a></em></p>]]></content:encoded></item><item><title>Semen Indonesia Nine-Month 2026 Profit Jumps 363.1% to Rp532 Billion</title><link>https://www.homex.co.id/en/news/342</link><guid isPermaLink="true">https://www.homex.co.id/en/news/342</guid><pubDate>Sun, 01 Nov 2026 09:11:46 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Semen Indonesia profit reached Rp532 billion in Jan–Sep 2026, up 363.1%, as domestic sales grew 4.2% to 22.27 million tonnes and US exports began.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261101-i-laba-sig-9m26.jpg" alt="Semen Indonesia Nine-Month 2026 Profit Jumps 363.1% to Rp532 Billion"></p><p><strong>Semen Indonesia profit</strong> for January–September 2026 reached Rp532 billion, up 363.1% year on year, detikFinance reported on 31 October 2026. The jump came from recovering sales volumes, revenue growth of 9.3% and a sharp fall in finance costs. For building material buyers, the numbers point to rising domestic cement demand heading into the end of the year, even though energy costs remain a pressure point.</p>
<h2>Key Facts</h2><ul>
<li>SIG net profit for January–September 2026 was Rp532 billion, up 363.1% year on year (2026-10-31, source: <a href="https://finance.detik.com/bursa-dan-valas/d-8732424/semen-indonesia-cetak-laba-rp-532-m-melonjak-363" target="_blank" rel="noopener">detikFinance, 31 Oct 2026</a>).</li>
<li>Total sales volume was 27.87 million tonnes; domestic sales rose 4.2% to 22.27 million tonnes (2026-10-31, source: <a href="https://finance.detik.com/bursa-dan-valas/d-8732424/semen-indonesia-cetak-laba-rp-532-m-melonjak-363" target="_blank" rel="noopener">detikFinance, 31 Oct 2026</a>).</li>
<li>Revenue rose 9.3% to Rp27.67 trillion and EBITDA rose 8.4% to Rp3.56 trillion (2026-10-31, source: <a href="https://finance.detik.com/bursa-dan-valas/d-8732424/semen-indonesia-cetak-laba-rp-532-m-melonjak-363" target="_blank" rel="noopener">detikFinance, 31 Oct 2026</a>).</li>
<li>National cement consumption was about 6 million tonnes in September 2026 (up 3%) and 48.1 million tonnes over nine months (up 7.9%) (2026-10-26, source: <a href="https://epaper.bisnis.com/articles/read/20261026/442/2015481/jangkar-saham-semen-smgr-intp-jelang-akhir-tahun" target="_blank" rel="noopener">Bisnis Indonesia, 26 Oct 2026 (ASI data)</a>).</li>
</ul>
<h2>Where the Semen Indonesia profit growth came from</h2>
<p>SIG President Director Indrieffouny Indra described the result as proof of the company's resilience despite overcapacity in the domestic cement industry and geopolitical pressures that push prices up. Domestic bagged cement was the main contributor, growing 4.6%, while bulk cement grew 2.9%. Bagged cement is what hardware stores and house builders buy most, so its growth reflects renovation and home construction activity on the ground.</p>
<p>On the cost side, cost of revenue rose 6.1%, slower than revenue, even as energy costs climbed. Net finance costs fell 37.0%. Together these explain why net profit grew far faster than sales.</p>
<h3>Special cement exports to the United States</h3>
<p>Since June 2026, SIG subsidiary PT Solusi Bangun Indonesia Tbk has exported more than 300,000 tonnes of special-type cement to the United States through a partnership with Taiheiyo Cement Corporation. These exports help absorb surplus plant capacity at home.</p>
<h2>National cement consumption and regional supply</h2>
<p>Indonesian Cement Association (ASI) data cited by Bisnis Indonesia show domestic consumption of about 6 million tonnes in September 2026, up 3% year on year. Bulk cement grew 8.2% thanks to dry weather, project deadlines and faster year-end budget spending, while bagged cement fell to 4.2 million tonnes that month. Over nine months, consumption reached 48.1 million tonnes, up 7.9%.</p>
<p>Rising national figures do not guarantee stock in every region. In early October 2026, the West Nusa Tenggara trade and industry office said cement supply to the province had been disrupted for about a month because of limited coal for plants and limited industrial diesel for distribution. The lesson for contractors outside Java is to lock in delivery schedules early and keep an alternative brand ready.</p>
<h2>What it means for building material buyers</h2>
<p>SIG says it is watching opportunities from the 3 million homes programme, national infrastructure, the giant sea wall and private projects such as data centres and commercial estates. If these projects move ahead, year-end cement demand could stay strong. A few practical steps:</p>
<ul><li>Order cement for year-end projects early, especially in island regions that depend on ships.</li>
<li>Compare several brands meeting the same SNI so work does not stop if one brand runs out.</li>
<li>Record the price per bag and delivery cost separately, because energy and logistics costs affect store prices.</li></ul>
<p>homeX, an integrated building materials and furniture platform in Indonesia with showroom, warehousing and delivery services, helps buyers compare cement and other materials in a single quotation request.</p>
<h2>Semen Indonesia profit: related articles and products</h2><ul>
<li><a href="/en/news/317">SIG cement supply chain digitalisation and AksesToko</a></li>
<li><a href="/en/news/318">Indocement market share in September 2026</a></li>
<li><a href="/en/news/319">Cement shortage in Sumbawa, October 2026</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much profit did Semen Indonesia make up to September 2026?</strong> SIG booked net profit of Rp532 billion for January–September 2026, up 363.1% year on year, on revenue of Rp27.67 trillion.</p>
<p><strong>How much cement does Indonesia consume in 2026?</strong> According to ASI data, domestic consumption in the first nine months of 2026 reached 48.1 million tonnes, up 7.9%.</p>
<p><strong>Does Indonesia export cement to the United States?</strong> Yes. Solusi Bangun Indonesia, an SIG subsidiary, has exported more than 300,000 tonnes of special cement to the US since June 2026.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://finance.detik.com/bursa-dan-valas/d-8732424/semen-indonesia-cetak-laba-rp-532-m-melonjak-363" target="_blank" rel="noopener">detikFinance, 31 Oct 2026</a>; <a href="https://epaper.bisnis.com/articles/read/20261026/442/2015481/jangkar-saham-semen-smgr-intp-jelang-akhir-tahun" target="_blank" rel="noopener">Bisnis Indonesia, 26 Oct 2026 (ASI data)</a>; <a href="https://mataram.antaranews.com/berita/574525/disperindag-ntb-memastikan-suplai-semen-stabil-dalam-waktu-dekat" target="_blank" rel="noopener">ANTARA Mataram, 6 Oct 2026</a></em></p>]]></content:encoded></item><item><title>Sika Product Prices 2026: SikaTop 107, Sika Grout 215, Sikaflex and Tile Grout</title><link>https://www.homex.co.id/en/news/341</link><guid isPermaLink="true">https://www.homex.co.id/en/news/341</guid><pubDate>Sat, 31 Oct 2026 09:28:50 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Sika prices at Depo Bangunan on 31 Oct 2026: SikaTop 107 Seal Rp379,912, Sika Grout 215 Rp130,894, Sikaflex 11 FC Rp157,000 and Sika tile grout from Rp11,999.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261031-i-harga-sika.jpg" alt="Sika Product Prices 2026: SikaTop 107, Sika Grout 215, Sikaflex and Tile Grout"></p><p><strong>Sika prices</strong> at the official Depo Bangunan online store on 31 October 2026 ranged from Rp11,999 for a 1 kg pack of Sika Tile Grout to Rp2,839,200 for SikaLastic 590 20 kg. SikaTop 107 Seal 25 kg set waterproofing sold at Rp379,912 (regular Rp562,000), and many products carried special prices that the store says run until 31 December 2026.</p>
<h2>Key Facts</h2><ul>
<li>SikaTop 107 Seal 25 kg set (5 L liquid + 20 kg powder) special price Rp379,912, regular Rp562,000 (2026-10-31, source: <a href="https://www.depobangunan.co.id/pelapis-anti-bocor-sika-top-107-seal-25kg-set.html" target="_blank" rel="noopener">Depo Bangunan, SikaTop 107 Seal 25 kg set (checked 31 Oct 2026)</a>).</li>
<li>SikaLastic 590 grey 20 kg costs Rp2,839,200; Sikaflex 11 FC grey 310 ml costs Rp157,000 (2026-10-31, source: <a href="https://www.depobangunan.co.id/pelapis-anti-bocor-sika-lastic-590-grey-20kg.html" target="_blank" rel="noopener">Depo Bangunan, SikaLastic 590 20 kg (checked 31 Oct 2026)</a>).</li>
<li>Sika Grout 215 25 kg special Rp130,894 (regular Rp217,000); Sika Chapdur 25 kg Rp98,903 (regular Rp166,000) (2026-10-31, source: <a href="https://www.depobangunan.co.id/sika-grout-215-bag-25-kg.html" target="_blank" rel="noopener">Depo Bangunan, Sika Grout 215 25 kg (checked 31 Oct 2026)</a>).</li>
<li>SikaCeram-180 GA 25 kg Rp106,908 (regular Rp175,000); Sika Tile Grout 1 kg from Rp11,999 (regular Rp23,000) (2026-10-31, source: <a href="https://www.depobangunan.co.id/sika-tile-grout-grey.html" target="_blank" rel="noopener">Depo Bangunan, Sika Tile Grout 1 kg (checked 31 Oct 2026)</a>).</li>
</ul>
<h2>Sika prices by product</h2><p>The prices below come from Depo Bangunan product pages on 31 October 2026. The first figure is the special price and the figure in brackets the regular price. The store lists the special-price period as 2 July–31 December 2026, but it can change at any time.</p><ul><li>SikaTop 107 Seal 25 kg set: Rp379,912 (Rp562,000) — cement-polymer waterproofing for bathrooms, pools and roof decks</li><li>SikaLastic 590 grey 20 kg: Rp2,839,200 — liquid roof coating</li><li>Sikaflex 11 FC grey 310 ml: Rp157,000 — polyurethane sealant and adhesive</li><li>Sika Grout 215 25 kg: Rp130,894 (Rp217,000) — non-shrink grout for anchors and machine bases</li><li>Sika Chapdur grey 25 kg: Rp98,903 (Rp166,000) — concrete floor hardener</li><li>SikaCeram-180 GA grey 25 kg: Rp106,908 (Rp175,000) — granite and ceramic tile adhesive</li><li>Sika Tile Grout 1 kg: Rp11,999–Rp14,299 depending on colour (regular Rp23,000–Rp24,500)</li></ul><h3>How to read these prices</h3><p>The gap between special and regular prices on several products is 35–40%, so timing has a big effect on the budget. For projects, also compare consumption per m²: waterproofing is usually applied in two coats, while tile adhesive depends on bed thickness and tile size. Always check the official technical data sheet before calculating quantities.</p><h3>Tips for choosing Sika products</h3><p>Choose by function: cement-based coatings for wet areas that will be tiled, elastic liquid coatings for exposed roofs, polyurethane sealants for moving joints and non-shrink grout for structural work. Carry out a flood test after waterproofing a bathroom and before laying tiles.</p><p>homeX, an Indonesian one-stop building materials and furniture service platform with a showroom, warehousing and delivery, can help prepare construction chemicals together with tiles and other materials in one delivery. This article only summarises public prices from an official store; it does not show homeX selling prices.</p>
<h2>Sika prices: related articles and products</h2><ul>
<li><a href="/en/news/51">Tile and granite adhesive prices 2026</a></li>
<li><a href="/en/news/64">Tile grout prices 2026</a></li>
<li><a href="/en/news/299">Bathroom waterproofing flood test</a></li>
<li><a href="/en/products/217">Lvkang 888 elastic sealant</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much is SikaTop 107 Seal?</strong> At Depo Bangunan on 31 Oct 2026, the 25 kg set had a special price of Rp379,912 against a regular Rp562,000.</p>
<p><strong>How long does the special price last?</strong> The store page lists 2 July–31 December 2026, but it may change; check again before buying.</p>
<p><strong>How much is 1 kg of Sika tile grout?</strong> Sika Tile Grout 1 kg costs Rp11,999–Rp14,299 depending on colour.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.depobangunan.co.id/pelapis-anti-bocor-sika-top-107-seal-25kg-set.html" target="_blank" rel="noopener">Depo Bangunan, SikaTop 107 Seal 25 kg set (checked 31 Oct 2026)</a>; <a href="https://www.depobangunan.co.id/pelapis-anti-bocor-sika-lastic-590-grey-20kg.html" target="_blank" rel="noopener">Depo Bangunan, SikaLastic 590 20 kg (checked 31 Oct 2026)</a>; <a href="https://www.depobangunan.co.id/sikaflex-11-fc-grey-310-ml.html" target="_blank" rel="noopener">Depo Bangunan, Sikaflex 11 FC 310 ml (checked 31 Oct 2026)</a>; <a href="https://www.depobangunan.co.id/sika-grout-215-bag-25-kg.html" target="_blank" rel="noopener">Depo Bangunan, Sika Grout 215 25 kg (checked 31 Oct 2026)</a>; <a href="https://www.depobangunan.co.id/penguat-lantai-beton-sika-chapdur-abu-abu-25kg.html" target="_blank" rel="noopener">Depo Bangunan, Sika Chapdur 25 kg (checked 31 Oct 2026)</a>; <a href="https://www.depobangunan.co.id/sika-ceram-perekat-granit-180-ga-grey-25kg.html" target="_blank" rel="noopener">Depo Bangunan, SikaCeram-180 GA 25 kg (checked 31 Oct 2026)</a>; <a href="https://www.depobangunan.co.id/sika-tile-grout-grey.html" target="_blank" rel="noopener">Depo Bangunan, Sika Tile Grout 1 kg (checked 31 Oct 2026)</a></em></p>]]></content:encoded></item><item><title>No Drop Paint Price 2026: 1 kg, 4 kg and 20 kg at Depo Bangunan</title><link>https://www.homex.co.id/en/news/340</link><guid isPermaLink="true">https://www.homex.co.id/en/news/340</guid><pubDate>Sat, 31 Oct 2026 09:28:50 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>No Drop paint price at Depo Bangunan online on 31 Oct 2026: acrylic 1 kg Rp65,500, 4 kg Rp247,600, 20 kg Rp1,130,200; Bitumen Black from Rp46,400.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261031-i-harga-cat-no-drop.jpg" alt="No Drop Paint Price 2026: 1 kg, 4 kg and 20 kg at Depo Bangunan"></p><p>The <strong>No Drop paint price</strong> at the official Depo Bangunan online store on 31 October 2026 ranged from Rp65,500 for a 1 kg pack to Rp1,130,200 for 20 kg (acrylic variant). No Drop Bitumen Black is cheaper, starting at Rp46,400 per kg. The price per kilogram falls noticeably in larger packs, so the 20 kg size is better value for concrete roofs or large walls.</p>
<h2>Key Facts</h2><ul>
<li>No Drop Acrylic 1 kg costs Rp65,500 (colours such as 002 grey, 009 white, 010 light grey) (2026-10-31, source: <a href="https://www.depobangunan.co.id/no-drop-cat-akrilik-002-grey-1kg.html" target="_blank" rel="noopener">Depo Bangunan, No Drop Acrylic 1 kg (checked 31 Oct 2026)</a>).</li>
<li>No Drop Acrylic 4 kg costs Rp247,600 and 20 kg Rp1,130,200 (2026-10-31, source: <a href="https://www.depobangunan.co.id/no-drop-cat-akrilik-010-abu-abu-muda-20kg.html" target="_blank" rel="noopener">Depo Bangunan, No Drop Acrylic 20 kg (checked 31 Oct 2026)</a>).</li>
<li>No Drop Bitumen Black costs Rp46,400 for 1 kg, Rp174,700 for 4 kg and Rp753,900 for 20 kg (2026-10-31, source: <a href="https://www.depobangunan.co.id/catalog/product/view/id/2023/s/nodrop-bitumen-black-20kg/category/2/" target="_blank" rel="noopener">Depo Bangunan, No Drop Bitumen Black 20 kg (checked 31 Oct 2026)</a>).</li>
<li>Avian Brands states coverage of 2 m²/kg/coat with 2–3 coats and 30-minute touch-dry time (2026-10-31, source: <a href="https://avianbrands.com/nodrop/produk/6/no-drop" target="_blank" rel="noopener">Avian Brands, No Drop technical data (accessed 31 Oct 2026)</a>).</li>
</ul>
<h2>No Drop paint price list by pack size</h2><p>The prices below were taken from Depo Bangunan product pages on 31 October 2026 and may change at any time. For the coloured acrylic variant, the price was the same for every colour checked.</p><ul><li>No Drop Acrylic 1 kg: Rp65,500 (about Rp65,500/kg)</li><li>No Drop Acrylic 4 kg: Rp247,600 (about Rp61,900/kg)</li><li>No Drop Acrylic 20 kg: Rp1,130,200 (about Rp56,510/kg)</li><li>No Drop Bitumen Black 1 kg: Rp46,400</li><li>No Drop Bitumen Black 4 kg: Rp174,700 (about Rp43,675/kg)</li><li>No Drop Bitumen Black 20 kg: Rp753,900 (about Rp37,695/kg)</li></ul><p>The per-kilogram difference between the 1 kg and 20 kg acrylic packs is about Rp9,000. For small jobs such as hairline cracks or gutters, 1 kg is enough; for concrete roof decks or large exterior walls, 20 kg is more economical.</p><h3>How to estimate quantity</h3><p>Avian Brands' official page puts No Drop coverage at about 2 m² per kg per coat and recommends 2–3 coats. A 20 m² roof deck with two coats therefore needs about 20 kg, plus a reserve for joints and corners. The product is thinned with clean water, is touch-dry in about 30 minutes and fully dry in 24 hours, and can be tinted to other colours.</p><h3>Comparison with Aquaproof</h3><p>For comparison, on the same date Depo Bangunan listed Aquaproof 1 kg at a special price of Rp66,897 (regular Rp79,000) and Aquaproof 20 kg in 061 grey at Rp1,119,888 (regular Rp1,370,900). Special prices are store promotions and can end at any time, so always check again before buying.</p><p>homeX, an Indonesian one-stop building materials and furniture service platform with a showroom, warehousing and delivery, can help prepare waterproof coatings together with other renovation materials in one delivery. This article only summarises public prices from an official store; it does not show homeX selling prices.</p>
<h2>No Drop paint price: related articles and products</h2><ul>
<li><a href="/en/news/52">Waterproof paint prices 2026: No Drop, Aquaproof, Elastex, Sika and AM</a></li>
<li><a href="/en/news/227">Waterproofing price per kg 2026</a></li>
<li><a href="/en/news/185">Avian and Avitex paint prices 2026</a></li>
<li><a href="/en/products/217">Lvkang 888 elastic sealant</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much is No Drop 20 kg?</strong> At Depo Bangunan on 31 Oct 2026, No Drop Acrylic 20 kg was Rp1,130,200 and No Drop Bitumen Black 20 kg was Rp753,900.</p>
<p><strong>How many m² does 1 kg cover?</strong> About 2 m² per coat according to Avian Brands; roughly 1 m² with two coats.</p>
<p><strong>Is the price the same for every colour?</strong> For the acrylic variant checked, every colour had the same price for the same pack size.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.depobangunan.co.id/no-drop-cat-akrilik-002-grey-1kg.html" target="_blank" rel="noopener">Depo Bangunan, No Drop Acrylic 1 kg (checked 31 Oct 2026)</a>; <a href="https://www.depobangunan.co.id/catalog/product/view/id/2012/s/nodrop-acrylic-002-abu-abu-4kg/category/2/" target="_blank" rel="noopener">Depo Bangunan, No Drop Acrylic 4 kg (checked 31 Oct 2026)</a>; <a href="https://www.depobangunan.co.id/no-drop-cat-akrilik-010-abu-abu-muda-20kg.html" target="_blank" rel="noopener">Depo Bangunan, No Drop Acrylic 20 kg (checked 31 Oct 2026)</a>; <a href="https://www.depobangunan.co.id/catalog/product/view/id/2022/s/nodrop-bitumen-black/category/2/" target="_blank" rel="noopener">Depo Bangunan, No Drop Bitumen Black 1 kg (checked 31 Oct 2026)</a>; <a href="https://www.depobangunan.co.id/catalog/product/view/id/2023/s/nodrop-bitumen-black-20kg/category/2/" target="_blank" rel="noopener">Depo Bangunan, No Drop Bitumen Black 20 kg (checked 31 Oct 2026)</a>; <a href="https://www.depobangunan.co.id/catalogsearch/result/?q=aquaproof" target="_blank" rel="noopener">Depo Bangunan, Aquaproof search results (checked 31 Oct 2026)</a>; <a href="https://avianbrands.com/nodrop/produk/6/no-drop" target="_blank" rel="noopener">Avian Brands, No Drop technical data (accessed 31 Oct 2026)</a></em></p>]]></content:encoded></item><item><title>WIKA Beton Q3 2026 Profit Up 81.46% on Rp2.55 Trillion Revenue</title><link>https://www.homex.co.id/en/news/339</link><guid isPermaLink="true">https://www.homex.co.id/en/news/339</guid><pubDate>Sat, 31 Oct 2026 09:28:50 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>WIKA Beton profit for Q3 2026 rose 81.46% to Rp15.15 billion on revenue of Rp2.55 trillion, with spun concrete products the largest contributor.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261031-i-laba-wika-beton-q3.jpg" alt="WIKA Beton Q3 2026 Profit Up 81.46% on Rp2.55 Trillion Revenue"></p><p><strong>WIKA Beton profit</strong> attributable to owners of the parent rose 81.46% year on year to Rp15.15 billion in Q3 2026, from Rp8.35 billion a year earlier. According to an official release from PT Wijaya Karya Beton Tbk (30 Oct 2026), revenue up to the end of Q3 reached Rp2.55 trillion. Spun concrete products were the largest contributor, showing that demand for precast concrete in foundation and infrastructure projects continues.</p>
<h2>Key Facts</h2><ul>
<li>Profit attributable to owners of the parent rose 81.46% from Rp8.35 billion to Rp15.15 billion (2026-10-30, source: <a href="https://www.wika-beton.co.id/berita/fokus-keberlanjutan-bisnis-wika-beton-catat-pertumbuhan-laba-8146-pada-q3-2026/" target="_blank" rel="noopener">WIKA Beton official release, 30 Oct 2026</a>).</li>
<li>Revenue up to Q3 2026 reached Rp2.55 trillion (2026-10-30, source: <a href="https://www.wika-beton.co.id/berita/fokus-keberlanjutan-bisnis-wika-beton-catat-pertumbuhan-laba-8146-pada-q3-2026/" target="_blank" rel="noopener">WIKA Beton official release, 30 Oct 2026</a>).</li>
<li>Revenue mix: spun products 46.93%, non-spun products 35.50%, construction 13.97%, services 3.60% (2026-10-30, source: <a href="https://www.wika-beton.co.id/berita/fokus-keberlanjutan-bisnis-wika-beton-catat-pertumbuhan-laba-8146-pada-q3-2026/" target="_blank" rel="noopener">WIKA Beton official release, 30 Oct 2026</a>).</li>
<li>Bulk cement sales rose 8.2% to 1.9 million tonnes in September 2026, a sign of large-project activity (2026-10-20, source: <a href="https://sekuritas.miraeasset.co.id/id/news/research/cement-neutral-maintain-raising-fy-26-f-on-a-strong-9-m26" target="_blank" rel="noopener">Mirae Asset Sekuritas, 20 Oct 2026 (cement research)</a>).</li>
</ul>
<h2>What drove WIKA Beton profit</h2><p>WIKA Beton said the growth came from market expansion and diversification of its strategic portfolio amid shifting conditions in the national construction industry during 2026. The company, now under Danantara, said it is committed to keeping up financial growth to the end of the year and strengthening the national construction ecosystem.</p><p>Although the percentage increase is large, the profit is still small relative to Rp2.55 trillion of revenue, so the net margin remains thin. This is typical of the capital-intensive precast concrete industry, with heavy costs for cement, steel, aggregates, energy and heavy transport.</p><h3>Revenue by segment</h3><p>Spun products contributed 46.93% of revenue. In the precast industry, spun products generally means items made by centrifugal casting, such as spun piles and concrete electricity poles. Non-spun products, such as beams, slabs and box culverts, contributed 35.50%. The rest came from construction (13.97%) and services (3.60%). With this mix, the company's performance depends heavily on building foundations, roads, bridges and power projects.</p><h3>Construction market context</h3><p>Mirae Asset Sekuritas research (20 Oct 2026) shows bulk cement sales rose 8.2% to 1.9 million tonnes in September 2026, faster than bagged cement at 0.8%. Bulk cement is widely used by concrete plants and large projects, so the figure is consistent with ongoing demand for precast and ready-mix concrete.</p><p>On site, precast concrete offers more consistent quality because it is made in a factory, and faster installation than casting in place. In return, contractors must prepare road access, lifting equipment and a stacking area before delivery, since products such as piles are long and heavy. Coordinating the plant, transport and installation crew is key.</p><p>For contractors and developers, this means precast production and delivery slots should be booked well ahead, especially for projects with year-end deadlines. homeX, an Indonesian one-stop building materials and furniture service platform with a showroom, warehousing and delivery, supplies supporting project materials such as light-steel framing, pipes and finishing products.</p>
<h2>WIKA Beton profit: related articles and products</h2><ul>
<li><a href="/en/news/136">Ready-mix concrete prices per m³ 2026</a></li>
<li><a href="/en/news/295">Converting concrete grade K to fc</a></li>
<li><a href="/en/news/183">Rebar and steel mills in Indonesia</a></li>
<li><a href="/en/products/159">Hollow Kencana 2x4 0.25 mm</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What was WIKA Beton's Q3 2026 profit?</strong> Rp15.15 billion, up 81.46% from Rp8.35 billion, according to the company's official release.</p>
<p><strong>What was its revenue?</strong> Revenue up to the end of Q3 2026 was Rp2.55 trillion.</p>
<p><strong>Which segment is largest?</strong> Spun products at 46.93%, followed by non-spun products at 35.50%.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.wika-beton.co.id/berita/fokus-keberlanjutan-bisnis-wika-beton-catat-pertumbuhan-laba-8146-pada-q3-2026/" target="_blank" rel="noopener">WIKA Beton official release, 30 Oct 2026</a>; <a href="https://sekuritas.miraeasset.co.id/id/news/research/cement-neutral-maintain-raising-fy-26-f-on-a-strong-9-m26" target="_blank" rel="noopener">Mirae Asset Sekuritas, 20 Oct 2026 (cement research)</a></em></p>]]></content:encoded></item><item><title>Avia Avian Q3 2026 Results: Rp1.38 Trillion Profit and 150 Distribution Centres</title><link>https://www.homex.co.id/en/news/338</link><guid isPermaLink="true">https://www.homex.co.id/en/news/338</guid><pubDate>Sat, 31 Oct 2026 09:28:50 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Avia Avian results for Q3 2026: sales of Rp2.3 trillion (+13.9%), nine-month net profit of Rp1.38 trillion and 150 company-owned distribution centres.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261031-i-laba-avia-q3.jpg" alt="Avia Avian Q3 2026 Results: Rp1.38 Trillion Profit and 150 Distribution Centres"></p><p><strong>Avia Avian results</strong> kept growing in Q3 2026: PT Avia Avian Tbk (AVIA) posted consolidated sales of Rp2.3 trillion, up 13.9% year on year, according to CNBC Indonesia (29 Oct 2026). Nine-month net profit reached Rp1.38 trillion with a 20% margin, and its network of company-owned distribution centres grew to 150. For paint buyers, this signals wider supply and distribution from a major brand.</p>
<h2>Key Facts</h2><ul>
<li>Q3 2026 consolidated sales were Rp2.3 trillion, up 13.9% year on year (2026-10-29, source: <a href="https://www.cnbcindonesia.com/market/20261029164639-17-780662/laba-emiten-cat-konglo-surabaya--avia--tembus-rp138-triliun" target="_blank" rel="noopener">CNBC Indonesia, 29 Oct 2026</a>).</li>
<li>Nine-month 2026 sales were Rp6.9 trillion, up 16.7%, helped by 3.5% growth in architectural solutions volume (2026-10-29, source: <a href="https://www.cnbcindonesia.com/market/20261029164639-17-780662/laba-emiten-cat-konglo-surabaya--avia--tembus-rp138-triliun" target="_blank" rel="noopener">CNBC Indonesia, 29 Oct 2026</a>).</li>
<li>Net profit was Rp1.38 trillion with a 20% net margin (2026-10-29, source: <a href="https://www.cnbcindonesia.com/market/20261029164639-17-780662/laba-emiten-cat-konglo-surabaya--avia--tembus-rp138-triliun" target="_blank" rel="noopener">CNBC Indonesia, 29 Oct 2026</a>).</li>
<li>Three company-owned distribution centres were added in Q3, bringing the total to 150; 11 new products were launched in nine months (2026-10-29, source: <a href="https://www.cnbcindonesia.com/market/20261029164639-17-780662/laba-emiten-cat-konglo-surabaya--avia--tembus-rp138-triliun" target="_blank" rel="noopener">CNBC Indonesia, 29 Oct 2026</a>).</li>
</ul>
<h2>Inside the Avia Avian results</h2><p>CNBC Indonesia reported that nine-month sales growth of 16.7% to Rp6.9 trillion was supported by a 3.5% rise in architectural solutions volume. The company held its net margin at 20% despite high raw-material prices linked to the conflict in Iran and global uncertainty. The gap between value growth and volume growth suggests price and product mix made a sizeable contribution.</p><p>President director Wijono Tanoko said the company has applied its strategy consistently to keep up the momentum. In Q3, AVIA added three company-owned distribution centres, bringing the total to 150, to improve product availability and delivery speed for customers across Indonesia. It also launched two new products in the quarter, making 11 new products in nine months.</p><h3>Why the distribution network matters</h3><p>Paints and coatings come in many colours, sizes and variants, so stock close to shops and projects is critical. Company-owned distribution centres help manufacturers manage inventory, restock retailers and deliver project orders. In an archipelago like Indonesia, such networks also shorten delivery lead times.</p><h3>Brands buyers know</h3><p>Avian Brands markets several paint and coating brands, including No Drop, a leak-prevention coating that its official page lists in 1 kg, 4 kg and 20 kg packs. For the final quarter of 2026, AVIA says it will focus on customer relationships, optimising its distribution network and operational efficiency. Wijono stressed that customer trust is the foundation of the company's growth.</p><p>For contractors and homeowners, a manufacturer's results do not automatically mean prices will rise or fall; retail prices are still set by shops and sales channels. Buyers should compare prices from official stores and check the price date. For projects with many rooms, calculate paint needs from wall area, coverage per litre or kilogram and number of coats, and make sure all cans come from the same colour batch. homeX, an Indonesian one-stop building materials and furniture service platform with a showroom, warehousing and delivery, helps prepare paint and finishing materials for renovation projects.</p>
<h2>Avia Avian results: related articles and products</h2><ul>
<li><a href="/en/news/185">Avian and Avitex paint prices 2026</a></li>
<li><a href="/en/news/36">Wall paint prices 2026: Avian, Nippon, Dulux, Jotun</a></li>
<li><a href="/en/news/94">Wall primer prices 2026</a></li>
<li><a href="/en/products/229">Wall putty</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What was AVIA's nine-month 2026 profit?</strong> According to CNBC Indonesia, net profit was Rp1.38 trillion with a 20% margin.</p>
<p><strong>How many distribution centres does AVIA have?</strong> After adding three in Q3 2026, it has 150 company-owned distribution centres.</p>
<p><strong>Is No Drop an Avian product?</strong> Yes, No Drop is marketed by Avian Brands as a leak-prevention coating in 1, 4 and 20 kg packs.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.cnbcindonesia.com/market/20261029164639-17-780662/laba-emiten-cat-konglo-surabaya--avia--tembus-rp138-triliun" target="_blank" rel="noopener">CNBC Indonesia, 29 Oct 2026</a>; <a href="https://avianbrands.com/nodrop/produk/6/no-drop" target="_blank" rel="noopener">Avian Brands, No Drop product page (accessed 31 Oct 2026)</a></em></p>]]></content:encoded></item><item><title>Sumatra Infrastructure Recovery: Rp21.42 Trillion, Roads at 59%, Bridges at 63%</title><link>https://www.homex.co.id/en/news/337</link><guid isPermaLink="true">https://www.homex.co.id/en/news/337</guid><pubDate>Sat, 31 Oct 2026 09:28:50 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Sumatra infrastructure recovery has a Rp21.42 trillion 2026 budget; national roads average 59.04% progress and bridges 63.29%, while irrigation still lags.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261031-i-pemulihan-sumatera.jpg" alt="Sumatra Infrastructure Recovery: Rp21.42 Trillion, Roads at 59%, Bridges at 63%"></p><p>The 2026 budget for post-disaster <strong>Sumatra infrastructure recovery</strong> has been set at Rp21.42 trillion, and roads and bridges are already more than half complete. According to KonstruksiTekno (29 Oct 2026), Public Works Ministry secretary-general Apri Artoto presented the figures at a task-force coordination meeting on 28 October 2026, while irrigation and river works are still lagging. Rehabilitation will continue until 2028.</p>
<h2>Key Facts</h2><ul>
<li>The effective 2026 budget is Rp21.42 trillion: water resources Rp7.85 trillion, highways Rp6.64 trillion, human settlements Rp4.05 trillion and strategic infrastructure Rp2.89 trillion (2026-10-29, source: <a href="https://konstruksitekno.id/berita/kementerian-pu-siapkan-rp2142-triliun-pulihkan-infrastruktur-sumatera" target="_blank" rel="noopener">KonstruksiTekno, 29 Oct 2026</a>).</li>
<li>Of 33 national road sections, 2 are finished and the rest average 59.04%; of 20 bridges, 5 are finished and 15 are at 63.29% (2026-10-29, source: <a href="https://konstruksitekno.id/berita/kementerian-pu-siapkan-rp2142-triliun-pulihkan-infrastruktur-sumatera" target="_blank" rel="noopener">KonstruksiTekno, 29 Oct 2026</a>).</li>
<li>17 of 25 irrigation areas are being handled at about 15% progress; 33 rivers average 19.19% (2026-10-29, source: <a href="https://konstruksitekno.id/berita/kementerian-pu-siapkan-rp2142-triliun-pulihkan-infrastruktur-sumatera" target="_blank" rel="noopener">KonstruksiTekno, 29 Oct 2026</a>).</li>
<li>Temporary housing reached 1,794 of a 1,914-unit target as of 25 October 2026 (2026-10-29, source: <a href="https://konstruksitekno.id/berita/kementerian-pu-siapkan-rp2142-triliun-pulihkan-infrastruktur-sumatera" target="_blank" rel="noopener">KonstruksiTekno, 29 Oct 2026</a>).</li>
<li>About Rp9 trillion is proposed to shift to 2027, bringing next year's recovery budget to about Rp42 trillion (2026-10-29, source: <a href="https://konstruksitekno.id/berita/kementerian-pu-siapkan-rp2142-triliun-pulihkan-infrastruktur-sumatera" target="_blank" rel="noopener">KonstruksiTekno, 29 Oct 2026</a>).</li>
</ul>
<h2>Details of the Sumatra infrastructure recovery</h2><p>The coordination meeting of the Rehabilitation and Reconstruction Acceleration Task Force was held at the Home Affairs Ministry and attended by Home Affairs Minister and task-force chief Muhammad Tito Karnavian. The largest share of the budget goes to water resources, followed by roads and bridges. Of the five completed bridges, three are in Aceh and two in West Sumatra.</p><p>In water resources, eight irrigation areas are still being tendered. River mouths are a focus because they control flow from upstream to downstream: of 29 locations, four are finished and six are under way at about 14.94%. The ministry is also building 11 sabo dams at 35.58% progress and 94 raw-water pumps at only 10.33%.</p><h3>Temporary housing and settlements</h3><p>The remaining 120 temporary housing units are in Tuka district, Central Tapanuli, at 97.41% progress. In human settlements, drinking-water systems are at 54.55%, final waste-processing sites at 62.35% and sludge-treatment plants at 62.04%. Tito said the Finance Ministry has disbursed about Rp21.1 trillion of the Rp22.3 trillion requested, and river normalisation is a priority because heavy sediment could trigger floods in Solok, Padang, Central Tapanuli and several regencies in Aceh.</p><h3>Impact on building-material supply</h3><p>About Rp9 trillion of the 2026 allocation cannot be carried out because too little time remains, so it is proposed to move to 2027. As a result, demand for cement, rebar, aggregates, pipes and pumps in Sumatra is likely to stay high next year. Contractors and building-material shops in the region should plan stock levels and delivery routes for the rainy season.</p><p>homeX, an Indonesian one-stop building materials and furniture service platform with a showroom, warehousing and delivery, follows this recovery programme as an indicator of material demand outside Java.</p>
<h2>Sumatra infrastructure recovery: related articles and products</h2><ul>
<li><a href="/en/news/12">Low-emission cement and green steel in Public Works procurement</a></li>
<li><a href="/en/news/292">Construction wholesale prices up 9.63% in September 2026</a></li>
<li><a href="/en/news/307">Northern Java Giant Sea Wall starts in Demak</a></li>
<li><a href="/en/products/166">JIS PVC pipe</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What is the 2026 Sumatra infrastructure recovery budget?</strong> An effective budget of Rp21.42 trillion split across water resources, highways, human settlements and strategic infrastructure.</p>
<p><strong>How far along are roads and bridges?</strong> Two of 33 national road sections are finished and the rest average 59.04%; five of 20 bridges are finished and 15 are at 63.29%.</p>
<p><strong>How long will rehabilitation last?</strong> According to the task-force chief, rehabilitation and reconstruction will continue until 2028.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://konstruksitekno.id/berita/kementerian-pu-siapkan-rp2142-triliun-pulihkan-infrastruktur-sumatera" target="_blank" rel="noopener">KonstruksiTekno, 29 Oct 2026</a></em></p>]]></content:encoded></item><item><title>Jabodetabek Toll Tariff Integration: What It Means for Material Delivery Costs</title><link>https://www.homex.co.id/en/news/336</link><guid isPermaLink="true">https://www.homex.co.id/en/news/336</guid><pubDate>Sat, 31 Oct 2026 09:28:50 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Jabodetabek toll tariff integration is being finalised by the Public Works Ministry; 74.1% of FKBI respondents back it, but hauliers warn about costs.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261031-i-integrasi-tarif-tol.jpg" alt="Jabodetabek Toll Tariff Integration: What It Means for Material Delivery Costs"></p><p>Draft rules on <strong>Jabodetabek toll tariff integration</strong> are being finalised by the Ministry of Public Works, which wants the harmonisation process completed soon. According to Liputan6 (29 Oct 2026), the aim is to spread traffic more evenly across connected toll roads, including the corridor to Tanjung Priok Port. For building-material distribution, the outcome depends on the tariff level finally set.</p>
<h2>Key Facts</h2><ul>
<li>The Ministry of Public Works aims to finish harmonising the draft ministerial regulation on Jabodetabek toll tariff integration soon (2026-10-29, source: <a href="https://www.liputan6.com/bisnis/read/8324462/kementerian-pu-matangkan-aturan-integrasi-tarif-tol-jabodetabek" target="_blank" rel="noopener">Liputan6, 29 Oct 2026</a>).</li>
<li>The highlighted corridor covers the Cibitung–Cilincing toll road, the Jakarta–Cikampek toll road and the Tanjung Priok Access toll road (2026-10-29, source: <a href="https://www.liputan6.com/bisnis/read/8324462/kementerian-pu-matangkan-aturan-integrasi-tarif-tol-jabodetabek" target="_blank" rel="noopener">Liputan6, 29 Oct 2026</a>).</li>
<li>An FKBI online survey found 74.1% of respondents support the tariff integration (2026-10-29, source: <a href="https://www.liputan6.com/bisnis/read/8324462/kementerian-pu-matangkan-aturan-integrasi-tarif-tol-jabodetabek" target="_blank" rel="noopener">Liputan6, 29 Oct 2026</a>).</li>
<li>Supply Chain Indonesia estimates tolls absorb 7–14% of drivers' trip money on existing routes and 28–40% in a toll-route scenario (2026-10-29, source: <a href="https://www.liputan6.com/bisnis/read/8324462/kementerian-pu-matangkan-aturan-integrasi-tarif-tol-jabodetabek" target="_blank" rel="noopener">Liputan6, 29 Oct 2026</a>).</li>
</ul>
<h2>What Jabodetabek toll tariff integration means</h2><p>Sony Sulaksono Wibowo, a member of the Toll Road Regulatory Agency (BPJT), said the government is preparing a legal basis to manage trips across connected toll sections as one network. Toll construction has already been planned as a single network under the National Toll Road Network Master Plan 2020–2040. However, differences in construction order, delays to supporting sections and tariff gaps have left some sections congested while alternatives remain under-used.</p><p>One focus is the corridor of the Cibitung–Cilincing, Jakarta–Cikampek and Tanjung Priok Access toll roads. Integrating these three is expected to speed up the movement of goods from industrial estates east of Jakarta to the port. Many trucks carrying cement, rebar, tiles and imported building materials also use this corridor.</p><h3>Concerns from logistics operators</h3><p>Public support is fairly strong: an FKBI online survey found 74.1% of respondents in favour. However, Sugi Purnoto, senior consultant at Supply Chain Indonesia, warned that the tariff scheme must consider freight operating costs. In his simulation, tolls absorb about 7–14% of drivers' trip money on existing routes, and in a scenario where logistics trucks use the toll sections the share could reach 28–40%. He said physical connectivity must come with tariffs that let drivers cover their operating needs.</p><h3>What it means for building-material buyers</h3><p>Delivery costs for heavy materials depend heavily on distance, travel time and toll fees. If integration makes routes smoother without raising the burden on trucks, delivery times to projects can become more predictable. If the toll share is too high, some drivers may return to busier arterial roads. Contractors should ask suppliers to itemise delivery costs and routes, and schedule deliveries outside peak and truck-restriction hours.</p><p>homeX, an Indonesian one-stop building materials and furniture service platform with a showroom, warehousing and delivery, follows rule changes like this because they directly affect route planning and delivery schedules for projects in Jabodetabek. Final tariffs and the start date have not been announced, so the figures above are still simulations and survey results.</p>
<h2>Jabodetabek toll tariff integration: related articles and products</h2><ul>
<li><a href="/en/news/291">Jakarta truck restriction hours for building materials</a></li>
<li><a href="/en/news/184">B2B building-material supply models 2026: warehouses, ODOL and logistics</a></li>
<li><a href="/en/news/316">Inter-island cement shipping: lessons from Khatulistiwa 8</a></li>
<li><a href="/en/products/166">JIS PVC pipe</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What is the aim of the policy?</strong> According to BPJT, to distribute vehicles more evenly and make better use of under-used toll sections.</p>
<p><strong>Which sections are in focus?</strong> The Cibitung–Cilincing, Jakarta–Cikampek and Tanjung Priok Access toll roads.</p>
<p><strong>Are the new tariffs in force?</strong> Not yet; as of 29 October 2026 the draft ministerial regulation was still being harmonised.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.liputan6.com/bisnis/read/8324462/kementerian-pu-matangkan-aturan-integrasi-tarif-tol-jabodetabek" target="_blank" rel="noopener">Liputan6, 29 Oct 2026</a></em></p>]]></content:encoded></item><item><title>SEPABLOCK by Semen Padang and PLN: Interlock Bricks Bundled With Free Power Upgrade</title><link>https://www.homex.co.id/en/news/335</link><guid isPermaLink="true">https://www.homex.co.id/en/news/335</guid><pubDate>Sat, 31 Oct 2026 09:28:50 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>SEPABLOCK Semen Padang interlock bricks will be bundled with a free 900→1,300 VA PLN power upgrade for West Sumatra developers from early 2027 (min. 10 houses).</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261031-i-sepablock-semen-padang.jpg" alt="SEPABLOCK by Semen Padang and PLN: Interlock Bricks Bundled With Free Power Upgrade"></p><p><strong>SEPABLOCK Semen Padang</strong> interlock bricks will be sold in a bundle with PLN Group: housing developers in West Sumatra who use them can get a priority free power upgrade from 900 VA to 1,300 VA. According to PT Semen Padang's official release (30 Oct 2026), the programme is planned to start in early 2027 for orders of at least 10 houses.</p>
<h2>Key Facts</h2><ul>
<li>The SEPABLOCK, cement and supporting-material package is combined with a priority free PLN power upgrade from 900 VA to 1,300 VA (2026-10-30, source: <a href="https://www.semenpadang.co.id/id/article/read/semen-padang-dan-pln-siapkan-bundling-sepablock-pengembang-perumahan-bisa-nikmati-prioritas-tambah-daya-listrik" target="_blank" rel="noopener">PT Semen Padang official release, 30 Oct 2026</a>).</li>
<li>SEPABLOCK holds SNI 9384:2025 certification, has 97.09% local content (TKDN) and passed the PUPR technology clearing test (2026-10-30, source: <a href="https://www.semenpadang.co.id/id/article/read/semen-padang-dan-pln-siapkan-bundling-sepablock-pengembang-perumahan-bisa-nikmati-prioritas-tambah-daya-listrik" target="_blank" rel="noopener">PT Semen Padang official release, 30 Oct 2026</a>).</li>
<li>A type-36 house is estimated to take about 21–30 days to build, depending on project conditions (2026-10-30, source: <a href="https://www.semenpadang.co.id/id/article/read/semen-padang-dan-pln-siapkan-bundling-sepablock-pengembang-perumahan-bisa-nikmati-prioritas-tambah-daya-listrik" target="_blank" rel="noopener">PT Semen Padang official release, 30 Oct 2026</a>).</li>
<li>The Padang plant is projected to supply the equivalent of 200 houses a month; 11 developers and 4 contractors already use the product (2026-10-30, source: <a href="https://www.semenpadang.co.id/id/article/read/semen-padang-dan-pln-siapkan-bundling-sepablock-pengembang-perumahan-bisa-nikmati-prioritas-tambah-daya-listrik" target="_blank" rel="noopener">PT Semen Padang official release, 30 Oct 2026</a>).</li>
<li>The programme was introduced at a PLN Group forum at Pangeran Beach Hotel, Padang, on 28 October 2026 (2026-10-30, source: <a href="https://gopadang.com/pt-semen-padang-dan-pln-group-tawarkan-bundling-sepablock-tambah-daya-gratis/" target="_blank" rel="noopener">GoPadang, 30 Oct 2026</a>).</li>
</ul>
<h2>What the SEPABLOCK Semen Padang package includes</h2><p>Ridwan Muchtar, head of Semen Padang's non-cement and derivative products department, said the scheme covers SEPABLOCK, cement and supporting materials supplied by the company and its subsidiaries. The package is combined with priority power upgrades from PLN for developers who meet the requirements. The aim is that developers no longer have to arrange materials and electricity separately.</p><p>The planned mechanism includes ordering a material package for at least 10 houses, verification of the purchase and unit data, construction with SEPABLOCK, and then an application to PLN for the power upgrade under the agreed terms. The programme will run after the partnership is finalised and officially launched in early 2027.</p><h3>Why developers are looking at interlock bricks</h3><p>Interlock bricks are designed to lock into each other, so walls can be built faster and more neatly. Semen Padang estimates that a type-36 house built with SEPABLOCK can be finished in about 21–30 days, depending on site conditions and work stages. The product holds SNI 9384:2025 certification and 97.09% local content, which matters for projects with domestic-content requirements. The Padang plant is projected to supply the equivalent of 200 houses a month.</p><h3>PLN's role and the smart-home ecosystem</h3><p>Rudi Hamiri, manager of PLN UP3 Padang, said residents now need both electricity and digital services, and PLN Icon Plus can support connectivity for smart homes. Forum data show that from 2024 to October 2026 about 166 housing estates with around 4,152 customers had been connected. Corporate secretary Win Bernadino described the partnership as synergy between state-owned companies.</p><p>For developers and contractors outside West Sumatra, this is an example of materials being bundled with services. homeX, an Indonesian one-stop building materials and furniture service platform with a showroom, warehousing and delivery, likewise combines material supply with scheduled delivery to project sites.</p>
<h2>SEPABLOCK Semen Padang: related articles and products</h2><ul>
<li><a href="/en/news/58">Lightweight brick prices 2026: Hebel per cubic metre, Citicon, Grand Elephant</a></li>
<li><a href="/en/news/130">Concrete block and red brick prices 2026</a></li>
<li><a href="/en/news/311">SNI 8640 lightweight bricks: classes and compressive strength</a></li>
<li><a href="/en/products/233">Kompon A Plus joint compound</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What is SEPABLOCK?</strong> Semen Padang Bata Interlock, a wall material made by PT Semen Padang with SNI 9384:2025 certification and 97.09% local content.</p>
<p><strong>When does the bundle start?</strong> It is planned for early 2027, after the partnership is finalised and launched.</p>
<p><strong>What are the main requirements?</strong> A material order for at least 10 houses, data verification, construction with SEPABLOCK and then a power-upgrade application to PLN.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.semenpadang.co.id/id/article/read/semen-padang-dan-pln-siapkan-bundling-sepablock-pengembang-perumahan-bisa-nikmati-prioritas-tambah-daya-listrik" target="_blank" rel="noopener">PT Semen Padang official release, 30 Oct 2026</a>; <a href="https://gopadang.com/pt-semen-padang-dan-pln-group-tawarkan-bundling-sepablock-tambah-daya-gratis/" target="_blank" rel="noopener">GoPadang, 30 Oct 2026</a></em></p>]]></content:encoded></item><item><title>Public Works Ministry BIM for Sekolah Rakyat Phase II: CDE, 4D–5D and KPIs</title><link>https://www.homex.co.id/en/news/334</link><guid isPermaLink="true">https://www.homex.co.id/en/news/334</guid><pubDate>Sat, 31 Oct 2026 09:28:50 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Public Works Ministry BIM now supervises Sekolah Rakyat Phase II: 3D models are checked against site progress in the PU CDE, with KPIs and fortnightly reviews.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261031-i-bim-sekolah-rakyat.jpg" alt="Public Works Ministry BIM for Sekolah Rakyat Phase II: CDE, 4D–5D and KPIs"></p><p><strong>Public Works Ministry BIM</strong> is now being used to supervise construction of Sekolah Rakyat (People's School) Phase II. According to Akurat (29 Oct 2026), each school's 3D digital model is compared directly with site progress on the ministry's Common Data Environment (CDE), and contractor performance is scored with key performance indicators. It marks a shift in government project supervision from paper reports to digital data.</p>
<h2>Key Facts</h2><ul>
<li>The Ministry of Public Works applies BIM integrated with the PU CDE to Sekolah Rakyat Phase II construction (2026-10-29, source: <a href="https://akurat.co/infrastruktur/902636/kementerian-pu-terapkan-bim-untuk-perkuat-pengawasan-sekolah-rakyat-tahap-ii" target="_blank" rel="noopener">Akurat, 29 Oct 2026</a>).</li>
<li>Site progress is compared with the 3D model using photos, video and S-curves (2026-10-29, source: <a href="https://akurat.co/infrastruktur/902636/kementerian-pu-terapkan-bim-untuk-perkuat-pengawasan-sekolah-rakyat-tahap-ii" target="_blank" rel="noopener">Akurat, 29 Oct 2026</a>).</li>
<li>4D and 5D BIM link the model to the schedule and the cost of works (2026-10-29, source: <a href="https://akurat.co/infrastruktur/902636/kementerian-pu-terapkan-bim-untuk-perkuat-pengawasan-sekolah-rakyat-tahap-ii" target="_blank" rel="noopener">Akurat, 29 Oct 2026</a>).</li>
<li>Contractors carry out a self-assessment every two weeks as part of KPI scoring (2026-10-29, source: <a href="https://akurat.co/infrastruktur/902636/kementerian-pu-terapkan-bim-untuk-perkuat-pengawasan-sekolah-rakyat-tahap-ii" target="_blank" rel="noopener">Akurat, 29 Oct 2026</a>).</li>
<li>The Directorate General of Construction Development and Glodon Indonesia launched the AI x 5D BIM Master Challenge 2026 (2026-05-26, source: <a href="https://binakonstruksi.pu.go.id/informasi-terkini/sekretariat-direktorat-jenderal/kementerian-pekerjaan-umum-dorong-transformasi-digital-sektor-konstruksi-melalui-peluncuran-ai-x-5d-bim-master-challenge-2026/" target="_blank" rel="noopener">Directorate General of Construction Development, Ministry of Public Works, 26 May 2026 (AI x 5D BIM Master Challenge)</a>).</li>
</ul>
<h2>How Public Works Ministry BIM works at Sekolah Rakyat</h2><p>Public Works Minister Dody Hanggodo has pushed for Sekolah Rakyat Phase II to be supervised digitally. Each work package has a BIM model uploaded to the PU CDE, a shared data space where the owner, supervising consultant and contractor see the same documents. Supervisors upload photos, video and S-curves from the site, so gaps between plan and actual progress show up quickly.</p><p>With 4D BIM each building element is linked to the schedule; with 5D BIM the same element is linked to cost. If structural work falls behind, the effect on finishing works and the budget can be calculated early. At the end of the project, documents and models are handed over digitally, giving school managers asset data for maintenance.</p><h3>KPIs and fortnightly reviews</h3><p>Akurat reports that contractor performance is scored with KPIs and that every two weeks contractors must carry out a self-assessment. This encourages contractors to keep data tidy, such as installed material volumes, progress on each floor and quality-test records. For suppliers, it means product documents such as SNI certificates, technical data sheets and delivery notes should be available in digital form.</p><h3>An AI and 5D BIM ecosystem</h3><p>Earlier, on 26 May 2026, the Directorate General of Construction Development and Glodon Indonesia launched the AI x 5D BIM Master Challenge 2026 to encourage young talent to master BIM-based cost modelling. The launch at AEC Connect Day 2026 was led by Kimron Manik, Director of Construction Workforce Competence and Productivity, who stressed that Indonesian construction players must keep up with digital technology. Activities like this widen the pool of people ready to work with digital models on both public and private projects.</p><p>For the building-materials industry, the direction is clear: projects will increasingly demand accurate volume data and delivery schedules. homeX, an Indonesian one-stop building materials and furniture service platform with a showroom, warehousing and delivery, keeps product data and delivery schedules organised so project teams can use them easily.</p>
<h2>Public Works Ministry BIM: related articles and products</h2><ul>
<li><a href="/en/news/30">Construction BIM and AI gain ground in Indonesia: INKINDO DKI–I2MI MoU</a></li>
<li><a href="/en/news/308">AI for toll road maintenance: Hutama Karya shows Si Patrol</a></li>
<li><a href="/en/news/321">Construction worker certification 2026</a></li>
<li><a href="/en/products/164">C channel</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What is the PU CDE?</strong> The Public Works Ministry's Common Data Environment, a shared space for BIM models, documents and project progress reports.</p>
<p><strong>What is the difference between 4D and 5D BIM?</strong> 4D BIM links the model to the schedule, while 5D BIM links it to cost.</p>
<p><strong>How often are contractors reviewed?</strong> Contractors carry out a self-assessment every two weeks as part of KPI scoring.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://akurat.co/infrastruktur/902636/kementerian-pu-terapkan-bim-untuk-perkuat-pengawasan-sekolah-rakyat-tahap-ii" target="_blank" rel="noopener">Akurat, 29 Oct 2026</a>; <a href="https://binakonstruksi.pu.go.id/informasi-terkini/sekretariat-direktorat-jenderal/kementerian-pekerjaan-umum-dorong-transformasi-digital-sektor-konstruksi-melalui-peluncuran-ai-x-5d-bim-master-challenge-2026/" target="_blank" rel="noopener">Directorate General of Construction Development, Ministry of Public Works, 26 May 2026 (AI x 5D BIM Master Challenge)</a></em></p>]]></content:encoded></item><item><title>BDExpo Indonesia 2026 at JIExpo, 25–28 Nov: What Chinese Suppliers Should Know</title><link>https://www.homex.co.id/en/news/333</link><guid isPermaLink="true">https://www.homex.co.id/en/news/333</guid><pubDate>Sat, 31 Oct 2026 09:28:50 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>BDExpo Indonesia 2026 runs 25–28 November at JIExpo Kemayoran with nearly 600 exhibitors, while cement and price data point to a growing market.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261031-i-bdexpo-2026.jpg" alt="BDExpo Indonesia 2026 at JIExpo, 25–28 Nov: What Chinese Suppliers Should Know"></p><p><strong>BDExpo Indonesia 2026</strong> will take place on 25–28 November 2026 at JIExpo Kemayoran, Jakarta, and is one of the main events for Chinese building-material suppliers that want to enter the Indonesian market. The organiser's official site says this 11th edition expects more than 50,000 m² of space and nearly 600 exhibitors. The latest cement demand and price data show the local market is still growing.</p>
<h2>Key Facts</h2><ul>
<li>The 11th BDExpo runs 25–28 November 2026 at Jakarta International Expo (JIExpo), Kemayoran (2026-10-31, source: <a href="https://bdeexpo.com/" target="_blank" rel="noopener">BDExpo Indonesia official organiser site (accessed 31 Oct 2026)</a>).</li>
<li>Organiser Meorient Exhibition expects more than 50,000 m² of exhibition space and nearly 600 exhibitors (2026-10-31, source: <a href="https://bdeexpo.com/" target="_blank" rel="noopener">BDExpo Indonesia official organiser site (accessed 31 Oct 2026)</a>).</li>
<li>Domestic cement consumption reached 48.1 million tonnes in the first nine months of 2026, up 7.9%; the full-year forecast was raised to 66.9 million tonnes (2026-10-20, source: <a href="https://sekuritas.miraeasset.co.id/id/news/research/cement-neutral-maintain-raising-fy-26-f-on-a-strong-9-m26" target="_blank" rel="noopener">Mirae Asset Sekuritas, 20 Oct 2026 (cement research)</a>).</li>
<li>BPS data show the construction wholesale price index rose 9.63% year on year in September 2026, with rebar up 11.99% and cement up 7.44% (2026-10-02, source: <a href="https://periskop.id/makro/20261002/ihpb-bangunan-dan-konstruksi-naik-963-pada-september-2026" target="_blank" rel="noopener">Periskop, 2 Oct 2026 (BPS wholesale price data)</a>).</li>
</ul>
<h2>What BDExpo Indonesia 2026 will show</h2><p>According to its official website, BDExpo is organised by Meorient Exhibition, which has run trade shows in more than 15 countries for over 20 years. The main categories are architectural building materials, bathrooms and kitchens, hardware tools and system lighting. The organiser also offers one-on-one business matching between exhibitors and B2B buyers such as developers, contractors, architects, property owners and government representatives.</p><p>For Chinese factories and exporters, this format is a useful way to test market response before opening a local warehouse or appointing a distributor. Categories that usually draw strong interest in Indonesia include ceramic and granite tiles, sanitary ware, aluminium doors and windows, wall panels and lighting. Suppliers still need SNI documents for products that require certification and should calculate import duties from the start.</p><h3>Market signals: cement and material prices</h3><p>Mirae Asset Sekuritas research dated 20 October 2026 recorded domestic cement sales of 6.0 million tonnes in September 2026, up 3.0% year on year. Bulk cement rose 8.2% to 1.9 million tonnes while bagged cement rose 0.8% to 4.2 million tonnes. Over the first nine months, consumption reached 48.1 million tonnes, and the full-year forecast was raised to 66.9 million tonnes. Growth in bulk cement usually reflects large projects and infrastructure.</p><p>On prices, BPS data reported by Periskop show the construction wholesale price index rose 9.63% year on year in September 2026 to 111.64. Asphalt was up 27.91%, rebar 11.99%, crushed stone 11.86%, sand 8.78% and cement 7.44%. Rising costs push contractors to look for alternative suppliers, including competitively priced imports.</p><h3>Tips for buyers and suppliers</h3><p>Visitors should register in advance on the official site, bring a list of requirements and specifications, and ask for samples and certification documents before ordering. homeX, an Indonesian one-stop building materials and furniture service platform with a showroom, warehousing and delivery, follows exhibitions like this to widen its network of local and overseas suppliers.</p>
<h2>BDExpo Indonesia 2026: related articles and products</h2><ul>
<li><a href="/en/news/173">China Homelife Indonesia 2026: building materials fair 25–28 Nov at JIExpo</a></li>
<li><a href="/en/news/33">Building materials exhibition calendar 2026–2027</a></li>
<li><a href="/en/news/292">Construction wholesale prices up 9.63% in September 2026</a></li>
<li><a href="/en/products/232">A Plus Gypsum</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>When and where is BDExpo Indonesia 2026?</strong> On 25–28 November 2026 at JIExpo Kemayoran, Jakarta, according to the organiser's official site.</p>
<p><strong>Who organises it?</strong> Meorient Exhibition, which says it has operated in more than 15 countries for over 20 years.</p>
<p><strong>What products are shown?</strong> Architectural building materials, bathrooms and kitchens, hardware tools and system lighting.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://bdeexpo.com/" target="_blank" rel="noopener">BDExpo Indonesia official organiser site (accessed 31 Oct 2026)</a>; <a href="https://sekuritas.miraeasset.co.id/id/news/research/cement-neutral-maintain-raising-fy-26-f-on-a-strong-9-m26" target="_blank" rel="noopener">Mirae Asset Sekuritas, 20 Oct 2026 (cement research)</a>; <a href="https://periskop.id/makro/20261002/ihpb-bangunan-dan-konstruksi-naik-963-pada-september-2026" target="_blank" rel="noopener">Periskop, 2 Oct 2026 (BPS wholesale price data)</a></em></p>]]></content:encoded></item><item><title>Jabodetabek Warehouse Rent Hits Rp81,800/m² as Occupancy Reaches 97% in Q3 2026</title><link>https://www.homex.co.id/en/news/332</link><guid isPermaLink="true">https://www.homex.co.id/en/news/332</guid><pubDate>Sat, 31 Oct 2026 09:28:49 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Jabodetabek warehouse rent averaged Rp81,800/m² a month with 97% occupancy in Q3 2026, CBRE says; only about 91,000 m² of modern space is still vacant.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261031-i-gudang-sewa-cbre.jpg" alt="Jabodetabek Warehouse Rent Hits Rp81,800/m² as Occupancy Reaches 97% in Q3 2026"></p><p>The <strong>Jabodetabek warehouse rent</strong> market keeps tightening. CBRE Indonesia data quoted by Investortrust on 28 October 2026 show modern logistics warehouse occupancy reached 97% in Q3 2026, with average rent of Rp81,800 per m² a month. Building-material distributors that need extra space should plan early and be ready to compare locations outside the main corridors.</p>
<h2>Key Facts</h2><ul>
<li>Occupancy of modern logistics warehouses in Jabodetabek reached 97% in Q3 2026 (2026-10-28, source: <a href="https://investortrust.id/business/120756/gudang-logistik-jabodetabek-makin-terbatas-okupansi-capai-97" target="_blank" rel="noopener">Investortrust, 28 Oct 2026 (CBRE Indonesia data)</a>).</li>
<li>Total stock is about 3.6 million m², net absorption 26,800 m² and remaining vacant space about 91,000 m² (2026-10-28, source: <a href="https://investortrust.id/business/120756/gudang-logistik-jabodetabek-makin-terbatas-okupansi-capai-97" target="_blank" rel="noopener">Investortrust, 28 Oct 2026 (CBRE Indonesia data)</a>).</li>
<li>Average rent is Rp81,800 per m² a month, up slightly more than 2% year on year (2026-10-28, source: <a href="https://investortrust.id/business/120756/gudang-logistik-jabodetabek-makin-terbatas-okupansi-capai-97" target="_blank" rel="noopener">Investortrust, 28 Oct 2026 (CBRE Indonesia data)</a>).</li>
<li>New supply this quarter was about 45,000 m² in Karawang; about 1 million m² more is expected by 2029 (2026-10-28, source: <a href="https://investortrust.id/business/120756/gudang-logistik-jabodetabek-makin-terbatas-okupansi-capai-97" target="_blank" rel="noopener">Investortrust, 28 Oct 2026 (CBRE Indonesia data)</a>).</li>
<li>Colliers expects the East Corridor share of warehouse supply to rise from 74% to 83% by 2029 (2026-10-08, source: <a href="https://ekonomi.bisnis.com/read/20261008/98/2010825/colliers-koridor-timur-kokoh-jadi-ibu-kota-logistik-dan-pergudangan" target="_blank" rel="noopener">Bisnis.com, 8 Oct 2026 (Colliers research)</a>).</li>
</ul>
<h2>Why Jabodetabek warehouse rent keeps rising</h2><p>According to Anton Sitorus of CBRE Indonesia, demand comes from third-party logistics firms, e-commerce, retail and manufacturing companies that want stock closer to consumers in the metropolitan area. With only about 91,000 m² vacant, large tenants struggle to find a building with the right specification at short notice. Landlords therefore have more bargaining power, even though annual rent growth has been moderate at just over 2%.</p><p>CBRE also notes that new supply this quarter was concentrated in Karawang, at about 45,000 m². Roughly 1 million m² of modern warehouse space is expected to be added by 2029, which may ease the pressure over the next few years. Until those projects are completed, however, ready-to-use space remains scarce.</p><h3>The East Corridor and alternative locations</h3><p>Colliers research published by Bisnis.com on 8 October 2026 places the East Corridor—Bekasi, Cikarang and Karawang—as the main logistics hub. Its share of warehouse supply is projected to grow from 74% to 83% by 2029. Ferry Salanto of Colliers said tenants compare truck access, distance to toll gates, building specifications and service charges before choosing a site. CBRE adds that some companies are looking at Subang in West Java and at Semarang, Kendal and Batang in Central Java as alternatives.</p><h3>What it means for the building-materials supply chain</h3><p>Materials such as cement, tiles, pipes and light-steel framing need large warehouses with strong floors and access for heavy trucks. When modern warehouses are nearly full, storage costs and the risk of delivery delays rise as well. Project buyers should therefore check that suppliers hold stock near the job site and offer a clear delivery schedule. homeX, an Indonesian one-stop building materials and furniture service platform, runs a showroom, warehousing and delivery so project orders can be consolidated and shipped on schedule.</p><p>For business owners planning to lease space, the practical step is to compare total cost—rent, service charge and transport to customers—rather than only the price per square metre. A cheaper warehouse further away can add many truck kilometres every day.</p>
<h2>Jabodetabek warehouse rent: related articles and products</h2><ul>
<li><a href="/en/news/28">Building-material warehouses scarcer: Jabodetabek occupancy at 96.4%</a></li>
<li><a href="/en/news/184">B2B building-material supply models 2026: warehouses, ODOL and logistics</a></li>
<li><a href="/en/news/291">Jakarta truck restriction hours for building materials</a></li>
<li><a href="/en/products/159">Hollow Kencana 2x4 0.25 mm</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What is the current Jabodetabek warehouse rent?</strong> CBRE data quoted by Investortrust (28 Oct 2026) put average modern warehouse rent at about Rp81,800 per m² a month in Q3 2026.</p>
<p><strong>How high is occupancy?</strong> About 97%, leaving roughly 91,000 m² vacant out of 3.6 million m² of stock.</p>
<p><strong>Where is most new supply?</strong> About 45,000 m² was added in Karawang this quarter; Colliers expects the East Corridor to hold 83% of supply by 2029.</p>
<p>For building and renovation material needs, reach the homeX team on WhatsApp <a href="https://wa.me/628211818998">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://investortrust.id/business/120756/gudang-logistik-jabodetabek-makin-terbatas-okupansi-capai-97" target="_blank" rel="noopener">Investortrust, 28 Oct 2026 (CBRE Indonesia data)</a>; <a href="https://ekonomi.bisnis.com/read/20261008/98/2010825/colliers-koridor-timur-kokoh-jadi-ibu-kota-logistik-dan-pergudangan" target="_blank" rel="noopener">Bisnis.com, 8 Oct 2026 (Colliers research)</a></em></p>]]></content:encoded></item><item><title>PPR Pipe PN10, PN16 and PN20: Temperature, Pressure and Fusion Times</title><link>https://www.homex.co.id/en/news/331</link><guid isPermaLink="true">https://www.homex.co.id/en/news/331</guid><pubDate>Sat, 31 Oct 2026 09:16:48 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>PPR pipe PN10, PN16 and PN20: blue-line PN10 for cold water, yellow PN16 and red PN20 for hot water up to 70°C, plus fusion times such as 5 s for 20 mm.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261031-k-pipa-ppr-pn.jpg" alt="PPR Pipe PN10, PN16 and PN20: Temperature, Pressure and Fusion Times"></p><p>Choosing <strong>PPR pipe PN10, PN16 or PN20</strong> decides whether a home hot-water line lasts or sags and leaks. In short, PN10 (blue line) is fine for pressurised cold water, while lines from a water heater should use PN16 (yellow line) or PN20 (red line), with a maximum working temperature of about 70°C. The quality of the heat-fusion joints matters as much as the pipe class.</p>
<h2>Key Facts</h2><ul>
<li>RUCIKA Kelen Green PN10 has a blue line for pressurised cold water, PN16 yellow for hot and cold water, and PN20 red for pressurised hot water (2026-10-31, source: <a href="https://www.rucika.co.id/produk/kelen-green/" target="_blank" rel="noopener">RUCIKA, produk Kelen Green, accessed 31/10/2026</a>).</li>
<li>Rucika PPR pipes PN10–PN20 are used for water at 10–70°C and come in Ø20–160 mm, 4 m per length (2022-08-25, source: <a href="https://www.rucika.co.id/mengenal-lebih-jauh-pipa-ppr-rucika-kelen-green/" target="_blank" rel="noopener">RUCIKA, Mengenal Lebih Jauh Pipa PPR Rucika Kelen Green (25/08/2022)</a>).</li>
<li>Wavin Ekoplastik PPR: PN10 in Ø20–125 mm, PN16 and PN20 in Ø16–125 mm, maximum 70°C, made to EN ISO 15874 and DIN 8077/8078 (2026-10-31, source: <a href="https://mediahub.wavin.com/asset/3e905f51-e1af-4e8c-aa79-2f389fca42e8/-ID-Leaflet-PPR.pdf" target="_blank" rel="noopener">Wavin Indonesia, Leaflet Ekoplastik PPR (PDF), accessed 31/10/2026</a>).</li>
<li>Under the DVS 2207-11 table, a Ø20 mm pipe is heated for 5 seconds, aligned within 4 seconds and cooled for 2 minutes; Ø25 mm is heated for 7 seconds (2026-10-31, source: <a href="https://www.aquatherm.de/en-gb/aquatherm-knowhow/processing/aquatherm-energy/heating-element-welding/" target="_blank" rel="noopener">aquatherm UK, Heating element welding (DVS 2207-11), accessed 31/10/2026</a>).</li>
</ul>
<h2>Difference between PPR PN10, PN16 and PN20</h2>
<p>PN (pressure nominal) is the pressure class. The higher the PN, the thicker the wall for the same outside diameter, so the pipe holds more pressure at high temperature. Local makers print coloured lines that make checking easy in the shop:</p>
<ul><li><strong>PN10 – blue line</strong>: pressurised cold water, such as the line from a tank or pump to the taps.</li>
<li><strong>PN16 – yellow line</strong>: hot and cold water.</li>
<li><strong>PN20 – red line</strong>: pressurised hot water, such as a water-heater outlet.</li></ul>
<p>Kelen Green is made of random polypropylene type 3 (PP-R 80), and Rucika states that its pipes and fittings follow EN ISO 15874-2 and EN ISO 15874-3. The design life quoted by the maker is up to 50 years, provided the system is installed correctly.</p>
<h3>Wall thickness and inner diameter</h3>
<p>The Wavin leaflet gives the example of a Ø20 mm PPR pipe in series 2.5 with a 3.4 mm wall and a 13.2 mm inner diameter. Thick-walled high-class pipe therefore reduces the flow area. For long runs to an upstairs bathroom, discuss pipe size with your plumber or designer so the taps still get enough flow.</p>
<h2>How to join PPR pipe by heat fusion</h2>
<p>PPR pipe is joined with a heating tool (polyfusion or electrofusion) so pipe and fitting fuse into one piece. The DVS 2207 part 11 table quoted by aquatherm gives these reference times:</p>
<ul><li><strong>Ø20 mm</strong>: heating 5 s, alignment 4 s, cooling 2 min, welding depth 14.5 mm.</li>
<li><strong>Ø25 mm</strong>: heating 7 s, alignment 4 s, cooling 2 min, depth 16 mm.</li>
<li><strong>Ø32 mm</strong>: heating 8 s, alignment 6 s, cooling 4 min, depth 18 mm.</li></ul>
<p>The table comes from aquatherm's product guide, so always check it against the instructions of the pipe brand you use. Overheating lets the melt narrow the bore, while underheating leaves a weak joint. Mark the welding depth on the pipe before heating.</p>
<h3>Expansion and sunlight</h3>
<p>Wavin lists a linear expansion coefficient of 0.12 mm/mK for regular pipe. As an editorial calculation, a 4 m pipe that warms by 40°C can grow by about 19 mm, so long hot-water runs need room to move and suitable clamps. Rucika also stresses that PPR must not be exposed to direct sunlight because UV makes it brittle; protect it with rubber insulation, styrofoam plus aluminium, or a simple cover.</p>
<h3>Test before closing up</h3>
<p>Once every joint has cooled, run a pressure test following the manufacturer's instructions before the wall is plastered or tiled. A leak is far cheaper to fix while it is still exposed.</p>
<p>homeX, an Indonesian one-stop building materials and furniture service platform with a showroom, warehousing and delivery, supplies PPR pipes and fittings for renovation projects and can deliver them with your other materials.</p>
<h2>PPR pipe PN10 PN16 PN20: related articles and products</h2><ul>
<li><a href="/news/89">PPR pipe prices 2026: Rucika Kelen Green and Westpex</a></li>
<li><a href="/news/237">Home clean-water piping installation cost per point</a></li>
<li><a href="/news/60">Rucika PVC pipe prices, AW and D class</a></li>
<li><a href="/products/396">PPR hot-water pipe S2.5 Ø20 mm 4 m</a></li>
<li><a href="/products/393">PPR cold-water pipe S4 Ø20 mm 4 m</a></li>
<li><a href="/products">homeX building materials catalogue</a></li></ul>
<h2>FAQ</h2>
<p><strong>Which PPR pipe should I use for a water heater?</strong> Use a hot-water class: PN16 (yellow line) or PN20 (red line). Blue-line PN10 is intended for cold water.</p>
<p><strong>What is the maximum temperature for PPR pipe?</strong> Rucika and Wavin both give a limit of about 70°C for their PPR pipes.</p>
<p><strong>How long do I heat a 20 mm PPR pipe when welding?</strong> According to the DVS 2207-11 table, 5 seconds of heating, 4 seconds of alignment and 2 minutes of cooling.</p>
<p>Need help choosing or delivering materials? Contact the homeX team on WhatsApp <a href="https://wa.me/628211818998" target="_blank" rel="noopener">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or via the <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.rucika.co.id/produk/kelen-green/" target="_blank" rel="noopener">RUCIKA, produk Kelen Green, accessed 31/10/2026</a>; <a href="https://www.rucika.co.id/mengenal-lebih-jauh-pipa-ppr-rucika-kelen-green/" target="_blank" rel="noopener">RUCIKA, Mengenal Lebih Jauh Pipa PPR Rucika Kelen Green (25/08/2022)</a>; <a href="https://mediahub.wavin.com/asset/3e905f51-e1af-4e8c-aa79-2f389fca42e8/-ID-Leaflet-PPR.pdf" target="_blank" rel="noopener">Wavin Indonesia, Leaflet Ekoplastik PPR (PDF), accessed 31/10/2026</a>; <a href="https://www.aquatherm.de/en-gb/aquatherm-knowhow/processing/aquatherm-energy/heating-element-welding/" target="_blank" rel="noopener">aquatherm UK, Heating element welding (DVS 2207-11), accessed 31/10/2026</a></em></p>]]></content:encoded></item><item><title>Rebar Weight per Metre under SNI 2052: Tolerance, End Colour Codes and Labels</title><link>https://www.homex.co.id/en/news/330</link><guid isPermaLink="true">https://www.homex.co.id/en/news/330</guid><pubDate>Sat, 31 Oct 2026 09:16:48 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Rebar weight per metre under SNI 2052:2017: S10 0.617 kg, S13 1.042 kg, S16 1.578 kg; tolerance ±5–7%, 10/12 m lengths and end colour codes.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261031-k-besi-beton-sni2052.jpg" alt="Rebar Weight per Metre under SNI 2052: Tolerance, End Colour Codes and Labels"></p><p>The most practical way to check rebar quality on site is to weigh it and compare the result with the <strong>rebar weight per metre</strong> in SNI 2052:2017. In short, deformed bar S10 should weigh 0.617 kg/m, S13 1.042 kg/m and S16 1.578 kg/m, with a per-bar weight tolerance of ±5–7% depending on diameter. Bars that are much lighter, lack the embossed brand and have no paint on the ends deserve suspicion.</p>
<h2>Key Facts</h2><ul>
<li>SNI 2052:2017 "Steel bars for concrete reinforcement" was set on 11 September 2017 by decree 276/KEP/BSN/9/2017 and is in force (2017-09-11, source: <a href="https://pesta.bsn.go.id/produk/detail/11443-sni20522017" target="_blank" rel="noopener">BSN, SNI 2052:2017 catalogue entry, accessed 31/10/2026</a>).</li>
<li>Nominal weight of deformed bars: S10 0.617 kg/m, S13 1.042 kg/m, S16 1.578 kg/m, S19 2.226 kg/m (2026-10-31, source: <a href="https://www.toyogiristeel.com/file/SNI%202052-2017.pdf" target="_blank" rel="noopener">SNI 2052:2017 Steel bars for concrete reinforcement (PDF copy on the PT Toyogiri Iron Steel website), accessed 31/10/2026</a>).</li>
<li>Per-bar weight tolerance for deformed bars: ±7% (6–8 mm), ±6% (10–14 mm), ±5% (16–29 mm), ±4% (>29 mm) (2026-10-31, source: <a href="https://www.toyogiristeel.com/file/SNI%202052-2017.pdf" target="_blank" rel="noopener">SNI 2052:2017 Steel bars for concrete reinforcement (PDF copy on the PT Toyogiri Iron Steel website), accessed 31/10/2026</a>).</li>
<li>Standard lengths are 10 m and 12 m, with a tolerance of 0 to +70 mm (2026-10-31, source: <a href="https://www.toyogiristeel.com/file/SNI%202052-2017.pdf" target="_blank" rel="noopener">SNI 2052:2017 Steel bars for concrete reinforcement (PDF copy on the PT Toyogiri Iron Steel website), accessed 31/10/2026</a>).</li>
<li>Bar end colours: BjTS 280 black, BjTS 420A yellow, BjTS 420B red, BjTS 520 green (2026-10-31, source: <a href="https://www.toyogiristeel.com/file/SNI%202052-2017.pdf" target="_blank" rel="noopener">SNI 2052:2017 Steel bars for concrete reinforcement (PDF copy on the PT Toyogiri Iron Steel website), accessed 31/10/2026</a>).</li>
</ul>
<h2>Rebar weight per metre table (SNI 2052:2017)</h2>
<p>SNI 2052 distinguishes plain bars (BjTP, code P) from deformed bars (BjTS, code S). For the same diameter the nominal weight is identical, calculated as 0.785 × 0.7854 × d² / 100 kg/m (d = nominal diameter in mm). The sizes most used in houses are:</p>
<ul><li>6 mm: 0.222 kg/m</li><li>8 mm: 0.395 kg/m</li><li>10 mm: 0.617 kg/m</li><li>12 mm (plain P12): 0.888 kg/m</li><li>13 mm (deformed S13): 1.042 kg/m</li><li>16 mm: 1.578 kg/m</li><li>19 mm: 2.226 kg/m</li></ul>
<p>Note that the deformed size in the SNI table is 13 mm while the plain size is 12 mm. Do not compare a 13 mm deformed bar against the 12 mm figure.</p>
<h2>Checking the weight tolerance on site</h2>
<p>For deformed bars, SNI uses a per-bar weight tolerance. Worked examples from the table (rounded by the editors):</p>
<ul><li><strong>S10, 12 m long</strong>: nominal 7.40 kg; ±6% gives roughly 6.96–7.85 kg.</li>
<li><strong>S13, 12 m long</strong>: nominal 12.50 kg; ±6% gives roughly 11.75–13.25 kg.</li>
<li><strong>S16, 12 m long</strong>: nominal 18.94 kg; ±5% gives roughly 17.99–19.88 kg.</li></ul>
<p>For plain bars, SNI sets a diameter tolerance instead: ±0.4 mm for 8–14 mm and ±0.5 mm for 16–25 mm. Measure with a vernier caliper at several points. Undersized bars are often called "besi banci" in Indonesian markets; if the scale or caliper shows values outside the limits, ask the supplier for an explanation and certificates.</p>
<h3>Practical steps</h3>
<ul><li>Pick several bars at random from each bundle, not just the top ones.</li>
<li>Measure the length: SNI sets 10 m or 12 m, up to 70 mm longer but never shorter.</li>
<li>Weigh whole bars on a calibrated scale and compare with the ranges above.</li></ul>
<h2>SNI markings: embossing, end colour and labels</h2>
<p>The marking clause of SNI 2052:2017 requires every bar to carry embossed letters showing the manufacturer's brand and nominal diameter. The bar ends are painted in a durable colour by steel class: black for BjTP 280 and BjTS 280, yellow for BjTS 420A, red for BjTS 420B, green for BjTS 520, white for BjTS 550 and blue for BjTS 700. Each bundle label must show the manufacturer's name and brand, size (diameter and length), steel class, heat number and production date.</p>
<p>The class also sets strength. BjTS 420B, for example, must have a yield strength of 420–545 MPa, tensile strength of at least 525 MPa, elongation of at least 14% for diameters up to 19 mm and a tensile-to-yield ratio of at least 1.25. These values can only be proven by laboratory tests or the mill certificate, not by eye.</p>
<p>homeX, an Indonesian one-stop building materials and furniture service platform with a showroom, warehousing and delivery, can help prepare a rebar list by diameter together with supporting documents from suppliers.</p>
<h2>Rebar weight per metre: related articles and products</h2><ul>
<li><a href="/news/134">Plain and deformed rebar prices 2026 per bar</a></li>
<li><a href="/news/288">Mandatory SNI for building materials and how to check the mark</a></li>
<li><a href="/news/284">Reinforcement for practical columns, sloof and ring beams</a></li>
<li><a href="/products">homeX building materials catalogue</a></li></ul>
<h2>FAQ</h2>
<p><strong>How much does a 12 m length of 10 mm rebar weigh?</strong> Nominal 0.617 kg/m × 12 m ≈ 7.40 kg; for deformed bar the ±6% tolerance gives about 6.96–7.85 kg.</p>
<p><strong>What does red paint on the rebar end mean?</strong> Under SNI 2052:2017, red marks class BjTS 420B; yellow is BjTS 420A and black is class 280.</p>
<p><strong>Is 13 mm deformed bar the same as 12 mm?</strong> No. The SNI table lists deformed S13 at 1.042 kg/m, while plain P12 weighs 0.888 kg/m.</p>
<p>Need help choosing or delivering materials? Contact the homeX team on WhatsApp <a href="https://wa.me/628211818998" target="_blank" rel="noopener">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or via the <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.toyogiristeel.com/file/SNI%202052-2017.pdf" target="_blank" rel="noopener">SNI 2052:2017 Steel bars for concrete reinforcement (PDF copy on the PT Toyogiri Iron Steel website), accessed 31/10/2026</a>; <a href="https://pesta.bsn.go.id/produk/detail/11443-sni20522017" target="_blank" rel="noopener">BSN, SNI 2052:2017 catalogue entry, accessed 31/10/2026</a></em></p>]]></content:encoded></item><item><title>Tile Grout Classification CG2WA: What CG1, CG2, W, A, F and RG Mean in EN 13888</title><link>https://www.homex.co.id/en/news/329</link><guid isPermaLink="true">https://www.homex.co.id/en/news/329</guid><pubDate>Sat, 31 Oct 2026 09:16:48 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Tile grout classification under EN 13888: CG1 is basic, CG2WA adds abrasion and water resistance, RG is epoxy. Test limits, TDS examples and how to choose.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261031-k-nat-cg2wa.jpg" alt="Tile Grout Classification CG2WA: What CG1, CG2, W, A, F and RG Mean in EN 13888"></p><p>Understanding <strong>tile grout classification</strong> stops you from buying the wrong product: the CG1, CG2WA or RG code on the bag tells you how well the grout resists wear and water. In short, choose a cementitious CG2 grout with both W and A (CG2WA) for bathroom, kitchen and terrace floors, and use an RG epoxy grout where chemicals or strict hygiene are involved. The codes come from the European standard EN 13888 and ISO 13007-3, and the numbers can be checked on the technical data sheet (TDS).</p>
<h2>Key Facts</h2><ul>
<li>A CG1 cementitious grout must reach abrasion ≤2,000 mm³, compressive strength ≥15 N/mm², shrinkage ≤3 mm/m and water absorption ≤5 g (30 minutes) and ≤10 g (240 minutes) (2026-10-31, source: <a href="https://www.sopro.pl/fileadmin/user-files-lt/Poradnik/Sopro_Guide__LT__02.pdf" target="_blank" rel="noopener">Sopro, Tile grouts and sealants guide (PDF), accessed 31/10/2026</a>).</li>
<li>The letter A on a CG2 grout means abrasion ≤1,000 mm³; W means water absorption ≤2 g after 30 minutes and ≤5 g after 240 minutes (2026-10-31, source: <a href="https://www.sopro.pl/fileadmin/user-files-lt/Poradnik/Sopro_Guide__LT__02.pdf" target="_blank" rel="noopener">Sopro, Tile grouts and sealants guide (PDF), accessed 31/10/2026</a>).</li>
<li>Reaction resin (RG, epoxy) grouts require abrasion ≤250 mm³, compressive strength ≥45 N/mm² and water absorption ≤0.1 g after 240 minutes (2026-10-31, source: <a href="https://www.sopro.pl/fileadmin/user-files-lt/Poradnik/Sopro_Guide__LT__02.pdf" target="_blank" rel="noopener">Sopro, Tile grouts and sealants guide (PDF), accessed 31/10/2026</a>).</li>
<li>Mapei Ultracolor Plus is classified CG2FWA under EN 13888-1 for joints up to 20 mm, with abrasion of 700 mm³ and water absorption of 0.1 g after 30 minutes (2026-10-31, source: <a href="https://cdnmedia.mapei.com/docs/librariesprovider2/products-documents/1_02801_ultracolor-plus_en_77ebfd1ea8484259a4fd7c2727f90337.pdf?sfvrsn=ef29f318_0" target="_blank" rel="noopener">Mapei, Ultracolor Plus technical data sheet (PDF), accessed 31/10/2026</a>).</li>
<li>The MU-408 ColorFill TDS (issued 9 March 2023) lists a joint width of 1–4 mm, abrasion of 850 mm³ (EN 12808-2) and compressive strength of 17 N/mm² (2023-03-09, source: <a href="https://www.mortarutama.com/wp-content/uploads/2024/03/TDS-MU-408-ColorFill-EN.pdf" target="_blank" rel="noopener">Mortar Utama (Saint-Gobain Indonesia), TDS MU-408 ColorFill (PDF), accessed 31/10/2026</a>).</li>
</ul>
<h2>Tile grout classification: what CG, RG, 1, 2, W, A and F mean</h2>
<p>EN 13888 splits grouts into two types. <strong>CG</strong> (cementitious grout) is cement based, while <strong>RG</strong> (reaction resin grout) hardens through a chemical reaction, as epoxy grouts do. A cementitious grout that passes the basic requirements is <strong>CG1</strong> (normal). If it also passes the additional requirements it becomes <strong>CG2</strong> (improved), which is always followed by <strong>A</strong> (high abrasion resistance), <strong>W</strong> (reduced water absorption) or both. The letter <strong>F</strong> marks a fast-setting grout. So CG2FWA or CG2WAF means an improved, fast-setting cement grout that resists abrasion and absorbs little water. RG has a single class because resin grouts already perform at a very high level.</p>
<p>Besides the figures in Key Facts, CG1 also requires flexural strength ≥2.5 N/mm², while RG requires flexural strength ≥30 N/mm² and shrinkage ≤1.5 mm/m.</p>
<p>A lower abrasion figure means the joint survives shoes and brooms better; lower water absorption keeps stains, soap and mould out of the grout line.</p>
<h2>Choosing grout for each area of the house</h2>
<ul><li><strong>Dry walls</strong> (living room, bedroom): a CG1 grout is usually enough because wear and water exposure are low.</li>
<li><strong>House floors, bathrooms, kitchens, terraces</strong>: choose CG2WA so the joints do not wear quickly or darken.</li>
<li><strong>Pools, façades, balconies</strong>: check that the TDS explicitly allows exterior use and immersion.</li>
<li><strong>Commercial kitchens, laboratories, chemical areas</strong>: consider an RG epoxy grout, which absorbs almost no water.</li></ul>
<h3>How to read a grout TDS</h3>
<p>Not every grout sold in Indonesia prints an EN 13888 code. The MU-408 ColorFill TDS from Saint-Gobain Indonesia reports test results using EN 12808 methods (abrasion 850 mm³, compressive strength 17 N/mm², shrinkage 2.36 mm/m) but does not state a CG class. Although its abrasion figure is below the 1,000 mm³ limit for A, a class only applies once the manufacturer declares it after passing every test. If no code is printed, ask the distributor for written confirmation.</p>
<h3>Application tips from the data sheets</h3>
<ul><li>Let the adhesive cure first: the Ultracolor Plus TDS gives 24 hours for floors laid with normal adhesive and 7–10 days for floors laid on mortar.</li>
<li>Empty the joints to at least 2/3 of the tile thickness and remove dust and adhesive residue.</li>
<li>Follow the water ratio: 20–26% by weight for Ultracolor Plus, 330–340 ml per 1 kg for MU-408.</li>
</ul>
<p>homeX, an Indonesian one-stop building materials and furniture service platform with a showroom, warehousing and delivery, can help match grout with tiles and adhesive in a single project order.</p>
<h2>Tile grout classification: related articles and products</h2><ul>
<li><a href="/news/310">C2TE tile adhesive classification under EN 12004</a></li>
<li><a href="/news/64">Tile grout prices in Indonesia 2026 by brand</a></li>
<li><a href="/news/95">Tile and granite installation cost per m²</a></li>
<li><a href="/products">homeX building materials catalogue</a></li></ul>
<h2>FAQ</h2>
<p><strong>What does CG2WA mean on a tile grout?</strong> An improved cementitious grout (CG2) with reduced water absorption (W, ≤2 g in 30 minutes) and high abrasion resistance (A, ≤1,000 mm³).</p>
<p><strong>Which grout is best for a bathroom floor?</strong> At least CG2WA; where chemicals or strict hygiene are involved, an RG epoxy grout with water absorption ≤0.1 g is the safer choice.</p>
<p><strong>How long should I wait before grouting a floor?</strong> For Ultracolor Plus, the TDS states 24 hours when tiles are laid with normal adhesive and 7–10 days when laid on mortar.</p>
<p>Need help choosing or delivering materials? Contact the homeX team on WhatsApp <a href="https://wa.me/628211818998" target="_blank" rel="noopener">+62 821 1818 998</a>, by email at <a href="mailto:homex9998@gmail.com">homex9998@gmail.com</a> or via the <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.mapei.com/sg/en/blog/detail/tech-talk/2020/10/28/understanding-tile-grouts-and-its-standards-for-tile-and-stone-works" target="_blank" rel="noopener">Mapei Singapore, Understanding tile grouts and its standards (28/10/2020)</a>; <a href="https://www.sopro.pl/fileadmin/user-files-lt/Poradnik/Sopro_Guide__LT__02.pdf" target="_blank" rel="noopener">Sopro, Tile grouts and sealants guide (PDF), accessed 31/10/2026</a>; <a href="https://cdnmedia.mapei.com/docs/librariesprovider2/products-documents/1_02801_ultracolor-plus_en_77ebfd1ea8484259a4fd7c2727f90337.pdf?sfvrsn=ef29f318_0" target="_blank" rel="noopener">Mapei, Ultracolor Plus technical data sheet (PDF), accessed 31/10/2026</a>; <a href="https://www.mortarutama.com/wp-content/uploads/2024/03/TDS-MU-408-ColorFill-EN.pdf" target="_blank" rel="noopener">Mortar Utama (Saint-Gobain Indonesia), TDS MU-408 ColorFill (PDF), accessed 31/10/2026</a></em></p>]]></content:encoded></item><item><title>Acetic vs Neutral Silicone Sealant: Which for Glass, Aluminium and Roofs</title><link>https://www.homex.co.id/en/news/328</link><guid isPermaLink="true">https://www.homex.co.id/en/news/328</guid><pubDate>Fri, 30 Oct 2026 14:14:19 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Acetic sealant smells and can corrode some materials; neutral sealant suits aluminium, concrete and polycarbonate roofs. DOWSIL 795 data: ±50% joint movement.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261030-b-sealant-asam-netral.jpg" alt="Acetic vs Neutral Silicone Sealant: Which for Glass, Aluminium and Roofs"></p><p>Choosing <strong>acetic vs neutral silicone sealant</strong> decides whether glass joints, aluminium frames or roofs last or fail. Both are elastic silicone polymers, but acetic (acid) sealant releases acid while curing and neutral sealant does not.</p>
<h2>Key Facts</h2><ul>
<li>Acetic sealant has a strong smell during application and is corrosive to some materials; avoid it on polycarbonate (2026-10-30, source: <a href="https://www.oci-international.com/id/artikel/perbedaan-sealant-asam-dan-netral/" target="_blank" rel="noopener">OCI Material Pratama (Impack Pratama), accessed 30 Oct 2026</a>).</li>
<li>Neutral sealant has no acid smell and is recommended for bathrooms, door frames, glass work, and polycarbonate and uPVC roofs (2026-10-30, source: <a href="https://www.oci-international.com/id/artikel/perbedaan-sealant-asam-dan-netral/" target="_blank" rel="noopener">OCI Material Pratama (Impack Pratama), accessed 30 Oct 2026</a>).</li>
<li>DOWSIL 795 (neutral) is tack-free in 3 hours, cures in 7–14 days and reaches full adhesion in 14–21 days at 25°C/50% RH (2026-10-30, source: <a href="https://www.dow.com/documents/61/61-885-dowsil-795-silicone-building-sealant2.pdf" target="_blank" rel="noopener">Dow, DOWSIL 795 TDS, accessed 30 Oct 2026</a>).</li>
<li>DOWSIL 795 handles ±50% joint movement and should not be used on surfaces to be painted or continuously immersed in water (2026-10-30, source: <a href="https://www.dow.com/documents/61/61-885-dowsil-795-silicone-building-sealant2.pdf" target="_blank" rel="noopener">Dow, DOWSIL 795 TDS, accessed 30 Oct 2026</a>).</li>
</ul>
<h2>Acetic vs neutral silicone sealant: when to use which</h2><ul><li><strong>Acetic</strong>: cures fast, suits glass, ceramic and non-porous indoor surfaces. Avoid sensitive metals, polycarbonate and concrete.</li><li><strong>Neutral</strong>: safer on almost all materials, including aluminium, concrete, stone and roofing; low odour for enclosed rooms.</li></ul><h3>Application tips</h3><ul><li>Clean joints of dust, oil, water and old sealant.</li><li>Fit backer rod and masking tape, then tool before a skin forms.</li><li>Do not paint silicone; paint generally does not adhere.</li><li>Test adhesion on porous surfaces; a primer may be needed.</li></ul>
<h2>Acetic vs neutral silicone sealant: related articles and products</h2><ul>
<li><a href="/en/news/65">Silicone and sealant prices 2026</a></li>
<li><a href="/en/news/78">Polycarbonate prices 2026 for canopies</a></li>
<li><a href="/en/news/76">Aluminium window prices 2026</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>Which sealant for aluminium frames?</strong> Neutral sealant, because acetic sealant can corrode some materials.</p>
<p><strong>Can acetic sealant be used on polycarbonate roofs?</strong> Not recommended; OCI advises avoiding acetic sealant on polycarbonate and using neutral sealant.</p>
<p><strong>How long does neutral sealant take to cure?</strong> For DOWSIL 795: about 3 hours tack-free, 7–14 days cure, 14–21 days full adhesion.</p>
<p>For building and renovation material needs, reach the homeX team through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.oci-international.com/id/artikel/perbedaan-sealant-asam-dan-netral/" target="_blank" rel="noopener">OCI Material Pratama (Impack Pratama), accessed 30 Oct 2026</a>; <a href="https://www.dow.com/documents/61/61-885-dowsil-795-silicone-building-sealant2.pdf" target="_blank" rel="noopener">Dow, DOWSIL 795 TDS, accessed 30 Oct 2026</a></em></p>]]></content:encoded></item><item><title>BMT vs TCT in Light Steel: What the Thickness Means, AZ100 and SNI 8399 Checks</title><link>https://www.homex.co.id/en/news/327</link><guid isPermaLink="true">https://www.homex.co.id/en/news/327</guid><pubDate>Fri, 30 Oct 2026 14:14:19 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>BMT is the base steel thickness that sets strength; TCT is total thickness after coating. KS example: BMT 0.70 mm, TCT 0.75 mm, 50-micron AZ100 coating.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261030-b-bmt-tct.jpg" alt="BMT vs TCT in Light Steel: What the Thickness Means, AZ100 and SNI 8399 Checks"></p><p>The terms <strong>BMT vs TCT light steel</strong> often lead buyers to compare prices wrongly. BMT (Base Metal Thickness) is the core steel thickness before coating, while TCT (Total Coated Thickness) includes the anti-rust coating and paint. A C-channel labelled "0.75" may mean 0.75 mm TCT with only 0.70 mm of core steel.</p>
<h2>Key Facts</h2><ul>
<li>BMT is the base steel thickness before resin, aluminium-zinc or paint coating, and indicates strength in structural design (2024-06-03, source: <a href="https://www.ksbajaringan.co.id/2024/06/03/apa-perbedaan-dari-bmt-dan-tct/" target="_blank" rel="noopener">PT Kencana Baja Trada (KS light steel), 3 Jun 2024</a>).</li>
<li>TCT is the thickness after coating; it does not reflect core strength but helps prevent rust (2024-06-03, source: <a href="https://www.ksbajaringan.co.id/2024/06/03/apa-perbedaan-dari-bmt-dan-tct/" target="_blank" rel="noopener">PT Kencana Baja Trada (KS light steel), 3 Jun 2024</a>).</li>
<li>KS C-channel with AZ100 coating: BMT 0.70 mm and TCT 0.75 mm, so the coating is 0.05 mm or 50 microns (2024-06-03, source: <a href="https://www.ksbajaringan.co.id/2024/06/03/apa-perbedaan-dari-bmt-dan-tct/" target="_blank" rel="noopener">PT Kencana Baja Trada (KS light steel), 3 Jun 2024</a>).</li>
<li>KS products follow SNI 8399:2017 (light steel framing profiles), SNI 4096:2007 base material and G550 grade for C-channels (2024-06-03, source: <a href="https://www.ksbajaringan.co.id/2024/06/03/apa-perbedaan-dari-bmt-dan-tct/" target="_blank" rel="noopener">PT Kencana Baja Trada (KS light steel), 3 Jun 2024</a>).</li>
</ul>
<h2>BMT vs TCT light steel: which one to design with</h2><p>Roof truss design uses BMT because strength comes from the core steel. TCT only indicates rust protection. When comparing quotes, ask for the BMT, the coating class (AZ100 = 100 g/m² aluminium-zinc) and the steel grade (G550).</p><h3>How to check on site</h3><ul><li>Measure with an analogue or digital micrometer in millimetres; a field reading is TCT.</li><li>Subtract the stated BMT from TCT to get coating thickness.</li><li>Check the print on the profile: brand, SNI, size and thickness.</li></ul><h3>Common mistakes</h3><ul><li>Comparing two "0.75" prices without knowing one is BMT and the other TCT.</li><li>Using thin profiles for wide spans without an applicator's calculation.</li></ul>
<h2>BMT vs TCT light steel: related articles and products</h2><ul>
<li><a href="/en/news/45">Light steel prices per bar 2026</a></li>
<li><a href="/en/news/38">Light steel factories in Indonesia</a></li>
<li><a href="/en/news/79">Light steel roof truss cost per m² 2026</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What is the difference between BMT and TCT?</strong> BMT is the core steel thickness before coating and sets strength; TCT is total thickness after anti-rust coating and paint.</p>
<p><strong>How is coating thickness calculated?</strong> TCT minus BMT; the KS example is 0.75 − 0.70 = 0.05 mm or 50 microns.</p>
<p><strong>Which SNI covers light steel profiles?</strong> SNI 8399:2017 for light steel framing profiles; the sheet material follows SNI 4096:2007.</p>
<p>For building and renovation material needs, reach the homeX team through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.ksbajaringan.co.id/2024/06/03/apa-perbedaan-dari-bmt-dan-tct/" target="_blank" rel="noopener">PT Kencana Baja Trada (KS light steel), 3 Jun 2024</a></em></p>]]></content:encoded></item><item><title>Tempered vs Laminated Glass: Differences, LA–LX Codes and Mandatory SNI 9144</title><link>https://www.homex.co.id/en/news/326</link><guid isPermaLink="true">https://www.homex.co.id/en/news/326</guid><pubDate>Fri, 30 Oct 2026 14:14:19 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Tempered vs laminated glass under Industry Regulation 22/2026: how each breaks, LA–LX type codes, SNI 9144-1/-2 and when the mandatory SNI applies.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261030-b-kaca-tempered-laminated.jpg" alt="Tempered vs Laminated Glass: Differences, LA–LX Codes and Mandatory SNI 9144"></p><p>Choosing <strong>tempered vs laminated glass</strong> for doors, shower screens, railings or canopies is now also a compliance question. Industry Regulation 22/2026 makes SNI mandatory for both: laminated safety glass follows SNI 9144-1:2022 and tempered (toughened) safety glass follows SNI 9144-2:2022. The obligation applies 6 months after the regulation was promulgated on 31 July 2026.</p>
<h2>Key Facts</h2><ul>
<li>Laminated safety glass = two or more glass sheets bonded with an interlayer; if broken, fragments stay attached to the interlayer (2026-07-31, source: <a href="https://pasal.id/peraturan/permen/permenperin-22-2026" target="_blank" rel="noopener">Ministry of Industry Reg. 22/2026 (promulgated 31 Jul 2026), Pasal.id</a>).</li>
<li>Tempered safety glass = pre-stressed glass that breaks into small, blunt pieces (2026-07-31, source: <a href="https://pasal.id/peraturan/permen/permenperin-22-2026" target="_blank" rel="noopener">Ministry of Industry Reg. 22/2026 (promulgated 31 Jul 2026), Pasal.id</a>).</li>
<li>Laminated types are coded LA, LD, LHS, LM, LP, LR, LT and LX (Article 2(4)) (2026-07-31, source: <a href="https://pasal.id/peraturan/permen/permenperin-22-2026" target="_blank" rel="noopener">Ministry of Industry Reg. 22/2026 (promulgated 31 Jul 2026), Pasal.id</a>).</li>
<li>The SNI obligation applies 6 months after the regulation takes effect; certified products must carry the SNI mark and an electronic mark (2026-07-31, source: <a href="https://pasal.id/peraturan/permen/permenperin-22-2026" target="_blank" rel="noopener">Ministry of Industry Reg. 22/2026 (promulgated 31 Jul 2026), Pasal.id</a>).</li>
</ul>
<h2>Tempered vs laminated glass: the main differences</h2><ul><li><strong>Tempered</strong>: strong against impact and heat, breaks into small granules. It cannot be cut or drilled after tempering, so sizes and holes must be final before ordering.</li><li><strong>Laminated</strong>: fragments stay on the interlayer so the opening stays closed; suited to skylights, canopies, railings and upper-floor windows.</li><li>Laminated tempered glass (code LT) combines strength with fragment retention.</li></ul><h3>Which to use where</h3><ul><li>Shower screens and glass doors: tempered is usually enough.</li><li>Overhead glass (canopies, skylights) and railings: prefer laminated or laminated tempered.</li><li>Ask suppliers for the SNI mark or certificate.</li></ul><h3>Transition</h3><p>Glass produced or imported before the regulation took effect may still be sold to end users. Test samples and R&amp;D lots of up to 10 sheets are exempt.</p>
<h2>Tempered vs laminated glass: related articles and products</h2><ul>
<li><a href="/en/news/24">Tempered and laminated glass SNI soon mandatory</a></li>
<li><a href="/en/news/117">Indonesia building materials market trends 2026</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What is the difference between tempered and laminated glass?</strong> Tempered breaks into small blunt pieces; laminated has two or more sheets with an interlayer that holds fragments in place.</p>
<p><strong>Which SNI applies to safety glass?</strong> SNI 9144-1:2022 for laminated and SNI 9144-2:2022 for tempered, made mandatory by Industry Regulation 22/2026.</p>
<p><strong>Can tempered glass be drilled on site?</strong> No; cut and drill before tempering.</p>
<p>For building and renovation material needs, reach the homeX team through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://pasal.id/peraturan/permen/permenperin-22-2026" target="_blank" rel="noopener">Ministry of Industry Reg. 22/2026 (promulgated 31 Jul 2026), Pasal.id</a></em></p>]]></content:encoded></item><item><title>HGBT Gas for the Ceramic Tile Industry: 73% Allocation, China Anti-Dumping and 60% Utilisation</title><link>https://www.homex.co.id/en/news/325</link><guid isPermaLink="true">https://www.homex.co.id/en/news/325</guid><pubDate>Fri, 30 Oct 2026 14:14:19 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>The industry minister says ceramic tile utilisation fell to about 60%; ASAKI says October gas averaged US$11/MMBTU despite a 73% HGBT allocation (26–28 Oct 2026).</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261030-b-keramik-hgbt.jpg" alt="HGBT Gas for the Ceramic Tile Industry: 73% Allocation, China Anti-Dumping and 60% Utilisation"></p><p>The <strong>HGBT gas ceramic tile industry</strong> issue resurfaced in late October 2026. Industry Minister Muhammad Sarmuji said tile plant utilisation fell to about 60% because gas quotas are limited, while the government plans to add industrial gas allocations and hopes they will use the HGBT fixed-price gas scheme.</p>
<h2>Key Facts</h2><ul>
<li>The minister said ceramic tile utilisation fell to about 60% or slightly below because gas supply is capped by quota (2026-10-26, source: <a href="https://wartaekonomi.co.id/read643540/industri-berharap-tambahan-gas-masuk-skema-hgbt-utilisasi-keramik-tertekan" target="_blank" rel="noopener">Warta Ekonomi, 26 Oct 2026</a>).</li>
<li>ASAKI: the HGBT allocation covers about 73% of needs; the average price should be US$8–8.5/MMBTU but reached US$11/MMBTU in October (2026-10-28, source: <a href="https://www.industriproperti.com/nasional/industri-keramik-nasional-2/" target="_blank" rel="noopener">IndustriProperti citing the Ministry of Industry, 28 Oct 2026</a>).</li>
<li>Ceramic products from China already face anti-dumping duties; possible dumping from India still needs study (2026-10-28, source: <a href="https://www.industriproperti.com/nasional/industri-keramik-nasional-2/" target="_blank" rel="noopener">IndustriProperti citing the Ministry of Industry, 28 Oct 2026</a>).</li>
<li>National installed tile capacity reached 686 million m² in 2026; a 2026–2028 expansion adds 110 million m² worth about Rp12 trillion (2026-10-28, source: <a href="https://www.industriproperti.com/nasional/industri-keramik-nasional-2/" target="_blank" rel="noopener">IndustriProperti citing the Ministry of Industry, 28 Oct 2026</a>).</li>
</ul>
<h2>HGBT gas for the ceramic tile industry: price and supply</h2><p>ASAKI raised two issues: gas affordability and reliability. Supply disruptions and usage limits from September to October pushed production costs up. The minister said his ministry will fight for supply certainty so plants can plan output.</p><h3>Impact on tile buyers</h3><ul><li>Higher energy costs may limit factory and distributor discounts in the fourth quarter.</li><li>For projects, lock in prices and delivery dates early, especially for energy-intensive 60×60 and granite tiles.</li><li>Chinese tiles carry anti-dumping duties, narrowing the price gap with local products.</li></ul>
<h2>HGBT gas ceramic tile industry: related articles and products</h2><ul>
<li><a href="/en/news/315">Ceramic industry utilisation falls below 70%</a></li>
<li><a href="/en/news/20">Industrial gas at US$11: ASAKI keeps expanding</a></li>
<li><a href="/en/news/305">Ceramic imports 2026: selective relaxation</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What is current tile plant utilisation?</strong> About 60% or slightly below, according to the industry minister on 26 October 2026.</p>
<p><strong>What gas price does the tile industry pay?</strong> ASAKI says the October 2026 average reached US$11/MMBTU versus US$8–8.5 expected with a 73% HGBT allocation.</p>
<p><strong>Do Chinese tiles face anti-dumping duties?</strong> Yes, the minister said ceramic products from China already face anti-dumping duties.</p>
<p>For building and renovation material needs, reach the homeX team through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.industriproperti.com/nasional/industri-keramik-nasional-2/" target="_blank" rel="noopener">IndustriProperti citing the Ministry of Industry, 28 Oct 2026</a>; <a href="https://wartaekonomi.co.id/read643540/industri-berharap-tambahan-gas-masuk-skema-hgbt-utilisasi-keramik-tertekan" target="_blank" rel="noopener">Warta Ekonomi, 26 Oct 2026</a></em></p>]]></content:encoded></item><item><title>Jakarta Building Material Prices 2026 from the DKI Survey: Cement Rp1,500/kg, Rebar Rp10,000/kg</title><link>https://www.homex.co.id/en/news/324</link><guid isPermaLink="true">https://www.homex.co.id/en/news/324</guid><pubDate>Fri, 30 Oct 2026 14:14:19 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Median 2026 survey prices on the Bangun Jakarta portal: cement Rp1,500/kg, 13 mm rebar Rp10,000/kg, 10 cm AAC block Rp7,300 each, masonry sand Rp525,000/m³.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261030-b-survei-harga-dki.jpg" alt="Jakarta Building Material Prices 2026 from the DKI Survey: Cement Rp1,500/kg, Rebar Rp10,000/kg"></p><p><strong>Jakarta building material prices 2026</strong> from the official survey by the DKI Housing, Spatial Planning and Land Agency on the Bangun Jakarta portal, summarised by Jakartabuilding.id, give median benchmarks per city area. Portland cement is Rp1,500 per kg, 13 mm deformed rebar Rp10,000 per kg and masonry sand Rp525,000 per m³, excluding delivery.</p>
<h2>Key Facts</h2><ul>
<li>Portland cement median Rp1,500/kg (n=113, range Rp1,200–1,800); 40 kg bag median Rp52,350 (n=4) (2026-10-30, source: <a href="https://jakartabuilding.id/harga-bahan-bangunan-jakarta-2026/" target="_blank" rel="noopener">Jakartabuilding.id, Bangun Jakarta portal data (updated 30 Oct 2026)</a>).</li>
<li>Deformed rebar 10 mm Rp10,200/kg, 13 mm Rp10,000/kg, 16 mm Rp10,300/kg and 19 mm Rp11,900/kg (2026-10-30, source: <a href="https://jakartabuilding.id/harga-bahan-bangunan-jakarta-2026/" target="_blank" rel="noopener">Jakartabuilding.id, Bangun Jakarta portal data (updated 30 Oct 2026)</a>).</li>
<li>AAC block 10 cm Rp7,300 each, 7.5 cm Rp5,500 each; red brick Rp650 each (2026-10-30, source: <a href="https://jakartabuilding.id/harga-bahan-bangunan-jakarta-2026/" target="_blank" rel="noopener">Jakartabuilding.id, Bangun Jakarta portal data (updated 30 Oct 2026)</a>).</li>
<li>40×40 floor tile matte Rp10,000 per piece, glossy Rp11,000; C75 0.75 mm light steel Rp100,000 per bar (2026-10-30, source: <a href="https://jakartabuilding.id/harga-bahan-bangunan-jakarta-2026/" target="_blank" rel="noopener">Jakartabuilding.id, Bangun Jakarta portal data (updated 30 Oct 2026)</a>).</li>
<li>Masonry sand cheapest in North Jakarta at Rp455,000/m³, highest in Central Jakarta at Rp599,000/m³ (2026-10-30, source: <a href="https://jakartabuilding.id/harga-bahan-bangunan-jakarta-2026/" target="_blank" rel="noopener">Jakartabuilding.id, Bangun Jakarta portal data (updated 30 Oct 2026)</a>).</li>
</ul>
<h2>Jakarta building material prices 2026 by group</h2><p>The survey uses medians, so one or two extreme prices do not skew it. Concrete sand is Rp500,000/m³, fill sand Rp425,000/m³ and crushed stone Rp600,000/m³. AAC adhesive mortar is Rp2,800/kg, metal roof tile Rp43,000/m² and ridge caps Rp30,000 each.</p><h3>Differences between areas</h3><p>Cement is nearly uniform across the five city areas (South Jakarta Rp1,550/kg). Bulk materials vary most: crushed stone in Central Jakarta is Rp775,000/m³, about 38% above North Jakarta. 13 mm rebar is cheapest in West and South Jakarta at Rp9,200/kg and highest in Central Jakarta at Rp11,100/kg.</p><h2>How to use the data</h2><ul><li>Use it as a benchmark for a bill of quantities, then ask stores for quotes including delivery.</li><li>Tangerang and nearby areas may differ; compare per kg or per m³, not only per bag or truck.</li><li>Check rebar weight per metre against SNI to avoid undersized bars.</li></ul>
<h2>Jakarta building material prices 2026: related articles and products</h2><ul>
<li><a href="/en/news/7">Construction wholesale price index up 9.63% in September 2026</a></li>
<li><a href="/en/news/40">40 kg cement prices by brand 2026</a></li>
<li><a href="/en/news/168">How to check SNI rebar</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What does cement cost in Jakarta per the 2026 DKI survey?</strong> A median of Rp1,500 per kg; the 40 kg bag median is Rp52,350, but from only 4 data points.</p>
<p><strong>What is rebar per kg?</strong> 13 mm deformed rebar has a median of Rp10,000/kg; 19 mm is Rp11,900/kg.</p>
<p><strong>Do prices include delivery?</strong> No; survey prices exclude delivery to site.</p>
<p>For building and renovation material needs, reach the homeX team through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://jakartabuilding.id/harga-bahan-bangunan-jakarta-2026/" target="_blank" rel="noopener">Jakartabuilding.id, Bangun Jakarta portal data (updated 30 Oct 2026)</a> Median survey prices may differ from store prices; confirm before buying.</em></p>]]></content:encoded></item><item><title>BSPS Home Renovation Programme at 70.9%: Disbursement Pushed Through End-October</title><link>https://www.homex.co.id/en/news/323</link><guid isPermaLink="true">https://www.homex.co.id/en/news/323</guid><pubDate>Fri, 30 Oct 2026 14:14:19 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>The BSPS home renovation programme reached 70.9% as of 26 October 2026; the housing ministry is pushing disbursement through end-October so work finishes by year-end.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261030-b-bsps-709.jpg" alt="BSPS Home Renovation Programme at 70.9%: Disbursement Pushed Through End-October"></p><p><strong>BSPS home renovation progress</strong> (Indonesia's self-help housing stimulus) reached 70.9% as of 26 October 2026. The Ministry of Housing and Settlements (PKP) is speeding up verification and disbursement through the end of October so recipients have about two months to finish renovation before year-end.</p>
<h2>Key Facts</h2><ul>
<li>Director General of Settlements Fitrah Nur put BSPS achievement at 70.9% as of 26 October 2026 (2026-10-27, source: <a href="https://aktual.com/pkp-hapus-syarat-2-komponen-rusak-program-bedah-rumah-capai-709-persen/" target="_blank" rel="noopener">Aktual.com, 27 Oct 2026</a>).</li>
<li>West Java has the largest BSPS allocation, about 49,000 homes (2026-10-27, source: <a href="https://aktual.com/pkp-hapus-syarat-2-komponen-rusak-program-bedah-rumah-capai-709-persen/" target="_blank" rel="noopener">Aktual.com, 27 Oct 2026</a>).</li>
<li>Of 39,000 units proposed via five ministries and agencies, only 15,960 (42.45%) had been disbursed and 204 homes completed (2026-10-27, source: <a href="https://aktual.com/pkp-hapus-syarat-2-komponen-rusak-program-bedah-rumah-capai-709-persen/" target="_blank" rel="noopener">Aktual.com, 27 Oct 2026</a>).</li>
<li>The home renovation target rose from 45,000 units in 2025 to 400,000 units in 2026 (2026-10-23, source: <a href="https://pkp.go.id/berita/detail/hingga-15-oktober-2026-pembangunan-dan-peningkatan-kualitas-rumah-capai-1790081-unit" target="_blank" rel="noopener">Ministry of Housing (PKP), 23 Oct 2026</a>).</li>
</ul>
<h2>BSPS home renovation progress and the new rule</h2><p>According to Aktual.com, the ministry dropped the requirement that two building components be damaged, speeding up verification. The government aims to maximise disbursement through end-October 2026. Housing Minister Maruarar Sirait stressed targeting by house condition and household income.</p><h3>Materials used most</h3><ul><li>BSPS work usually covers roofs, floors and walls: light steel, metal roof tiles, cement, AAC blocks and ceramic tiles.</li><li>Disbursement bunched at year-end can lift demand at regional building stores quickly; suppliers should stock up from November.</li></ul>
<h2>BSPS home renovation progress: related articles and products</h2><ul>
<li><a href="/en/news/22">BSPS 2026 targets 400,000 homes at Rp17.5 million each</a></li>
<li><a href="/en/news/58">AAC block prices 2026</a></li>
<li><a href="/en/news/59">Roof tile prices 2026</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What is BSPS progress in 2026?</strong> 70.9% as of 26 October 2026, according to the ministry's Director General of Settlements.</p>
<p><strong>Which province has the largest allocation?</strong> West Java, about 49,000 homes.</p>
<p><strong>What is the 2026 renovation target?</strong> 400,000 homes, up from 45,000 in 2025.</p>
<p>For building and renovation material needs, reach the homeX team through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://aktual.com/pkp-hapus-syarat-2-komponen-rusak-program-bedah-rumah-capai-709-persen/" target="_blank" rel="noopener">Aktual.com, 27 Oct 2026</a>; <a href="https://pkp.go.id/berita/detail/hingga-15-oktober-2026-pembangunan-dan-peningkatan-kualitas-rumah-capai-1790081-unit" target="_blank" rel="noopener">Ministry of Housing (PKP), 23 Oct 2026</a></em></p>]]></content:encoded></item><item><title>Krakatau Steel Plans 1.2 Million-Tonne Nickel Slab Project Worth Rp6.36 Trillion</title><link>https://www.homex.co.id/en/news/322</link><guid isPermaLink="true">https://www.homex.co.id/en/news/322</guid><pubDate>Fri, 30 Oct 2026 14:14:19 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Krakatau Steel plans a nickel downstream facility producing 1.2 million tonnes of slab a year, worth US$350 million (Kompas, 29 Oct 2026).</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261030-b-krakatau-slab-nikel.jpg" alt="Krakatau Steel Plans 1.2 Million-Tonne Nickel Slab Project Worth Rp6.36 Trillion"></p><p>A <strong>Krakatau Steel nickel slab</strong> plant is the state steelmaker's latest project: a downstream facility turning nickel into slab with capacity of 1.2 million tonnes a year. Investment is estimated at US$350 million, about Rp6.36 trillion, announced at the Danantara Technology Innovation Investment Forum 2026 in Jakarta.</p>
<h2>Key Facts</h2><ul>
<li>Krakatau Steel plans a nickel-to-slab downstream project with capacity of 1.2 million tonnes a year (2026-10-29, source: <a href="https://money.kompas.com/read/2026/10/29/111200526/investasi-rp-6-36-triliun-krakatau-steel-garap-proyek-hilirisasi-nikel-1-2" target="_blank" rel="noopener">Kompas.com, 29 Oct 2026</a>).</li>
<li>Estimated investment is US$350 million, about Rp6.36 trillion at Rp18,180 per US dollar (2026-10-29, source: <a href="https://money.kompas.com/read/2026/10/29/111200526/investasi-rp-6-36-triliun-krakatau-steel-garap-proyek-hilirisasi-nikel-1-2" target="_blank" rel="noopener">Kompas.com, 29 Oct 2026</a>).</li>
<li>The facility is projected to generate annual revenue of more than US$2 billion (2026-10-29, source: <a href="https://money.kompas.com/read/2026/10/29/111200526/investasi-rp-6-36-triliun-krakatau-steel-garap-proyek-hilirisasi-nikel-1-2" target="_blank" rel="noopener">Kompas.com, 29 Oct 2026</a>).</li>
<li>The plan was presented at DTIIF 2026, held 26–28 October 2026 in Jakarta (2026-10-29, source: <a href="https://money.kompas.com/read/2026/10/29/111200526/investasi-rp-6-36-triliun-krakatau-steel-garap-proyek-hilirisasi-nikel-1-2" target="_blank" rel="noopener">Kompas.com, 29 Oct 2026</a>).</li>
</ul>
<h2>What the Krakatau Steel nickel slab project means</h2><p>Krakatau Steel's director of infrastructure and operations Sidik Darusulistyo said the project aims to add value to processed nickel. Slab is a semi-finished product later rolled into plate or sheet. Construction timing and final product specifications have not been announced.</p><h3>Context for construction steel buyers</h3><ul><li>The project does not affect current rebar or light-steel prices; any effect comes only after the plant runs.</li><li>The domestic steel market is still under import pressure; imports reached about 7 million tonnes by August 2026 (see related article).</li><li>On projects, keep checking SNI marks and weight per metre of rebar on delivery.</li></ul>
<h2>Krakatau Steel nickel slab: related articles and products</h2><ul>
<li><a href="/en/news/21">Steel imports reach 7 million tonnes by August 2026</a></li>
<li><a href="/en/news/168">How to check SNI rebar: weight per metre</a></li>
<li><a href="/en/news/45">Light steel prices per bar 2026</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What is the capacity of the Krakatau Steel nickel slab project?</strong> 1.2 million tonnes of slab a year.</p>
<p><strong>How much is the investment?</strong> About US$350 million, or Rp6.36 trillion at Rp18,180 per US dollar.</p>
<p><strong>Will rebar prices fall right away?</strong> There is no sign of that; the project is still at the planning stage.</p>
<p>For building and renovation material needs, reach the homeX team through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://money.kompas.com/read/2026/10/29/111200526/investasi-rp-6-36-triliun-krakatau-steel-garap-proyek-hilirisasi-nikel-1-2" target="_blank" rel="noopener">Kompas.com, 29 Oct 2026</a></em></p>]]></content:encoded></item><item><title>Construction Worker Certification 2026: 41,824 Certified, Surabaya Leads</title><link>https://www.homex.co.id/en/news/321</link><guid isPermaLink="true">https://www.homex.co.id/en/news/321</guid><pubDate>Fri, 30 Oct 2026 14:14:19 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Indonesia&#x27;s Ministry of Public Works certified 41,824 construction workers by 22 October 2026; the Surabaya regional office led with 14,288.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261030-b-sertifikasi-tkk.jpg" alt="Construction Worker Certification 2026: 41,824 Certified, Surabaya Leads"></p><p>Indonesia's <strong>construction worker certification</strong> drive by the Ministry of Public Works reached 41,824 people by 22 October 2026. The Directorate General of Construction ran it through seven regional construction service centres (BJKW), with Surabaya, Jakarta and Makassar accounting for about two-thirds of participants.</p>
<h2>Key Facts</h2><ul>
<li>The Ministry of Public Works recorded 41,824 certified construction workers as of 22 October 2026 (2026-10-27, source: <a href="https://www.antaranews.com/berita/5814063/pu-cetak-41824-tenaga-konstruksi-untuk-perkuat-sdm-infrastruktur" target="_blank" rel="noopener">ANTARA, 27 Oct 2026</a>).</li>
<li>BJKW IV Surabaya certified 14,288, BJKW III Jakarta 6,872 and BJKW VI Makassar 6,691 (2026-10-27, source: <a href="https://www.antaranews.com/berita/5814063/pu-cetak-41824-tenaga-konstruksi-untuk-perkuat-sdm-infrastruktur" target="_blank" rel="noopener">ANTARA, 27 Oct 2026</a>).</li>
<li>Banda Aceh 4,867, Palembang 3,478, Banjarmasin 3,311 and Jayapura 2,317 (2026-10-26, source: <a href="https://news.detik.com/berita/d-8724294/kementerian-pu-bina-41-824-tenaga-kerja-konstruksi-hingga-oktober-2026" target="_blank" rel="noopener">detikNews, 26 Oct 2026</a>).</li>
<li>Coverage spans skilled levels 1–6, expert level 7, instructors, assessors and management support staff (2026-10-26, source: <a href="https://news.detik.com/berita/d-8724294/kementerian-pu-bina-41-824-tenaga-kerja-konstruksi-hingga-oktober-2026" target="_blank" rel="noopener">detikNews, 26 Oct 2026</a>).</li>
</ul>
<h2>Construction worker certification by region</h2><p>Public Works Minister Dody Hanggodo said certification should make workers more professional, efficient and safe. Training covers safety and quality standards as well as technical skills. East Java, through BJKW Surabaya, contributed most, followed by Jakarta, which also serves Banten and West Java.</p><h3>Why it matters to project owners</h3><ul><li>Government tenders and many main contractors require a work competency certificate (SKK) for site staff.</li><li>Certified tradespeople tend to follow material specifications, such as tile adhesive use, mortar ratios and light-steel installation per manufacturer.</li><li>Homeowners can ask for SKK when choosing a renovation contractor.</li></ul>
<h2>Construction worker certification Indonesia: related articles and products</h2><ul>
<li><a href="/en/news/31">Builder certification: ministry targets 40,000 workers by 2027</a></li>
<li><a href="/en/news/309">Construction worker safety and K3 training</a></li>
<li><a href="/en/news/95">Tile and granite installation cost per m² 2026</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>How many construction workers has the ministry certified this year?</strong> 41,824 by 22 October 2026, according to the Directorate General of Construction.</p>
<p><strong>Which region certified the most?</strong> BJKW IV Surabaya with 14,288, followed by Jakarta with 6,872 and Makassar with 6,691.</p>
<p><strong>Who is covered?</strong> Skilled workers levels 1–6, experts at level 7, instructors and assessors, pilot workers and management support staff.</p>
<p>For building and renovation material needs, reach the homeX team through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://www.antaranews.com/berita/5814063/pu-cetak-41824-tenaga-konstruksi-untuk-perkuat-sdm-infrastruktur" target="_blank" rel="noopener">ANTARA, 27 Oct 2026</a>; <a href="https://news.detik.com/berita/d-8724294/kementerian-pu-bina-41-824-tenaga-kerja-konstruksi-hingga-oktober-2026" target="_blank" rel="noopener">detikNews, 26 Oct 2026</a></em></p>]]></content:encoded></item><item><title>NabungDP Home Down-Payment Savings by Perumnas and BTN, Plus 40-Year Subsidised Mortgages</title><link>https://www.homex.co.id/en/news/320</link><guid isPermaLink="true">https://www.homex.co.id/en/news/320</guid><pubDate>Fri, 30 Oct 2026 14:14:19 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Perumnas and BTN launched NabungDP, a home down-payment savings plan; BP Tapera highlights subsidised mortgages of up to 40 years (ANTARA, 29 Oct 2026).</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261030-b-nabungdp.jpg" alt="NabungDP Home Down-Payment Savings by Perumnas and BTN, Plus 40-Year Subsidised Mortgages"></p><p>A <strong>home down payment savings</strong> plan called NabungDP was launched by state housing developer Perumnas and Bank BTN in Jakarta in late October 2026. Buyers save their deposit in a BTN account in their own name while their Perumnas home is being built, so the bank can see the saving record when a mortgage is requested. On the same day BP Tapera highlighted subsidised mortgages with tenors of up to 40 years.</p>
<h2>Key Facts</h2><ul>
<li>Perumnas and BTN launched NabungDP, their first joint home down-payment savings programme (2026-10-29, source: <a href="https://mataram.antaranews.com/berita/579323/program-nabungdp-membantu-mudahkan-masyarakat-miliki-rumah" target="_blank" rel="noopener">ANTARA Mataram, 29 Oct 2026 (NabungDP)</a>).</li>
<li>According to Perumnas, banks usually look for at least 6 months of consistent saving, which helps informal workers without payslips (2026-10-29, source: <a href="https://mataram.antaranews.com/berita/579323/program-nabungdp-membantu-mudahkan-masyarakat-miliki-rumah" target="_blank" rel="noopener">ANTARA Mataram, 29 Oct 2026 (NabungDP)</a>).</li>
<li>BP Tapera says subsidised mortgages now offer tenors of up to 40 years, a fixed rate to maturity, VAT borne by the government, down-payment aid and free BPHTB (2026-10-29, source: <a href="https://www.antaranews.com/berita/5818327/bp-tapera-pemerintah-beri-kesempatan-emas-generasi-muda-miliki-rumah" target="_blank" rel="noopener">ANTARA, 29 Oct 2026 (BP Tapera)</a>).</li>
<li>The head of Bappenas said housing has a large multiplier effect on other industries (2026-10-29, source: <a href="https://www.antaranews.com/berita/5818687/kepala-bappenas-sektor-perumahan-miliki-efek-pengganda-yang-besar" target="_blank" rel="noopener">ANTARA, 29 Oct 2026 (Bappenas)</a>).</li>
</ul>
<h2>How the NabungDP home down payment savings work</h2><p>Acting Perumnas CEO Imelda Alini Pohan said buyers struggle with raising a deposit, high instalments and bank approval. Under NabungDP the money sits in a personal BTN account; once the deposit target is reached the saver can sign the mortgage for a Perumnas home. Existing homeowners can use it to save for a next home.</p><h3>Link to 40-year subsidised mortgages</h3><p>BP Tapera stressed that subsidised mortgage quotas are now ample and that long tenors target young workers early in their careers. Bappenas urged an integrated housing ecosystem and the use of domestic products.</p><h2>What it means for building materials</h2><ul><li>More approved buyers keeps demand for new landed homes and basic materials (cement, AAC blocks, light steel, tiles) steady.</li><li>Subsidised-housing developers buy in volume to standard specs, so steady supply and price matter more than brand.</li><li>Post-handover renovation adds demand for paint, ceilings and sanitary ware.</li></ul>
<h2>Home down payment savings: related articles and products</h2><ul>
<li><a href="/en/news/23">FLPP subsidised mortgages reach 185,333 units by 20 October 2026</a></li>
<li><a href="/en/news/22">BSPS home renovation programme targets 400,000 units in 2026</a></li>
<li><a href="/en/news/117">Indonesia building materials market trends 2026</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>What is NabungDP?</strong> A down-payment savings programme by Perumnas and BTN launched in late October 2026; funds are kept in a BTN account in the saver's name.</p>
<p><strong>How long do banks look at the saving record?</strong> Perumnas says banks usually look for at least 6 months of consistent saving.</p>
<p><strong>What is the longest subsidised mortgage tenor?</strong> BP Tapera cites an option of up to 40 years with a fixed rate to maturity.</p>
<p>For building and renovation material needs, reach the homeX team through our <a href="/contact">contact page</a>.</p>
<p><em>Sources: <a href="https://mataram.antaranews.com/berita/579323/program-nabungdp-membantu-mudahkan-masyarakat-miliki-rumah" target="_blank" rel="noopener">ANTARA Mataram, 29 Oct 2026 (NabungDP)</a>; <a href="https://www.antaranews.com/berita/5818327/bp-tapera-pemerintah-beri-kesempatan-emas-generasi-muda-miliki-rumah" target="_blank" rel="noopener">ANTARA, 29 Oct 2026 (BP Tapera)</a>; <a href="https://www.antaranews.com/berita/5818687/kepala-bappenas-sektor-perumahan-miliki-efek-pengganda-yang-besar" target="_blank" rel="noopener">ANTARA, 29 Oct 2026 (Bappenas)</a></em></p>]]></content:encoded></item><item><title>Cement Shortage in Sumbawa, October 2026: Retail Price Up to Rp100,000 per Bag</title><link>https://www.homex.co.id/en/news/319</link><guid isPermaLink="true">https://www.homex.co.id/en/news/319</guid><pubDate>Fri, 30 Oct 2026 09:58:44 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Cement shortage in Sumbawa, NTB: producer stock empty and retail prices up from Rp83,000 to Rp100,000 per bag (ANTARA, 28 Oct 2026).</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261024-a-pengiriman-semen-antarpulau.jpg" alt="Cement Shortage in Sumbawa, October 2026: Retail Price Up to Rp100,000 per Bag"></p><p>A <strong>cement shortage</strong> hit Sumbawa Regency, West Nusa Tenggara, in late October 2026. The regency trade office said producer stock was completely empty, and retail prices that had been about Rp83,000 per bag were reported up to Rp100,000 at some retailers. For comparison, 40 kg cement in East Java was still about Rp48,000–57,000 per bag on 29 October 2026.</p>
<h2>Key Facts</h2><ul>
<li>Sumbawa's trade office confirmed producer cement stock was empty, blaming factory production problems and coal and fuel supply constraints (2026-10-28, source: <a href="https://mataram.antaranews.com/berita/579027/sumbawa-telusuri-kelangkaan-semen-pemicu-kenaikan-harga" target="_blank" rel="noopener">ANTARA Mataram</a>).</li>
<li>Retail cement prices in Sumbawa rose from about Rp83,000 to as much as Rp100,000 per bag, pending confirmation with traders (2026-10-28, source: <a href="https://mataram.antaranews.com/berita/579027/sumbawa-telusuri-kelangkaan-semen-pemicu-kenaikan-harga" target="_blank" rel="noopener">ANTARA Mataram</a>).</li>
<li>In Mataram, cement rose from a normal Rp60,000 to Rp80,000–87,000 per bag; distributors received 1 ship a month instead of the usual 4 (2026-10-02, source: <a href="https://mataram.antaranews.com/berita/573851/disdag-mataram-turun-pantau-kenaikan-harga-semen" target="_blank" rel="noopener">ANTARA Mataram</a>).</li>
<li>East Java consumer prices: Semen Gresik 40 kg Rp57,046, Semen Padang 40 kg Rp48,959, Semen Bosowa 40 kg Rp48,230 (2026-10-29, source: <a href="https://siskaperbapo.indagjatim.com/display/show" target="_blank" rel="noopener">SISKAPERBAPO, East Java Trade Office</a>).</li>
</ul>
<h2>Causes of the cement shortage in Sumbawa</h2>
<p>According to the head of Sumbawa's trade office, ES Adi Nusantara, coordination with the provincial office showed the shortage stems from production disruptions at the factory level and energy supply problems, mainly coal and fuel. Long fuel queues also delayed cement trucks. The local government has also received complaints that some stores required buyers to purchase other materials to get cement.</p>
<h3>The same pattern since early October</h3>
<p>In early October, Mataram's trade office noted that one cement ship usually carries about 7,600 tonnes (about 150,000 bags). With deliveries falling from four ships to one a month, each store received only about 20–50 bags. The office said distributor prices stayed normal; the jump happened at retail level.</p>
<h2>What it means for buyers and contractors</h2>
<ul><li>Compare prices per kg and per brand; regional gaps are currently very large.</li>
<li>For projects outside Java, build ship schedules and unloading queues into the work plan.</li>
<li>Avoid panic buying; local governments urge buying only what is needed.</li></ul>
<h2>Cement shortage: related articles and products</h2>
<ul><li><a href="/news/9">Cement price per bag and empty stock in Bima, NTB</a></li>
<li><a href="/news/40">40 kg cement prices by brand in Greater Jakarta, 2026</a></li>
<li><a href="/news/316">Inter-island cement shipping and its risks</a></li>
<li><a href="/products">homeX building materials catalog</a></li></ul>
<h2>FAQ</h2>
<p><strong>Why is cement scarce in Sumbawa?</strong> According to Sumbawa's trade office (28 Oct 2026), factory production was disrupted and coal and fuel supplies were delayed, leaving producer stock empty and trucks late.</p>
<p><strong>How much does cement cost in Sumbawa now?</strong> ANTARA reported a rise from about Rp83,000 to as much as Rp100,000 per bag at some retailers, still pending confirmation with traders.</p>
<p><strong>What are East Java cement prices for comparison?</strong> SISKAPERBAPO data for 29 Oct 2026: Semen Gresik 40 kg Rp57,046, Padang Rp48,959, Tonasa Rp48,506, Bosowa Rp48,230.</p>
<p><em>Sources: <a href="https://mataram.antaranews.com/berita/579027/sumbawa-telusuri-kelangkaan-semen-pemicu-kenaikan-harga" target="_blank" rel="noopener">ANTARA Mataram, 28 October 2026</a>; <a href="https://mataram.antaranews.com/berita/573851/disdag-mataram-turun-pantau-kenaikan-harga-semen" target="_blank" rel="noopener">ANTARA Mataram, 2 October 2026</a>; <a href="https://siskaperbapo.indagjatim.com/display/show" target="_blank" rel="noopener">SISKAPERBAPO East Java, 29 October 2026</a>. Prices may change; confirm with the seller before buying.</em></p>
<p class="hx-askprice" style="margin-top:24px"><a href="https://wa.me/628211818998" target="_blank" rel="noopener" style="display:inline-block;background:#25D366;color:#fff;padding:10px 18px;border-radius:6px;font-weight:600;text-decoration:none">Ask for a Price on WhatsApp +62 821 1818 998</a></p>]]></content:encoded></item><item><title>Indocement Market Share September 2026 Hits 31.6%: Volumes and Energy Costs</title><link>https://www.homex.co.id/en/news/318</link><guid isPermaLink="true">https://www.homex.co.id/en/news/318</guid><pubDate>Sat, 24 Oct 2026 16:06:40 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Indocement (INTP) market share rose to 31.6% in September 2026 on 1.9 million tons (+12.1% YoY), while energy costs push it toward dry-mix mortar.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/news_20261023_a4.jpg" alt="Indocement Market Share September 2026 Hits 31.6%: Volumes and Energy Costs"></p><p><strong>Indocement market share</strong> in Indonesia's domestic cement market rose to 31.6% in September 2026, the highest since at least 2021, according to Mirae Asset Sekuritas research quoted by Kontan. At the same time, coal and industrial diesel costs are squeezing production, so Indocement is pushing value-added products such as dry-mix mortar. For contractors and building-material shops in Greater Jakarta, this shifts brand availability and instant-cement choices.</p>
<h2>Key Facts</h2><ul>
<li>Indocement (INTP) September 2026 sales volume: 1.9 million tons, up 1.9% MoM and 12.1% YoY; market share 31.6% (2026-10-22, source: <a href="https://investasi.kontan.co.id/news/konsumsi-semen-naik-per-september-2026-simak-prospek-kinerja-emiten-semen" target="_blank" rel="noopener">Kontan</a>).</li>
<li>Semen Indonesia (SMGR) domestic market share fell to 44% in September 2026, its lowest since at least 2021 (2026-10-22, source: <a href="https://investasi.kontan.co.id/news/konsumsi-semen-naik-per-september-2026-simak-prospek-kinerja-emiten-semen" target="_blank" rel="noopener">Kontan</a>).</li>
<li>INTP volume January–September 2026: 14.1 million tons, up 7.8% YoY (2026-10-22, source: <a href="https://investasi.kontan.co.id/news/konsumsi-semen-naik-per-september-2026-simak-prospek-kinerja-emiten-semen" target="_blank" rel="noopener">Kontan</a>).</li>
<li>First half 2026: INTP cement and clinker sales 9.56 million tons (+7.6% YoY), profit for the period Rp589.6 billion (+19.2%) (2026-09-09, source: <a href="https://topkonstruksi.com/inovasi-semen-mortar-jadi-strategi-indocement-hadapi-tekanan-biaya-energi/" target="_blank" rel="noopener">Top Konstruksi</a>).</li>
<li>National cement capacity is about 120 million tons a year with utilisation of about 56%, per ASI data (2026-09-09, source: <a href="https://topkonstruksi.com/inovasi-semen-mortar-jadi-strategi-indocement-hadapi-tekanan-biaya-energi/" target="_blank" rel="noopener">Top Konstruksi</a>).</li></ul>
<h2>Indocement market share grows as cement demand firms</h2>
<p>Domestic cement consumption reached 6 million tons in September 2026, up 3% YoY, led by bulk cement at 1.9 million tons (+8.2% YoY). INTP grew faster than the market, while SMGR group volume fell to 3 million tons (-12.3% YoY). Mirae Asset raised its 2026 domestic consumption estimate to 66.9 million tons.</p>
<h2>Energy cost pressure and the mortar strategy</h2>
<p>Higher coal and industrial diesel prices and a stronger US dollar have raised production costs. Indocement is responding by diversifying into value-added derivatives such as dry-mix mortar, amid industry overcapacity.</p>
<h2>What it means for building-material buyers</h2>
<p>For renovation projects, compare cement and instant-cement brands per project, since prices and stock vary by region. See also <a href="/news/177">cement consumption in September 2026</a> and <a href="/news/50">dry-mix mortar prices 2026</a>, or browse the <a href="/products">homeX building materials catalogue</a>.</p>
<h2>FAQ</h2>
<p><strong>What was Indocement's market share in September 2026?</strong> About 31.6%, on 1.9 million tons, according to Mirae Asset research quoted by Kontan on 22 October 2026.</p>
<p><strong>Why is Indocement pushing dry-mix mortar?</strong> Rising energy costs (coal, diesel) and industry overcapacity make value-added products such as mortar more attractive.</p>
<p><em>Sources (checked 24 October 2026): <a href="https://investasi.kontan.co.id/news/konsumsi-semen-naik-per-september-2026-simak-prospek-kinerja-emiten-semen" target="_blank" rel="noopener">Kontan, 22 October 2026</a>; <a href="https://topkonstruksi.com/inovasi-semen-mortar-jadi-strategi-indocement-hadapi-tekanan-biaya-energi/" target="_blank" rel="noopener">Top Konstruksi, 9 September 2026</a>.</em></p>
<p class="hx-askprice" style="margin-top:24px"><a href="https://wa.me/628211818998?text=Hello%20homeX%2C%20I%20would%20like%20a%20price" target="_blank" rel="noopener" style="display:inline-block;background:#25D366;color:#fff;padding:10px 18px;border-radius:6px;font-weight:600;text-decoration:none">Ask for a Price on WhatsApp +62 821 1818 998</a></p>]]></content:encoded></item><item><title>Cement Supply Chain Digitalisation in Indonesia: SIG AI and AksesToko</title><link>https://www.homex.co.id/en/news/317</link><guid isPermaLink="true">https://www.homex.co.id/en/news/317</guid><pubDate>Sat, 24 Oct 2026 09:29:03 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Cement supply chain digitalisation at SIG: AI sets delivery priority from customer stock, and the AksesToko app serves building shops. Facts and impact.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261024-a-digitalisasi-rantai-pasok-semen.jpg" alt="Cement Supply Chain Digitalisation in Indonesia: SIG AI and AksesToko"></p><p><strong>Cement supply chain digitalisation</strong> in Indonesia is most visible at PT Semen Indonesia (Persero) Tbk (SIG), which according to ANTARA (9 September 2026) uses digital tools and artificial intelligence (AI) to manage distribution from 10 integrated plants, 26 packing plants, 6 grinding plants and 7 ports to more than 300 distributors and 63,000 retail stores. SIG reported that AI helped raise order fulfilment by 1.16%, about 118,000 tonnes of cement, and cut data consolidation from days to 2 hours. For building-material shops, stock and order data increasingly decide how fast supply arrives.</p>
<h2>Cement supply chain digitalisation at SIG: what is already running</h2><p>In a press release dated 16 July 2025, SIG explained that digital tools are used from inventory monitoring at distribution facilities to supply-chain cost reports presented in real time. AI recommends delivery priorities based on stock levels in customer warehouses and makes forecasts from customer transaction history. Reported results for November 2024 to February 2025: lower stock-out risk at distribution facilities, order fulfilment up 1.16% (equal to 118,000 tonnes) and data consolidation down to 2 hours. Note that these figures come from a 2025 release, not the latest data.</p>
<ul><li><strong>First-half 2026 results (ANTARA):</strong> sales volume 18.28 million tonnes (up 5.6%), domestic 14.18 million tonnes (up 9.7%), revenue Rp17.65 trillion (up 13.1%), net profit Rp207 billion.</li><li><strong>Brands:</strong> nine cement brands, including Semen Gresik, Semen Padang, Semen Tonasa, Dynamix and Semen Kujang.</li><li><strong>Distribution:</strong> more than 300 distributors in Indonesia and Vietnam, and more than 63,000 retail stores in Indonesia.</li></ul>
<h3>AksesToko: ordering cement from a phone</h3><p>On the shop side, SIG runs AksesToko, a digital service that, according to its official site, connects PT Semen Indonesia with building-material shop owners to simplify ordering, payment and delivery to shops or project sites, with a loyalty points programme. The site shows 137 distributors, 179,611 transactions per year and 18,349 AksesToko partners, and says transactions take less than 15 minutes. These are site claims we read on 24 October 2026 and did not verify independently.</p>
<h3>What it means for shops and contractors</h3><p>If delivery priority is calculated from stock in customer warehouses, shops that record stock and orders carefully will find it easier to be served on time. Contractors also benefit when suppliers can show real stock and delivery status rather than verbal promises. Competition is tight as well: September 2026 sales data show market shares between producers shifting (see our cement consumption article), so speed and reliability of distribution become a differentiator.</p>
<h3>Simple steps to start</h3><ul><li>Record daily cement stock by brand and bag size, at least in a spreadsheet.</li><li>Set a minimum stock level that triggers a reorder.</li><li>Ask suppliers for written confirmation of delivery schedules and shipment status.</li><li>Combine cement orders with other materials to make delivery cost per tonne more efficient.</li></ul>
<p>homeX is also building data-driven ordering, warehousing and delivery of building materials from Tangerang for project and shop customers.</p>
<h2>Request a cement and building materials quote for your project</h2><p>homeX can compare several brands at once and prepare a written quote for projects, renovations or shop stock. Send your needs (brand, size, quantity, location) via <a href="https://wa.me/628211818998">WhatsApp +62 821 1818 998</a>, or visit the homeX showroom: Priskilla Tower, 6th floor, Jl. Atang Sanjaya No.21, Benda, Kota Tangerang, Banten 15125. <a href="/visit">Visit the homeX Showroom</a>.</p>
<h2>FAQ</h2><p><strong>What is an example of cement supply chain digitalisation in Indonesia?</strong> SIG uses digital tools and AI to monitor stock, set delivery priority from customer warehouse stock and forecast orders; building shops can order through the AksesToko app.</p><p><strong>What results did SIG report from AI in its supply chain?</strong> According to SIG&#39;s 16 July 2025 release, order fulfilment rose 1.16% (about 118,000 tonnes) in November 2024–February 2025 and data consolidation fell from days to 2 hours.</p><p><strong>What is AksesToko?</strong> A PT Semen Indonesia digital service for building shops covering ordering, payment and delivery, with a loyalty points programme, according to its official site.</p><h2>Cement supply chain digitalisation: related articles and products</h2><p>Related articles:</p><ul><li><a href="/news/177">Cement Consumption September 2026: 6 Million Tons, 9M Up 7.9%</a></li><li><a href="/news/29">B2B Building Materials Platforms and Supply Chain Digitalisation: From AZKO to Dow</a></li><li><a href="/news/170">Indonesia Logistics Cost Target of 12.5% of GDP: What It Means for Building Materials</a></li><li><a href="/news/40">Cement Price per Bag in Indonesia 2026: Tiga Roda, Gresik, SCG, Merdeka</a></li></ul><p>Related products at homeX:</p><ul><li><a href="/products">See the full homeX building materials catalogue</a></li></ul><p><em>Sources (checked 24 October 2026): <a href="https://www.antaranews.com/berita/5732681/sig-catat-pertumbuhan-kinerja-seiring-penguatan-ekosistem-bisnis-semen" target="_blank" rel="noopener">ANTARA, 9 Sep 2026 — SIG performance and cement business ecosystem (Indonesian)</a>; <a href="https://www.sig.id/sig-optimalkan-digitalisasi-dan-ai-untuk-jaga-kelancaran-pasokan-bahan-bangunan-di-pasar" target="_blank" rel="noopener">SIG press release, 16 Jul 2025 — digitalisation and AI for supply continuity (Indonesian)</a>; <a href="https://web.aksestoko.id/" target="_blank" rel="noopener">AksesToko — official site (read 24 Oct 2026)</a>.</em></p>
<p class="hx-askprice" style="margin-top:24px"><a href="https://wa.me/628211818998?text=Hello%20homeX%2C%20I%20would%20like%20a%20price" target="_blank" rel="noopener" style="display:inline-block;background:#25D366;color:#fff;padding:10px 18px;border-radius:6px;font-weight:600;text-decoration:none">Ask for a Price on WhatsApp +62 821 1818 998</a></p>]]></content:encoded></item><item><title>Inter-Island Cement Shipping: Lessons from the Khatulistiwa 8 Sinking</title><link>https://www.homex.co.id/en/news/316</link><guid isPermaLink="true">https://www.homex.co.id/en/news/316</guid><pubDate>Sat, 24 Oct 2026 09:29:03 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Inter-island cement shipping in focus: MV Khatulistiwa 8, carrying 1,850 t of cement, sank off Tuban on 7 Oct 2026. Official facts and tips for buyers.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261024-a-pengiriman-semen-antarpulau.jpg" alt="Inter-Island Cement Shipping: Lessons from the Khatulistiwa 8 Sinking"></p><p><strong>Inter-island cement shipping</strong> is back in focus after the cargo ship MV Khatulistiwa 8, carrying 1,850 tonnes of cement from the PT Semen Indonesia (SIG) special terminal in Tuban to Sampit, Central Kalimantan, collided with a sand barge and sank on the night of 7 October 2026. Seventeen of the 18 crew survived, one crew member was found dead three days later, and the cargo was lost. For building-material buyers outside Java, it is a reminder of the value of buffer stock, cargo insurance and suppliers with a back-up plan.</p>
<h2>Timeline: an inter-island cement shipping voyage that ended on the seabed</h2><p>According to the Directorate General of Sea Transportation at the Ministry of Transportation, the Indonesian-flagged ship left the SIG Tuban special terminal at 17:30 WIB. At about 21:37 WIB, the agent was told by the chief engineer that the ship had hit a sand-laden barge towed by the tug TB Berkat Bahari, about 9 nautical miles from the terminal, and that the forward hull was leaking. VTS Surabaya broadcast the information on radio Channel 16.</p><ul><li><strong>Cargo:</strong> 1,850 tonnes of cement in polysling packaging, Tuban to Sampit.</li><li><strong>23:07 WIB:</strong> 17 crew including the master were rescued by TB Amazon Harbour and taken to the SIG Tuban terminal.</li><li><strong>23:45 WIB:</strong> the ship listed and sank; the cargo went down with it.</li><li><strong>Follow-up:</strong> the Tanjung Pakis harbour master (KSOP Class III) issued a Notice to Mariners, deployed patrol boat KNP 485 with Basarnas Brondong, and is monitoring possible pollution. The cause is still under investigation.</li><li><strong>10 October 2026:</strong> Kompas.com reported that the chief officer, Mayan Petter Saba, was found dead about 2 miles south of the collision point. The ship was reported to belong to PT Elano Kusuma Shipping.</li></ul>
<h3>Why this matters to building-material buyers</h3><p>Cement, tiles, steel and light steel for projects in Kalimantan, Sulawesi or eastern Indonesia usually travel by sea from plants and warehouses in Java. One lost ship means one cancelled delivery, and buyers at the destination must wait for the next vessel. We found no official report of cement supply disruption in Sampit after this accident, so this article does not claim a shortage. But the risk is real for any project that depends on a single shipment.</p>
<h3>Practical steps for inter-island deliveries</h3><ul><li><strong>Buffer stock:</strong> do not schedule a concrete pour or installation on the day the ship is due; leave room for delays.</li><li><strong>Cargo insurance:</strong> ask whether the price includes marine insurance, who the insured party is and which documents a claim needs.</li><li><strong>Split shipments:</strong> for large volumes, consider several sailings so not all material is on one ship.</li><li><strong>Hand-over point:</strong> state in the contract when risk passes from seller to buyer (warehouse, loading port or project site).</li><li><strong>Packaging:</strong> bulk cement, jumbo bags and 40–50 kg sacks unload differently; check the equipment at the destination port.</li></ul>
<p>homeX handles building-material sales and delivery from Tangerang, near Soekarno-Hatta Airport, and can help plan delivery schedules and compare supplier options for projects outside Java.</p>
<h2>Request a inter-island building materials delivery quote for your project</h2><p>homeX can compare several brands at once and prepare a written quote for projects, renovations or shop stock. Send your needs (brand, size, quantity, location) via <a href="https://wa.me/628211818998">WhatsApp +62 821 1818 998</a>, or visit the homeX showroom: Priskilla Tower, 6th floor, Jl. Atang Sanjaya No.21, Benda, Kota Tangerang, Banten 15125. <a href="/visit">Visit the homeX Showroom</a>.</p>
<h2>FAQ</h2><p><strong>What happened to MV Khatulistiwa 8?</strong> The ship, carrying 1,850 tonnes of cement from Tuban to Sampit, hit a sand barge about 9 nautical miles from the SIG Tuban terminal on 7 October 2026 and sank at about 23:45 WIB.</p><p><strong>How many crew survived?</strong> 17 of the 18 crew survived. The missing chief officer was found dead on 10 October 2026, according to Kompas.com.</p><p><strong>How can I reduce inter-island cement shipping risk?</strong> Keep time and stock buffers, put cargo insurance and the risk-transfer point in writing, and split large volumes across several sailings.</p><h2>Inter-island cement shipping: related articles and products</h2><p>Related articles:</p><ul><li><a href="/news/170">Indonesia Logistics Cost Target of 12.5% of GDP: What It Means for Building Materials</a></li><li><a href="/news/184">B2B Building Materials Supply 2026: Warehouses, ODOL & Logistics</a></li><li><a href="/news/28">Building Material Warehouses Tight as Greater Jakarta Occupancy Hits 96.4%</a></li><li><a href="/news/40">Cement Price per Bag in Indonesia 2026: Tiga Roda, Gresik, SCG, Merdeka</a></li></ul><p>Related products at homeX:</p><ul><li><a href="/products">See the full homeX building materials catalogue</a></li></ul><p><em>Sources (checked 24 October 2026): <a href="https://maritimhub.kemenhub.go.id/publikasi/berita/kemenhub-terbitkan-notice-to-mariners-dan-dukung-pencarian-abk-hilang-pasca-tenggelamnya-mv-khatulistiwa-8-di-perairan-tuban" target="_blank" rel="noopener">Directorate General of Sea Transportation, 8 Oct 2026 — Notice to Mariners, MV Khatulistiwa 8 (Indonesian)</a>; <a href="https://surabaya.kompas.com/read/2026/10/08/211335778/kapal-khatulistiwa-8-terbalik-di-tuban-semua-kru-melompat-ke-laut-17" target="_blank" rel="noopener">Kompas.com, 8 Oct 2026 — Khatulistiwa 8 capsizes off Tuban (Indonesian)</a>; <a href="https://surabaya.kompas.com/read/2026/10/10/175728678/abk-kapal-mv-khatulistiwa-8-yang-tenggelam-di-perairan-tuban-ditemukan" target="_blank" rel="noopener">Kompas.com, 10 Oct 2026 — missing crew member found dead (Indonesian)</a>.</em></p>
<p class="hx-askprice" style="margin-top:24px"><a href="https://wa.me/628211818998?text=Hello%20homeX%2C%20I%20would%20like%20a%20price" target="_blank" rel="noopener" style="display:inline-block;background:#25D366;color:#fff;padding:10px 18px;border-radius:6px;font-weight:600;text-decoration:none">Ask for a Price on WhatsApp +62 821 1818 998</a></p>]]></content:encoded></item><item><title>Indonesia Ceramic Industry Utilisation Falls Below 70% on Gas Curbs</title><link>https://www.homex.co.id/en/news/315</link><guid isPermaLink="true">https://www.homex.co.id/en/news/315</guid><pubDate>Sat, 24 Oct 2026 09:29:03 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Indonesia ceramic industry utilisation fell below 70% in October 2026 on gas curbs; ASAKI says 1,400 workers hit, China tiles face 20–25% anti-dumping duty.</description><content:encoded><![CDATA[<p><img src="https://www.homex.co.id/uploads/site/20261024-a-utilisasi-industri-keramik.jpg" alt="Indonesia Ceramic Industry Utilisation Falls Below 70% on Gas Curbs"></p><p><strong>Indonesia ceramic industry utilisation</strong> fell below 70% in October 2026 because of gas supply restrictions, after reaching 75% in January to August. The Indonesian Ceramic Industry Association (ASAKI) says about 1,400 employees have been affected: around 500 were laid off in July and around 900 are currently furloughed. The government says it will push for gas certainty, while Chinese ceramics already face 20–25% anti-dumping duties and India will be investigated.</p>
<p>The news matters to contractors, building-material shops and homeowners planning tile and granite purchases for year-end projects. Below is a summary of the facts reported on 16 and 21 October 2026, with homeX notes on what buyers can do.</p>
<h2>Indonesia ceramic industry utilisation in 2026: from 75% to below 70%</h2><ul><li><strong>January–August 2026:</strong> utilisation 75%, up from 73% in 2025. The start-of-year target was 78–80%.</li><li><strong>October 2026:</strong> utilisation dropped below 70% due to limits on gas use.</li><li><strong>November–December:</strong> ASAKI chairman Edy Suyanto expects a further fall, possibly to about 60%, if the restrictions continue.</li><li><strong>Workforce:</strong> about 1,400 employees affected; furloughed staff could become layoffs.</li><li><strong>Installed capacity 2026:</strong> 686 million m2; Indonesia is now the world&#39;s fifth-largest ceramic producer, up from seventh.</li></ul>
<p>ASAKI says it reported the problem to the Ministry of Industry in mid-September, but supply disruption continued into October. At the same time, ASAKI is still preparing a second expansion phase for 2026–2028 of 110 million m2, with about Rp12 trillion of investment that could create 7,000–7,500 new jobs, and says Indonesia could overtake Vietnam as the world&#39;s fourth-largest producer if gas supply is smooth. In other words, the current problem is energy supply rather than market demand.</p>
<h3>US$11 gas and ASAKI&#39;s three proposals</h3><p>According to ASAKI, the average gas price paid by the industry in October reached US$11 per MMBTU, although under Energy Ministerial Decree No. 281.K of 2026 the price for HGBT recipients should be about US$8–8.5 per MMBTU, with allocations covering only about 73% of needs. ASAKI proposes faster domestic market obligations (DMO), gas import permits for PGN when supply falls short, and higher priority for ceramics in gas allocation. We covered the gas price in a separate article; the focus here is the impact on output and jobs.</p>
<h3>Anti-dumping: China 20–25%, India to be investigated</h3><p>Industry Minister Muhammad Sarmuji said after meeting ASAKI on 21 October 2026 that Chinese ceramics already carry anti-dumping duties of 20–25%, and he asked the Indonesian Anti-Dumping Committee (KADI) to investigate possible dumping from India. If proven, the ministry will propose duties in line with the dumping margin found. Import relaxation will only be considered for ceramic types not yet produced domestically.</p>
<h3>What it means for buyers and suppliers</h3><p>At the time of writing we found no official announcement of higher tile selling prices. However, lower production can make certain designs or sizes sell out faster. For large projects, order early, get single-batch stock confirmed in writing and prepare alternative designs. For exporters and overseas suppliers, especially from China, anti-dumping duties and stricter SNI rules mean the landed price in Indonesia must be fully calculated before quoting local distributors.</p>
<h2>Request a tile and granite quote for your project</h2><p>homeX can compare several brands at once and prepare a written quote for projects, renovations or shop stock. Send your needs (brand, size, quantity, location) via <a href="https://wa.me/628211818998">WhatsApp +62 821 1818 998</a>, or visit the homeX showroom: Priskilla Tower, 6th floor, Jl. Atang Sanjaya No.21, Benda, Kota Tangerang, Banten 15125. <a href="/visit">Visit the homeX Showroom</a>.</p>
<h2>FAQ</h2><p><strong>What is Indonesia ceramic industry utilisation now?</strong> According to ASAKI, below 70% in October 2026, down from 75% in January–August 2026, and possibly about 60% in November–December if gas limits continue.</p><p><strong>How many ceramic workers are affected?</strong> ASAKI counts about 1,400 employees: around 500 laid off in July and around 900 furloughed as of mid-October 2026.</p><p><strong>What is the anti-dumping duty on Chinese ceramics?</strong> The industry minister cited 20–25% (21 October 2026); suspected dumping from India has been referred to KADI for investigation.</p><h2>Indonesia ceramic industry utilisation: related articles and products</h2><p>Related articles:</p><ul><li><a href="/news/20">Ceramic Tile Prices Indonesia: US$11 Gas Hits Makers as ASAKI Plans 110 Million m² Expansion</a></li><li><a href="/news/116">Guide: Exporting Chinese Building Materials to Indonesia 2026</a></li><li><a href="/news/34">Tile Factories in Indonesia: Ceramic & Granite Brands, Makers, Addresses</a></li><li><a href="/news/167">KW1, KW2, KW3 Ceramic Tiles in Indonesia: Meaning, Price Gap and Checks</a></li></ul><p>Related products at homeX:</p><ul><li><a href="/products">See the full homeX building materials catalogue</a></li></ul><p><em>Sources (checked 24 October 2026): <a href="https://www.cnbcindonesia.com/news/20261016154039-4-776945/900-buruh-keramik-terancam-phk-bos-pengusaha-ungkap-penyebabnya" target="_blank" rel="noopener">CNBC Indonesia, 16 Oct 2026 — 900 ceramic workers face layoffs (Indonesian)</a>; <a href="https://www.cnbcindonesia.com/news/20261021181236-4-778358/pengusaha-keramik-ri-ngadu-ke-menperin-soal-gas-ungkit-soal-vietnam" target="_blank" rel="noopener">CNBC Indonesia, 21 Oct 2026 — ceramic makers take gas issue to industry minister (Indonesian)</a>; <a href="https://www.bloombergtechnoz.com/detail-news/125323/menperin-evaluasi-tarif-antidumping-pasokan-gas-industri-keramik" target="_blank" rel="noopener">Bloomberg Technoz, 21 Oct 2026 — minister to review anti-dumping duties and gas supply (Indonesian)</a>.</em></p>
<p class="hx-askprice" style="margin-top:24px"><a href="https://wa.me/628211818998?text=Hello%20homeX%2C%20I%20would%20like%20a%20price" target="_blank" rel="noopener" style="display:inline-block;background:#25D366;color:#fff;padding:10px 18px;border-radius:6px;font-weight:600;text-decoration:none">Ask for a Price on WhatsApp +62 821 1818 998</a></p>]]></content:encoded></item><item><title>Wasser Faucet Price 2026: Wall Taps, Showers &amp; Mixers at Depo Bangunan</title><link>https://www.homex.co.id/en/news/314</link><guid isPermaLink="true">https://www.homex.co.id/en/news/314</guid><pubDate>Sat, 24 Oct 2026 09:29:03 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Wasser faucet price at Depo Bangunan on 24 Oct 2026: jet shower from Rp98,100, wall tap Rp180,000, mixers from Rp324,996, shower columns to Rp2.8m.</description></item><item><title>Infiniti Granite Tile Price 2026: 60x60 and 60x120 per Box at Mitra10</title><link>https://www.homex.co.id/en/news/313</link><guid isPermaLink="true">https://www.homex.co.id/en/news/313</guid><pubDate>Sat, 24 Oct 2026 09:29:03 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Infiniti granite tile price at Mitra10 on 24 Oct 2026: 60x60 from Rp167,688 to Rp263,500 per 1.44 m2 box, plus 60x120 sizes and homeX per-m2 maths.</description></item><item><title>Drainage Pipe Size for Houses per SNI 8153: 3-Inch Toilet Drain, Slope and Vents</title><link>https://www.homex.co.id/en/news/312</link><guid isPermaLink="true">https://www.homex.co.id/en/news/312</guid><pubDate>Sat, 24 Oct 2026 09:22:36 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Drainage pipe size per SNI 8153:2015: toilet drains min 3 in, 2/3/4-inch capacity 8/35/216 fixture units, slope 20.8 mm/m, floor drains min 80 mm.</description></item><item><title>SNI 8640 Lightweight Brick Standard: Classes, Minimum Strength and Sizes</title><link>https://www.homex.co.id/en/news/311</link><guid isPermaLink="true">https://www.homex.co.id/en/news/311</guid><pubDate>Sat, 24 Oct 2026 09:22:36 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>SNI 8640 lightweight brick rules: class I structural up to 2 storeys, class II non-structural; min strength 6/4/2 MPa, 600x200 mm, 75–150 mm thick.</description></item><item><title>Tile Adhesive Classification C2TE: What C1, C2, T, E and S1 Mean (EN 12004)</title><link>https://www.homex.co.id/en/news/310</link><guid isPermaLink="true">https://www.homex.co.id/en/news/310</guid><pubDate>Sat, 24 Oct 2026 09:22:36 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Tile adhesive classification under EN 12004/ISO 13007: C1 ≥0.5 N/mm², C2 ≥1 N/mm², T slip ≤0.5 mm, E 30 min open time, S1/S2 deformable. Sika, MU-400.</description></item><item><title>Construction Worker Safety Indonesia: Two Fatal Accidents and K3 Training</title><link>https://www.homex.co.id/en/news/309</link><guid isPermaLink="true">https://www.homex.co.id/en/news/309</guid><pubDate>Sat, 24 Oct 2026 09:22:12 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Construction worker safety Indonesia is in focus after two workers died on 20–21 October 2026. Lessons for renovation and delivery, plus free K3 training.</description></item><item><title>AI Road Maintenance Indonesia: Hutama Karya Shows Si Patrol at KRTJ-16</title><link>https://www.homex.co.id/en/news/308</link><guid isPermaLink="true">https://www.homex.co.id/en/news/308</guid><pubDate>Sat, 24 Oct 2026 09:22:12 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>AI road maintenance Indonesia: at KRTJ-16 Hutama Karya showed Si Patrol, which spots potholes and cracks, plus a TLS–BIM bridge model accurate to ±5–10 mm.</description></item><item><title>Giant Sea Wall Java Starts in Demak with Mangroves, HexBricks and Bamboo</title><link>https://www.homex.co.id/en/news/307</link><guid isPermaLink="true">https://www.homex.co.id/en/news/307</guid><pubDate>Sat, 24 Oct 2026 09:22:12 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Giant Sea Wall Java began on 19 October 2026 in Demak with a mangrove, HexBricks and bamboo pilot. Construction of the physical dike is targeted for 2027.</description></item><item><title>Arwana Citramulia Earnings: 9M 2026 Profit Up 22% on Rp2.51T Sales</title><link>https://www.homex.co.id/en/news/306</link><guid isPermaLink="true">https://www.homex.co.id/en/news/306</guid><pubDate>Sat, 24 Oct 2026 09:22:12 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Arwana Citramulia earnings: January–September 2026 profit attributable rose 22.35% to Rp369.6bn on net sales of Rp2.51tn; third-party sales grew 52%.</description></item><item><title>Ceramic Tile Imports Indonesia: Selective Relaxation, Local Output Protected</title><link>https://www.homex.co.id/en/news/305</link><guid isPermaLink="true">https://www.homex.co.id/en/news/305</guid><pubDate>Sat, 24 Oct 2026 09:22:11 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Ceramic tile imports Indonesia: relief only for types not made locally. National capacity is 686 million m², but gas supply is squeezing utilisation.</description></item><item><title>Kalsi Fibre Cement Board: Sizes, Weight and Etex Gresik and Karawang Address</title><link>https://www.homex.co.id/en/news/304</link><guid isPermaLink="true">https://www.homex.co.id/en/news/304</guid><pubDate>Fri, 23 Oct 2026 19:44:09 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Kalsi fibre cement board (PT Etex Building Performance Indonesia): sizes and weights of KalsiRata 3 mm, KalsiBoard Ling 3.5–6 mm, KalsiQua 8 mm, KalsiClad 10–12 mm; Gresik address. As of 23 Oct 2026.</description></item><item><title>Concrete Curing for 7 Days and Formwork Removal at 30 Hours: Bina Marga Guide</title><link>https://www.homex.co.id/en/news/303</link><guid isPermaLink="true">https://www.homex.co.id/en/news/303</guid><pubDate>Fri, 23 Oct 2026 19:44:09 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Concrete curing per Bina Marga guide Pd T-07-2005-B: wet cover at least 7 days, wall formwork 30 hours, beams and slabs 85% of design strength. Road/bridge guide. As of 23 Oct 2026.</description></item><item><title>Construction Electronic Catalogue V6: Mini-Competition or Negotiation, 2026</title><link>https://www.homex.co.id/en/news/302</link><guid isPermaLink="true">https://www.homex.co.id/en/news/302</guid><pubDate>Fri, 23 Oct 2026 19:44:09 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Construction electronic catalogue V6: since the 7 May 2026 notice, main materials may use Mini-Competition or Negotiation; it was Mini-Competition only from 1 Sep 2025. As of 23 Oct 2026.</description></item><item><title>Anti-Alkali Primer for New Walls: Moisture Limits 12%, 17% and 22% per TDS</title><link>https://www.homex.co.id/en/news/301</link><guid isPermaLink="true">https://www.homex.co.id/en/news/301</guid><pubDate>Fri, 23 Oct 2026 19:44:09 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Anti-alkali primer for new walls: Nippon TDS gives a 12% moisture and pH 9 limit, Dulux Diamond Sealer A1000 17%, Dulux Alkali Killer 22%; Jotun states no limit. As of 23 Oct 2026.</description></item><item><title>Hollow Tiles After Installation: Causes and Prevention per Sika and MU TDS</title><link>https://www.homex.co.id/en/news/300</link><guid isPermaLink="true">https://www.homex.co.id/en/news/300</guid><pubDate>Fri, 23 Oct 2026 19:44:09 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Hollow tiles after installation: Sika (11 May 2026) lists 3 causes and double spreading; the SikaCeram-180 and MU-420 TDS give 5.5 and 5 m² per 25 kg bag. As of 23 Oct 2026.</description></item><item><title>Bathroom Waterproofing Flood Test: How Many Hours? Sika vs LATICRETE</title><link>https://www.homex.co.id/en/news/299</link><guid isPermaLink="true">https://www.homex.co.id/en/news/299</guid><pubDate>Fri, 23 Oct 2026 19:44:09 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Bathroom waterproofing flood test: Sika Indonesia says a soak test of at least 2 x 24 hours; LATICRETE TDS 169 (30 Jul 2026) says 24 to 72 hours. As of 23 Oct 2026.</description></item><item><title>Construction Cost Index West Java 2026 and East Java: Bogor 130.33, Gresik 111.23</title><link>https://www.homex.co.id/en/news/298</link><guid isPermaLink="true">https://www.homex.co.id/en/news/298</guid><pubDate>Fri, 23 Oct 2026 19:17:32 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Construction cost index West Java 2026: Bogor Regency 130.33 and Bandung City 130.26 are highest; East Java: Gresik 111.23 is top. Top 10 regencies/cities per province, as of 23 Oct 2026.</description></item><item><title>Construction Companies in Indonesia 2025: 199,006, East Java Leads with 24,564</title><link>https://www.homex.co.id/en/news/297</link><guid isPermaLink="true">https://www.homex.co.id/en/news/297</guid><pubDate>Fri, 23 Oct 2026 19:17:32 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Construction companies in Indonesia 2025 per BPS (via GoodStats): 199,006 companies, 86.66% small. East Java 24,564, West Java 17,916, Central Java 15,418. As of 23 Oct 2026.</description></item><item><title>PUIL 2020 for Houses: 30 mA RCD (GPAS) on Sockets and in Bathrooms</title><link>https://www.homex.co.id/en/news/296</link><guid isPermaLink="true">https://www.homex.co.id/en/news/296</guid><pubDate>Fri, 23 Oct 2026 19:17:32 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>PUIL 2020 for houses: clauses 411.3.3 and 415.1 (quoted in a Schneider forum) require a 30 mA maximum RCD (GPAS) for sockets up to 32 A and bathroom circuits. As of 23 Oct 2026.</description></item><item><title>Concrete Grade K to fc Conversion: K-300 Is About 25 MPa (Bina Marga Table 6)</title><link>https://www.homex.co.id/en/news/295</link><guid isPermaLink="true">https://www.homex.co.id/en/news/295</guid><pubDate>Fri, 23 Oct 2026 19:17:32 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Concrete grade K to fc conversion: Table 6 of Pd T-07-2005-B pairs K-300 with fc 25 MPa (15x30 cylinder); the practical rule K/10 x 0.83 gives 24.90. Note the gap at K-500.</description></item><item><title>Steel Pipe Manufacturers in Indonesia: SPINDO, Bakrie Pipe and Plant Addresses</title><link>https://www.homex.co.id/en/news/294</link><guid isPermaLink="true">https://www.homex.co.id/en/news/294</guid><pubDate>Fri, 23 Oct 2026 19:17:32 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Steel pipe manufacturers in Indonesia with official addresses: SPINDO (6 plants + 1 upcoming in Gresik, warehouses) and Bakrie Pipe (Bekasi, South Lampung). As of 23 Oct 2026.</description></item><item><title>Construction Cost Index Indonesia 2026 by Province: Papua Highlands 260.15, NTT 89.06</title><link>https://www.homex.co.id/en/news/293</link><guid isPermaLink="true">https://www.homex.co.id/en/news/293</guid><pubDate>Fri, 23 Oct 2026 19:17:32 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Construction cost index Indonesia 2026 (BPS, released 1 Oct 2026): highest Papua Highlands 260.15, DKI Jakarta 127.36; lowest NTT 89.06, East Java 99.28. Reference city: Medan.</description></item><item><title>Building Materials Wholesale Price Index September 2026: Up 9.63% Year on Year</title><link>https://www.homex.co.id/en/news/292</link><guid isPermaLink="true">https://www.homex.co.id/en/news/292</guid><pubDate>Fri, 23 Oct 2026 18:50:32 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Building materials wholesale price index September 2026: 111.64, up 9.63% y/y and 0.19% m/m (BPS). Rebar +11.99%, cement +7.44%, sand +8.78%, ceramic tiles +12.53%.</description></item><item><title>Jakarta Truck Ban Hours: Planning Building Material Deliveries to Projects</title><link>https://www.homex.co.id/en/news/291</link><guid isPermaLink="true">https://www.homex.co.id/en/news/291</guid><pubDate>Fri, 23 Oct 2026 18:50:32 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Jakarta truck ban hours (Pergub 89/2020): 06.00–09.00 and 16.00–20.00 WIB on in-city toll roads and main non-toll roads. Lebaran 2026: rebar, cement, timber restricted.</description></item><item><title>BoQ for a 2-Storey Boarding House, 3-Storey Shophouse and Warehouse: Cost per m2 2026</title><link>https://www.homex.co.id/en/news/290</link><guid isPermaLink="true">https://www.homex.co.id/en/news/290</guid><pubDate>Fri, 23 Oct 2026 18:50:32 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>BoQ for a 2-storey boarding house, 425.9 m2: Rp2.995 billion (Rp7.03 million/m2 incl. 10% fee). Shophouse 652 m2: Rp2.79 billion. Steel warehouse Rp1.5–6 million/m2.</description></item><item><title>Construction Services Final Income Tax Indonesia 2026: 1.75%, 2.65%, 4% and VAT</title><link>https://www.homex.co.id/en/news/289</link><guid isPermaLink="true">https://www.homex.co.id/en/news/289</guid><pubDate>Fri, 23 Oct 2026 18:50:32 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Construction services final income tax Indonesia 2026 (PP 9/2022): 1.75% small firms, 2.65% medium/large, 4% uncertified; consulting 3.5% or 6%. Rp1 billion example and VAT.</description></item><item><title>Mandatory SNI Building Materials Indonesia 2026: Cement, Rebar, Ceramic Tiles, Steel</title><link>https://www.homex.co.id/en/news/288</link><guid isPermaLink="true">https://www.homex.co.id/en/news/288</guid><pubDate>Fri, 23 Oct 2026 18:50:32 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Mandatory SNI building materials: cement (Permenperin 26/2024, 7 SNI), rebar (55/2024, SNI 2052:2024), ceramic tiles (36/2024), zinc-coated steel (67/2024). What the SNI mark and SPPT SNI mean.</description></item><item><title>RFQ for Building Materials: Spec, Delivery and Payment Checklist for Projects</title><link>https://www.homex.co.id/en/news/287</link><guid isPermaLink="true">https://www.homex.co.id/en/news/287</guid><pubDate>Fri, 23 Oct 2026 18:50:32 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>RFQ for building materials: 10 parts to write, from specification and SNI, VAT, price validity, delivery schedule, down payment, instalments and 5% retention to guarantees.</description></item><item><title>How Many People Fit a Type 36 House? Habitable Area for Types 36, 45, 70</title><link>https://www.homex.co.id/en/news/286</link><guid isPermaLink="true">https://www.homex.co.id/en/news/286</guid><pubDate>Fri, 23 Oct 2026 18:23:57 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>How many people fit a type 36 house? At 7.2 m2 per person: 5; at 9 m2: 4. Type 45: 6 / 5; type 70: 9 / 7. Windows 10%, ventilation 5% of floor area.</description></item><item><title>Minimum Roof Pitch for Roof Tiles, Spandek, uPVC and Bitumen by Brand</title><link>https://www.homex.co.id/en/news/285</link><guid isPermaLink="true">https://www.homex.co.id/en/news/285</guid><pubDate>Fri, 23 Oct 2026 18:23:57 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Minimum roof pitch for roof tiles: M-Class ceramic 25°, RATTA 30°, Kanmuri ideal ≥30°; Onduline Classic &gt;5°, Alderon uPVC 10°, Lysaght Spandek 3° (manufacturer data, 23 Oct 2026).</description></item><item><title>Practical Column, Sloof and Ring Beam for a House: Rebar and Spacing</title><link>https://www.homex.co.id/en/news/284</link><guid isPermaLink="true">https://www.homex.co.id/en/news/284</guid><pubDate>Fri, 23 Oct 2026 18:23:57 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Practical column, sloof and ring beam for a one-storey house (RLH Pocket Book 2025): column 4 D10 + Ø8 stirrups at 15 cm, column spacing 3–4 m, ring beam 15 x 20 cm. Rebar weight per metre.</description></item><item><title>Renovation Contract with a Contractor: Checklist from Article 47 of Law 2/2017</title><link>https://www.homex.co.id/en/news/283</link><guid isPermaLink="true">https://www.homex.co.id/en/news/283</guid><pubDate>Fri, 23 Oct 2026 18:23:57 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>A renovation contract with a contractor must be written (Law 2/2017 Article 46) and cover at least 16 items (Article 47): scope, value, payment, certified workers, building failure and disputes.</description></item><item><title>Rainwater Infiltration Well SNI 8456:2017: Size, Distances and Formulas</title><link>https://www.homex.co.id/en/news/282</link><guid isPermaLink="true">https://www.homex.co.id/en/news/282</guid><pubDate>Fri, 23 Oct 2026 18:23:57 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Rainwater infiltration well SNI 8456:2017: 80–100 cm sides, water table deeper than 2 m, permeability above 2 cm/h. A 100 m2 roof in the standard example needs 8 wells of 3 m (silt, sealed wall).</description></item><item><title>Septic Tank Size per SNI 2398:2017: Dimensions by Users, Distances and Pipes</title><link>https://www.homex.co.id/en/news/281</link><guid isPermaLink="true">https://www.homex.co.id/en/news/281</guid><pubDate>Fri, 23 Oct 2026 18:23:57 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Septic tank size per SNI 2398:2017 (3-year desludging): 5 users 1.6 x 0.8 x 1.6 m (2.1 m3), 10 users 2.1 x 1.0 x 1.8 m (3.9 m3). Minimum 10 m to a drinking-water well.</description></item><item><title>Bank Indonesia Business Activity Survey Q3 2026: SBT 11.46%, Construction 0.92%</title><link>https://www.homex.co.id/en/news/280</link><guid isPermaLink="true">https://www.homex.co.id/en/news/280</guid><pubDate>Fri, 23 Oct 2026 18:05:32 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Bank Indonesia business activity survey Q3 2026 (released 19 Oct 2026): SBT 11.46% (Q2 12.97%), construction 0.92%, real estate 0.34%, capacity utilisation 73.75%; what it means for building materials.</description></item><item><title>Building Approval PBG Cost for a House 2026: Jakarta Formula and Examples</title><link>https://www.homex.co.id/en/news/279</link><guid isPermaLink="true">https://www.homex.co.id/en/news/279</guid><pubDate>Fri, 23 Oct 2026 18:05:32 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Building approval PBG cost for a house 2026 (Jakarta Regional Regulation 1/2024 formula, homeX calculation): a 36 m2 house about Rp224,856-Rp250,452, a 90 m2 two-storey Rp583,220. 2026 SHST not found; not an official bill.</description></item><item><title>Roof Heat Insulation Aluminium Foil Price 2026: Zehn per Roll and m2</title><link>https://www.homex.co.id/en/news/278</link><guid isPermaLink="true">https://www.homex.co.id/en/news/278</guid><pubDate>Fri, 23 Oct 2026 18:05:32 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Roof heat insulation aluminium foil price on 23 Oct 2026: Zehn 30 m2 roll Rp323,910-Rp1,549,000 (about Rp10,797-Rp51,633 per m2), SCG Stay Cool Rp222,400, No Drop heat-reflective paint 16 L Rp1,556,300. homeX calculation for a 100 m2 roof.</description></item><item><title>Glass Mosaic Wall Tile Price per Sheet 2026: Zehn, DBS and Eleganza</title><link>https://www.homex.co.id/en/news/277</link><guid isPermaLink="true">https://www.homex.co.id/en/news/277</guid><pubDate>Fri, 23 Oct 2026 18:05:32 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Glass mosaic wall tile price per sheet on 23 Oct 2026: Zehn Rp36,450-Rp60,120, Eleganza ceramic Rp50,500, DBS aluminium Rp27,500-Rp37,500 (30x30 cm sheets). homeX calculation per m2 and for a 1.8 m2 backsplash.</description></item><item><title>3D Wall Panel and Wall Sticker Price 2026: Oxo, DBS and QONE per m2</title><link>https://www.homex.co.id/en/news/276</link><guid isPermaLink="true">https://www.homex.co.id/en/news/276</guid><pubDate>Fri, 23 Oct 2026 18:05:32 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>3D wall panel and wall sticker price on 23 Oct 2026: Oxo 60x60 cm Rp48,400-Rp56,400 per piece, DBS wall sticker Rp125,000 per 1.8 m2 roll, QONE foam wallpaper Rp77,500. homeX calculation for an 8.4 m2 wall.</description></item><item><title>Skirting Board and Plint Price 2026: Zehn, DBS and Golden per Piece</title><link>https://www.homex.co.id/en/news/275</link><guid isPermaLink="true">https://www.homex.co.id/en/news/275</guid><pubDate>Fri, 23 Oct 2026 18:05:32 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Skirting board and plint price on 23 Oct 2026 (Mitra10, Depo Bangunan): Zehn polystyrene 2.4 m from Rp60,000, DBS 244 cm Rp42,750, Golden granite plint Rp27,200. homeX calculation for a 4x4 m room.</description></item><item><title>Bank Indonesia Banking Survey Q3 2026: Q4 New Lending Up, Reserve Ratio 7%</title><link>https://www.homex.co.id/en/news/274</link><guid isPermaLink="true">https://www.homex.co.id/en/news/274</guid><pubDate>Fri, 23 Oct 2026 17:39:55 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Bank Indonesia banking survey Q3 2026 (22 Oct 2026): Q4 new lending net balance 91.31%, loans up 8.20% yoy. Board meeting 21 Oct: BI-Rate 5.75%, reserve requirement to 7% (1 Dec). Building materials: homeX analysis.</description></item><item><title>SPC Flooring Installation Labour per m2 2026: Labour Only and Installed Total</title><link>https://www.homex.co.id/en/news/273</link><guid isPermaLink="true">https://www.homex.co.id/en/news/273</guid><pubDate>Fri, 23 Oct 2026 17:39:55 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>SPC flooring installation labour per m2 as of 23 Oct 2026 (vendor sites, not official rates): labour Rp30,000-Rp60,000; installed example SPC TACO 5mm Rp295,699. Store material per m2 and a 20 m2 calculation (homeX).</description></item><item><title>Builder Daily Wages 2026: Labourer, Mason and Foreman in Jakarta and Padang</title><link>https://www.homex.co.id/en/news/272</link><guid isPermaLink="true">https://www.homex.co.id/en/news/272</guid><pubDate>Fri, 23 Oct 2026 17:39:55 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Builder daily wages 2026 (unit-price standards, not market wages): Jakarta mason Rp241,112, labourer Rp229,195, foreman Rp277,239; Padang mason Rp181,900, labourer Rp133,700. Checked 23 Oct 2026.</description></item><item><title>Switch and MCB Factories in Indonesia 2026: Broco, Schneider, ABB Addresses</title><link>https://www.homex.co.id/en/news/271</link><guid isPermaLink="true">https://www.homex.co.id/en/news/271</guid><pubDate>Fri, 23 Oct 2026 17:39:55 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Switch and MCB factories in Indonesia per APPI profiles (accessed 23 Oct 2026): addresses of Broco (Tangerang), Schneider (Batam, Bekasi), ABB (Tangerang, Cibitung), Mega Cipta Bangsa and Sinarindo (Bantar Gebang).</description></item><item><title>PVC Ceiling Installation Labour per m2 2026: Labour Only vs Installed</title><link>https://www.homex.co.id/en/news/270</link><guid isPermaLink="true">https://www.homex.co.id/en/news/270</guid><pubDate>Fri, 23 Oct 2026 17:39:55 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>PVC ceiling installation labour per m2 as of 23 Oct 2026 (vendor sites, not official prices): labour only Rp50,000; installed with Golden brand Rp190,000-Rp200,000. homeX calculation for 20 m2.</description></item><item><title>Paving Block Factories in Indonesia 2026: Conbloc, Masterblock, Aston Addresses</title><link>https://www.homex.co.id/en/news/269</link><guid isPermaLink="true">https://www.homex.co.id/en/news/269</guid><pubDate>Fri, 23 Oct 2026 17:39:55 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Paving block factories in Indonesia as of 23 Oct 2026: addresses of National Precast (Gunung Sindur), Aston Conbloc (Sleman), Nusacon (Kalasan); Masterblock, Conbloc and Kalla Beton do not publish a street address.</description></item><item><title>Indonesia Retail Sales August 2026 +1.3%: Other Household Equipment -5.2%</title><link>https://www.homex.co.id/en/news/268</link><guid isPermaLink="true">https://www.homex.co.id/en/news/268</guid><pubDate>Fri, 23 Oct 2026 17:01:16 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Indonesia retail sales August 2026 per the BI survey: the real sales index (IPR) at 226.5, up 1.3% yoy; the other household equipment group at 83.0, down 5.2% yoy. September forecast: up 1.0%. As of 23 Oct 2026.</description></item><item><title>Roof Tile Installation Labour Cost per m2 2026: Concrete, Ceramic, Metal, Tear-off</title><link>https://www.homex.co.id/en/news/267</link><guid isPermaLink="true">https://www.homex.co.id/en/news/267</guid><pubDate>Fri, 23 Oct 2026 17:01:16 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Roof tile installation labour cost per m2 as of 23 Oct 2026 (site ranges, not official prices): concrete/ceramic Rp45,000-Rp65,000 in Greater Jakarta; ceramic Rp55,000-Rp85,000; tear-off Rp35,000. homeX calculation for a 70 m2 roof.</description></item><item><title>Door Lock Factories in Indonesia 2026: AAS, Dekkson and UniKey Addresses</title><link>https://www.homex.co.id/en/news/266</link><guid isPermaLink="true">https://www.homex.co.id/en/news/266</guid><pubDate>Fri, 23 Oct 2026 17:01:16 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Door lock factories in Indonesia as of 23 Oct 2026: addresses of PT Arga Anggala Sentosa (Tangerang), Dekkson (West Jakarta), UniKey (Batuceper) and Solid Gradino contacts. Dekkson prices: 144 store products.</description></item><item><title>Vacuum Cleaner Price 2026: Bosch, Sharp, Panasonic &amp; Artugo</title><link>https://www.homex.co.id/en/news/265</link><guid isPermaLink="true">https://www.homex.co.id/en/news/265</guid><pubDate>Fri, 23 Oct 2026 17:01:16 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Vacuum cleaner price on 23 Oct 2026 at Mitra10: Rp869,000 (Sharp EC-8305) to Rp6,715,500 (Bosch BCS711PET), 22 models. Models named cordless average Rp4,482,583. homeX calculation.</description></item><item><title>Bottom Load Water Dispenser Price 2026: Sharp, Philips, Polytron</title><link>https://www.homex.co.id/en/news/264</link><guid isPermaLink="true">https://www.homex.co.id/en/news/264</guid><pubDate>Fri, 23 Oct 2026 17:01:16 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Bottom load water dispenser price on 23 Oct 2026 at Mitra10: Rp1,079,000 (Miyako WDP 200 H) to Rp5,039,000 (Philips ADD4981GYAC), 33 models. Artugo AD-10N top-load Rp1,171,000. homeX calculation.</description></item><item><title>Rice Cooker Price 2026: Miyako, Sharp, Philips &amp; Maspion 1.8 L</title><link>https://www.homex.co.id/en/news/263</link><guid isPermaLink="true">https://www.homex.co.id/en/news/263</guid><pubDate>Fri, 23 Oct 2026 17:01:16 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Rice cooker price on 23 Oct 2026 at Mitra10: 1.8 L Rp229,000–Rp1,489,000 (22 models), Sharp IH Rp1,489,000. Maspion MRJ-1808SS at Depo Rp596,000. Price per litre is a homeX calculation.</description></item><item><title>PMI-BI Q3 2026 at 52.28%: Non-Metallic Minerals Highest</title><link>https://www.homex.co.id/en/news/262</link><guid isPermaLink="true">https://www.homex.co.id/en/news/262</guid><pubDate>Fri, 23 Oct 2026 16:34:18 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>PMI-BI Q3 2026 was 52.28% (51.43% in Q2); the non-metallic mineral products industry was highest at 55.79%. What it means for building materials is homeX analysis only, not sales data.</description></item><item><title>Iron Fence Installation Cost per Meter 2026: Hollow, Welding and Paint</title><link>https://www.homex.co.id/en/news/261</link><guid isPermaLink="true">https://www.homex.co.id/en/news/261</guid><pubDate>Fri, 23 Oct 2026 16:34:18 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Iron fence installation cost per meter as of 23 Oct 2026 per public sources: Rp350 thousand to Rp2.5 million per running metre, depending on hollow section, finish and scope. Plus a homeX material simulation and Mitra10 steel paint prices.</description></item><item><title>Plywood Factories in Indonesia 2026: KTI, KLI, SGS and MDF Addresses</title><link>https://www.homex.co.id/en/news/260</link><guid isPermaLink="true">https://www.homex.co.id/en/news/260</guid><pubDate>Fri, 23 Oct 2026 16:34:18 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Plywood factories in Indonesia as of 23 Oct 2026: addresses and claimed capacities of Kutai Timber (Probolinggo), Kayu Lapis Indonesia (Kendal), Sumber Graha Sejahtera, plus MDF and particle board plants. The APKINDO list shows 131 members.</description></item><item><title>Two-Door Refrigerator Price 2026: Sharp, Samsung, LG, Polytron, Panasonic</title><link>https://www.homex.co.id/en/news/259</link><guid isPermaLink="true">https://www.homex.co.id/en/news/259</guid><pubDate>Fri, 23 Oct 2026 16:34:18 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Two-door refrigerator price on 23 Oct 2026 at Mitra10: standard two-door Rp2,849,000–Rp8,979,000 (12 models), side by side Rp7,968,367–Rp12,856,122 (4 models); price per litre is a homeX calculation.</description></item><item><title>Washing Machine Price 2026: Top Load vs Front Load at Mitra10</title><link>https://www.homex.co.id/en/news/258</link><guid isPermaLink="true">https://www.homex.co.id/en/news/258</guid><pubDate>Fri, 23 Oct 2026 16:34:18 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Washing machine price on 23 Oct 2026 at Mitra10: twin tub Rp1,539,000 (Sharp 6.5 kg), top load Rp3,349,000–Rp4,489,000, front load Rp3,986,157–Rp8,070,408 (20 models). Price per kg of capacity is a homeX calculation.</description></item><item><title>Portable Gas Stove Price 2026: Rinnai at Mitra10 vs Depo Bangunan</title><link>https://www.homex.co.id/en/news/257</link><guid isPermaLink="true">https://www.homex.co.id/en/news/257</guid><pubDate>Fri, 23 Oct 2026 16:34:18 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Portable gas stove price on 23 Oct 2026: Rinnai RI-301S single burner Rp205,000 to the RI-712GA (B) glass top Rp919,375 at Mitra10; 9 same-model listings checked at Depo Bangunan (average gap +10.2%, homeX calculation).</description></item><item><title>Indonesia Consumer Confidence September 2026 at 118.1: Building Materials</title><link>https://www.homex.co.id/en/news/256</link><guid isPermaLink="true">https://www.homex.co.id/en/news/256</guid><pubDate>Fri, 23 Oct 2026 16:07:38 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Indonesia consumer confidence September 2026: CCI 118.1 (August 118.5), durable goods index 106.7; retail sales September 2026 forecast +1.4% yoy; building materials wholesale price index +9.63% yoy. BI and BPS data; the building-material reading is homeX analysis only.</description></item><item><title>Lightweight Brick Wall Labour Cost per m² 2026 in Indonesia: Hebel Labour Only vs Installed</title><link>https://www.homex.co.id/en/news/255</link><guid isPermaLink="true">https://www.homex.co.id/en/news/255</guid><pubDate>Fri, 23 Oct 2026 16:07:38 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Lightweight brick wall labour cost per m² 2026: AHSP × DKI wage simulation Rp61,243 (labour only); a contractor blog says Rp35-65 thousand labour only and Rp160-250 thousand installed. Citicon material Rp8,275 a piece (Mitra10, 23 Oct 2026).</description></item><item><title>Air Conditioner Factories in Indonesia: Daikin, Sharp, Polytron &amp; LG Addresses</title><link>https://www.homex.co.id/en/news/254</link><guid isPermaLink="true">https://www.homex.co.id/en/news/254</guid><pubDate>Fri, 23 Oct 2026 16:07:38 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Air conditioner factories in Indonesia as of 23 Oct 2026: addresses of Daikin (GIIC Cikarang), Sharp (KIIC Karawang), Polytron (Kudus and Sayung) and LG (West Cikarang, no street address). Plus the Rinnai, Panasonic Gobel and Sanken offices.</description></item><item><title>Electric Voltage Stabilizer Price 2026: Matsuyama AVR 500 VA to 45,000 VA</title><link>https://www.homex.co.id/en/news/253</link><guid isPermaLink="true">https://www.homex.co.id/en/news/253</guid><pubDate>Fri, 23 Oct 2026 16:07:38 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Electric voltage stabilizer price on 23 Oct 2026 at Mitra10: Matsuyama AVR 500 VA Rp470,400 to 45,000 VA Rp36,848,000; 5000 VA stabilizer Rp6,115,200-Rp7,212,800. The AVR-L series outputs 110 V; use the max watt, not VA.</description></item><item><title>1.5 PK AC Price Indonesia 2026 &amp; 2 PK: Daikin, Samsung, LG, Sharp, Panasonic</title><link>https://www.homex.co.id/en/news/252</link><guid isPermaLink="true">https://www.homex.co.id/en/news/252</guid><pubDate>Fri, 23 Oct 2026 16:07:38 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>1.5 PK AC price Indonesia on 23 Oct 2026 at Mitra10: Sharp inverter Rp5,550,000 (installation included) to Daikin Alpha Rp9,279,000 (unit only); 2 PK AC from Rp7,662,245 to Rp12,449,000. Packages differ by product.</description></item><item><title>Sliding Door Rail Price 2026: Paloma, Dekkson, Zehn &amp; Waterplus Compared</title><link>https://www.homex.co.id/en/news/251</link><guid isPermaLink="true">https://www.homex.co.id/en/news/251</guid><pubDate>Fri, 23 Oct 2026 16:07:38 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Sliding door rail price in 2026 as of 23 Oct 2026: Dekkson SR H3 Rp254,790 (75 kg) to Paloma SRP 002 Rp1,475,000 (150 kg, 3 m top rail); 9 sets at Mitra10 and 3 Waterplus sets at Depo. Maximum loads are from the store text.</description></item><item><title>Construction Credit August 2026 +49.5%: What It Means for Building Materials</title><link>https://www.homex.co.id/en/news/250</link><guid isPermaLink="true">https://www.homex.co.id/en/news/250</guid><pubDate>Fri, 23 Oct 2026 15:33:56 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Construction credit August 2026: Rp585.3 trillion (+49.5% y-on-y), property credit Rp1,724.7 trillion (+18.3%), mortgages +4.2%; the reserve requirement falls step by step to 7% (Nov-Dec 2026). BI, Kontan and CNBC data; the building-material reading is homeX analysis only.</description></item><item><title>Painter Labour Cost per m² Indonesia 2026: Walls, Ceilings, Wood &amp; Steel</title><link>https://www.homex.co.id/en/news/249</link><guid isPermaLink="true">https://www.homex.co.id/en/news/249</guid><pubDate>Fri, 23 Oct 2026 15:33:56 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Painter labour cost per m² Indonesia 2026 (labour only): DKI benchmark simulation new wall Rp33,735, repaint Rp25,297, ceiling Rp31,627; blog rates Rp22,000-Rp27,000. Repaint material about Rp8,484 per m² (homeX calculation).</description></item><item><title>Elevator Companies in Indonesia: Otis, Schindler, KONE &amp; TKE Addresses</title><link>https://www.homex.co.id/en/news/248</link><guid isPermaLink="true">https://www.homex.co.id/en/news/248</guid><pubDate>Fri, 23 Oct 2026 15:33:56 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Elevator companies in Indonesia as of 23 Oct 2026: office addresses of Otis (South Jakarta), Berca Schindler (Puri Indah), KONE (Kebon Sirih), TK Elevator, the Sigma agent and Hyundai. Offices, not factories; data gaps listed.</description></item><item><title>Solar Water Heater Price Indonesia 2026: Hegel, SolarHeat &amp; Ariston per Litre</title><link>https://www.homex.co.id/en/news/247</link><guid isPermaLink="true">https://www.homex.co.id/en/news/247</guid><pubDate>Fri, 23 Oct 2026 15:33:56 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Solar water heater price Indonesia as of 23 Oct 2026 at Mitra10: Hegel 80 L Rp12,800,000, 200 L Rp23,200,000, SolarHeat 100 L Rp16,470,750-Rp21,047,520, Ariston 100 L Rp19,699,000. Price per litre is a homeX calculation.</description></item><item><title>Circular Saw Price Indonesia 2026: Bosch vs Makita Planer &amp; Rotary Hammer</title><link>https://www.homex.co.id/en/news/246</link><guid isPermaLink="true">https://www.homex.co.id/en/news/246</guid><pubDate>Fri, 23 Oct 2026 15:33:56 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Circular saw price Indonesia as of 23 Oct 2026: Bosch GKS 130 Rp1,274,580, Makita M5801B Rp1,856,640 (Depo) and Rp1,860,000 (Mitra10). Bosch vs Makita planer, rotary hammer, sander and trimmer; no Maktec listed.</description></item><item><title>CCTV Price Indonesia 2026: Zehn, Onassis &amp; Ontetica Cameras at Mitra10</title><link>https://www.homex.co.id/en/news/245</link><guid isPermaLink="true">https://www.homex.co.id/en/news/245</guid><pubDate>Fri, 23 Oct 2026 15:33:56 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>CCTV price Indonesia as of 23 Oct 2026 at Mitra10: Zehn 3MP cameras Rp324,350-Rp467,350, Onassis indoor Rp712,500 and outdoor Rp791,250, Ontetica Rp690,001. Specs from listings; none at Depo Bangunan.</description></item><item><title>Raw Material Imports Indonesia August 2026 +22.5%: Building Materials</title><link>https://www.homex.co.id/en/news/244</link><guid isPermaLink="true">https://www.homex.co.id/en/news/244</guid><pubDate>Fri, 23 Oct 2026 15:11:00 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Raw material imports Indonesia August 2026: US$16.67 billion (+22.48% y-on-y); total January-August imports US$186.39 billion (+19.84%). BPS, DEN and BI data, plus a cautious reading for building materials (homeX analysis, not data).</description></item><item><title>Carport Canopy Cost per m² Indonesia 2026: Spandek, Alderon, Polycarbonate</title><link>https://www.homex.co.id/en/news/243</link><guid isPermaLink="true">https://www.homex.co.id/en/news/243</guid><pubDate>Fri, 23 Oct 2026 15:11:00 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Carport canopy cost per m² Indonesia (Greater Jakarta, 2026) per vendors: lightweight steel + spandek Rp200,000-Rp250,000 (Talentama, 28 Apr 2026) vs Rp300,000-Rp350,000 (hargakanopi.com). Plus Mitra10/Depo material prices on 23 Oct 2026.</description></item><item><title>Ready Mix Concrete Plants in Indonesia: Adhimix, WIKA Beton, Waskita</title><link>https://www.homex.co.id/en/news/242</link><guid isPermaLink="true">https://www.homex.co.id/en/news/242</guid><pubDate>Fri, 23 Oct 2026 15:11:00 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Directory of ready mix concrete plants in Indonesia as of 23 Oct 2026: addresses of WIKA Beton, Waskita Beton Precast, Adhimix, Pionir Beton, Solusi Bangun Beton and VU Beton from official sites, plus data gaps.</description></item><item><title>Safe Price Indonesia 2026: Zehn Fireproof, Safety Box, Laptop Safe</title><link>https://www.homex.co.id/en/news/241</link><guid isPermaLink="true">https://www.homex.co.id/en/news/241</guid><pubDate>Fri, 23 Oct 2026 15:11:00 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Safe price Indonesia as of 23 Oct 2026 at Mitra10: cash box Rp103,000, Zehn safety box Rp349,000-Rp620,200, fireproof safe Rp3,498,998-Rp6,374,250, deposit box Rp2,659,300-Rp6,999,300. homeX per-litre figures.</description></item><item><title>Welding Machine Price Indonesia 2026: Zehn Inverter, Genset, Electrodes</title><link>https://www.homex.co.id/en/news/240</link><guid isPermaLink="true">https://www.homex.co.id/en/news/240</guid><pubDate>Fri, 23 Oct 2026 15:11:00 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Welding machine price Indonesia as of 23 Oct 2026: Zehn inverter MMA-120 Rp799,000, 160LK Rp1,400,000, 200P Rp1,900,000; electrodes Rp23,900/kg; generators Rp5,893,000-Rp13,650,000. homeX calculations and data gaps.</description></item><item><title>Epoxy Glue Price Indonesia 2026: Dextone, Sika, Hydrocrete, Bondcrete</title><link>https://www.homex.co.id/en/news/239</link><guid isPermaLink="true">https://www.homex.co.id/en/news/239</guid><pubDate>Fri, 23 Oct 2026 15:11:00 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Epoxy glue price Indonesia as of 23 Oct 2026: Dextone 48 g Rp20,500, non-sag steel epoxy 170 g Rp49,200, Sika Dur-31 Rp133,500, Hydrocrete SBR Rp125,000-Rp2,834,918, Bondcrete Rp44,000-Rp2,666,664. homeX per-gram/kg figures and data gaps.</description></item><item><title>Investment Realisation Q3 2026 Rp528.7 T: What It Means for Building Materials</title><link>https://www.homex.co.id/en/news/238</link><guid isPermaLink="true">https://www.homex.co.id/en/news/238</guid><pubDate>Fri, 23 Oct 2026 14:43:32 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Investment realisation in Q3 2026 of Rp528.7 trillion (+7.6% y-on-y), January-September Rp1,539.2 T (75.4% of target); FDI vs domestic, Java vs outside Java, basic metals sector. A cautious reading for building materials: homeX analysis, not data. Data gaps listed.</description></item><item><title>Clean Water Pipe Installation Cost 2026: per Point and per Metre</title><link>https://www.homex.co.id/en/news/237</link><guid isPermaLink="true">https://www.homex.co.id/en/news/237</guid><pubDate>Fri, 23 Oct 2026 14:43:32 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Clean water pipe installation cost as of 23 Oct 2026: labour Rp150,000-300,000 per point or Rp25,000-50,000 per metre (contractor blogs), plumber Rp200,000-350,000 per day, Pralon AW pipe Rp23,400 (½&quot;, 4 m), faucet elbow Rp9,800. 20-point example and data gaps.</description></item><item><title>LED Lamp Factories in Indonesia: Philips, Panasonic, Hannochs Addresses</title><link>https://www.homex.co.id/en/news/236</link><guid isPermaLink="true">https://www.homex.co.id/en/news/236</guid><pubDate>Fri, 23 Oct 2026 14:43:32 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Directory of LED lamp factories in Indonesia as of 23 Oct 2026: Signify/Philips (Karawang), Panasonic (Pasuruan, Cileungsi), Pikolite/BIG (Tangerang), Fokus Indo, Optima, Honoris and Hannochs; addresses from official sites and news, data gaps listed.</description></item><item><title>Wall, Street and Sensor Lamp Prices 2026: Lumina, Philips</title><link>https://www.homex.co.id/en/news/235</link><guid isPermaLink="true">https://www.homex.co.id/en/news/235</guid><pubDate>Fri, 23 Oct 2026 14:43:32 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Wall lamp prices as of 23 Oct 2026: Lumina Rp119,700-Rp386,100, Philips Trunkline at Depo Rp38,550-Rp75,900; Nero street lamps Rp600,000-Rp2,800,000; sensor lamps Rp50,670-Rp156,001. Per watt is a homeX calculation; data gaps.</description></item><item><title>Door Handle and Pull Handle Prices 2026: Paloma, Belleza, Zehn</title><link>https://www.homex.co.id/en/news/234</link><guid isPermaLink="true">https://www.homex.co.id/en/news/234</guid><pubDate>Fri, 23 Oct 2026 14:43:31 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Door handle prices as of 23 Oct 2026: Dekkson pull plate Rp42,920, Paloma ring Rp50,000, Zehn pull handle Rp158,400, Belleza Rp150,000-Rp325,000, Bellucci Rp180,264, Paloma HRP Rp200,000-Rp225,000. Mitra10 and Depo; data gaps.</description></item><item><title>WPC Decking Prices 2026: Durawood and DBS Deck Tile per m²</title><link>https://www.homex.co.id/en/news/233</link><guid isPermaLink="true">https://www.homex.co.id/en/news/233</guid><pubDate>Fri, 23 Oct 2026 14:43:31 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>WPC decking prices as of 23 Oct 2026: Durawood 2.4 m boards Rp92,640-Rp98,430 each, hollow board Rp170,765-Rp199,000, 30x30 deck tile Rp66,161-Rp70,296, DBS at Depo Rp42,750. Per m² (homeX calculation) and data gaps.</description></item><item><title>Construction Sector Growth 2026 6.68% and Inflation 3.28%: Building Materials</title><link>https://www.homex.co.id/en/news/232</link><guid isPermaLink="true">https://www.homex.co.id/en/news/232</guid><pubDate>Fri, 23 Oct 2026 14:20:13 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Construction sector growth in Q2 2026 of 6.68% (0.62 point contribution) and September 2026 inflation of 3.28% (BPS): data, sources and a cautious reading for building-material buyers; homeX analysis, not data. Data gaps listed.</description></item><item><title>Well Drilling Cost per Metre 2026: 20-60 m Packages and Pump Installation</title><link>https://www.homex.co.id/en/news/231</link><guid isPermaLink="true">https://www.homex.co.id/en/news/231</guid><pubDate>Fri, 23 Oct 2026 14:20:13 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Well drilling cost per metre in 2026 per five different sources: Rp100,000-Rp1,200,000 per metre; packages of 30 m Rp6.5-9 million, 60 m Rp18-22 million; pump installation Rp200,000-Rp1.5 million (non-industrial). Mitra10 pump prices as of 23 Oct 2026. Data gaps listed.</description></item><item><title>Water Pump Factories in Indonesia: Shimizu, Panasonic, Ebara Addresses</title><link>https://www.homex.co.id/en/news/230</link><guid isPermaLink="true">https://www.homex.co.id/en/news/230</guid><pubDate>Fri, 23 Oct 2026 14:20:13 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Directory of water pump factories in Indonesia as of 23 Oct 2026: Shimizu (Balaraja), Panasonic/Sanyo/KDK (PMI, Pasar Rebo), Ebara (Depok), Grundfos (Cakung), plus the Sanyo, Wasser and CRI offices; addresses from official sites, data gaps listed.</description></item><item><title>Wall Fan Prices 2026: Durevole, Miyako, Maspion, KDK</title><link>https://www.homex.co.id/en/news/229</link><guid isPermaLink="true">https://www.homex.co.id/en/news/229</guid><pubDate>Fri, 23 Oct 2026 14:20:13 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Wall fan prices as of 23 Oct 2026: 16 inch Miyako Rp317,900, Durevole Rp332,100, Maspion Rp408,000, Panasonic Rp656,900, KDK Rp706,400-Rp1,129,600; 26 inch Durevole Rp1,709,100. Mitra10 and Depo. Context: October 2026 heat.</description></item><item><title>Urinal and Toilet Seat Cover Prices 2026: TOTO, Amstad, DBS, Ceramax</title><link>https://www.homex.co.id/en/news/228</link><guid isPermaLink="true">https://www.homex.co.id/en/news/228</guid><pubDate>Fri, 23 Oct 2026 14:20:13 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Urinal prices as of 23 Oct 2026: DBS C27 Rp836,000, Tidy Elio Rp1,689,999, TOTO U57MW/F Rp2,068,000, Amstad Rp2,169,000; TOTO TC365 seat cover Rp524,400, Ceramax Rp400,000; Roca inlet valve Rp100,000. Mitra10 and Depo.</description></item><item><title>Waterproofing Price per Kg 2026: Sika, AM, Lemkra, Aqua Tite</title><link>https://www.homex.co.id/en/news/227</link><guid isPermaLink="true">https://www.homex.co.id/en/news/227</guid><pubDate>Fri, 23 Oct 2026 14:20:13 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Waterproofing price per kg as of 23 Oct 2026: Sika Top 107 Seal Rp13,160/kg (25 kg set), AM 122 Rp14,800/kg, Aquaproof 20 kg Rp44,900/kg, AM 115 PU Rp69,350/kg, Aqua Tite Rp158,728/kg. Mitra10 and Depo; homeX calculation.</description></item><item><title>Concrete Slab (Cor Dak) Cost per m² 2026: Ready Mix, Rebar, Formwork, Pump</title><link>https://www.homex.co.id/en/news/226</link><guid isPermaLink="true">https://www.homex.co.id/en/news/226</guid><pubDate>Fri, 23 Oct 2026 13:41:59 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Slab (cor dak) cost per m² in 2026 from public sources: Kapten Kontruksi (9 Jun) Rp750,000–1,100,000 installed, Jakartabuilding (6 Oct) about Rp874,000 (ready mix without pump) to Rp984,000 (mixer). Breakdown of concrete, rebar, formwork, pump, labour, source conflicts and a homeX calculation for…</description></item><item><title>Aluminium Extrusion Factories in Indonesia: Alexindo, Indal, MPG Addresses</title><link>https://www.homex.co.id/en/news/225</link><guid isPermaLink="true">https://www.homex.co.id/en/news/225</guid><pubDate>Fri, 23 Oct 2026 13:41:59 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Directory of aluminium extrusion factories in Indonesia as of 23 Oct 2026: Alexindo (Bekasi, Cikampek), Indal (Sidoarjo), Calindo, Alumex (Tangerang), MPG (Bogor), ATA (Cikarang) and Alcomex (Cibitung), with addresses from each official site; data gaps are listed.</description></item><item><title>Water Tank Float Valve Prices 2026: Fluid, San-Ei, Onda, AER</title><link>https://www.homex.co.id/en/news/224</link><guid isPermaLink="true">https://www.homex.co.id/en/news/224</guid><pubDate>Fri, 23 Oct 2026 13:41:58 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Water tank float valve prices as of 23 Oct 2026: Fluid FV-ZS 1/2 inch Rp39,000, 1 inch Rp69,000; San-Ei PVN41 Rp53,000-Rp81,200 (Mitra10); Onda F01 Rp234,900, AER brass Rp203,150 (Depo Bangunan). homeX calculations.</description></item><item><title>Roof Ridge Cap and Accessory Prices 2026: M-Class, Onduline, Zigzag</title><link>https://www.homex.co.id/en/news/223</link><guid isPermaLink="true">https://www.homex.co.id/en/news/223</guid><pubDate>Fri, 23 Oct 2026 13:41:58 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Roof ridge cap prices as of 23 Oct 2026 at Mitra10: M-Class M-2 ridge Rp24,900-Rp30,800, three-way ridge Rp85,700, Onduline ridge 90×50 Rp85,000, Zigzag side ridge Rp31,500; Zehn aluminium foil 1.2×25 m Rp323,910-Rp1,549,000.</description></item><item><title>Door Closer, Door Bolt and Stopper Prices 2026: Dekkson, Paloma</title><link>https://www.homex.co.id/en/news/222</link><guid isPermaLink="true">https://www.homex.co.id/en/news/222</guid><pubDate>Fri, 23 Oct 2026 13:41:58 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Door closer prices as of 23 Oct 2026 at Mitra10: Zehn 5012AW Rp186,750, Belucci DC/BLC 058 Rp286,000, Dekkson DCL 300 Rp366,510 and DCL 522 Rp926,250. Paloma door bolts Rp18,750-Rp87,500, Dekkson door stoppers Rp41,760-Rp130,500.</description></item><item><title>Stop Tap and Ball Valve Prices 2026: Tidy, SCG, Fluid, San-Ei</title><link>https://www.homex.co.id/en/news/221</link><guid isPermaLink="true">https://www.homex.co.id/en/news/221</guid><pubDate>Fri, 23 Oct 2026 13:41:58 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Stop tap prices as of 23 Oct 2026: SCG PVC AW 1/2 inch Rp12,000, 1 inch Rp32,000; Tidy PVC Rp15,000-Rp22,000; basin stop taps Rp46,000-Rp297,500; Fluid brass ball valve Rp126,000 (1/2&quot;) and Rp239,000 (1&quot;). Mitra10 and Depo Bangunan.</description></item><item><title>Manufacturing PMI 52.4 and IKI 51.93 (Sep 2026): What It Means for Building Materials</title><link>https://www.homex.co.id/en/news/220</link><guid isPermaLink="true">https://www.homex.co.id/en/news/220</guid><pubDate>Fri, 23 Oct 2026 12:58:02 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>S&amp;P Global Indonesia manufacturing PMI rose to 52.4 in September 2026 from 49.8; the Industry Ministry IKI was 51.93, down 0.37 points from 52.30. Orders rose in both, IKI output fell. The non-metallic minerals sub-sector (cement, ceramics, glass) expanded; there is no direct building-material…</description></item><item><title>Brick Fence Cost per Metre 2026: Brick, Foundation and Plaster</title><link>https://www.homex.co.id/en/news/219</link><guid isPermaLink="true">https://www.homex.co.id/en/news/219</guid><pubDate>Fri, 23 Oct 2026 12:58:02 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Wall fence cost per running metre as of 23 Oct 2026: 2 m high, half-brick red brick, rubble-stone foundation, plaster both sides, about Rp1,371,703-Rp1,410,687 per metre (materials + DKI labour); 10 m about Rp13,717,030-Rp14,106,870. Excluding columns, sloof, rebar, paint and gate.</description></item><item><title>Glass Factories in Indonesia: Asahimas, Muliaglass and ACP Processor Addresses</title><link>https://www.homex.co.id/en/news/218</link><guid isPermaLink="true">https://www.homex.co.id/en/news/218</guid><pubDate>Fri, 23 Oct 2026 12:58:02 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Directory of flat glass factories in Indonesia as of 23 Oct 2026: Asahimas (Jakarta, Sidoarjo, Cikampek), Muliaglass (Cikarang) and 7 Asahimas Certified Processor sites, with addresses from official websites; Tossa Shakti (Kendal) is recorded as closed.</description></item><item><title>Air Compressor &amp; Spray Gun Prices 2026: Zehn, Lakoni, Diton Spray Paint</title><link>https://www.homex.co.id/en/news/217</link><guid isPermaLink="true">https://www.homex.co.id/en/news/217</guid><pubDate>Fri, 23 Oct 2026 12:58:02 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Air compressor prices as of 23 Oct 2026: Zehn 10 L Rp1,160,000, 30 L Rp1,469,000, 40 L Rp1,850,000, 100 L Rp5,247,900; Lakoni Imola 125 Rp2,522,560 (Depo); Zehn spray guns Rp96,900-Rp259,900; Diton spray paint Rp35,000-Rp62,500 per can. Specs from names and URLs.</description></item><item><title>Water Filter Prices 2026: Hydro Well and PDAM, Penguin, Fluid Cartridges</title><link>https://www.homex.co.id/en/news/216</link><guid isPermaLink="true">https://www.homex.co.id/en/news/216</guid><pubDate>Fri, 23 Oct 2026 12:58:02 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Water filter prices as of 23 Oct 2026 at Mitra10: Hydro well 4000 Rp11,411,400 (automatic Rp27,247,500), PDAM type 4000 Rp15,849,750, Fluid 10-inch stainless housing Rp274,000, 10-inch cartridges Rp12,500-Rp45,000, Penguin Bleu Rp167,000-Rp200,000. No Depo data; specs not tested.</description></item><item><title>Propan Paint Prices 2026: Eco Emulsion, Decor, Lasur and Politur</title><link>https://www.homex.co.id/en/news/215</link><guid isPermaLink="true">https://www.homex.co.id/en/news/215</guid><pubDate>Fri, 23 Oct 2026 12:58:02 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Propan paint prices as of 23 Oct 2026: Eco Emulsion interior 5 kg Rp166,430, exterior 25 kg Rp793,645, Decor Lotus 2.5 L Rp272,935, DWS-320 primer 2.5 L Rp188,800, EL501 wood stain Rp147,200-Rp171,000 per litre, P01 polish Rp119,600. Mitra10 and Depo Bangunan, plus data gaps.</description></item><item><title>FLPP Subsidised Mortgages 2026: 52.67% Done, Impact on Materials</title><link>https://www.homex.co.id/en/news/214</link><guid isPermaLink="true">https://www.homex.co.id/en/news/214</guid><pubDate>Fri, 23 Oct 2026 12:35:24 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>As of 19 Oct 2026, FLPP subsidised mortgages reached 184,342 units, or 52.67% of the 350,000-unit target (BP Tapera via the Housing Ministry). 165,658 units remain in 73 days; Housing Programme Credit stands at Rp27.74 trillion, including Rp2.94 trillion for building material traders.</description></item><item><title>Stone Foundation Cost per m³ 2026: Calculation and House Example</title><link>https://www.homex.co.id/en/news/213</link><guid isPermaLink="true">https://www.homex.co.id/en/news/213</guid><pubDate>Fri, 23 Oct 2026 12:35:24 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Rubble-stone foundation cost per m³ per SNI 2836:2008, as of 23 Oct 2026: 1PC:4PP mix about Rp1,416,999-Rp1,590,264 per m³ (materials + DKI labour), depending on the stone price. House example, 36 m of foundation: about Rp17,344,068-Rp19,464,831.</description></item><item><title>Water Tank Makers in Indonesia: Penguin, Tedmond, Pennyu, MPOIN</title><link>https://www.homex.co.id/en/news/212</link><guid isPermaLink="true">https://www.homex.co.id/en/news/212</guid><pubDate>Fri, 23 Oct 2026 12:35:24 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Directory of water tank makers in Indonesia as of 23 Oct 2026: Penguin (8 addresses on the IBB portal), Tedmond Groups (Surabaya head office and 10 branches), Pennyu (Temanggung factory), Profil Tank (Surabaya) and MPOIN (Surabaya), with addresses from company websites.</description></item><item><title>Wheelbarrow, Shovel, Hoe &amp; Trowel Prices 2026</title><link>https://www.homex.co.id/en/news/211</link><guid isPermaLink="true">https://www.homex.co.id/en/news/211</guid><pubDate>Fri, 23 Oct 2026 12:35:24 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Mixing and pouring tool prices as of 23 Oct 2026: Tidy wheelbarrows Rp371,610-Rp539,010, shovels Rp55,120-Rp97,700, hoes Rp66,900-Rp77,000, trowels Rp17,100-Rp45,900 (Mitra10 and Depo). Includes a homeX worker tool kit calculation.</description></item><item><title>Nail &amp; Screw Prices 2026: Concrete Nails, Gypsum, Roofing Screws</title><link>https://www.homex.co.id/en/news/210</link><guid isPermaLink="true">https://www.homex.co.id/en/news/210</guid><pubDate>Fri, 23 Oct 2026 12:35:24 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Nail and screw prices as of 23 Oct 2026 at Depo Bangunan: concrete nails 25 pcs Rp23,000 (homeX calculation Rp920 each), gypsum screws 100 pcs Rp32,600 (Rp326 each), roofing screws Rp55,500-Rp59,500. Per-piece figures and data gaps included.</description></item><item><title>Site PPE Prices 2026: Zehn Helmets, Goggles, Gloves &amp; Boots</title><link>https://www.homex.co.id/en/news/209</link><guid isPermaLink="true">https://www.homex.co.id/en/news/209</guid><pubDate>Fri, 23 Oct 2026 12:35:24 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Site PPE prices as of 23 Oct 2026 at Mitra10 (Zehn): helmet Rp34,000 and CE EN 397 helmet Rp69,900, glasses Rp29,900-Rp67,900, gloves Rp17,900-Rp38,900, ear plugs 5 pairs Rp20,900, full body harness Rp939,000. Includes per-worker kits and data not found.</description></item><item><title>Rupiah at Rp18,000 per US$ and Building Material Prices: October 2026 Data</title><link>https://www.homex.co.id/en/news/208</link><guid isPermaLink="true">https://www.homex.co.id/en/news/208</guid><pubDate>Fri, 23 Oct 2026 12:10:38 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>What does a rupiah at Rp18,000 per US dollar mean for building material prices? BI mid rate Rp18,047 on 23 Oct 2026 (up 0.83% since 5 Oct). Gapensi (informal survey, June 2026): construction costs up 6%-12%, imported materials and steel 10%-15%. Data, sources and what it means for buyers.</description></item><item><title>Wall Cost per m² 2026: Red Brick vs AAC Block, How to Calculate</title><link>https://www.homex.co.id/en/news/207</link><guid isPermaLink="true">https://www.homex.co.id/en/news/207</guid><pubDate>Fri, 23 Oct 2026 12:10:38 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Wall cost per m² as of 23 Oct 2026: half-brick red-brick wall about Rp178,331 (materials + labour), 7.5 cm AAC wall about Rp143,165; plaster and skim coat on both sides about Rp348,108. 3x10 m example, material quantities and data notes.</description></item><item><title>Cable Factories in Indonesia: Addresses of Jembo, Sucaco, KMI, Voksel</title><link>https://www.homex.co.id/en/news/206</link><guid isPermaLink="true">https://www.homex.co.id/en/news/206</guid><pubDate>Fri, 23 Oct 2026 12:10:38 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Directory of electric cable factories in Indonesia as of 23 Oct 2026: SUCACO (Supreme) has 5 plants (West Jakarta, Bekasi, Cikarang, Tangerang, Balaraja), Jembo in Jatiuwung, KMI in Cakung, Kabelindo in Pulogadung, Sumi Indo Kabel in Jatiuwung and Voksel in Cileungsi. Addresses and phones from…</description></item><item><title>Hand Tool Prices 2026: Hammers, Saws &amp; Measuring, Fixman, Hasston, Sellery</title><link>https://www.homex.co.id/en/news/205</link><guid isPermaLink="true">https://www.homex.co.id/en/news/205</guid><pubDate>Fri, 23 Oct 2026 12:10:37 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Contractor hand tool prices as of 23 Oct 2026: Fixman 4 lb stone hammer Rp182,400 vs Camel 3 lb Rp120,800 (Depo), 18-inch wood saw Fixman Rp109,000 vs Hasston Rp79,000, Sellery 12-inch hacksaws Rp75,400-Rp122,700, 9-inch spirit level Rp30,400. Includes data not found.</description></item><item><title>Trash Bin Prices 2026: Zehn vs DBS &amp; Lion Star, per Litre</title><link>https://www.homex.co.id/en/news/204</link><guid isPermaLink="true">https://www.homex.co.id/en/news/204</guid><pubDate>Fri, 23 Oct 2026 12:10:37 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Trash bin prices as of 23 Oct 2026: Zehn swing lid 12 L Rp44,800, pedal 20 L Rp106,685, 120 L Rp650,581 and 240 L Rp959,432 at Mitra10; DBS TS-120 Rp580,000 and TS-240 Rp799,000, sensor HAT-12 Rp252,000 at Depo. Includes price per litre (homeX calculation) and data not found.</description></item><item><title>Tile Cutter Prices 2026: Zehn, NLG &amp; Bosch GDC 140 Marble Cutter</title><link>https://www.homex.co.id/en/news/203</link><guid isPermaLink="true">https://www.homex.co.id/en/news/203</guid><pubDate>Fri, 23 Oct 2026 12:10:37 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Tile cutter prices as of 23 Oct 2026: Zehn manual 60 cm from Rp749,900 (Mitra10), 90 cm Rp896,900-Rp1,760,000, NLG TC-65 Rp1,861,500 (Depo); Bosch GDC 140 Rp1,305,620 at Mitra10 vs Rp1,305,700 at Depo. Includes cutting-length maths and data not found.</description></item><item><title>Indonesia E-Commerce &amp; Building Materials Procurement 2026</title><link>https://www.homex.co.id/en/news/202</link><guid isPermaLink="true">https://www.homex.co.id/en/news/202</guid><pubDate>Fri, 23 Oct 2026 11:43:34 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Indonesia e-commerce transactions 2025 Rp589.08 T (+15.0%), January-June 2026 Rp374.28 T and 2.59 billion transactions (BI, 6 Sep 2026); FMCG e-commerce H1 2026 Rp88.4 T (+29.4%). Data as of 23 Oct 2026 and what it means for B2B building-materials procurement.</description></item><item><title>Conwood Prices 2026: Decking, Siding &amp; Fence Boards</title><link>https://www.homex.co.id/en/news/201</link><guid isPermaLink="true">https://www.homex.co.id/en/news/201</guid><pubDate>Fri, 23 Oct 2026 11:43:34 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Conwood prices as of 23 Oct 2026 at Mitra10: 6-inch decking 25 mm thick Rp332,690 (about Rp717,623 per m²) vs 14 mm Rp173,740 (about Rp374,763 per m²), 8-inch siding Rp144,670 (about Rp237,164 per m²), 1 m fence board Rp44,880 and ECP 60x120 wall panel Rp223,465.</description></item><item><title>Pendant Light Prices 2026: Durevole &amp; Lumina</title><link>https://www.homex.co.id/en/news/200</link><guid isPermaLink="true">https://www.homex.co.id/en/news/200</guid><pubDate>Fri, 23 Oct 2026 11:43:34 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Decorative and pendant light prices as of 23 Oct 2026 at Mitra10: Durevole E27 from Rp159,000 (DG0502-1), 3-arm Rp351,200, decorative DNCX Rp296,650-Rp395,000; Lumina single Rp474,050-Rp854,050, 3-light Rp1,424,050, up to Rp3,505,500. Single Lumina is about 3x the cheapest Durevole.</description></item><item><title>Artificial Grass Prices 2026: Fantasy &amp; Green Grass per m²</title><link>https://www.homex.co.id/en/news/199</link><guid isPermaLink="true">https://www.homex.co.id/en/news/199</guid><pubDate>Fri, 23 Oct 2026 11:43:34 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Artificial grass prices as of 23 Oct 2026: Fantasy BNC001 15 mm 1x2 m Rp264,900 at Depo vs Green Grass Ruben BNC-001 Rp268,801 at Mitra10 (1.5% gap, probably the same product), Nature 25 mm 1x3 m Rp538,800, Fantasy 7 mm Rp110,000 per metre, 50x50 grass fence panels Rp470,400 per m².</description></item><item><title>Bio Septic Tank Prices 2026: Pennyu PB6/PB12 &amp; Penguin 1000 L</title><link>https://www.homex.co.id/en/news/198</link><guid isPermaLink="true">https://www.homex.co.id/en/news/198</guid><pubDate>Fri, 23 Oct 2026 11:43:34 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Bio septic tank prices as of 23 Oct 2026: Pennyu PB6 Rp3,866,500 and PB12 Rp9,666,250 (Mitra10), Penguin Bio-100 1000 L Rp4,070,700 at Mitra10 vs Rp6,248,000 at Depo (+53.5%, probably the same product), SCG 4-inch clean-out cover Rp37,000. Includes how to choose capacity and the data not found.</description></item><item><title>Kitchen Set &amp; Cabinet Prices 2026: Activ, Avanti, King</title><link>https://www.homex.co.id/en/news/197</link><guid isPermaLink="true">https://www.homex.co.id/en/news/197</guid><pubDate>Fri, 23 Oct 2026 11:43:34 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Modular kitchen set and cabinet prices as of 23 Oct 2026: Depo Avanti/Activ lower 115 cm Rp2,144,800, upper 115 cm Rp1,701,700 (special price until 31 Dec 2026); Mitra10 King 2-door lower cabinet 90 cm Rp3,634,961, upper 90 cm Rp1,926,444. Per metre of width King is about 1.8x Depo. Countertops:…</description></item><item><title>China Investment &amp; Industrial Parks 2026: Building Materials Demand</title><link>https://www.homex.co.id/en/news/196</link><guid isPermaLink="true">https://www.homex.co.id/en/news/196</guid><pubDate>Fri, 23 Oct 2026 11:25:05 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>China realised investment Q1 2026 US$2.2 billion (+22% YoY), Q2 US$1.7 billion behind Hong Kong at US$5.5 billion; IWIP 11 projects US$10.2 billion; Greater Jakarta industrial land absorption Q2 36.74 ha (Colliers). Data as of 23 Oct 2026 and what it means for building-material suppliers.</description></item><item><title>Anti-Slip Bathroom Floor Tile Prices 2026: 30x30 to 60x60</title><link>https://www.homex.co.id/en/news/195</link><guid isPermaLink="true">https://www.homex.co.id/en/news/195</guid><pubDate>Fri, 23 Oct 2026 11:25:05 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Bathroom floor tile prices as of 23 Oct 2026: 30x30 at Mitra10 Rp37,750 (KIA Morgins, 11 pcs per box) to Rp74,880 (KIA Braga); Depo Habitat Spark Grey 50x50 labelled anti-slip Rp102,000 and iGrip Rp106,000–Rp110,000, the same as non-anti-slip Habitat lines. Tips on asking for the R class and slip…</description></item><item><title>Faucet Prices 2026: Tidy, Ceramax &amp; Amstad Basin, Wall &amp; Kitchen Taps</title><link>https://www.homex.co.id/en/news/194</link><guid isPermaLink="true">https://www.homex.co.id/en/news/194</guid><pubDate>Fri, 23 Oct 2026 11:25:05 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Faucet prices as of 23 Oct 2026 (Mitra10): Tidy wall taps Rp51,000–Rp108,300, Tidy basin taps Rp123,300–Rp141,000, Ceramax Dublin Rp188,000–Rp277,200, Amstad wall taps Rp180,310–Rp206,245. Gold/gun-metal finishes add 20%–40% over chrome in the same Ceramax series.</description></item><item><title>Supreme Cable Prices 2026: NYM, NYMHY, NYY, NYA vs Eterna, Extrana</title><link>https://www.homex.co.id/en/news/193</link><guid isPermaLink="true">https://www.homex.co.id/en/news/193</guid><pubDate>Fri, 23 Oct 2026 11:25:05 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Supreme cable prices as of 23 Oct 2026 at Depo: NYM 2x1.5 50 m Rp811,490, 3x2.5 Rp1,506,415; NYMHY 3x1.5 Rp1,318,900; NYY 3x2.5 Rp2,000,600; NYA 1x1.5 100 m Rp592,400. Eterna at Depo is about 16% cheaper than Supreme. Mitra10 Supreme prices for three sizes look inconsistent.</description></item><item><title>LED Tube, Strip &amp; Flood Light Prices 2026: Durevole, Panasonic</title><link>https://www.homex.co.id/en/news/192</link><guid isPermaLink="true">https://www.homex.co.id/en/news/192</guid><pubDate>Fri, 23 Oct 2026 11:25:05 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>LED tube, strip, flood and garden light prices as of 23 Oct 2026: Durevole flood 10 W Rp89,600 to 100 W Rp446,250 (100 W is about 50% cheaper per watt), Durevole strip 5 m Rp80,000, Panasonic strip Rp31,350 per metre, Philips DLI320 5 m Rp168,800 at Depo.</description></item><item><title>LED Downlight &amp; Panel Light Prices 2026: Panasonic, Durevole, Nero</title><link>https://www.homex.co.id/en/news/191</link><guid isPermaLink="true">https://www.homex.co.id/en/news/191</guid><pubDate>Fri, 23 Oct 2026 11:25:04 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>LED downlight and panel prices as of 23 Oct 2026: Panasonic G3 12 W Rp82,900 at Mitra10 vs Rp96,500 at Depo (+16.4%); Hannochs Easy II 12 W Rp64,530 and Ecolink 12 W Rp57,000 at Depo; Durevole 12 W Rp92,000, Nero Slim 12 W Rp124,000. Includes price per watt, recessed vs outbow types and buying tips.</description></item><item><title>BI-Rate 5.75%, LTV 100% to 2027 and Rp11.77T PKP Budget: Materials</title><link>https://www.homex.co.id/en/news/190</link><guid isPermaLink="true">https://www.homex.co.id/en/news/190</guid><pubDate>Fri, 23 Oct 2026 11:05:01 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>BI-Rate held at 5.75% (20–21 Oct 2026 meeting), LTV/FTV 100% extended to 31 Dec 2027, and the 2027 PKP Ministry ceiling is Rp11.77 trillion with BSPS at Rp8.67 trillion for 315,000 units (vs a 400,000-unit target in 2026). The data and what it means in practice for building-material buyers.</description></item><item><title>Ceiling Paint Prices 2026: Vinilex, Pentalite, Jotun, Avitex One Coat</title><link>https://www.homex.co.id/en/news/189</link><guid isPermaLink="true">https://www.homex.co.id/en/news/189</guid><pubDate>Fri, 23 Oct 2026 11:05:01 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Ceiling paint prices (23 Oct 2026): Nippon Vinilex Ceiling 25 kg Rp742,200, Dulux Pentalite 25 kg Rp1,005,872 (Mitra10) vs Rp1,009,800 (Depo), Avitex One Coat 22 kg Rp790,700, Jotun Essence Easy Ceiling 18 L Rp1,038,100. Per kg: Vinilex Rp29,688, Pentalite Rp40,235.</description></item><item><title>Pralon PVC Pipe Prices 2026: AW 1/2&quot;–1 1/2&quot; and TS/DV Fittings</title><link>https://www.homex.co.id/en/news/188</link><guid isPermaLink="true">https://www.homex.co.id/en/news/188</guid><pubDate>Fri, 23 Oct 2026 11:05:01 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Pralon pipe prices at Depo (23 Oct 2026): PVC AW 4 m 1/2&quot; Rp23,400, 3/4&quot; Rp32,400, 1&quot; Rp44,100, 1 1/2&quot; Rp77,900; TS fittings Rp1,300–Rp18,000, DV 2&quot;–4&quot; Rp6,600–Rp31,700. Mitra10: Tidy PVC stop valve Rp32,000–Rp38,000, Dextone pipe glue 400 g Rp53,500.</description></item><item><title>Roman Granite Prices 2026: 60x60, 15x60 &amp; 30x60 vs Indogress per Box</title><link>https://www.homex.co.id/en/news/187</link><guid isPermaLink="true">https://www.homex.co.id/en/news/187</guid><pubDate>Fri, 23 Oct 2026 11:05:01 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Roman granite prices at Depo (23 Oct 2026), 24 60x60 products on the first results page: Rp193,500 (10 designs), Rp211,000, Rp220,000 (9 KW1 designs), Rp237,000, Rp263,500 per box; 15x60 Rp193,500–Rp259,000. Indogress 60x60 at Mitra10 Rp187,200–Rp315,395.</description></item><item><title>Exterior Paint Prices 2026 per Litre: Sunguard, Propan, Mowilex, Jotun</title><link>https://www.homex.co.id/en/news/186</link><guid isPermaLink="true">https://www.homex.co.id/en/news/186</guid><pubDate>Fri, 23 Oct 2026 11:05:01 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Exterior paint prices as of 23 Oct 2026, per litre (20 L): Mowilex Weather Coat about Rp98,510, Dulux Weathershield Dual Shield Rp139,085, Sunguard Rp144,267, Decorflex Propan Rp144,360, Jotashield Antifade Rp159,415 up to Infinity Rp184,980.</description></item><item><title>Avian &amp; Avitex Paint Prices 2026: Gold, Copolymer, Primer, Enamel</title><link>https://www.homex.co.id/en/news/185</link><guid isPermaLink="true">https://www.homex.co.id/en/news/185</guid><pubDate>Fri, 23 Oct 2026 11:05:01 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Avian and Avitex paint prices (23 Oct 2026): Super White 5 kg Rp157,300 (Mitra10) vs Rp157,000 (Depo), 25 kg Rp738,500 vs Rp738,300; Alkali Primer 21 kg Rp599,800 vs Rp748,200 (Depo +24.7%); coloured Copolymer 5 kg from Rp127,500; Avitex Gold 25 kg Rp875,202.</description></item><item><title>B2B Building Materials Supply 2026: Warehouses, ODOL &amp; Logistics</title><link>https://www.homex.co.id/en/news/184</link><guid isPermaLink="true">https://www.homex.co.id/en/news/184</guid><pubDate>Fri, 23 Oct 2026 10:33:51 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Modern Jabodetabek warehouses are 96.4% occupied (Q3 2026), logistics cost is 14.29% of GDP (2022) with an 8% target (Perpres 41/2026), and Zero ODOL is due in 2027. What this means for a B2B building-materials supply model: consolidated POs, delivery from the nearest point and landed-cost…</description></item><item><title>Steel &amp; Rebar Manufacturers in Indonesia: Krakatau, GRP, Master Steel</title><link>https://www.homex.co.id/en/news/183</link><guid isPermaLink="true">https://www.homex.co.id/en/news/183</guid><pubDate>Fri, 23 Oct 2026 10:33:51 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Directory of steel and rebar manufacturers in Indonesia as of 23 Oct 2026: Krakatau Steel &amp; Wajatama (Cilegon), Gunung Raja Paksi (Bekasi), Master Steel (Jakarta), Ispat Indo (Sidoarjo) plus IISIA members in Surabaya, Medan and Banten.</description></item><item><title>Mowilex Paint Prices 2026: Emulsion, Vinyl Silk, Weathercoat, Primers</title><link>https://www.homex.co.id/en/news/182</link><guid isPermaLink="true">https://www.homex.co.id/en/news/182</guid><pubDate>Fri, 23 Oct 2026 10:33:51 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Mowilex paint prices at Mitra10 (23 Oct 2026): Emulsion 20 L Rp1,240,000–1,257,400, Vinyl Silk 20 L Rp1,728,900–1,944,200, Weathercoat 20 L Rp1,877,600–1,990,200 (W-1501 Rp2,721,400), Undercoat 20 L Rp1,329,500, Waterbase Sealer 20 L Rp839,300.</description></item><item><title>KIA Ceramic Tile Prices 2026: 40x40, 50x50 &amp; 30x60 Wall Tiles</title><link>https://www.homex.co.id/en/news/181</link><guid isPermaLink="true">https://www.homex.co.id/en/news/181</guid><pubDate>Fri, 23 Oct 2026 10:33:51 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>KIA ceramic tile prices (23 Oct 2026): 40x40 floor Rp76,320–88,512 (Mitra10) vs Rp79,500 (Depo); 50x50 Rp78,840–95,712 vs Rp92,000–99,700; 30x60 wall Rp90,574–97,968 vs Rp100,250–105,800 per box. No identical models at both stores.</description></item><item><title>Niro Granite Prices 2026: 60x60, 60x120, 80x80 per Box</title><link>https://www.homex.co.id/en/news/180</link><guid isPermaLink="true">https://www.homex.co.id/en/news/180</guid><pubDate>Fri, 23 Oct 2026 10:33:51 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Niro granite prices (23 Oct 2026): 60x60 from Rp174,040 (GG042) to Rp399,200 per box at Mitra10; same models Legnix GNX04 Rp275,300 vs Rp275,236 (Depo), Urbane GUR01 Rp351,300 vs Rp351,210, Magnifico 60x120 GCO01 Rp378,300 vs Rp378,216.</description></item><item><title>Jotun Paint Prices 2026: Jotashield, Majestic, Essen, Primers</title><link>https://www.homex.co.id/en/news/179</link><guid isPermaLink="true">https://www.homex.co.id/en/news/179</guid><pubDate>Fri, 23 Oct 2026 10:33:51 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Jotun paint prices (23 Oct 2026): Jotaplast 18 L Rp725,000 (Mitra10) vs Rp859,700 (Depo); Jotashield Primer 07 20 L Rp1,222,300 vs Rp1,401,200; Majestic True Beauty Matt 20 L Rp2,251,700, Jotashield Infinity 20 L Rp3,699,600 (Depo).</description></item><item><title>Stop Gas Exports 2026: ASAKI Welcomes Plan to Restore Ceramic Gas Supply</title><link>https://www.homex.co.id/en/news/178</link><guid isPermaLink="true">https://www.homex.co.id/en/news/178</guid><pubDate>Fri, 23 Oct 2026 09:22:36 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>ASAKI welcomes Energy Minister Bahlil&#x27;s plan to stop gas exports. Ceramic makers paying US$11/MMBtu with utilisation below 70% hope gas supply recovers.</description></item><item><title>Cement Consumption September 2026: 6 Million Tons, 9M Up 7.9%</title><link>https://www.homex.co.id/en/news/177</link><guid isPermaLink="true">https://www.homex.co.id/en/news/177</guid><pubDate>Fri, 23 Oct 2026 09:22:36 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Cement consumption September 2026: 6.0 million tons (+3.0% YoY), bulk cement up 8.2%; the 9-month total reached 48.1 million tons, up 7.9%, per Mirae Asset.</description></item><item><title>Gentengisasi 2026: 2.4 Million SNI Majalengka Roof Tiles at IDR 2,500</title><link>https://www.homex.co.id/en/news/176</link><guid isPermaLink="true">https://www.homex.co.id/en/news/176</guid><pubDate>Fri, 23 Oct 2026 09:22:36 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Gentengisasi 2026: Indonesia&#x27;s housing ministry readies 2.4 million roof tiles from 45 Majalengka makers on 8 November, at IDR 2,500 per piece via cooperatives.</description></item><item><title>Fox Glue Prices 2026: PVAC White Glue, Contact Glue, HPL &amp; Pipe Glue</title><link>https://www.homex.co.id/en/news/175</link><guid isPermaLink="true">https://www.homex.co.id/en/news/175</guid><pubDate>Fri, 23 Oct 2026 09:22:36 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Fox glue prices at Depo Bangunan, 23 Oct 2026: PVAC white glue IDR 23,900 (½ kg) to 355,900 (10 kg); Fox contact glue 2.5 kg IDR 222,100; HPL and pipe glue.</description></item><item><title>Onda Faucet Prices 2026: Wall, Garden, Kitchen &amp; Basin Taps at Depo</title><link>https://www.homex.co.id/en/news/174</link><guid isPermaLink="true">https://www.homex.co.id/en/news/174</guid><pubDate>Fri, 23 Oct 2026 09:22:36 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Onda faucet prices at Depo Bangunan, 23 Oct 2026: wall taps IDR 44,000–633,000, garden taps IDR 60,300–215,000, kitchen taps IDR 202,000–707,000.</description></item><item><title>China Homelife Indonesia 2026: Building Materials Expo at JIExpo, 25–28 November</title><link>https://www.homex.co.id/en/news/173</link><guid isPermaLink="true">https://www.homex.co.id/en/news/173</guid><pubDate>Fri, 23 Oct 2026 09:22:12 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>China Homelife Indonesia 2026 runs 25–28 November at JIExpo Kemayoran with a BDE building-materials zone, the same week as IndoBuildTech Part 2 at NICE PIK 2.</description></item><item><title>Interlocking Brick in Indonesia: SIG Precision Blocks Cut House Build Time to a Month</title><link>https://www.homex.co.id/en/news/172</link><guid isPermaLink="true">https://www.homex.co.id/en/news/172</guid><pubDate>Fri, 23 Oct 2026 09:22:12 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>SIG precision interlocking brick debuts at Sunrise City Maros, Sulawesi&#x27;s first estate using it, cutting house build time from 4–5 months to about one month.</description></item><item><title>Construction Worker Training in Indonesia: Cement Makers Help Certify 201 Tukang</title><link>https://www.homex.co.id/en/news/171</link><guid isPermaLink="true">https://www.homex.co.id/en/news/171</guid><pubDate>Fri, 23 Oct 2026 09:22:12 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Construction worker training by Indonesian cement makers: Semen Padang trained 101 tukang in South Bengkulu; Semen Baturaja backed 100 in South Lampung.</description></item><item><title>Indonesia Logistics Cost Target of 12.5% of GDP: What It Means for Building Materials</title><link>https://www.homex.co.id/en/news/170</link><guid isPermaLink="true">https://www.homex.co.id/en/news/170</guid><pubDate>Fri, 23 Oct 2026 09:22:12 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Indonesia logistics cost target: from 14.29% of GDP (2022) to 12.5% by 2029 under Perpres 41/2026, as Avian opens its 151st distribution centre in Surabaya.</description></item><item><title>AI in Indonesian Construction: WIKA Gedung and Hutama Karya Honoured at YII 2026</title><link>https://www.homex.co.id/en/news/169</link><guid isPermaLink="true">https://www.homex.co.id/en/news/169</guid><pubDate>Fri, 23 Oct 2026 09:22:11 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>AI in Indonesian construction gains recognition: WIKA Gedung won a 2026 YII award for the JIS roof and Hutama Karya used AI to route heavy equipment at IKN.</description></item><item><title>How to Check SNI Rebar in Indonesia: Full vs Undersize, Weight per Metre</title><link>https://www.homex.co.id/en/news/168</link><guid isPermaLink="true">https://www.homex.co.id/en/news/168</guid><pubDate>Fri, 23 Oct 2026 09:18:41 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>How to check SNI rebar: check SNI embossing and bar-end colour, then weigh. A 12 m D13 bar is 12.50 kg nominal, ±6%. Mandatory under Permenperin 55/2024.</description></item><item><title>KW1, KW2, KW3 Ceramic Tiles in Indonesia: Meaning, Price Gap and Checks</title><link>https://www.homex.co.id/en/news/167</link><guid isPermaLink="true">https://www.homex.co.id/en/news/167</guid><pubDate>Fri, 23 Oct 2026 09:18:41 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>KW1, KW2, KW3 ceramic tiles are factory quality grades, not fakes. How to read the box label, the 20–50% price gap and 5 checks to make in the shop.</description></item><item><title>Gypsum Board Manufacturers in Indonesia: Jayaboard, Elephant, Gyproc &amp; Aplus</title><link>https://www.homex.co.id/en/news/166</link><guid isPermaLink="true">https://www.homex.co.id/en/news/166</guid><pubDate>Fri, 23 Oct 2026 09:18:41 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Gypsum board manufacturers in Indonesia: Jayaboard (Knauf) in Gresik and Cilegon, Elephant in Bekasi, Gyproc in Cikande, Aplus in Rangkasbitung and Gresik.</description></item><item><title>Indonesia Home Prices Q2 2026: +0.69% &amp; Building Material Costs</title><link>https://www.homex.co.id/en/news/165</link><guid isPermaLink="true">https://www.homex.co.id/en/news/165</guid><pubDate>Fri, 23 Oct 2026 00:09:01 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>BI survey Q2 2026: residential price index 110.89 (+0.69% yoy); primary home sales −2.36% yoy (Q1 −25.67%); mortgages 70.05% of purchases; mortgage rate 7.44%; rising building-material prices the top constraint (27.10%).</description></item><item><title>Clothes Drying Rack Prices 2026: Foldable, Wall &amp; Stainless</title><link>https://www.homex.co.id/en/news/164</link><guid isPermaLink="true">https://www.homex.co.id/en/news/164</guid><pubDate>Fri, 23 Oct 2026 00:09:01 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Drying rack prices (22 Oct 2026, Mitra10): Zehn foldable Rp295,000–391,901, stainless Rp487,901, aluminium tower Rp615,900; Liveo wall-mounted Rp709,400–1,304,900; Mami towel racks Rp306,000–533,000. Depo: HAWDD Haidar double rod Rp605,680 (promo).</description></item><item><title>Screwdriver Prices 2026: Phillips, Flat, Impact &amp; Sets</title><link>https://www.homex.co.id/en/news/163</link><guid isPermaLink="true">https://www.homex.co.id/en/news/163</guid><pubDate>Fri, 23 Oct 2026 00:09:01 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Screwdriver prices (22 Oct 2026): Fixman 75–300 mm Rp23,000–57,500, impact drivers Rp59,000–66,000, 8-pc set Rp166,600 (Mitra10); Sellery Rp36,700–80,700, Hasston 2-in-1 Rp39,200, Bosch X-Line set Rp121,900 (Depo).</description></item><item><title>Pliers &amp; Adjustable Wrench Prices 2026: Fixman, Sellery, Hasston</title><link>https://www.homex.co.id/en/news/162</link><guid isPermaLink="true">https://www.homex.co.id/en/news/162</guid><pubDate>Fri, 23 Oct 2026 00:09:01 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Pliers &amp; wrench prices (22 Oct 2026): combination pliers 6–8 inch Rp65,700 (Hasston, Depo) – Rp162,000 (Fixman, Mitra10); diagonal cutters Rp82,600–142,000; adjustable wrenches 6–12 inch Rp100,000–161,000 (Fixman) and Sellery 10-inch Rp119,500 (Depo).</description></item><item><title>Emergency Light Prices 2026: Philips, Panasonic, Hannochs Bulbs</title><link>https://www.homex.co.id/en/news/161</link><guid isPermaLink="true">https://www.homex.co.id/en/news/161</guid><pubDate>Fri, 23 Oct 2026 00:09:01 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Emergency light prices (22 Oct 2026): Panasonic LDRHV9DE27 9 W Rp115,900 (Mitra10) vs Rp123,100 (Depo); Hannochs 6–12 W Rp66,045–99,025; Ecolink 8 W Rp65,100; Philips 7.5–9 W Rp147,800–162,100 (Depo); Durevole Rp85,500–274,000 (Mitra10).</description></item><item><title>Angle Grinder Prices 2026: 4-inch Bosch, Makita, Ryotech</title><link>https://www.homex.co.id/en/news/160</link><guid isPermaLink="true">https://www.homex.co.id/en/news/160</guid><pubDate>Fri, 23 Oct 2026 00:09:00 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>4-inch angle grinder prices (22 Oct 2026): Ryotech Rp279,900–341,900, Fixman 710 W Rp474,600, Bosch GWS 700 Rp484,500, GWS 750 Rp1,053,550 (Mitra10); Makita M0900B Rp554,720, M9513B Rp972,800, 9553B Rp1,155,200, GA4030 Rp1,269,200 (Depo, promo).</description></item><item><title>Housing VAT Incentive 2026: PMK 90/2025, 9,618 Units &amp; 2027</title><link>https://www.homex.co.id/en/news/159</link><guid isPermaLink="true">https://www.homex.co.id/en/news/159</guid><pubDate>Fri, 23 Oct 2026 00:01:53 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>As of 22 Oct 2026: PMK 90/2025 grants a 100% government-borne VAT on the first Rp2bn of new ready homes priced ≤Rp5bn, handover 1 Jan–31 Dec 2026; 9,618 units used it in 1H 2026; the government announced a 100% extension into 2027, regulation not yet issued.</description></item><item><title>Bathroom Mirror Prices 2026: Round, Oval &amp; Mirror Cabinets</title><link>https://www.homex.co.id/en/news/158</link><guid isPermaLink="true">https://www.homex.co.id/en/news/158</guid><pubDate>Fri, 23 Oct 2026 00:01:53 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Bathroom mirror prices (22 Oct 2026): Ceramax round 55–60 cm Rp599,000–799,200, oval Rp735,000–871,500, rectangular 80x60 Rp815,100–860,000 (Mitra10); DBS cabinet + mirror Rp2.19–3.17m, Activ Forte Rp2.29–3.81m (Depo, promo).</description></item><item><title>Bathtub Prices 2026: Drop-in, Acrylic &amp; Artstone + Mixers</title><link>https://www.homex.co.id/en/news/157</link><guid isPermaLink="true">https://www.homex.co.id/en/news/157</guid><pubDate>Fri, 23 Oct 2026 00:01:53 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Bathtub prices (22 Oct 2026, Mitra10): Ceramax drop-in Rp3.19–3.85m; acrylic freestanding Rp8.87–12.4m; artstone Rp18.5–22.35m. Bathtub mixers Rp420,500–1,706,400 (Mitra10); TOTO TX471KEA Rp1,589,000 (Depo).</description></item><item><title>Gas Regulator &amp; Hose Prices 2026: Gascomp, Azalea</title><link>https://www.homex.co.id/en/news/156</link><guid isPermaLink="true">https://www.homex.co.id/en/news/156</guid><pubDate>Fri, 23 Oct 2026 00:01:53 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Gas regulator prices (22 Oct 2026): Gascomp regulator + hose sets Rp84,000–150,000, meter regulators Rp116,000 (Depo Bangunan); Azalea SR-AZ02 1.8 m regulator hose Rp483,652 (Mitra10).</description></item><item><title>Water Hose Prices 2026: Flexible Tap Hoses &amp; Garden Hoses</title><link>https://www.homex.co.id/en/news/155</link><guid isPermaLink="true">https://www.homex.co.id/en/news/155</guid><pubDate>Fri, 23 Oct 2026 00:01:53 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Hose prices (22 Oct 2026): cold flexible hose 30 cm Rp25,650 (Tidy) – Rp38,950 (Amstad, Depo); hot 30 cm Rp34,200–51,300; 10 m garden hose Rp137,400–156,500; 10 m hose reel Rp179,800–313,404.</description></item><item><title>Paint Brush &amp; Roller Prices 2026: Nippon, Oldfield, DBS, Tidy</title><link>https://www.homex.co.id/en/news/154</link><guid isPermaLink="true">https://www.homex.co.id/en/news/154</guid><pubDate>Fri, 23 Oct 2026 00:01:53 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Brush &amp; roller prices (22 Oct 2026): 1-inch brush Rp6,200–19,700, 2-inch Rp12,000–30,600, 4-inch Rp26,800–56,000; 9-inch roller with frame Rp18,900–63,800; 9-inch roller cover Rp16,500–39,200 (Mitra10 vs Depo Bangunan).</description></item><item><title>Indonesia Cement 2026: 120Mt Capacity, 56% Utilisation &amp; Exports</title><link>https://www.homex.co.id/en/news/153</link><guid isPermaLink="true">https://www.homex.co.id/en/news/153</guid><pubDate>Thu, 22 Oct 2026 23:53:01 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>As of 22 Oct 2026: national cement capacity ~120 Mt/yr; utilisation ~54% in 2025, projected ~56% in 2026 (ideal 80–85%); domestic sales Jan–Jun 2026 30.71 Mt (+10.5%); Indocement 1H exports 473 kt (+99.7%); SBI special-cement exports to the US 97,500 t.</description></item><item><title>Spray Paint Prices 2026: Pylox vs Diton 300 cc per Can</title><link>https://www.homex.co.id/en/news/152</link><guid isPermaLink="true">https://www.homex.co.id/en/news/152</guid><pubDate>Thu, 22 Oct 2026 23:53:01 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>300 cc spray paint prices (22 Oct 2026): Diton at Mitra10 Rp26,200 (metallic) – Rp35,000 (standard black/white), fluorescent Rp44,600, anti-rust Rp46,000, premium Rp55,000, chrome Rp62,500; Pylox Solid white/clear and Pylox Prime primer Rp38,100 at Depo.</description></item><item><title>Padlock Prices 2026: Paloma, Zehn, Solid &amp; Gradino 40–70 mm</title><link>https://www.homex.co.id/en/news/151</link><guid isPermaLink="true">https://www.homex.co.id/en/news/151</guid><pubDate>Thu, 22 Oct 2026 23:53:01 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Padlock prices (22 Oct 2026): Zehn cast iron 40–60 mm Rp49,700–65,170, Paloma P-500 50–70 mm Rp112,500–150,000, Paloma stainless Rp175,000–350,000 (Mitra10); Solid 40–60 mm Rp38,250–76,500, Gradino 60 mm Rp98,250 (Depo).</description></item><item><title>Cooker Hood Prices 2026: Range Hoods at Mitra10 vs Depo</title><link>https://www.homex.co.id/en/news/150</link><guid isPermaLink="true">https://www.homex.co.id/en/news/150</guid><pubDate>Thu, 22 Oct 2026 23:53:01 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Cooker hood prices (22 Oct 2026): Rinnai slim RH-S1456 60 cm Rp1,013,296 (Mitra10) vs Rp1,084,800 (Depo); RH-S1757 70 cm Rp1,279,000 vs Rp1,342,150; RH-529SS 90 cm Rp2,743,860 vs Rp2,708,000; Modena CX 7917 chimney Rp5,398,901; Fotile/Bosch premium Rp8.4–14.95 million.</description></item><item><title>Built-In Gas Hob Prices 2026: 2 &amp; 3 Burners, Mitra10 vs Depo</title><link>https://www.homex.co.id/en/news/149</link><guid isPermaLink="true">https://www.homex.co.id/en/news/149</guid><pubDate>Thu, 22 Oct 2026 23:53:01 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Built-in hob prices (22 Oct 2026): Mitra10 Rinnai RB-772RO Rp2,067,332, Hafele 2-burner Rp2,182,653, Modena BH 1725 Rp3,349,000, Artugo 3-burner Rp5,121,000; Depo Azalea AGC 732 Rp2,490,035, Linea GLI 73 Rp2,699,981, Modena BH 1725 LA Rp3,091,556, Teka GKE Lux Rp4,550,000.</description></item><item><title>Split AC Prices 2026: 1/2 PK &amp; 1 PK, Standard vs Inverter</title><link>https://www.homex.co.id/en/news/148</link><guid isPermaLink="true">https://www.homex.co.id/en/news/148</guid><pubDate>Thu, 22 Oct 2026 23:53:01 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Split AC prices at Mitra10 (22 Oct 2026): 1/2 PK standard Rp2,753,061 (Midea) – Rp4,438,420 (Panasonic); 1 PK standard Rp3,161,224–5,046,020; 1 PK inverter Rp4,703,061 (Sharp J-Tech) – Rp7,639,000 (Daikin Alpha); LG 1 PK with installation Rp5,584,694.</description></item><item><title>IKN 2026–2028: Rp48.8T Budget &amp; Opportunities for Material Suppliers</title><link>https://www.homex.co.id/en/news/147</link><guid isPermaLink="true">https://www.homex.co.id/en/news/147</guid><pubDate>Thu, 22 Oct 2026 23:43:25 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>As of 22 Oct 2026: the President approved a Rp48.8 trillion IKN budget for 2025–2028 in three batches; OIKN 2026 ceiling Rp6.26 trillion; batch 2 legislative–judicial zone Rp20 trillion (2025–2027 multi-year), batch 3 housing &amp; diplomatic zone Rp17.2 trillion (2026–2028); parliament building ~10%…</description></item><item><title>Aluminium Ladder Prices 2026: Folding, Multi-Purpose &amp; Telescopic</title><link>https://www.homex.co.id/en/news/146</link><guid isPermaLink="true">https://www.homex.co.id/en/news/146</guid><pubDate>Thu, 22 Oct 2026 23:43:25 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Aluminium ladder prices (22 Oct 2026): Zehn folding 2–3 step Rp390,151–431,600, 4-step Rp839,300, 6-step Rp1,091,300, 4x4 multi-purpose Rp1,799,400–1,949,350, telescopic 3.8–5 m Rp2,099,300–2,561,300 (Mitra10); Alexander DXL 8-step 200 cm Rp1,775,000 (Depo).</description></item><item><title>Power Drill Prices 2026: Corded &amp; Cordless Bosch, Makita, Fixman</title><link>https://www.homex.co.id/en/news/145</link><guid isPermaLink="true">https://www.homex.co.id/en/news/145</guid><pubDate>Thu, 22 Oct 2026 23:43:25 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Power drill prices (22 Oct 2026): corded Ryotech 10 mm Rp268,900, Fixman 13 mm Rp381,500, Makita M6501B Rp988,000, Bosch GSB 16 RE Rp1,448,080 (Mitra10); cordless Fixman 12V Rp439,000, Black &amp; Decker 18V Rp1,166,200 (Depo), Bosch GSB 183-LI Rp1,719,900.</description></item><item><title>Ceiling Fan Prices 2026: Panasonic, KDK &amp; Edma in Indonesia</title><link>https://www.homex.co.id/en/news/144</link><guid isPermaLink="true">https://www.homex.co.id/en/news/144</guid><pubDate>Thu, 22 Oct 2026 23:43:25 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Ceiling fan prices (22 Oct 2026): Panasonic F-EY1511 Rp1,057,200 and Edma Tornado 42-inch Rp1,040,000 at Mitra10; KDK WZ56 56-inch Rp1,115,200 and KDK WU56 remote Rp1,443,200 at Depo; Edma DC 60–72-inch up to Rp6.3 million.</description></item><item><title>Smart Door Lock Prices 2026: Digital Locks at Mitra10 vs Depo</title><link>https://www.homex.co.id/en/news/143</link><guid isPermaLink="true">https://www.homex.co.id/en/news/143</guid><pubDate>Thu, 22 Oct 2026 23:43:25 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Digital door lock prices (22 Oct 2026): Zehn Broklyn F4 Rp712,025 and Onassis T1 Pro Rp1,269,000 at Mitra10; at Depo MAB MK1C Rp821,800, Unikey DGL 8008 Rp824,950, Solid SDL700 Rp970,669, MAB MK4 fingerprint+WiFi Rp1,458,100, up to Kend K368 Rp4,753,686.</description></item><item><title>Exhaust Fan Prices 2026: Ceiling &amp; Wall, Mitra10 vs Depo Bangunan</title><link>https://www.homex.co.id/en/news/142</link><guid isPermaLink="true">https://www.homex.co.id/en/news/142</guid><pubDate>Thu, 22 Oct 2026 23:43:24 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Exhaust fan prices (22 Oct 2026): 8-inch ceiling at Mitra10 Rp226,000 (Maspion) – Rp416,000 (Panasonic), Depo KDK 8-inch Rp456,000; 10-inch wall Mitra10 Rp449,250–582,000, Depo KDK Rp640,800–701,600; KDK 16-inch industrial Rp1,196,800.</description></item><item><title>Indonesia Tax Holiday 2026: Status for Building-Material Factories</title><link>https://www.homex.co.id/en/news/141</link><guid isPermaLink="true">https://www.homex.co.id/en/news/141</guid><pubDate>Thu, 22 Oct 2026 23:33:45 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>As of 22 Oct 2026: the general tax holiday (PMK 130/2020 as amended by PMK 69/2024) ended 31 Dec 2025; the replacement draft finished harmonisation in April 2026 but has not been announced; BKPM says SEZ and free-trade-zone incentives still apply; QRTC and energy subsidies are being studied.</description></item><item><title>Water Heater Prices 2026: Electric, Gas &amp; Solar at Mitra10</title><link>https://www.homex.co.id/en/news/140</link><guid isPermaLink="true">https://www.homex.co.id/en/news/140</guid><pubDate>Thu, 22 Oct 2026 23:33:45 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Water heater prices at Mitra10 (22 Oct 2026): electric 10 L Rp1,568,000–2,090,000, 15 L Rp1,902,000–2,790,000, 30 L Rp2,321,000–3,312,000; gas 5–6 L Rp1,250,000–2,182,500; tankless Rp2,541,500–3,625,600; solar 80–300 L Rp17.99–37.55 million.</description></item><item><title>Wood-Look Tile Prices 2026: 15x60, 15x90, 20x120 Planks</title><link>https://www.homex.co.id/en/news/139</link><guid isPermaLink="true">https://www.homex.co.id/en/news/139</guid><pubDate>Thu, 22 Oct 2026 23:33:45 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Wood-look porcelain prices at Mitra10 (22 Oct 2026): Durafloor 15x90 from Rp182,000, Niro Fine Wood 15x60 Rp289,940 and 15x90 Rp326,135–347,414, Sincere 15x90 Rp360,767, Eleganza Heartwood 20x120 Rp390,156–457,080, Niro Ash Wood 60x120 Rp480,300.</description></item><item><title>Spandek Zincalume Roofing Prices 2026: 0.25–0.50 mm per Metre</title><link>https://www.homex.co.id/en/news/138</link><guid isPermaLink="true">https://www.homex.co.id/en/news/138</guid><pubDate>Thu, 22 Oct 2026 23:33:45 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Spandek zincalume prices, 1 m effective width (Oct 2026): 0.30 mm Rp60,000–85,000/m, 0.35 mm Rp70,000–95,000, 0.40 mm Rp80,000–105,000, 0.45 mm Rp95,000–125,000 (Nusantara Baja, Pratama Baja, Niaga Baja).</description></item><item><title>Wire Mesh Prices 2026: M6, M8, M10 per Sheet &amp; Roll</title><link>https://www.homex.co.id/en/news/137</link><guid isPermaLink="true">https://www.homex.co.id/en/news/137</guid><pubDate>Thu, 22 Oct 2026 23:33:45 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Wire mesh sheet 2.1 x 5.4 m prices (Oct 2026): M6 Rp285,500–420,561, M8 Rp523,500–747,597, M10 Rp860,500–1,168,158; Full SNI costs more than 0.3–0.5 mm tolerance (Metamoa, Jaya Steelindo, Pusat Atap Spandek).</description></item><item><title>Ready-Mix Concrete Price per m³ 2026: K-225, K-300 &amp; Minimix</title><link>https://www.homex.co.id/en/news/136</link><guid isPermaLink="true">https://www.homex.co.id/en/news/136</guid><pubDate>Thu, 22 Oct 2026 23:33:45 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Jabodetabek ready-mix prices (22 Oct 2026): K-225 standard truck Rp830,000–880,000/m³, minimix Rp1,225,000; K-300 Rp900,000–950,000/m³, minimix Rp1,300,000–1,350,000 (Mitra Readymix, Pusat Readymix, Beton Jayamix).</description></item><item><title>TKDN Guide for Building Materials 2026: Permenperin 35/2025</title><link>https://www.homex.co.id/en/news/135</link><guid isPermaLink="true">https://www.homex.co.id/en/news/135</guid><pubDate>Thu, 22 Oct 2026 23:24:52 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Summary of Permenperin 35/2025 (promulgated 11 Sep 2025, effective 3 months later): goods TKDN = materials 75% + labour 10% + overhead 15%; LVI verification; certificate valid 5 years; free self-declaration for small industry.</description></item><item><title>Rebar Prices 2026: Plain &amp; Deformed 8–16 mm per 12 m Bar</title><link>https://www.homex.co.id/en/news/134</link><guid isPermaLink="true">https://www.homex.co.id/en/news/134</guid><pubDate>Thu, 22 Oct 2026 23:24:52 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Rebar prices per 12 m bar (Oct 2026): plain 10 mm Rp63,650 (Jaya Steel, non-full) to Rp88,900 (Full SNI); deformed 13 mm Rp108,150–146,600; deformed 16 mm Rp163,850–211,900. DKI survey: 13 mm deformed Rp9,200–11,100/kg.</description></item><item><title>WPC &amp; Marble-Look Wall Panel Prices 2026: Durawood at Mitra10</title><link>https://www.homex.co.id/en/news/133</link><guid isPermaLink="true">https://www.homex.co.id/en/news/133</guid><pubDate>Thu, 22 Oct 2026 23:24:52 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Durawood wall panel prices at Mitra10 (22 Oct 2026): marble-look 2.9 x 1.22 m 8 mm Rp776,000–1,155,153; SC ZY series Rp3,096,000–3,560,000; wood-look WPC 2.9 m Rp1,104,000–1,546,720; granite-look WPC Rp1,056,000–1,672,357.</description></item><item><title>Membrane Canopy Price per m² 2026: Agtex, Heytex &amp; Serge Ferrari</title><link>https://www.homex.co.id/en/news/132</link><guid isPermaLink="true">https://www.homex.co.id/en/news/132</guid><pubDate>Thu, 22 Oct 2026 23:24:52 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Turnkey membrane canopy prices (22 Oct 2026): Agtex 550–1050 gsm Rp675,000–1,350,000/m², Heytex Rp700,000–1,450,000, Serge Ferrari Rp775,000–1,550,000 (Sumber Kanopi, Membranesia); residential Rp550–900k, commercial Rp950k–1.4m (Mega Membrane).</description></item><item><title>Sand &amp; Split Stone Prices 2026: per m³ and per Truck, Jabodetabek</title><link>https://www.homex.co.id/en/news/131</link><guid isPermaLink="true">https://www.homex.co.id/en/news/131</guid><pubDate>Thu, 22 Oct 2026 23:24:52 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Prices (22 Oct 2026): DKI survey medians – concrete sand Rp500,000/m³, masonry sand Rp525,000, fill sand Rp425,000, split stone Rp600,000/m³; per 6.1 m³ truck in Tangerang: fill sand Rp1.55m, washed sand Rp2.1m, black concrete sand Rp2.5m, split Rp3.3m (Solusi Pasir).</description></item><item><title>Batako &amp; Red Brick Prices 2026: per Piece, per 1,000 &amp; per m²</title><link>https://www.homex.co.id/en/news/130</link><guid isPermaLink="true">https://www.homex.co.id/en/news/130</guid><pubDate>Thu, 22 Oct 2026 23:24:52 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Prices (22 Oct 2026): pressed batako Rp1,350–2,100 each, 1,000 pcs 30x15x7 Rp2 million (detikProperti); Rp2,000–2,800 (Medcom, West Jakarta); red brick small Rp550–600, jumbo Rp900–1,100 each; per 1,000 small ~Rp600,000, jumbo ~Rp900,000 (Murni Baja).</description></item><item><title>Indonesia Infrastructure 2026: Rp118.5T Public Works Budget &amp; Materials</title><link>https://www.homex.co.id/en/news/129</link><guid isPermaLink="true">https://www.homex.co.id/en/news/129</guid><pubDate>Thu, 22 Oct 2026 23:11:11 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Data as of 22 Oct 2026: 2026 Public Works budget Rp118.5 trillion (water resources Rp34.74T, roads &amp; bridges Rp45.62T); targets 158 km new roads, 35.72 km toll roads, 15,905 ha new irrigation; proposed Inpres top-up Rp36.91T (regional irrigation and roads Rp15T each, Sekolah Rakyat Rp5.16T).</description></item><item><title>Glass Price per m² 2026: Clear 5–12 mm, Tempered &amp; Mirrors</title><link>https://www.homex.co.id/en/news/128</link><guid isPermaLink="true">https://www.homex.co.id/en/news/128</guid><pubDate>Thu, 22 Oct 2026 23:11:11 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Glass prices (22 Oct 2026, incl. VAT): clear 5 mm Rp133,200 (Muncul Jaya Sakti) – Rp160,000 (Optima Glass); 8 mm Rp265,000; 12 mm Rp425,000; tempered 5/8/10/12 mm Rp250/385/465/525k per m². Ceramax framed mirrors Rp599,000–899,000 (Mitra10).</description></item><item><title>Glass Block Prices 2026: Grandeur &amp; Mulia per Piece and per m²</title><link>https://www.homex.co.id/en/news/127</link><guid isPermaLink="true">https://www.homex.co.id/en/news/127</guid><pubDate>Thu, 22 Oct 2026 23:11:11 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Glass block prices (22 Oct 2026): Grandeur 8x19x19 cm, 15+ patterns, Rp24,700 each (Mitra10); Mulia Wave 19x19 and Quadra 19x9.5 Rp29,501 (Depo, regular Rp40,297). ~25 blocks per m² with joints → material ~Rp620–740k/m².</description></item><item><title>Concrete Breeze Block (Roster) Prices 2026: per Piece &amp; per m²</title><link>https://www.homex.co.id/en/news/126</link><guid isPermaLink="true">https://www.homex.co.id/en/news/126</guid><pubDate>Thu, 22 Oct 2026 23:11:11 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Roster prices (22 Oct 2026): 20x20 concrete Rp10,000–17,500/pc (Bermutu Bandung), Rp11,000 grey, Rp14,000 white, Rp15,000 terracotta (Dwi Jaya Beton); Trisensa RO 6B Rp40,800, RO-137E Rp75,000 (Depo). 1 m² = 25 pcs of 20x20 → ~Rp275–375k/m² material.</description></item><item><title>GRC &amp; Conwood Fascia Prices 2026: Plain, Woodgrain &amp; Installed</title><link>https://www.homex.co.id/en/news/125</link><guid isPermaLink="true">https://www.homex.co.id/en/news/125</guid><pubDate>Thu, 22 Oct 2026 23:11:11 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Fascia prices (22 Oct 2026): Conwood fascia 50/76/100 mm × 3.05 m Rp51,170/75,480/100,725 (Mitra10); GRC Super Plank Rp25,530/sheet, Rosewood plank Rp44,400 (Tangerang distributor); plain GRC 20 cm Rp30–50k/m, woodgrain Rp40–70k/m; labour Rp40–60k/m².</description></item><item><title>Rain Gutter Prices 2026: Maspion PVC, Galvalume &amp; Stainless</title><link>https://www.homex.co.id/en/news/124</link><guid isPermaLink="true">https://www.homex.co.id/en/news/124</guid><pubDate>Thu, 22 Oct 2026 23:11:10 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Gutter prices (22 Oct 2026): Maspion 4&quot; box PVC gutter 4 m Rp174,400–375,000/length, 8&quot; 4 m Rp470,000–628,000, HR 6 half-round Rp133,000–160,000 (marketplaces); per-metre ranges PVC Rp30–100k, galvalume Rp80–250k, stainless Rp150–500k (Djaya Cipta Pratama).</description></item><item><title>Opening a Building Materials Store in Indonesia 2026: KBLI, NIB &amp; PMA</title><link>https://www.homex.co.id/en/news/123</link><guid isPermaLink="true">https://www.homex.co.id/en/news/123</guid><pubDate>Thu, 22 Oct 2026 23:03:13 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Guide, 22 Oct 2026: building materials shops use KBLI 47521 (retail of construction materials, KBLI 2025); get the NIB on OSS RBA; a foreign-owned PT PMA needs at least Rp2.5 billion paid-up capital and &gt;Rp10 billion investment per KBLI per location (BKPM Reg. 5/2025).</description></item><item><title>SNI Certification for Imported Building Materials 2026: SPPT SNI &amp; NPB</title><link>https://www.homex.co.id/en/news/122</link><guid isPermaLink="true">https://www.homex.co.id/en/news/122</guid><pubDate>Thu, 22 Oct 2026 23:03:13 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Mandatory SNI flow for imports (22 Oct 2026): check HS restrictions on INSW → importer NIB on OSS → SPPT SNI from an LSPro (or Kemenperin SIINAS) → register NPB on OSS (3-working-day SLA) → mark SNI + NPB on goods and NPB on the PIB. Basis: Permendag 33/2025, 132 products require NPB.</description></item><item><title>Steel &amp; Iron Door Prices 2026: Willmore, Plate, Hollow, Wrought</title><link>https://www.homex.co.id/en/news/121</link><guid isPermaLink="true">https://www.homex.co.id/en/news/121</guid><pubDate>Thu, 22 Oct 2026 23:03:13 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Steel door prices (22 Oct 2026): Willmore Atlanta Steel 215x96 cm Rp3,632,475 (white) – Rp3,846,150 (black) at Mitra10. Custom iron doors per m²: 1.2 mm plate Rp1–1.2m, 1.5 mm Rp1.2–1.5m, hollow Rp0.9–1.3m, wrought Rp1.5–3m (Jaya Baru Steel).</description></item><item><title>Stair Railing Price per Metre 2026: Steel, Stainless &amp; Glass</title><link>https://www.homex.co.id/en/news/120</link><guid isPermaLink="true">https://www.homex.co.id/en/news/120</guid><pubDate>Thu, 22 Oct 2026 23:03:13 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Stair railing prices per running metre (22 Oct 2026): galvanised hollow steel Rp440,000–650,000, wrought iron Rp850,000–1.4 million, stainless 201 Rp805,000–1.25 million, stainless 304 Rp850,000–1.35 million, glass + stainless Rp1.2–2.8 million.</description></item><item><title>Natural Stone Wall Price per m² 2026: Andesite, Palimanan, Candi</title><link>https://www.homex.co.id/en/news/119</link><guid isPermaLink="true">https://www.homex.co.id/en/news/119</guid><pubDate>Thu, 22 Oct 2026 23:03:12 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Natural stone wall prices (22 Oct 2026): andesite 10x10 Rp70,000, 20x40 Rp100,000, 30x60 Rp110,000/m² (Batu Cirebon); installed andesite Rp140–240k, palimanan Rp150–260k/m²; Demix C6 adhesive 25 kg Rp379,900, stone coating 1 L Rp79,300–146,200 (Mitra10).</description></item><item><title>Paving Block Price per m² 2026: Brick, Hexagon, K-300 &amp; Installed</title><link>https://www.homex.co.id/en/news/118</link><guid isPermaLink="true">https://www.homex.co.id/en/news/118</guid><pubDate>Thu, 22 Oct 2026 23:03:12 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Paving block prices per m² (22 Oct 2026): K-300 brick 6 cm Rp110,000 (Sentracon, pavingbloc), hexagon 6 cm Rp115,000–125,000; 8 cm Rp120,000–135,000; installed hydraulic 6 cm Rp165,000 (NIU Beton).</description></item><item><title>Indonesia Building Materials Market Trends 2026</title><link>https://www.homex.co.id/en/news/117</link><guid isPermaLink="true">https://www.homex.co.id/en/news/117</guid><pubDate>Thu, 22 Oct 2026 22:53:14 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Data as of 22 Oct 2026: building-materials wholesale price index (IHPB) up 9.63% yoy in September 2026; H1 cement demand up 10.2% to 29.9 Mt (≈56% utilisation); 3-million-homes programme at 1.79 million units; 185,333 FLPP mortgages; ceramic industry expanding 110 million m² despite US$11/MMBTU gas.</description></item><item><title>Guide: Exporting Chinese Building Materials to Indonesia 2026</title><link>https://www.homex.co.id/en/news/116</link><guid isPermaLink="true">https://www.homex.co.id/en/news/116</guid><pubDate>Thu, 22 Oct 2026 22:53:13 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>As of 22 Oct 2026: Chinese ceramic tiles face anti-dumping duty Rp13,446–90,384/m² (31 named firms) and Rp94,544/m² (others) under PMK 70/2024 (26 Oct 2024–25 Oct 2029), plus a 12.44% safeguard duty (year 2) under PMK 14/2025 until 26 Feb 2027. The Industry Ministry supervises 45 mandatory SNIs;…</description></item><item><title>Electrical Installation Cost per Point 2026: Lights, Sockets, MCB</title><link>https://www.homex.co.id/en/news/115</link><guid isPermaLink="true">https://www.homex.co.id/en/news/115</guid><pubDate>Thu, 22 Oct 2026 22:53:13 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Electrical installation cost per point (Sejasa, as of 22 Oct 2026): light Rp50–80k labour / Rp150–225k with materials, socket Rp55–85k / Rp160–240k, switch Rp50–75k / Rp145–220k, AC/water heater Rp70–100k / Rp200–300k, MCB box Rp100–150k / Rp350–500k.</description></item><item><title>Epoxy Floor Price per m² 2026: Coating, Self-Levelling &amp; Paint</title><link>https://www.homex.co.id/en/news/114</link><guid isPermaLink="true">https://www.homex.co.id/en/news/114</guid><pubDate>Thu, 22 Oct 2026 22:53:13 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Epoxy floor contract prices (22 Oct 2026): 300–500 micron coating Rp60–160k/m², 1000 micron self-levelling Rp165–250k/m², 2000 micron Rp215–350k/m², mortar/3 mm+ Rp125–500k/m². Danapaint U-pox floor paint 0.9 L set Rp125,100–163,088 at Mitra10.</description></item><item><title>Philips LED Prices 2026: 9–19 W Bulbs, 4-Packs &amp; Downlights</title><link>https://www.homex.co.id/en/news/113</link><guid isPermaLink="true">https://www.homex.co.id/en/news/113</guid><pubDate>Thu, 22 Oct 2026 22:53:13 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Philips LED prices (22 Oct 2026): 9 W bulb Rp63,400, 11 W Rp71,200, 13 W Rp79,700, 14.5 W Rp82,900, 19 W Rp146,500 (Mitra10); 4-packs: Essential 9 W Rp121,600, 12 W Gen8 Rp244,885 (Depo); downlights Eridani 14 W Rp108,500, Smartbright 12 W Rp225,000.</description></item><item><title>Switch, Socket &amp; MCB Prices 2026: Panasonic, Schneider</title><link>https://www.homex.co.id/en/news/112</link><guid isPermaLink="true">https://www.homex.co.id/en/news/112</guid><pubDate>Thu, 22 Oct 2026 22:53:13 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Prices on 22 Oct 2026: Schneider Leona 1-gang switch Rp24,600, 2-gang Rp30,200; Leona socket Rp30,200, Panasonic Wide Rp40,664 (Mitra10) / Rp27,100 (Depo); Schneider Domae 1P MCB Rp99,300–129,000 (Mitra10), 32A Rp134,200, 2P Rp329,600 (Depo); 4–12 module MCB box Rp145,500–189,500.</description></item><item><title>Granite Tile vs Ceramic 2026: Differences, Price per m² &amp; Which Is Better</title><link>https://www.homex.co.id/en/news/111</link><guid isPermaLink="true">https://www.homex.co.id/en/news/111</guid><pubDate>Thu, 22 Oct 2026 22:19:41 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Granite (homogeneous) tile water absorption ≤0.5% (SNI ISO 13006 BIa), ceramic usually &gt;3%. Mitra10 prices 22 Oct 2026: Habitat 60x60 ceramic ≈Rp56,500/m², Carina 60x60 granite ≈Rp123,000/m², Niro ≈Rp130,000–254,400/m², Eleganza ≈Rp298,900–348,500/m²; AHSP labour 60x60 Rp80,334/m².</description></item><item><title>Bedroom Tiles 40x40 vs 60x60: 3x3 Room Cost &amp; How to Choose</title><link>https://www.homex.co.id/en/news/110</link><guid isPermaLink="true">https://www.homex.co.id/en/news/110</guid><pubDate>Thu, 22 Oct 2026 22:19:41 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>3x3 bedroom (9 m², 22 Oct 2026 prices): 40x40 ±10 boxes × Rp50,000 (Mulia, Mitra10) + AHSP labour Rp56,530/m² ≈ Rp1.0m; 60x60 9 boxes × Rp61,050 (Habitat KW.A 1.08 m²) + labour Rp80,334/m² ≈ Rp1.27m. Rooms &lt;9 m² suit 40x40, 9–20 m² suit 60x60.</description></item><item><title>NYM Cable Prices Indonesia 2026: 2x1.5, 3x1.5 &amp; 3x2.5 per Roll</title><link>https://www.homex.co.id/en/news/109</link><guid isPermaLink="true">https://www.homex.co.id/en/news/109</guid><pubDate>Thu, 22 Oct 2026 22:19:41 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>NYM cable prices (22 Oct 2026): Extrana 25 m 2x1.5 Rp215,600, 3x1.5 Rp269,600, 3x2.5 Rp404,700 (Mitra10); Eterna 50 m 2x1.5 Rp528,600 (Mitra10) / Rp700,340 (Depo), 3x1.5 Rp900,220, 3x2.5 Rp1,300,075 (Depo).</description></item><item><title>Door Hinge &amp; Lock Prices 2026: Paloma, Dekkson, Zehn</title><link>https://www.homex.co.id/en/news/108</link><guid isPermaLink="true">https://www.homex.co.id/en/news/108</guid><pubDate>Thu, 22 Oct 2026 22:19:41 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Prices at Mitra10 (22 Oct 2026): 4&quot; stainless hinges Rp60,000–111,300 (Paloma BHP 402 to Zehn SC), brass hinges Rp525,000+, invisible hinge Rp382,500; Paloma lock bodies Rp125,000–270,000, handles Rp137,500–275,000, digital lock Rp2,375,000.</description></item><item><title>Wall Paint Price per Pail 2026: Avian, Jotun, Mowilex, Dulux, Nippon</title><link>https://www.homex.co.id/en/news/107</link><guid isPermaLink="true">https://www.homex.co.id/en/news/107</guid><pubDate>Thu, 22 Oct 2026 22:19:41 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Wall paint pail prices at Mitra10 (22 Oct 2026): Dulux Catylac 25 kg Rp638,700, Vinilex Pro 20 kg Rp630,770, Jotun Jotaplast 18 L Rp725,000, Avitex 25 kg Rp738,500, Avitex Gold 25 kg Rp875,202, Mowilex Emulsion 20 L Rp1,240,000, Nippon Spot-less 20 L Rp2,030,225, Mowilex Weathercoat 20 L…</description></item><item><title>Building Materials Stores in Tangerang 2026: Addresses &amp; Tips</title><link>https://www.homex.co.id/en/news/106</link><guid isPermaLink="true">https://www.homex.co.id/en/news/106</guid><pubDate>Thu, 22 Oct 2026 22:19:41 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Large building-materials stores in Tangerang as of 22 Oct 2026 from official sites: Mitra10 Q-Big BSD, Gading Serpong, Bitung Cikupa, Pasar Baru Karawaci, Pondok Betung Bintaro, Siliwangi Pamulang, and Depo Bangunan Alam Sutera (open 08:00–20:00).</description></item><item><title>Tile Adhesive vs Sand-Cement: Cost per m² &amp; Coverage 2026</title><link>https://www.homex.co.id/en/news/105</link><guid isPermaLink="true">https://www.homex.co.id/en/news/105</guid><pubDate>Thu, 22 Oct 2026 22:09:18 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Per-m² comparison (22 Oct 2026 prices): adhesive 3–5 kg/m² × AM 45 Rp97,750/25 kg ≈ Rp11,700–19,600/m²; sand-cement ±10 kg cement/m² (SNI 7395) × Rp61,050/40 kg ≈ Rp15,300/m² + sand.</description></item><item><title>Toilet Installation Cost Indonesia 2026 + Toilet Prices</title><link>https://www.homex.co.id/en/news/104</link><guid isPermaLink="true">https://www.homex.co.id/en/news/104</guid><pubDate>Thu, 22 Oct 2026 22:09:18 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Toilet installation cost (as of 22 Oct 2026): squat ±Rp100k, sitting ±Rp200k per point (detik); with clean-water piping Rp400–700k (SN Studio). AHSP example: toilet Rp3,940,000 + labour Rp281,250.</description></item><item><title>Habitat &amp; Ikad Tile Prices 2026: 50x50, 60x60, 40x40, Wall</title><link>https://www.homex.co.id/en/news/103</link><guid isPermaLink="true">https://www.homex.co.id/en/news/103</guid><pubDate>Thu, 22 Oct 2026 22:09:18 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Prices per box (22 Oct 2026): Habitat 50x50 Rp45,700–49,300 and 25x50 wall Rp44,800–50,150 at Mitra10; Habitat 60x60 Rp150,000–170,000 at Depo Bangunan; Ikad 40x40 SXL Rp97,485 (Mitra10), Ikad SX Verona 40x40 Rp72,000 (Depo).</description></item><item><title>Bathroom Waterproofing Cost per m² 2026: Coating vs Membrane</title><link>https://www.homex.co.id/en/news/102</link><guid isPermaLink="true">https://www.homex.co.id/en/news/102</guid><pubDate>Thu, 22 Oct 2026 22:09:18 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Waterproofing service prices per m² (as of 22 Oct 2026): cementitious Rp55–95k, acrylic Rp75k, bitumen Rp85–120k, torch-on membrane Rp185–250k, polyurethane Rp150–350k (PT ATM, Dua Insan Epoxy).</description></item><item><title>House Construction Cost per m² Indonesia 2026</title><link>https://www.homex.co.id/en/news/101</link><guid isPermaLink="true">https://www.homex.co.id/en/news/101</guid><pubDate>Thu, 22 Oct 2026 22:09:18 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>House construction cost per m² in 2026 (as of 22 Oct 2026): simple Rp3.8–4.5m, standard Rp4.5–5.5m, mid Rp5.5–7m, luxury Rp7–12m+ (Elkasindo); Jakarta Rp5–7.5m/m².</description></item><item><title>Kitchen Renovation Cost Indonesia 2026: per m², 3x3 Kitchen &amp; Cabinets</title><link>https://www.homex.co.id/en/news/100</link><guid isPermaLink="true">https://www.homex.co.id/en/news/100</guid><pubDate>Thu, 22 Oct 2026 22:09:18 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Kitchen renovation estimates 2026 (as of 22 Oct 2026): light Rp1–2m/m², mid Rp2.5–5m/m², premium Rp5–8m+/m² (Maxpro). A 3x3 kitchen with a 4 m L-shaped kitchen set is about Rp22–45m. HPL cabinets Rp1.5–2.5m per running metre.</description></item><item><title>How to Calculate Tiles, Cement &amp; Gypsum Needed per m²</title><link>https://www.homex.co.id/en/news/99</link><guid isPermaLink="true">https://www.homex.co.id/en/news/99</guid><pubDate>Thu, 22 Oct 2026 21:58:05 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Material formulas: pieces per m² = 1 ÷ (L × W); 40x40 = 6.25 pcs/m², 60x60 = 2.78, 30x60 = 5.56, 80x80 = 1.56; an 80x80 box = 1.92 m² (3 pcs); add 5–10% for cuts. Plaster cement ~7–8 kg/m², one 40 kg bag ≈ 5 m² plaster / 12 m² skim; gypsum board 2.88 m²/sheet.</description></item><item><title>Plaster &amp; Skim Coat Cost per m² Indonesia 2026</title><link>https://www.homex.co.id/en/news/98</link><guid isPermaLink="true">https://www.homex.co.id/en/news/98</guid><pubDate>Thu, 22 Oct 2026 21:58:05 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Plaster + skim cost 2026 per m² one side: contract with materials Rp85,000–125,000 (Jakarta Rp95,000–125,000), labour only Rp55,000–85,000, plaster labour Rp35,000–55,000, skim labour Rp20,000–35,000, materials Rp26,000–38,000 (Kapten Kontruksi); builder.id Jabodetabek labour package…</description></item><item><title>Gypsum Ceiling Installation Cost per m² Indonesia 2026</title><link>https://www.homex.co.id/en/news/97</link><guid isPermaLink="true">https://www.homex.co.id/en/news/97</guid><pubDate>Thu, 22 Oct 2026 21:58:05 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Gypsum ceiling cost 2026: hollow frame + 9 mm gypsum Rp135,000 (Aplus) and Rp155,000/m² (Jayaboard) at Petra Truss; Rp155,000–185,000/m² (Mahkota Baja); Rp145,000–235,000/m² (Kapten Kontruksi); labour only Rp55,000–85,000/m²; drop ceiling Rp120,000/m²; cornice Rp35,000/m.</description></item><item><title>Bathroom Renovation Cost Indonesia 2026: 2x2 m Packages</title><link>https://www.homex.co.id/en/news/96</link><guid isPermaLink="true">https://www.homex.co.id/en/news/96</guid><pubDate>Thu, 22 Oct 2026 21:58:05 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Bathroom renovation cost 2026 (Jabodetabek): 1.5x2 m Rp12–18 million (standard), 2x2 m Rp15–23 million (standard) / Rp23–33 million (upper-mid), 2x2.5 m Rp18–28 million; budget tradesman 2x2 m Rp6.4–14 million; all-in 2x2 m packages from Rp18 million.</description></item><item><title>Tile &amp; Granite Installation Cost per m² Indonesia 2026</title><link>https://www.homex.co.id/en/news/95</link><guid isPermaLink="true">https://www.homex.co.id/en/news/95</guid><pubDate>Thu, 22 Oct 2026 21:58:05 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Tile installation cost 2026: DKI AHSP labour 40x40 Rp56,530/m², 60x60 Rp80,334/m², skirting Rp24,486–26,248/m; market: 30x30–50x50 Rp45,000–60,000, 60x60 Rp65,000–80,000, 80x80/60x120 Rp85,000–120,000, walls Rp75,000–95,000; with cement/sand Rp130,000–200,000/m².</description></item><item><title>Wall Primer Price Indonesia 2026: Avitex, Dulux, Nippon, Jotun</title><link>https://www.homex.co.id/en/news/94</link><guid isPermaLink="true">https://www.homex.co.id/en/news/94</guid><pubDate>Thu, 22 Oct 2026 21:58:04 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Wall primer prices at Mitra10 (22 Oct 2026): Mowilex Cendana 4 kg Rp117,200, Dulux Catylac 4 kg Rp120,540, Avitex Alkali Resisting 4 kg Rp148,200 (21 kg Rp599,800), Nippon 5100 2.5 L Rp161,400, Jotun Majestic 2.5 L Rp150,400, Jotun Ultra 2.5 L Rp191,800; 20 L pails Rp763,100–1,669,500.</description></item><item><title>Torch-On Membrane Price Indonesia 2026: Bitumax, Fosroc, Casali</title><link>https://www.homex.co.id/en/news/93</link><guid isPermaLink="true">https://www.homex.co.id/en/news/93</guid><pubDate>Thu, 22 Oct 2026 21:51:17 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Torch-on membrane prices per 1x10 m roll (Oct 2026): Bitumax sand 3 mm Rp600,000; Ultrachem sanded 3 mm Rp522,500; Fosroc sanded 3 mm Rp580,000, Torchseal 3 mm Rp873,448; Casali 3 mm Rp800,000; BASF Masterpren 3 mm Rp880,000; 4 mm usually Rp700,000–800,000.</description></item><item><title>Roof Tile Paint Price Indonesia 2026: Avitex, Propan, Mowilex</title><link>https://www.homex.co.id/en/news/92</link><guid isPermaLink="true">https://www.homex.co.id/en/news/92</guid><pubDate>Thu, 22 Oct 2026 21:51:17 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Roof paint prices Oct 2026: Danaroof 3.78 L Rp201,000 (Mitra10); Avitex 4 kg ~Rp280,000–392,000, 20 kg ~Rp1.22–1.84 million; Propan 4 kg ~Rp272,700–361,000 (official store); Mowilex Roof Paint 2.5 L ~Rp263,000–416,000; Nippon Matex 2.5 L ~Rp180,000–470,000 (marketplaces).</description></item><item><title>Wood &amp; Metal Paint Price Indonesia 2026: Avian, Danalac, Ftalit</title><link>https://www.homex.co.id/en/news/91</link><guid isPermaLink="true">https://www.homex.co.id/en/news/91</guid><pubDate>Thu, 22 Oct 2026 21:51:17 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Wood &amp; metal paint prices at Mitra10 (22 Oct 2026): Danalac 0.9 L Rp68,700–92,344; Ftalit 1 kg Rp77,800–101,626; Avian SW-Super 1 kg Rp87,800; Davies Quick Dry 1 L Rp85,600–152,300; Jotun Majestic Primer 0.9 L Rp83,500; primers Propan Metalkote 1 kg Rp43,000, Kansai Rp67,000–75,700.</description></item><item><title>Steel Hollow Section Price Indonesia 2026: 2x4, 4x4, 4x8</title><link>https://www.homex.co.id/en/news/90</link><guid isPermaLink="true">https://www.homex.co.id/en/news/90</guid><pubDate>Thu, 22 Oct 2026 21:51:17 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Steel hollow prices per 6 m length (Oct 2026, Galaxy 2 Bangunan): galvanised 2x4 0.8 mm Rp73,000, 1.2 mm Rp110,000; 4x4 0.9 mm Rp108,000, 1.2 mm Rp142,000; 4x8 1.0 mm Rp177,000; black hollow 4x4 1.4 mm Rp159,000, 4x8 1.4 mm Rp222,000, 5x10 1.6 mm Rp319,000.</description></item><item><title>PPR Pipe Price Indonesia 2026: Rucika Kelen Green &amp; Westpex</title><link>https://www.homex.co.id/en/news/89</link><guid isPermaLink="true">https://www.homex.co.id/en/news/89</guid><pubDate>Thu, 22 Oct 2026 21:51:17 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Rucika Kelen Green PPR pipe prices per 4 m length (incl. VAT, effective 15 June 2026): 20 mm PN10 Rp54,800, PN16 Rp67,400, PN20 Rp76,000; 25 mm Rp71,700/105,200/116,600; 32 mm Rp115,400/169,100/191,500. Westpex 20 mm PN10 Rp46,923.</description></item><item><title>80x80 Granite Tile Price Indonesia 2026: Carina, Fiorano, Niro</title><link>https://www.homex.co.id/en/news/88</link><guid isPermaLink="true">https://www.homex.co.id/en/news/88</guid><pubDate>Thu, 22 Oct 2026 21:51:17 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>80x80 granite prices at Mitra10 (22 Oct 2026, per 1.92 m² box): Carina Rp249,523–325,036, Fiorano Rp406,000–427,000, Eleganza Rp475,897–1,085,760, Sincere Rp498,432–690,019, Niro Rp499,600–556,700.</description></item><item><title>Jet Shower &amp; Toilet Bidet Price Indonesia 2026</title><link>https://www.homex.co.id/en/news/87</link><guid isPermaLink="true">https://www.homex.co.id/en/news/87</guid><pubDate>Thu, 22 Oct 2026 21:44:08 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Jet shower prices at Mitra10 (22 Oct 2026): Tidy hoses Rp54,150–66,500; Tidy jet showers Rp90,000–110,000; Ceramax Rp96,000–308,750; American Standard Duostix Rp315,000–378,000; Ceramax IZZE Wash bidet seat Rp666,900.</description></item><item><title>WPC &amp; Wooden Door Price Indonesia 2026: Cimoni, Willmore, Marga</title><link>https://www.homex.co.id/en/news/86</link><guid isPermaLink="true">https://www.homex.co.id/en/news/86</guid><pubDate>Thu, 22 Oct 2026 21:44:08 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Door prices at Mitra10 (22 Oct 2026): Cimoni WPC set 80x210 Rp2,001,552, leaf 753x2125 Rp2,567,208, 853x2125 Rp2,958,816, 953x2125 Rp3,306,912; Doorway wood-laminated uPVC + frame Rp1,899,000; Willmore carbon wood Rp2,774,250–2,887,500; Marga HP-16 Rp3,357,830.</description></item><item><title>Water Pump Price Indonesia 2026: Shimizu, Sanyo, Aquamax</title><link>https://www.homex.co.id/en/news/85</link><guid isPermaLink="true">https://www.homex.co.id/en/news/85</guid><pubDate>Thu, 22 Oct 2026 21:44:08 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Water pump prices at Mitra10 (22 Oct 2026): Shimizu PL-122 BIT Rp496,000, PL-138 BIT Rp641,000, 250BIT jet pump Rp1,729,000, SPG20 submersible Rp2,894,650–3,306,000; Sanyo PWH 137 Rp499,999, PH 137 Rp892,000, PH 236 Rp1,163,750, PDH-405 Rp10,509,850; Aquamax booster Rp699,000–899,000.</description></item><item><title>Water Tank Price Indonesia 2026: Penguin, Profil Tank, Mpoin</title><link>https://www.homex.co.id/en/news/84</link><guid isPermaLink="true">https://www.homex.co.id/en/news/84</guid><pubDate>Thu, 22 Oct 2026 21:44:07 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Water tank prices (22 Oct 2026): Penguin TB 55 520 L Rp1,064,000, TB 80 800 L Rp1,463,000, TB 110 1050 L Rp2,159,000, TB 120 1200 L Rp2,591,000, stainless TBSK 600 Rp3,703,000; Mpoin 250 L Rp741,000; Profil Tank TNA 1000 Rp2,460,000, stainless PS 1100 Rp4,867,000.</description></item><item><title>Floor Drain Price Indonesia 2026: Tidy, Ceramax, TOTO, Amstad</title><link>https://www.homex.co.id/en/news/83</link><guid isPermaLink="true">https://www.homex.co.id/en/news/83</guid><pubDate>Thu, 22 Oct 2026 21:44:07 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Floor drain prices at Mitra10 (22 Oct 2026): Tidy 11x11 Rp26,100; Ceramax stainless 10x10 Rp55,000–120,000, 15x15 Rp161,500; American Standard square Rp277,875; TOTO TX1DA round Rp408,660, TX1DB square Rp493,920.</description></item><item><title>Shower Set &amp; Shower Column Price Indonesia 2026</title><link>https://www.homex.co.id/en/news/82</link><guid isPermaLink="true">https://www.homex.co.id/en/news/82</guid><pubDate>Thu, 22 Oct 2026 21:44:07 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Shower set prices at Mitra10 (22 Oct 2026): Ceramax set Rp467,400; Tidy shower columns Rp808,999–1,450,000; Ceramax Rp1,301,000–3,027,600; TOTO Rp1,960,000–4,335,000; American Standard Rp2,944,200–4,757,310.</description></item><item><title>Squat Toilet Price Indonesia 2026: TOTO CE-6/CE-7/CE-9, FWC, Tidy</title><link>https://www.homex.co.id/en/news/81</link><guid isPermaLink="true">https://www.homex.co.id/en/news/81</guid><pubDate>Thu, 22 Oct 2026 21:33:27 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Squat toilet prices at Mitra10 (22 Oct 2026): FWC gooseneck Rp158,400–177,935, funnel Rp199,200; TOTO CE-7 white Rp265,000, CE-7 ivory Rp548,800, CE-6 Rp713,440; Tidy FSP1003S set with tank Rp988,132; TOTO CE-9 complete set Rp4,468,800.</description></item><item><title>Kitchen Wall Tile Price Indonesia 2026: 30x60 KIA, Luxagress, Roman</title><link>https://www.homex.co.id/en/news/80</link><guid isPermaLink="true">https://www.homex.co.id/en/news/80</guid><pubDate>Thu, 22 Oct 2026 21:33:27 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>30x60 wall tile prices at Mitra10 (22 Oct 2026, per box): Luxagress Rp72,310–92,970, Diamond Rp86,040, KIA Rp90,574–97,968, Platinum Rp93,720–109,890, Signature/Accura Rp97,110–98,550, Roman Rp111,940–126,898.</description></item><item><title>Light Steel Roof Truss Cost per m² Indonesia 2026</title><link>https://www.homex.co.id/en/news/79</link><guid isPermaLink="true">https://www.homex.co.id/en/news/79</guid><pubDate>Thu, 22 Oct 2026 21:33:27 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Light steel roof frame cost 2026 (Jabodetabek): frame with materials Rp130,000–200,000/m², with battens + foil Rp195,000–255,000/m², labour only Rp40,000–80,000/m²; 0.75 mm frame + stone-coated tiles ~Rp220,000/m².</description></item><item><title>Polycarbonate Sheet Price Indonesia 2026: Twinlite, Solarflat</title><link>https://www.homex.co.id/en/news/78</link><guid isPermaLink="true">https://www.homex.co.id/en/news/78</guid><pubDate>Thu, 22 Oct 2026 21:33:27 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Polycarbonate prices Oct 2026 (Bildeco): Twinlite 2.1x11.8 m 5 mm Rp3,860,000 (~Rp155,647/m²), 6 mm Rp4,450,000, 10 mm Rp5,960,000, 16 mm Rp10,100,000; Solarflat 3 mm roll 1.22x10 m Rp4,900,000, 6 mm 1.22x6 m Rp6,100,000.</description></item><item><title>uPVC Roofing Price Indonesia 2026: Alderon per Metre &amp; Dr Shield</title><link>https://www.homex.co.id/en/news/77</link><guid isPermaLink="true">https://www.homex.co.id/en/news/77</guid><pubDate>Thu, 22 Oct 2026 21:33:27 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>uPVC roofing prices 2026: Alderon RS Roma ~Rp67,700/m, RS Greca/Trimdek ~Rp70,700/m, RS 1000 ~Rp91,000/m, Alderon Lite ~Rp150,000/m, Twinwall 830 ~Rp200,000/m (official Alderon site); Dr Shield 12 mm Rp165,000/m matte and Rp215,000/m translucent (distributor).</description></item><item><title>Aluminium Window Price Indonesia 2026: Marga, Alphamax, Zehn, uPVC</title><link>https://www.homex.co.id/en/news/76</link><guid isPermaLink="true">https://www.homex.co.id/en/news/76</guid><pubDate>Thu, 22 Oct 2026 21:33:26 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Aluminium window prices at Mitra10 (22 Oct 2026): Marga top-hung AL-16 40x60 Rp1,360,100, AL-15 60x120 Rp2,159,220, sliding AL-19 100x120 Rp3,438,610; Alphamax 60x140 Rp2,015,100, sliding 120x140 Rp1,916,100; Zehn Rp2,762,100–3,626,100.</description></item><item><title>Dry-Mix Mortar &amp; Waterproofing Factories in Indonesia: Sika, MU-Weber</title><link>https://www.homex.co.id/en/news/75</link><guid isPermaLink="true">https://www.homex.co.id/en/news/75</guid><pubDate>Thu, 22 Oct 2026 21:05:41 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Dry-mix and waterproofing factories: Sika Indonesia (Cileungsi, MM2100 Cikarang Barat, Jababeka Cikarang, Gresik) and PT Cipta Mortar Utama/MU-Weber (Cibitung MM2100, Cikande, Gresik, Medan, Semarang).</description></item><item><title>Roof Tile Factories in Indonesia: Kanmuri, M-Class, Tatalogam</title><link>https://www.homex.co.id/en/news/74</link><guid isPermaLink="true">https://www.homex.co.id/en/news/74</guid><pubDate>Thu, 22 Oct 2026 21:05:40 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Roof tile factories in Indonesia: Kanmuri (PT Keramindo Megah Pertiwi, Balaraja), M-Class/Ratta (PT M Class Industry, Klari, Karawang), Sakura Roof/Multiroof metal tiles (Tatalogam group; Tata Metal Lestari plants in Cikarang &amp; Purwakarta).</description></item><item><title>Carport &amp; Terrace Tile Price Indonesia 2026: Anti-Slip 40x40–60x60</title><link>https://www.homex.co.id/en/news/73</link><guid isPermaLink="true">https://www.homex.co.id/en/news/73</guid><pubDate>Thu, 22 Oct 2026 21:05:40 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Carport/terrace tile prices at Depo Bangunan (22 Oct 2026): Signature Arkansas Stone &amp; Everest Sand 40x40 Rp77,500–79,200/box, Habitat iGrip 50x50 Rp106,000–110,000/box, Habitat 60x60 matt Rp150,000–170,000/box (Pietra X 4 pcs 1.44 m² ≈ Rp104,000/m²).</description></item><item><title>Vinyl &amp; SPC Flooring Price Indonesia 2026 per m²: Durawood, Tidy</title><link>https://www.homex.co.id/en/news/72</link><guid isPermaLink="true">https://www.homex.co.id/en/news/72</guid><pubDate>Thu, 22 Oct 2026 21:05:40 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Vinyl flooring prices 22 Oct 2026: Durawood LVT Rp502,500–536,000 per 3.34 m² box (~Rp150–160k/m²), Tidy Rp564,600 per 3.753 m² (~Rp150k/m²); Durawood SPC Rp604,480 per 2.23 m² (~Rp271k/m²), DBS SPC SC403 Rp451,440 per 2.6352 m² (~Rp171k/m²).</description></item><item><title>PVC &amp; uPVC Bathroom Door Price Indonesia 2026: Tidy, Doorway</title><link>https://www.homex.co.id/en/news/71</link><guid isPermaLink="true">https://www.homex.co.id/en/news/71</guid><pubDate>Thu, 22 Oct 2026 21:05:40 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>PVC bathroom door prices at Mitra10 (22 Oct 2026): Tidy 70x195 Rp785,745–1,313,100, Tidy 80x200 Rp1,358,595–1,466,100; Doorway uPVC 70x195 with lock Rp995,778–1,092,798, 80x200 Rp1,205,550; Willmore uPVC 70x200 Rp1,561,500.</description></item><item><title>Aluminium Door Price Indonesia 2026: Marga, Matari, Doorway, Willmore</title><link>https://www.homex.co.id/en/news/70</link><guid isPermaLink="true">https://www.homex.co.id/en/news/70</guid><pubDate>Thu, 22 Oct 2026 21:05:40 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Aluminium door prices at Mitra10 (22 Oct 2026): Doorway 80x200 with lock Rp1,756,550, Matari AL-8C 70x195 Rp2,798,880, Marga AL-511/AL-408 Rp2,959,320–3,039,050, Marga AL-31 88x205 Rp3,518,270, Willmore 96x215 Rp3,846,150–4,286,700.</description></item><item><title>AAC Block Factories in Indonesia: Citicon, Grand Elephant, Blesscon</title><link>https://www.homex.co.id/en/news/69</link><guid isPermaLink="true">https://www.homex.co.id/en/news/69</guid><pubDate>Thu, 22 Oct 2026 20:57:28 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>AAC factories: Citicon (Pungging, Mojokerto), Grand Elephant (Krian, Sidoarjo; 700,000 m³/yr), Blesscon/PT Superior Prima Sukses Tbk (Mojokerto, Lamongan, Sragen, Sidoarjo), with addresses from official sites.</description></item><item><title>PVC Pipe Factories in Indonesia: Rucika, Pralon, Vinilon, Maspion</title><link>https://www.homex.co.id/en/news/68</link><guid isPermaLink="true">https://www.homex.co.id/en/news/68</guid><pubDate>Thu, 22 Oct 2026 20:57:28 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>PVC pipe factories in Indonesia: Rucika (Cikarang Barat, Bekasi), Pralon (Klari, Karawang), Vinilon (Cileungsi, Bogor &amp; Kemlagi, Mojokerto) and Maspion (Gedangan, Sidoarjo), with addresses from official sources.</description></item><item><title>Sanitary Ware Factories in Indonesia: TOTO, American Standard, INA</title><link>https://www.homex.co.id/en/news/67</link><guid isPermaLink="true">https://www.homex.co.id/en/news/67</guid><pubDate>Thu, 22 Oct 2026 20:57:28 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Sanitary ware factories in Indonesia: PT Surya Toto Indonesia (Serpong, Cikupa, Pasar Kemis – Tangerang), PT American Standard Indonesia (Cileungsi, Bogor) and PT INAX International/INA (Semarang), with addresses from official sources.</description></item><item><title>Exposed Cement Finish Price Indonesia 2026: Demix Nuda X1 &amp; X2</title><link>https://www.homex.co.id/en/news/66</link><guid isPermaLink="true">https://www.homex.co.id/en/news/66</guid><pubDate>Thu, 22 Oct 2026 20:57:28 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Exposed cement finish prices at Mitra10 (22 Oct 2026): Demix Nuda X1 20 kg Rp237,500 (Natural Grey) to Rp396,810 (Black/Pink), X2 20 kg Rp452,610–502,900; Hydrostop waterproof skim 20 kg Rp175,470.</description></item><item><title>Silicone Sealant Price Indonesia 2026: Dextone, Propan, Sikaflex</title><link>https://www.homex.co.id/en/news/65</link><guid isPermaLink="true">https://www.homex.co.id/en/news/65</guid><pubDate>Thu, 22 Oct 2026 20:57:28 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Silicone sealant prices per 300 ml (22 Oct 2026): Dextone Rp35,400 (acetic) &amp; Rp38,900 (neutral/sanitary) at Mitra10, Rp39,600–43,000 at Depo; Propan PAS-100 Rp32,200–44,900; Bitacryl 450 g Rp41,000; Sikaflex 11 FC Rp157,000.</description></item><item><title>Tile Grout Price Indonesia 2026: AM, MU, Sika, Lemkra, Demix</title><link>https://www.homex.co.id/en/news/64</link><guid isPermaLink="true">https://www.homex.co.id/en/news/64</guid><pubDate>Thu, 22 Oct 2026 20:57:28 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Tile grout prices per 1 kg (22 Oct 2026): AM 53 Rp10,458–11,000, Sika Rp11,780, MU-408C Rp12,200–18,400, Lemkra FS Rp17,100–20,710 (Mitra10); Demix D2 acid-resistant Rp32,900 (Depo); AM 55 epoxy Rp168,345.</description></item><item><title>Kitchen Sink Price Indonesia 2026: Stainless &amp; Granite by Brand</title><link>https://www.homex.co.id/en/news/63</link><guid isPermaLink="true">https://www.homex.co.id/en/news/63</guid><pubDate>Thu, 22 Oct 2026 20:49:33 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Kitchen sink prices 22 Oct 2026: Tidy 1-bowl Rp287,165, Lavenia LV-1339 Rp811,218, Royal Sink Contempo Rp843,920, Modena KS 3130 Rp1,382,156, Zehn+ granite Rp1,317,378–2,934,528, Lavenia LVX black Rp2,806,100–4,183,640.</description></item><item><title>Washbasin Price Indonesia 2026: TOTO, American Standard, DBS</title><link>https://www.homex.co.id/en/news/62</link><guid isPermaLink="true">https://www.homex.co.id/en/news/62</guid><pubDate>Thu, 22 Oct 2026 20:49:33 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Washbasin prices 22 Oct 2026: DBS wall-hung Rp168,768–218,405, countertop 324S Rp324,900, pedestal B324 Rp311,363 (Depo); American Standard Studio 45 Rp392,700, TOTO LW240CJW Rp784,000, Omni LW893CJW Rp1,041,250 (Mitra10).</description></item><item><title>TOTO Faucet Price Indonesia 2026: Wall Tap, Basin, Kitchen, Shower</title><link>https://www.homex.co.id/en/news/61</link><guid isPermaLink="true">https://www.homex.co.id/en/news/61</guid><pubDate>Thu, 22 Oct 2026 20:49:33 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>TOTO faucet prices at Mitra10 (22 Oct 2026): wall tap T23B13B Rp343,000, basin faucets TX129 Rp490,000 to TX116LRSN Rp2,822,400, kitchen TX609K Rp622,300, shower mixer TX443SP Rp1,029,000.</description></item><item><title>PVC Pipe Price Indonesia 2026: Rucika AW, D &amp; JIS per Length</title><link>https://www.homex.co.id/en/news/60</link><guid isPermaLink="true">https://www.homex.co.id/en/news/60</guid><pubDate>Thu, 22 Oct 2026 20:49:33 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Rucika Standard 4 m PVC pipe prices (1 Oct 2026, incl. VAT): AW 1/2&quot; Rp28,200, 3/4&quot; Rp38,200, 1&quot; Rp52,200, 2&quot; Rp114,400, 3&quot; Rp234,700, 4&quot; Rp388,900; class D 4&quot; Rp199,900.</description></item><item><title>Roof Tile Price Indonesia 2026: Stone-Coated Metal, Ceramic, Bitumen</title><link>https://www.homex.co.id/en/news/59</link><guid isPermaLink="true">https://www.homex.co.id/en/news/59</guid><pubDate>Thu, 22 Oct 2026 20:49:32 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Roof tile prices 2026: M-Class ceramic Rp11,400–12,600/pc, Onduline 200x94 cm Rp186,010–199,500, Onduvilla Rp59,850–78,500 (Mitra10); stone-coated Sakura Roof ~Rp60–70k, Multiroof 0.40 mm Rp107–263k per sheet.</description></item><item><title>AAC Block Price Indonesia 2026: Hebel per m³, Citicon, Grand Elephant</title><link>https://www.homex.co.id/en/news/58</link><guid isPermaLink="true">https://www.homex.co.id/en/news/58</guid><pubDate>Thu, 22 Oct 2026 20:49:32 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>AAC block prices 2026: Citicon 600x200x75 mm Rp8,275/pc at Mitra10 (~Rp919k/m³); East Java distributor Rp580–680k/m³ (Apr 2026); Jabodetabek 10 cm estimate Rp780–950k/m³.</description></item><item><title>60x120 Granite Tile Price Indonesia 2026: Niro, Fiorano, Sincere</title><link>https://www.homex.co.id/en/news/57</link><guid isPermaLink="true">https://www.homex.co.id/en/news/57</guid><pubDate>Thu, 22 Oct 2026 20:40:28 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>60x120 granite prices at Mitra10 (22 Oct 2026): Niro Rp316,800–508,000/box, Fiorano Rp400,000; 75x150 Rp700,000–967,500; 120x240 Sincere Rp2,016,000–2,100,000.</description></item><item><title>House Painting Cost per m² in Indonesia 2026: Paint Calculator</title><link>https://www.homex.co.id/en/news/56</link><guid isPermaLink="true">https://www.homex.co.id/en/news/56</guid><pubDate>Thu, 22 Oct 2026 20:40:28 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>How to calculate painting cost per m²: wall area ÷ coverage × coats. Example Catylac 25 kg Rp619,700 (10–12 m²/kg): about Rp4,100–5,000/m² for 2 coats.</description></item><item><title>PVC Ceiling Price Indonesia 2026: Durawood per Box vs Gypsum</title><link>https://www.homex.co.id/en/news/55</link><guid isPermaLink="true">https://www.homex.co.id/en/news/55</guid><pubDate>Thu, 22 Oct 2026 20:40:28 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>PVC ceiling prices, 22 Oct 2026: Durawood 3.9 m, 10 pcs, Rp557,100–665,100/box at Mitra10; SPX promo Rp27,700/pc at Depo Bangunan.</description></item><item><title>Toilet (Closet Duduk) Price Indonesia 2026: TOTO, American Standard</title><link>https://www.homex.co.id/en/news/54</link><guid isPermaLink="true">https://www.homex.co.id/en/news/54</guid><pubDate>Thu, 22 Oct 2026 20:40:28 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Toilet prices at Mitra10 (22 Oct 2026): TOTO two-piece Rp1.98–6.75m, American Standard Rp1.58–6.13m, budget Renovo/Tidy/Oulu from Rp1.11m.</description></item><item><title>Wall Putty (Dempul/Plamir) Price Indonesia 2026: Matex, Dulux, Propan</title><link>https://www.homex.co.id/en/news/53</link><guid isPermaLink="true">https://www.homex.co.id/en/news/53</guid><pubDate>Thu, 22 Oct 2026 20:40:28 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Wall putty prices at Mitra10 (22 Oct 2026): Merfil 4 kg Rp70,295, Matex 4 kg Rp75,800, Dulux Catylac 5 kg Rp63,504, Propan DWF-200 4 kg Rp110,100.</description></item><item><title>Waterproof Coating Price Indonesia 2026: No Drop, Aquaproof, Sika</title><link>https://www.homex.co.id/en/news/52</link><guid isPermaLink="true">https://www.homex.co.id/en/news/52</guid><pubDate>Thu, 22 Oct 2026 20:40:28 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Waterproof coating prices at Mitra10 (22 Oct 2026): No Drop 4 kg Rp203,200–214,500, 20 kg Rp932,800–1,130,400; Aquaproof 4 kg Rp218,800–234,000, 20 kg Rp977,200–1,074,000.</description></item><item><title>Tile Adhesive Price in Indonesia 2026: MU, AM, Sika, Demix, Lemkra</title><link>https://www.homex.co.id/en/news/51</link><guid isPermaLink="true">https://www.homex.co.id/en/news/51</guid><pubDate>Thu, 22 Oct 2026 20:33:49 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Tile adhesive prices, 25 kg at Mitra10 (22 Oct 2026): Rp97,750 (AM 45) to Rp173,100 (MU-400); big-slab Rp418,000–570,000. Depo: MU-400 Rp198,250.</description></item><item><title>Dry-Mix Mortar Price in Indonesia 2026: MU, SCG, AM, Demix, Lemkra</title><link>https://www.homex.co.id/en/news/50</link><guid isPermaLink="true">https://www.homex.co.id/en/news/50</guid><pubDate>Thu, 22 Oct 2026 20:33:49 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Dry-mix mortar prices at Mitra10 (22 Oct 2026): 40 kg plaster Rp77,700–115,200, AAC block mortar Rp83,250–164,000, skim coat Rp89,500 (20 kg)–Rp214,000 (40 kg).</description></item><item><title>Dulux Paint Price List Indonesia 2026: Catylac, Pentalite, Weathershield</title><link>https://www.homex.co.id/en/news/49</link><guid isPermaLink="true">https://www.homex.co.id/en/news/49</guid><pubDate>Thu, 22 Oct 2026 20:33:49 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Dulux prices at Mitra10 (22 Oct 2026): Catylac 5 kg Rp130,100–163,800, 25 kg Rp608,600–790,400, Pentalite 20 L Rp1.79m, Weathershield 2.5 L Rp381,318.</description></item><item><title>Nippon Paint Price List Indonesia 2026: Vinilex, Spot-less, Elastex</title><link>https://www.homex.co.id/en/news/48</link><guid isPermaLink="true">https://www.homex.co.id/en/news/48</guid><pubDate>Thu, 22 Oct 2026 20:33:49 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Nippon Paint prices at Mitra10 (22 Oct 2026): Vinilex 5 kg Rp200,444–203,039, Vinilex 25 kg Rp968,320, Spot-less Plus 2.5 L Rp381,606, Elastex 20 kg Rp907,000.</description></item><item><title>Bathroom Tile Price in Indonesia 2026: 25x40 Wall &amp; Floor by Brand</title><link>https://www.homex.co.id/en/news/47</link><guid isPermaLink="true">https://www.homex.co.id/en/news/47</guid><pubDate>Thu, 22 Oct 2026 20:33:49 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Bathroom tile prices, 22 Oct 2026: 25x40 KW1 wall tiles Rp36,550–79,470/box (KIA, Platinum, Diamond, Grand Master, Signature); floor/wall 20x40–50x50 Rp62,700–87,800.</description></item><item><title>Platinum Tile Price in Indonesia 2026: 40x40, 50x50, 25x40, Asia Tile</title><link>https://www.homex.co.id/en/news/46</link><guid isPermaLink="true">https://www.homex.co.id/en/news/46</guid><pubDate>Thu, 22 Oct 2026 20:33:49 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Platinum tile prices at Mitra10 (22 Oct 2026): 40x40 floor Rp68,900–78,000/box, 50x50 Rp78,000–94,900, 60x60 granite Rp131,200; Asia Tile 25x25 Rp72,500 at Depo Bangunan.</description></item><item><title>Light Steel Truss Price in Indonesia 2026: Taso C75, Kencana, Battens</title><link>https://www.homex.co.id/en/news/45</link><guid isPermaLink="true">https://www.homex.co.id/en/news/45</guid><pubDate>Thu, 22 Oct 2026 20:26:25 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Light steel price per 6 m length (checked 22 Oct 2026): Taso C75 0.75 mm Rp134,000–137,000, Kencana Rp112,700, Hi Steel Rp100,100, Taso batten 32.45 Rp61,800–65,000.</description></item><item><title>Gypsum Board Price in Indonesia 2026: Jayaboard, Knauf, Elephant</title><link>https://www.homex.co.id/en/news/44</link><guid isPermaLink="true">https://www.homex.co.id/en/news/44</guid><pubDate>Thu, 22 Oct 2026 20:26:24 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Gypsum board prices per 120x240 sheet: Jayaboard 9 mm Rp75,000–82,000, Knauf 9 mm Rp58,000, Elephant 9 mm Rp78,000; 12 mm Rp92,500–130,000. Checked 22 Oct 2026.</description></item><item><title>Mulia Tile Price in Indonesia 2026: Mulia, Accura &amp; Signature</title><link>https://www.homex.co.id/en/news/43</link><guid isPermaLink="true">https://www.homex.co.id/en/news/43</guid><pubDate>Thu, 22 Oct 2026 20:26:24 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Mulia tile prices, 22 Oct 2026: Mulia 40x40 Rp50,000/box at Mitra10, Accura 40x40 Rp61,000–71,706 and Signature 40x40 Rp77,500–80,800 at Depo Bangunan.</description></item><item><title>Arwana Tile Price in Indonesia 2026: 40x40 per Box, UNO Note</title><link>https://www.homex.co.id/en/news/42</link><guid isPermaLink="true">https://www.homex.co.id/en/news/42</guid><pubDate>Thu, 22 Oct 2026 20:26:24 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Arwana 40x40 tile prices, 22 Oct 2026: Rp55,000/box at IG Keramik and Rp90,900/box (AR 7755) at monotaro. No public UNO granite price found.</description></item><item><title>Roman Tile Price in Indonesia 2026: 40x40, 30x30, 30x60 &amp; 25x50</title><link>https://www.homex.co.id/en/news/41</link><guid isPermaLink="true">https://www.homex.co.id/en/news/41</guid><pubDate>Thu, 22 Oct 2026 20:26:24 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Roman tile prices at Mitra10, 22 Oct 2026: 40x40 KW1 floor tiles Rp124,500–157,500/box, 30x30 Rp157,500–167,500, 30x60 wall tiles Rp157,500–208,000.</description></item><item><title>Cement Price per Bag in Indonesia 2026: Tiga Roda, Gresik, SCG, Merdeka</title><link>https://www.homex.co.id/en/news/40</link><guid isPermaLink="true">https://www.homex.co.id/en/news/40</guid><pubDate>Thu, 22 Oct 2026 20:26:24 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Cement price per bag in Indonesia, checked 22 Oct 2026: Tiga Roda 40 kg Rp60,500–88,000 in Greater Jakarta, SCG PCC 40 kg Rp61,050 at Mitra10, Gresik from Rp79,900.</description></item><item><title>Wall Paint Manufacturers in Indonesia: Avian, Nippon, Jotun Factories</title><link>https://www.homex.co.id/en/news/39</link><guid isPermaLink="true">https://www.homex.co.id/en/news/39</guid><pubDate>Thu, 22 Oct 2026 09:48:34 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Wall paint manufacturers in Indonesia and factory addresses: Avian (Sidoarjo, Serang), Nippon Paint (Gresik), Jotun (MM2100), Propan (Tangerang), Mowilex (Cikande). Data as of 22 October 2026.</description></item><item><title>Light Steel Frame Manufacturers in Indonesia: Factory Addresses 2026</title><link>https://www.homex.co.id/en/news/38</link><guid isPermaLink="true">https://www.homex.co.id/en/news/38</guid><pubDate>Thu, 22 Oct 2026 09:48:34 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Light steel frame manufacturers in Indonesia: Taso (Tatalogam), Lysaght SMARTRUSS (NS BlueScope), Prima Truss and Jayaboard, with official factory addresses. Data as of 22 October 2026.</description></item><item><title>60x60 Floor Tile &amp; Granite Prices 2026 by Brand: Niro, Indogress &amp; More</title><link>https://www.homex.co.id/en/news/37</link><guid isPermaLink="true">https://www.homex.co.id/en/news/37</guid><pubDate>Thu, 22 Oct 2026 09:45:48 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>60x60 floor tile and granite prices 2026 per box and per m²: Niro, Indogress, Infiniti, Platinum, Eleganza. Checked 22 October 2026.</description></item><item><title>Wall Paint Prices Indonesia 2026: Avian, Nippon, Dulux, Jotun, No Drop</title><link>https://www.homex.co.id/en/news/36</link><guid isPermaLink="true">https://www.homex.co.id/en/news/36</guid><pubDate>Thu, 22 Oct 2026 09:45:48 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Wall paint prices in Indonesia, 2026, for 5 kg and 20–25 kg packs: Avitex, Vinilex, Catylac, Jotaplast, No Drop, Mowilex. Checked 22 Oct 2026.</description></item><item><title>Cement Factories in Indonesia: Brands, Owners and Plant Locations</title><link>https://www.homex.co.id/en/news/35</link><guid isPermaLink="true">https://www.homex.co.id/en/news/35</guid><pubDate>Thu, 22 Oct 2026 09:45:48 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>List of cement factories in Indonesia: SIG brands, Dynamix, Tiga Roda, Conch, Merah Putih and Garuda, with owners, plants and 2024 market shares.</description></item><item><title>Tile Factories in Indonesia: Ceramic &amp; Granite Brands, Makers, Addresses</title><link>https://www.homex.co.id/en/news/34</link><guid isPermaLink="true">https://www.homex.co.id/en/news/34</guid><pubDate>Thu, 22 Oct 2026 09:45:48 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>List of tile factories in Indonesia: Arwana/UNO, Roman, Platinum/Asia Tile, Mulia, KIA, Milan, Niro, Indogress, with makers and factory addresses.</description></item><item><title>Indonesia Building Materials Exhibition Calendar 2026–2027</title><link>https://www.homex.co.id/en/news/33</link><guid isPermaLink="true">https://www.homex.co.id/en/news/33</guid><pubDate>Thu, 22 Oct 2026 09:40:26 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Indonesia building materials exhibition calendar 2026–2027, verified on official organiser sites: IndoBuildTech, Megabuild, Keramika, ARCH:ID, Construction Indonesia.</description></item><item><title>Building Materials Distributors Expand Showrooms and Warehouses: Buildhaus and Fortress</title><link>https://www.homex.co.id/en/news/32</link><guid isPermaLink="true">https://www.homex.co.id/en/news/32</guid><pubDate>Thu, 22 Oct 2026 09:14:23 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Building materials distributor Indonesia: Batara Group opened a Buildhaus showroom in Denpasar and Fortress moved to a bigger warehouse in Bandung as building material distributors get closer to buyers.</description></item><item><title>Construction Worker Certification: Public Works Ministry Targets 40,000 Workers in 2027</title><link>https://www.homex.co.id/en/news/31</link><guid isPermaLink="true">https://www.homex.co.id/en/news/31</guid><pubDate>Thu, 22 Oct 2026 09:14:23 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Construction worker certification: Public Works Ministry targets 40,000 construction workers for training and certification in 2027, as skilled building tukang get harder to find.</description></item><item><title>BIM in Indonesian Construction and AI Gain Pace: INKINDO DKI–I2MI Deal</title><link>https://www.homex.co.id/en/news/30</link><guid isPermaLink="true">https://www.homex.co.id/en/news/30</guid><pubDate>Thu, 22 Oct 2026 09:14:23 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>BIM in Indonesian construction: INKINDO DKI and I2MI signed a BIM training MoU and UNIZAR ran a BIM Coordinator Level 6 exam. BIM and AI matter more and more for estimating project materials.</description></item><item><title>B2B Building Materials Platforms and Supply Chain Digitalisation: From AZKO to Dow</title><link>https://www.homex.co.id/en/news/29</link><guid isPermaLink="true">https://www.homex.co.id/en/news/29</guid><pubDate>Thu, 22 Oct 2026 09:14:23 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>B2B building materials platform: AZKO relies on 29 distribution centres plus WMS and ERP systems, while Dow launched a B2B construction materials platform. Where digital procurement is heading.</description></item><item><title>Building Material Warehouses Tight as Greater Jakarta Occupancy Hits 96.4%</title><link>https://www.homex.co.id/en/news/28</link><guid isPermaLink="true">https://www.homex.co.id/en/news/28</guid><pubDate>Thu, 22 Oct 2026 09:14:23 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Building material warehouse Jakarta: Modern warehouse occupancy in Greater Jakarta hit 96.4% in Q3 2026, with rents near Rp77,600/m². What it means for building material stock and delivery.</description></item><item><title>PVC Pipe for Homes: AW vs D Class, SNI 06-0084-2002, Jointing and Pressure Testing</title><link>https://www.homex.co.id/en/news/27</link><guid isPermaLink="true">https://www.homex.co.id/en/news/27</guid><pubDate>Thu, 22 Oct 2026 09:12:51 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>AW-class PVC pipe is for pressurised clean water, D-class for waste. Learn SNI 06-0084-2002, wall thickness, solvent jointing, pressure tests and storage.</description></item><item><title>House Electrical Cable Guide: NYA vs NYM vs NYY, Sizes and PUIL Colour Code</title><link>https://www.homex.co.id/en/news/26</link><guid isPermaLink="true">https://www.homex.co.id/en/news/26</guid><pubDate>Thu, 22 Oct 2026 09:12:51 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>House electrical cable: Building wire must carry SNI under Permenperin 56/2024. Learn NYA, NYM and NYY, the 1.5 mm² minimum size, PUIL neutral and earth colours, and quality checks.</description></item><item><title>Gypsum Ceiling Guide: SNI &amp; ASTM, Board Thickness, Frame Spacing and Jointing</title><link>https://www.homex.co.id/en/news/25</link><guid isPermaLink="true">https://www.homex.co.id/en/news/25</guid><pubDate>Thu, 22 Oct 2026 09:12:51 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Gypsum ceiling: How to choose gypsum board for ceilings: SNI 03-6384 and ASTM C1396, 9 vs 12 mm thickness, frame and screw spacing, joint compound and quality checks.</description></item><item><title>Mandatory SNI for Tempered and Laminated Safety Glass as Indonesia Widens Surveillance to 45 Standards</title><link>https://www.homex.co.id/en/news/24</link><guid isPermaLink="true">https://www.homex.co.id/en/news/24</guid><pubDate>Thu, 22 Oct 2026 09:10:53 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Mandatory SNI safety glass: Indonesia&#x27;s industry ministry monitored 45 SNI standards and 78 brands by September 2026, adding 6 in Oct–Nov, as SNI for safety glass becomes mandatory.</description></item><item><title>FLPP Subsidised Mortgages Reach 185,333 Homes by 20 October 2026, Targeting 350,000</title><link>https://www.homex.co.id/en/news/23</link><guid isPermaLink="true">https://www.homex.co.id/en/news/23</guid><pubDate>Thu, 22 Oct 2026 09:10:53 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>BP Tapera says FLPP subsidised mortgages from 1 January to 20 October 2026 reached 185,333 homes worth Rp23.09 trillion, about 53% of the 350,000 target.</description></item><item><title>BSPS Home Renovation Programme 2026 Targets 400,000 Houses, Rp17.5 Million for Materials</title><link>https://www.homex.co.id/en/news/22</link><guid isPermaLink="true">https://www.homex.co.id/en/news/22</guid><pubDate>Thu, 22 Oct 2026 09:10:53 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>BSPS home renovation programme: Indonesia&#x27;s BSPS renovation programme has finished 53,000 of 400,000 target homes. Each gets Rp20 million, Rp17.5 million of it for building materials.</description></item><item><title>Indonesia Steel Imports Hit 7 Million Tonnes by August 2026: What It Means for Rebar Prices</title><link>https://www.homex.co.id/en/news/21</link><guid isPermaLink="true">https://www.homex.co.id/en/news/21</guid><pubDate>Thu, 22 Oct 2026 09:10:53 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Steel imports Indonesia: IISIA says steel imports reached 7 million tonnes by August 2026 with mill utilisation at 43–57%. The minister is weighing tariff and non-tariff protection.</description></item><item><title>Ceramic Tile Prices Indonesia: US$11 Gas Hits Makers as ASAKI Plans 110 Million m² Expansion</title><link>https://www.homex.co.id/en/news/20</link><guid isPermaLink="true">https://www.homex.co.id/en/news/20</guid><pubDate>Thu, 22 Oct 2026 09:10:53 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Ceramic tile prices Indonesia: ASAKI told the minister supply disruptions pushed ceramic makers&#x27; gas cost to US$11/MMBtu, even as a Rp12 trillion, 110 million m² expansion moves ahead.</description></item><item><title>Concrete Roof and Bathroom Waterproofing: Material Types and Application Steps</title><link>https://www.homex.co.id/en/news/19</link><guid isPermaLink="true">https://www.homex.co.id/en/news/19</guid><pubDate>Wed, 21 Oct 2026 22:19:24 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Concrete roof waterproofing: Leaks are the top complaint in tropical buildings. Learn cementitious, liquid-applied (PU/acrylic) and torch-on membrane systems, plus the correct work sequence and flood test.</description></item><item><title>Cement Types in Indonesia: OPC vs PCC vs PPC and When to Use Each</title><link>https://www.homex.co.id/en/news/18</link><guid isPermaLink="true">https://www.homex.co.id/en/news/18</guid><pubDate>Wed, 21 Oct 2026 22:19:24 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>Cement types Indonesia: What separates Portland cement (OPC) Types I–V, Portland Composite Cement (PCC) and Portland Pozzolan Cement (PPC)? How to choose, store and cure according to SNI.</description></item><item><title>How to Choose Floor Tiles: PEI Rating, Water Absorption and SNI ISO 13006</title><link>https://www.homex.co.id/en/news/17</link><guid isPermaLink="true">https://www.homex.co.id/en/news/17</guid><pubDate>Wed, 21 Oct 2026 22:19:24 +0800</pubDate><category>knowledge</category><author>homex9998@gmail.com (homeX)</author><description>How to choose floor tiles: A practical guide for contractors, retailers and homeowners to reading a tile box: PEI class, water-absorption group, slip resistance, sizing and the mandatory SNI mark.</description></item><item><title>Light Steel Roof Truss Guide: Check SNI 8399:2017, AZ100 Coating and BMT vs TCT</title><link>https://www.homex.co.id/en/news/16</link><guid isPermaLink="true">https://www.homex.co.id/en/news/16</guid><pubDate>Wed, 21 Oct 2026 16:47:14 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Light steel roof truss: With mandatory SNI for coated steel in force since 20 May 2026, know how to read light-steel labels: SNI 4096:2007 and 8399:2017, AZ100 minimum coating, 0.65 mm minimum thickness, and BMT vs TCT.</description></item><item><title>How to Waterproof a Bathroom: 7 Steps Before Tiling to Prevent Leaks</title><link>https://www.homex.co.id/en/news/15</link><guid isPermaLink="true">https://www.homex.co.id/en/news/15</guid><pubDate>Wed, 21 Oct 2026 16:47:14 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>How to waterproof a bathroom: Tiles and grout are not waterproof. Learn the bathroom waterproofing steps: surface preparation, two coats, corner reinforcement, a 48-hour flood test and only then tiling.</description></item><item><title>Building Materials Expo Indonesia 2026: IndoBuildTech Part 2, 25–29 November at NICE PIK 2 Tangerang</title><link>https://www.homex.co.id/en/news/14</link><guid isPermaLink="true">https://www.homex.co.id/en/news/14</guid><pubDate>Wed, 21 Oct 2026 16:47:14 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Building materials expo Indonesia 2026: IndoBuildTech Expo Part 2, Indonesia&#x27;s building, architecture and interior show, runs 25–29 November 2026 in Hall 11 of NICE PIK 2, Tangerang, focusing on distributors, retailers and trade.</description></item><item><title>Rising Building Material Costs of 10–15% Hit Indonesian Developers as Home Sales Weaken</title><link>https://www.homex.co.id/en/news/13</link><guid isPermaLink="true">https://www.homex.co.id/en/news/13</guid><pubDate>Wed, 21 Oct 2026 16:47:14 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Rising building material costs: A Demak developer says non-subsidised building costs rose from Rp3.5 million to Rp4 million per square metre, with cement, PVC pipe, steel and galvalume among the materials rising most.</description></item><item><title>Low-Carbon Cement and Steel Take Centre Stage in Indonesia&#x27;s Green Public Procurement</title><link>https://www.homex.co.id/en/news/12</link><guid isPermaLink="true">https://www.homex.co.id/en/news/12</guid><pubDate>Wed, 21 Oct 2026 16:47:14 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Low-carbon cement: Indonesia&#x27;s Public Works Ministry has committed to sustainable procurement from 2026. A regional forum in Jakarta on 6–8 October discussed low-emission materials, ecolabels, EPDs and carbon footprints.</description></item><item><title>Indonesia Housing Credit (KUR) Reaches Rp27.74 Trillion, Rp2.94 Trillion to Building Material Traders</title><link>https://www.homex.co.id/en/news/11</link><guid isPermaLink="true">https://www.homex.co.id/en/news/11</guid><pubDate>Wed, 21 Oct 2026 16:47:14 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Housing credit programme Indonesia: By 18 October 2026 Indonesia&#x27;s housing credit programme had disbursed Rp27.74 trillion to 115,897 borrowers, including Rp2.94 trillion to building material traders. FLPP mortgages reached 184,342 units.</description></item><item><title>Indonesia Housing Programme Reaches 1.79 Million Units by October 2026: Demand for Building Materials</title><link>https://www.homex.co.id/en/news/10</link><guid isPermaLink="true">https://www.homex.co.id/en/news/10</guid><pubDate>Wed, 21 Oct 2026 16:47:14 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Indonesia housing programme: Indonesia&#x27;s housing ministry recorded 1,790,081 homes built or renovated from January 2025 to 15 October 2026: 1.10 million new homes and 686,000 renovations, with 10 million targeted by 2029.</description></item><item><title>Cement Price per Bag Hits Rp75,000–85,000 as Bima, West Nusa Tenggara Runs Out for Two Weeks</title><link>https://www.homex.co.id/en/news/9</link><guid isPermaLink="true">https://www.homex.co.id/en/news/9</guid><pubDate>Wed, 21 Oct 2026 16:47:14 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Cement price per bag: Shops in Woha and Palibelo, Bima, have run short of cement since early October 2026 as supply from South Kalimantan dropped and shipping is limited. Retail prices are Rp75,000–85,000 per bag.</description></item><item><title>Indonesia Cement Demand Rises 10.2% in H1 2026 Amid Overcapacity</title><link>https://www.homex.co.id/en/news/8</link><guid isPermaLink="true">https://www.homex.co.id/en/news/8</guid><pubDate>Wed, 21 Oct 2026 16:47:14 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Indonesia cement demand: Domestic cement demand grew 10.2% to 29.9 million tonnes in H1 2026, yet plants run at only about 56% of the 120-million-tonne national capacity while energy costs stay high.</description></item><item><title>Building Material Prices Indonesia, September 2026: Construction Wholesale Index Up 9.63%</title><link>https://www.homex.co.id/en/news/7</link><guid isPermaLink="true">https://www.homex.co.id/en/news/7</guid><pubDate>Wed, 21 Oct 2026 16:47:14 +0800</pubDate><category>industry</category><author>homex9998@gmail.com (homeX)</author><description>Building material prices Indonesia: BPS data show Indonesia&#x27;s construction materials wholesale price index at 111.64 in September 2026, up 0.19% month on month and 9.63% year on year, led by asphalt, rebar and crushed stone.</description></item><item><title>Dragon Boat Festival Promo: All Tiles 15% OFF, Save Up to 5 Million IDR</title><link>https://www.homex.co.id/en/news/2</link><guid isPermaLink="true">https://www.homex.co.id/en/news/2</guid><pubDate>Wed, 05 Jun 2024 00:00:00 +0800</pubDate><category>promo</category><author>homex9998@gmail.com (homeX)</author><description>Dragon Boat Festival is coming, homeX launches tile special promotion, Dulux paint also enjoys 10% off.</description></item><item><title>homeX Platform Officially Launches, Ushering in a New Era of Digital Building Material Procurement in Indonesia</title><link>https://www.homex.co.id/en/news/1</link><guid isPermaLink="true">https://www.homex.co.id/en/news/1</guid><pubDate>Sat, 01 Jun 2024 10:00:00 +0800</pubDate><category>news</category><author>homex9998@gmail.com (homeX)</author><description>homeX building materials and renovation service platform officially launched today, aggregating hundreds of quality suppliers with support for Indonesian, English and Chinese interfaces.</description></item><item><title>homeX First Craftsman Training Conference Successfully Concluded with 200+ Craftsmen Participating</title><link>https://www.homex.co.id/en/news/3</link><guid isPermaLink="true">https://www.homex.co.id/en/news/3</guid><pubDate>Sun, 26 May 2024 10:00:00 +0800</pubDate><category>event</category><author>homex9998@gmail.com (homeX)</author><description>homeX held its first craftsmen skills training conference at the Jakarta headquarters, focusing on standard tile laying techniques and waterproofing construction specifications.</description></item></channel></rss>
